CADENCE DESIGN SYSTEMS, INC. Deferred Compensation Arrangement with Individual, Compensation Expense
CADENCE DESIGN SYSTEMS, INC. (CDNS) reported Deferred Compensation Arrangement with Individual, Compensation Expense of $4.45 million for the 12-month period ending 2012-12-29, per its 10-K filed 2013-02-21.
Discontinued › Expense Statement › Operating Expenses
us-gaap:DeferredCompensationArrangementWithIndividualCompensationExpense · last filed 2013-02-21
- CADENCE DESIGN SYSTEMS, INC. deferred compensation arrangement with individual, compensation expense for fiscal 2012 was $4.45M.
- CADENCE DESIGN SYSTEMS, INC. deferred compensation arrangement with individual, compensation expense for fiscal 2011 was -$472.00K, a 117.99% decline from fiscal 2011.
- CADENCE DESIGN SYSTEMS, INC. deferred compensation arrangement with individual, compensation expense for fiscal 2011 was $2.62M.
- CADENCE DESIGN SYSTEMS, INC. deferred compensation arrangement with individual, compensation expense for fiscal 2010 was -$1.05M.
| Period end | Deferred Compensation Arrangement with Individual, Compensation Expense 12 month |
|---|---|
| 2012-12-29 | $4.45M 10-K · filed 2013-02-21 |
| 2011-12-31 | -$472.00K 10-K · filed 2013-02-21 |
| 2011-01-01 | $2.62M 10-K · filed 2013-02-21 |
| 2010-01-02 | -$1.05M 10-K · filed 2012-02-24 |
Similar stocks
| Stock Name | Country | Market Cap | PE Ratio |
|---|---|---|---|
| ADOBE INC. (ADBE) | United States | $92.974B | 15.65 |
| SYNOPSYS INC (SNPS) | United States | $81.421B | 69.20 |
| INTUIT INC. (INTU) | United States | $74.038B | 18.58 |
| Snowflake Inc. (SNOW) | United States | $117.869B | -94.73 |
| TWILIO INC (TWLO) | United States | $46.017B | 27.27 |
| VEEVA SYSTEMS INC (VEEV) | United States | $44.506B | 32.51 |
| Autodesk, Inc. (ADSK) | United States | $44.179B | 30.10 |
| TAKE TWO INTERACTIVE SOFTWARE INC (TTWO) | United States | $37.976B | -145.88 |
| ServiceNow, Inc. (NOW) | United States | $142.511B | 61.48 |
| MongoDB, Inc. (MDB) | United States | $33.948B | 460.82 |