Evolve Transition Infrastructure LP Costs Incurred, Development Costs
Evolve Transition Infrastructure LP reported Costs Incurred, Development Costs of $131.00 thousand for the 12-month period ending 2019-12-31, per its 10-K filed 2021-03-16.
Discontinued › Expense Statement › Operating Expenses
us-gaap:CostsIncurredDevelopmentCosts · last filed 2021-03-16
- Evolve Transition Infrastructure LP costs incurred, development costs for fiscal 2019 was $131.00K, a 1090.91% increase from fiscal 2018.
- Evolve Transition Infrastructure LP costs incurred, development costs for fiscal 2018 was $11.00K, a 97.51% decline from fiscal 2017.
- Evolve Transition Infrastructure LP costs incurred, development costs for fiscal 2017 was $441.00K, a 52.93% decline from fiscal 2016.
- Evolve Transition Infrastructure LP costs incurred, development costs for fiscal 2016 was $937.00K, a 53.27% decline from fiscal 2015.
| Period end | Costs Incurred, Development Costs 12 month | Costs Incurred, Development Costs 12 month as first filed |
|---|---|---|
| 2019-12-31 | $131.00K 10-K · filed 2021-03-16 | |
| 2018-12-31 | $11.00K 10-K · filed 2020-03-13 | |
| 2017-12-31 | $441.00K 10-K · filed 2019-03-07 | |
| 2016-12-31 | $937.00K 10-K · filed 2018-03-12 | |
| 2015-12-31 | $2.00M 10-K · filed 2017-03-28 | $468.00K 10-K · filed 2016-03-30 |
| 2014-12-31 | $5.87M 10-K · filed 2016-03-30 | |
| 2013-12-31 | $15.69M 10-K · filed 2015-03-05 | |
| 2012-12-31 | $15.34M 10-K · filed 2014-03-27 |