Evolve Transition Infrastructure LP Changes in Estimated Future Development Costs
Evolve Transition Infrastructure LP reported Changes in Estimated Future Development Costs of -$27.16 million for the 12-month period ending 2020-12-31, per its 10-K filed 2021-03-16.
Discontinued › Expense Statement › Operating Expenses
srt:IncreaseDecreaseInEstimatedFutureDevelopmentCosts · last filed 2021-03-16
- Evolve Transition Infrastructure LP changes in estimated future development costs for fiscal 2020 was -$27.16M.
- Evolve Transition Infrastructure LP changes in estimated future development costs for fiscal 2019 was -$7.33M, a 142.15% decline from fiscal 2018.
- Evolve Transition Infrastructure LP changes in estimated future development costs for fiscal 2018 was $17.39M, a 15.67% increase from fiscal 2017.
- Evolve Transition Infrastructure LP changes in estimated future development costs for fiscal 2017 was $15.04M.
| Period end | Changes in Estimated Future Development Costs 12 month |
|---|---|
| 2020-12-31 | -$27.16M 10-K · filed 2021-03-16 |
| 2019-12-31 | -$7.33M 10-K · filed 2021-03-16 |
| 2018-12-31 | $17.39M 10-K · filed 2020-03-13 |
| 2017-12-31 | $15.04M 10-K · filed 2019-03-07 |