Advertisement
Screener

GRANITE CONSTRUCTION INC (GVA) Severance Costs (Deprecated 2013-01-31)

2.8 / 5 stars · 68/120 Roast Me

GRANITE CONSTRUCTION INC Severance Costs (Deprecated 2013-01-31)

GRANITE CONSTRUCTION INC (GVA) reported Severance Costs (Deprecated 2013-01-31) of $0 for the 12-month period ending 2012-12-31, per its 10-K filed 2013-03-01.

Discontinued › Expense Statement › Operating Expenses

us-gaap:SeveranceCosts · last filed 2013-03-01

  • GRANITE CONSTRUCTION INC severance costs (deprecated 2013-01-31) for fiscal 2012 was $0.00, a 100.00% decline from fiscal 2011.
  • GRANITE CONSTRUCTION INC severance costs (deprecated 2013-01-31) for fiscal 2011 was $471.00K, a 96.27% decline from fiscal 2010.
  • GRANITE CONSTRUCTION INC severance costs (deprecated 2013-01-31) for fiscal 2010 was $12.63M, a 81.98% increase from fiscal 2009.
  • GRANITE CONSTRUCTION INC severance costs (deprecated 2013-01-31) for fiscal 2009 was $6.94M.
Period endSeverance Costs (Deprecated 2013-01-31) 12 month
2012-12-31$0.00
10-K · filed 2013-03-01
2011-12-31$471.00K
10-K · filed 2013-03-01
2010-12-31$12.63M
10-K · filed 2013-03-01
2009-12-31$6.94M
10-K · filed 2012-02-23

Similar stocks

Stock NameCountryMarket CapPE Ratio
KBR, INC. (KBR)United States$4.388B10.67
FLUOR CORP (FLR)United States$6.772B-3.59
Orion Group Holdings Inc (ORN)United States$0.344B51.42
Shimmick Corp (SHIM)United States$0.137B
Southland Holdings, Inc. (SLND)United States$0.035B
STERLING INFRASTRUCTURE, INC. (STRL)United States$15.710B55.96
JACOBS SOLUTIONS INC. (J)United States$15.840B43.53