Advertisement
Screener

GRANITE CONSTRUCTION INC (GVA) Billings in Excess of Cost, Current

2.8 / 5 stars · 68/120 Roast Me

GRANITE CONSTRUCTION INC Billings in Excess of Cost, Current

GRANITE CONSTRUCTION INC (GVA) had Billings in Excess of Cost, Current of $117.35 million as of 2018-09-30, per its 10-Q filed 2018-10-29.

Discontinued › Notes › ASU 2014-09 Transition

us-gaap:BillingsInExcessOfCostCurrent · last filed 2018-10-29

  • 2018-09-30: Billings in Excess of Cost, Current $117.35M.
  • 2018-06-30: Billings in Excess of Cost, Current $91.15M.
  • 2018-03-31: Billings in Excess of Cost, Current $70.40M.
  • 2018-01-01: Billings in Excess of Cost, Current $82.75M.
Period endBillings in Excess of Cost, Current
2018-09-30$117.35M
10-Q · filed 2018-10-29
2018-06-30$91.15M
10-Q · filed 2018-08-08
2018-03-31$70.40M
10-Q · filed 2018-05-01
2018-01-01$82.75M
10-Q · filed 2018-10-29

Similar stocks

Stock NameCountryMarket CapPE Ratio
KBR, INC. (KBR)United States$4.388B10.67
FLUOR CORP (FLR)United States$6.772B-3.59
Orion Group Holdings Inc (ORN)United States$0.344B51.42
Shimmick Corp (SHIM)United States$0.137B
Southland Holdings, Inc. (SLND)United States$0.035B
STERLING INFRASTRUCTURE, INC. (STRL)United States$15.710B55.96
JACOBS SOLUTIONS INC. (J)United States$15.840B43.53