Beam Global Costs in Excess of Billings
Beam Global (BEEM) had Costs in Excess of Billings of $79.17 thousand as of 2016-09-30, per its 10-Q filed 2016-11-14.
Discontinued › Notes › ASU 2014-09 Transition
us-gaap:CostsInExcessOfBillingsOnUncompletedContractsOrPrograms · last filed 2017-03-31
- 2016-09-30: Costs in Excess of Billings $79.17K.
- 2016-06-30: Costs in Excess of Billings $68.83K.
- 2016-03-31: Costs in Excess of Billings $48.01K.
- 2015-12-31: Costs in Excess of Billings $22.06K.
| Period end | Costs in Excess of Billings |
|---|---|
| 2016-09-30 | $79.17K 10-Q · filed 2016-11-14 |
| 2016-06-30 | $68.83K 10-Q · filed 2016-08-15 |
| 2016-03-31 | $48.01K 10-Q · filed 2016-05-16 |
| 2015-12-31 | $22.06K 10-K · filed 2017-03-31 |
| 2015-09-30 | $17.15K 10-Q · filed 2015-11-16 |
| 2015-06-30 | $10.25K 10-Q · filed 2015-08-14 |
| 2015-03-31 | $111.72K 10-Q · filed 2015-05-15 |
| 2014-12-31 | $92.67K 10-K · filed 2016-03-30 |
| 2014-09-30 | $22.86K 10-Q · filed 2014-11-14 |
| 2014-06-30 | $134.45K 10-Q · filed 2014-08-14 |
| 2014-03-31 | $39.53K 10-Q · filed 2014-05-15 |
| 2013-12-31 | $0.00 10-K · filed 2015-03-31 |
| 2011-06-30 | $15.39K 10-Q · filed 2011-08-15 |
| 2010-12-31 | $7.47K 10-K · filed 2012-03-30 |
Similar stocks
| Stock Name | Country | Market Cap | PE Ratio |
|---|---|---|---|
| PIONEER POWER SOLUTIONS, INC. (PPSI) | United States | $0.036B | -5.28 |
| Dragonfly Energy Holdings Corp. (DFLI) | United States | $0.013B | -0.39 |
| ESS Tech, Inc. (GWH) | United States | $0.011B | -0.48 |
| Flux Power Holdings, Inc. (FLUX) | United States | $0.010B | -2.51 |
| Laser Photonics Corp (LASE) | United States | $0.045B | -3.14 |
| Nuburu, Inc. (BURU) | United States | $0.009B | |
| Polar Power, Inc. (POLA) | United States | $0.005B | -0.72 |
| Expion Energy, Inc. (XPON) | United States | $0.005B | |
| Nuvve Holding Corp. (NVVE) | United States | $0.003B | |
| Solidion Technology Inc. (STI) | United States | $0.057B | -1.49 |