North American Construction Group Ltd. Billings in Excess of Cost, Current
North American Construction Group Ltd. (NOA) had Billings in Excess of Cost, Current of CAD 0 as of 2018-12-31, per its 40-F filed 2019-02-25.
Discontinued › Notes › ASU 2014-09 Transition
us-gaap:BillingsInExcessOfCostCurrent · last filed 2019-02-25
- 2018-12-31: Billings in Excess of Cost, Current 0.00 CAD.
- 2017-12-31: Billings in Excess of Cost, Current 824.00K CAD.
- 2016-12-31: Billings in Excess of Cost, Current 1.07M CAD.
- 2015-12-31: Billings in Excess of Cost, Current 457.00K CAD.
| Period end | Billings in Excess of Cost, Current |
|---|---|
| 2018-12-31 | 0.00 CAD 40-F · filed 2019-02-25 |
| 2017-12-31 | 824.00K CAD 40-F · filed 2018-02-13 |
| 2016-12-31 | 1.07M CAD 40-F · filed 2018-02-13 |
| 2015-12-31 | 457.00K CAD 40-F · filed 2017-02-14 |
| 2014-12-31 | 0.00 CAD 20-F · filed 2016-02-16 |
| 2013-12-31 | 6.36M CAD 40-F · filed 2015-02-17 |
| 2013-03-31 | 7.08M CAD 40-F · filed 2013-06-11 |
| 2012-12-31 | 9.76M CAD 40-F · filed 2014-02-19 |
| 2012-03-31 | 7.51M CAD 40-F · filed 2013-06-11 |
| 2011-03-31 | 2.00M CAD 40-F · filed 2012-06-07 |