RACKSPACE TECHNOLOGY, INC. (RXT) Debt Components
- 2026-06-30: Long-term Debt, Current MaturitiesUSD $24.80M; Long-term Debt, Excluding Current MaturitiesUSD $2.76B; Long-term DebtUSD $2.79B; Long-Term Debt, Maturity, Year OneUSD (m).
- 2026-03-31: Long-term Debt, Current MaturitiesUSD $26.60M; Long-term Debt, Excluding Current MaturitiesUSD $2.68B; Long-term DebtUSD $2.71B; Long-Term Debt, Maturity, Year OneUSD (m).
- 2025-12-31: Long-term Debt, Current MaturitiesUSD $27.30M; Long-term Debt, Excluding Current MaturitiesUSD $2.72B; Long-term DebtUSD $2.75B; Long-Term Debt, Maturity, Year OneUSD (m).
- 2025-12-31: Long-term Debt, Current MaturitiesUSD (m); Long-term Debt, Excluding Current MaturitiesUSD (m); Long-term DebtUSD (m); Long-Term Debt, Maturity, Year OneUSD $20.30M.
RACKSPACE TECHNOLOGY, INC. Debt Components
Filed components and totals, with each concept and unit kept separate. Components can overlap; they are not added together. Missing disclosures remain (m). Original concept pages retain their detailed breakdowns and history.
| Period end | Long-term Debt, Current Maturities USD | Long-term Debt, Excluding Current Maturities USD | Long-term Debt USD | Long-Term Debt, Maturity, Year One USD | Long-Term Debt, Maturity, Year Two USD | Long-Term Debt, Maturity, Year Three USD | Long-Term Debt, Maturity, Year Four USD | Long-Term Debt, Maturity, Year Five USD | Long-Term Debt, Maturity, after Year Five USD | Long-term Debt, Gross USD | Debt Instrument, Unamortized Discount (Premium) and Debt Issuance Costs, Net USD | Debt Instrument, Unamortized Discount USD |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-06-30 | $24.80M | $2.76B | $2.79B | (m) | (m) | (m) | (m) | (m) | (m) | $2.57B | $-215.40M | (m) |
| 2026-03-31 | $26.60M | $2.68B | $2.71B | (m) | (m) | (m) | (m) | (m) | (m) | $2.48B | $-230.90M | (m) |
| 2025-12-31 | $27.30M | $2.72B | $2.75B | (m) | (m) | (m) | (m) | (m) | (m) | $2.49B | $-256.80M | (m) |
| 2025-12-31 | (m) | (m) | (m) | $20.30M | $20.30M | $2.45B | $0.00 | $0.00 | $0.00 | (m) | (m) | (m) |
| 2025-09-30 | $30.40M | $2.74B | $2.77B | (m) | (m) | (m) | (m) | (m) | (m) | $2.50B | $-273.20M | (m) |
| 2025-06-30 | $33.40M | $2.77B | $2.80B | (m) | (m) | (m) | (m) | (m) | (m) | $2.50B | $-295.90M | (m) |
| 2025-03-31 | $25.80M | $2.76B | $2.79B | (m) | (m) | (m) | (m) | (m) | (m) | $2.47B | $-313.00M | (m) |
| 2024-12-31 | $29.20M | $2.76B | $2.79B | (m) | (m) | (m) | (m) | (m) | (m) | $2.45B | $-336.20M | (m) |
| 2024-12-31 | (m) | (m) | (m) | $20.30M | $20.30M | $20.30M | $2.39B | $0.00 | $0.00 | (m) | (m) | (m) |
| 2024-09-30 | $27.10M | $2.78B | $2.81B | (m) | (m) | (m) | (m) | (m) | (m) | $2.45B | $-355.00M | (m) |
| 2024-06-30 | $54.00M | $2.82B | $2.87B | (m) | (m) | (m) | (m) | (m) | (m) | $2.48B | $-386.30M | (m) |
| 2024-03-31 | $20.30M | $2.97B | $2.99B | (m) | (m) | (m) | (m) | (m) | (m) | $2.60B | $-396.50M | (m) |
| 2023-12-31 | $23.00M | $2.84B | $2.86B | (m) | (m) | (m) | (m) | (m) | (m) | $2.89B | $29.90M | (m) |
| 2023-12-31 | (m) | (m) | (m) | $23.00M | $23.00M | $23.00M | $23.00M | $2.80B | $0.00 | (m) | (m) | $8.50M |
| 2023-09-30 | $47.40M | $3.01B | $3.06B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $9.30M |
| 2023-06-30 | $23.00M | $3.17B | $3.20B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $9.70M |
| 2023-03-31 | $23.00M | $3.27B | $3.29B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $10.20M |
| 2022-12-31 | $23.00M | $3.30B | $3.32B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $10.70M |
| 2022-12-31 | (m) | (m) | (m) | $23.00M | $23.00M | $23.00M | $23.00M | $23.00M | $3.24B | $3.36B | (m) | (m) |
| 2022-09-30 | $23.00M | $3.30B | $3.32B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $11.10M |
| 2022-06-30 | $23.00M | $3.30B | $3.33B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $11.70M |
| 2022-03-31 | $23.00M | $3.31B | $3.33B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $12.10M |
| 2021-12-31 | $23.00M | $3.31B | $3.33B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $12.60M |
| 2021-12-31 | (m) | (m) | (m) | $23.00M | $23.00M | $23.00M | $23.00M | $23.00M | $3.27B | $3.38B | (m) | (m) |
| 2021-09-30 | $23.00M | $3.31B | $3.34B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $13.00M |
| 2021-06-30 | $23.00M | $3.32B | $3.34B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $13.50M |
| 2021-03-31 | $27.00M | $3.37B | $3.40B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $14.00M |
| 2020-12-31 | $43.40M | $3.32B | $3.36B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $3.70M |
| 2020-12-31 | (m) | (m) | (m) | $43.40M | $79.60M | $2.74B | $0.00 | $0.00 | $550.00M | $3.41B | (m) | (m) |
| 2020-09-30 | $29.00M | $3.39B | $3.42B | (m) | (m) | (m) | (m) | (m) | (m) | $3.47B | (m) | $4.00M |
| 2020-06-30 | $29.00M | $3.90B | $3.93B | (m) | (m) | (m) | (m) | (m) | (m) | $4.00B | (m) | $4.30M |
| 2019-12-31 | $29.00M | $3.84B | $3.87B | (m) | (m) | (m) | (m) | (m) | (m) | $3.94B | (m) | $4.90M |
Similar stocks
| Stock Name | Country | Market Cap | PE Ratio |
|---|---|---|---|
| TripAdvisor, Inc. (TRIP) | United States | $1.000B | 321.35 |
| Taboola.com Ltd. (TBLA) | $1.157B | -326.37 | |
| CEVA INC (CEVA) | United States | $0.971B | -121.14 |
| Sabre Corp (SABR) | United States | $0.916B | 1.18 |
| HEALTHSTREAM INC (HSTM) | United States | $0.845B | |
| Bumble Inc. (BMBL) | United States | $0.320B | 21.65 |
| System1, Inc. (SST) | United States | $0.287B | -1.64 |
| Health Catalyst, Inc. (HCAT) | United States | $0.132B | -0.56 |
| Eva Live Inc (GOAI) | United States | $0.083B | |
| DoubleVerify Holdings, Inc. (DV) | United States | $2.072B | 28.53 |