OMNITEK ENGINEERING CORP. Billings in Excess of Cost
OMNITEK ENGINEERING CORP. (OMTK) had Billings in Excess of Cost of $30.00 thousand as of 2017-12-31, per its 10-K filed 2018-03-30.
Discontinued › Notes › ASU 2014-09 Transition
us-gaap:BillingsInExcessOfCost · last filed 2018-03-30
- 2017-12-31: Billings in Excess of Cost $30.00K.
- 2017-09-30: Billings in Excess of Cost -$30.00K.
- 2017-06-30: Billings in Excess of Cost -$6.00K.
- 2017-03-31: Billings in Excess of Cost $121.50K.
| Period end | Billings in Excess of Cost | Billings in Excess of Cost as first filed |
|---|---|---|
| 2017-12-31 | $30.00K 10-K · filed 2018-03-30 | |
| 2017-09-30 | -$30.00K 10-Q · filed 2017-11-08 | |
| 2017-06-30 | -$6.00K 10-Q · filed 2017-08-14 | |
| 2017-03-31 | $121.50K 10-Q · filed 2017-05-15 | |
| 2016-12-31 | $0.00 10-K · filed 2018-03-30 | $121.50K 10-K · filed 2017-03-31 |
| 2016-09-30 | $91.50K 10-Q · filed 2016-11-10 | |
| 2015-12-31 | $0.00 10-K · filed 2017-03-31 |