OMNITEK ENGINEERING CORP. Billings in Excess of Cost, Current
OMNITEK ENGINEERING CORP. (OMTK) had Billings in Excess of Cost, Current of $30.00 thousand as of 2017-12-31, per its 10-K filed 2018-03-30.
Discontinued › Notes › ASU 2014-09 Transition
us-gaap:BillingsInExcessOfCostCurrent · last filed 2018-03-30
- 2017-12-31: Billings in Excess of Cost, Current $30.00K.
- 2016-12-31: Billings in Excess of Cost, Current $0.00.
| Period end | Billings in Excess of Cost, Current |
|---|---|
| 2017-12-31 | $30.00K 10-K · filed 2018-03-30 |
| 2016-12-31 | $0.00 10-K · filed 2018-03-30 |