Evolve Transition Infrastructure LP Previously Estimated Development Costs Incurred During Period (Deprecated 2015-01-31)
Evolve Transition Infrastructure LP reported Previously Estimated Development Costs Incurred During Period (Deprecated 2015-01-31) of $18.07 million for the 12-month period ending 2014-12-31, per its 10-K filed 2015-03-05.
Discontinued › Expense Statement › Operating Expenses
us-gaap:PreviouslyEstimatedDevelopmentCostsIncurredDuringPeriod · last filed 2015-03-05
- Evolve Transition Infrastructure LP previously estimated development costs incurred during period (deprecated 2015-01-31) for fiscal 2014 was $18.07M, a 221.91% increase from fiscal 2013.
- Evolve Transition Infrastructure LP previously estimated development costs incurred during period (deprecated 2015-01-31) for fiscal 2013 was $5.62M, a 70.16% decline from fiscal 2012.
- Evolve Transition Infrastructure LP previously estimated development costs incurred during period (deprecated 2015-01-31) for fiscal 2012 was $18.82M.
| Period end | Previously Estimated Development Costs Incurred During Period (Deprecated 2015-01-31) 12 month |
|---|---|
| 2014-12-31 | $18.07M 10-K · filed 2015-03-05 |
| 2013-12-31 | $5.62M 10-K · filed 2015-03-05 |
| 2012-12-31 | $18.82M 10-K · filed 2014-03-27 |