Advertisement
Screener

LINCOLN ELECTRIC HOLDINGS INC (LECO) Shareholder Equity

LINCOLN ELECTRIC HOLDINGS INC (LECO) Shareholder Equity

  • 2026-06-30: Preferred Stock, Value, IssuedUSD (m); Common Stock, Value, IssuedUSD $9.86M; Additional Paid in Capital, Common StockUSD $617.88M; Treasury Stock, Common, ValueUSD $3.41B.
  • 2026-03-31: Preferred Stock, Value, IssuedUSD (m); Common Stock, Value, IssuedUSD $9.86M; Additional Paid in Capital, Common StockUSD $612.39M; Treasury Stock, Common, ValueUSD $3.33B.
  • 2025-12-31: Preferred Stock, Value, IssuedUSD $0.00; Common Stock, Value, IssuedUSD $9.86M; Additional Paid in Capital, Common StockUSD $601.57M; Treasury Stock, Common, ValueUSD $3.28B.
  • 2025-09-30: Preferred Stock, Value, IssuedUSD (m); Common Stock, Value, IssuedUSD $9.86M; Additional Paid in Capital, Common StockUSD $595.64M; Treasury Stock, Common, ValueUSD $3.23B.

LINCOLN ELECTRIC HOLDINGS INC Shareholder Equity

Filed components and totals, with each concept and unit kept separate. Components can overlap; they are not added together. Missing disclosures remain (m). Original concept pages retain their detailed breakdowns and history.

Period endPreferred Stock, Value, Issued
USD
Common Stock, Value, Issued
USD
Additional Paid in Capital, Common Stock
USD
Treasury Stock, Common, Value
USD
Accumulated Other Comprehensive Income (Loss), Net of Tax
USD
Retained Earnings (Accumulated Deficit)
USD
Stockholders' Equity Attributable to Parent
USD
Stockholders' Equity, Including Portion Attributable to Noncontrolling Interest
USD
Treasury Stock, Common, Shares
shares
Treasury Stock, Value, Acquired, Cost Method
USD
Treasury Stock, Value
USD
Accumulated Other Comprehensive Income (Loss), Foreign Currency Translation Adjustment, Net of Tax
USD
Accumulated Other Comprehensive (Income) Loss, Defined Benefit Plan, after Tax
USD
Treasury Stock, Shares, Acquired
shares
Treasury Stock Acquired, Average Cost Per Share
USD/shares
Reclassification from Accumulated Other Comprehensive Income, Current Period, Net of Tax
USD
Accumulated Other Comprehensive Income (Loss), Cumulative Changes in Net Gain (Loss) from Cash Flow Hedges, Effect Net of Tax
USD
Treasury Stock, Shares
shares
2026-06-30(m)$9.86M$617.88M$3.41B$-213.50M$4.55B$1.55B$1.55B44.08M3 month · $76.12M(m)(m)(m)(m)(m)(m)(m)(m)
2026-03-31(m)$9.86M$612.39M$3.33B$-213.77M$4.44B$1.51B$1.51B43.79M3 month · $56.67M(m)(m)(m)(m)(m)(m)(m)(m)
2025-12-31$0.00$9.86M$601.57M$3.28B$-205.93M$4.34B$1.47B$1.47B43.74M12 month · $338.31M(m)(m)(m)(m)(m)(m)(m)(m)
2025-09-30(m)$9.86M$595.64M$3.23B$-211.91M$4.25B$1.41B$1.41B43.56M3 month · $52.66M(m)(m)(m)(m)(m)(m)(m)(m)
2025-06-30(m)$9.86M$586.23M$3.17B$-210.66M$4.17B$1.38B$1.38B43.40M3 month · $127.13M(m)(m)(m)(m)(m)(m)(m)(m)
2025-03-31(m)$9.86M$581.25M$3.05B$-270.91M$4.07B$1.34B$1.34B42.76M3 month · $106.69M(m)(m)(m)(m)(m)(m)(m)(m)
2024-12-31$0.00$9.86M$566.74M$2.94B$-300.13M$3.99B$1.33B$1.33B42.37M12 month · $263.75M(m)(m)(m)(m)(m)(m)(m)(m)
2024-09-30(m)$9.86M$561.15M$2.89B$-235.83M$3.89B$1.34B$1.34B(m)3 month · $50.39M(m)(m)(m)(m)(m)(m)(m)(m)
2024-06-30(m)$9.86M$559.33M$2.84B$-249.91M$3.83B$1.31B$1.31B(m)3 month · $50.41M(m)(m)(m)(m)(m)(m)(m)(m)
2024-03-31(m)$9.86M$560.44M$2.79B$-239.45M$3.77B$1.31B$1.31B(m)3 month · $110.41M(m)(m)(m)(m)(m)(m)(m)(m)
2023-12-31$0.00$9.86M$523.36M$2.68B$-229.85M$3.69B$1.31B$1.31B41.61M12 month · $198.76M(m)(m)(m)(m)(m)(m)(m)(m)
2023-09-30(m)$9.86M$519.15M$2.62B$-265.83M$3.58B$1.23B(m)(m)3 month · $45.35M(m)(m)(m)(m)(m)(m)(m)(m)
2023-06-30(m)$9.86M$515.30M$2.57B$-236.19M$3.48B$1.20B(m)(m)3 month · $53.08M(m)(m)(m)(m)(m)(m)(m)(m)
2023-03-31(m)$9.86M$498.02M$2.52B$-250.84M$3.39B$1.13B$1.13B(m)3 month · $32.16M(m)(m)(m)(m)(m)(m)(m)(m)
2022-12-31$0.00$9.86M$481.86M$2.49B$-275.40M$3.31B$1.03B$1.03B40.96M12 month · $181.29M$2.49B(m)(m)(m)(m)(m)(m)40.96M
2022-09-30(m)$9.86M$471.17M(m)$-329.45M$3.24B$924.23M$924.23M(m)3 month · $26.52M$2.46B(m)(m)3 month · 200.00K
9 month · 1.20M
3 month · 133.74
9 month · 130.90
(m)(m)(m)
2022-06-30(m)$9.86M$465.62M(m)$-285.20M$3.16B$912.98M$912.98M(m)3 month · $25.12M$2.44B(m)(m)3 month · 200.00K
6 month · 1.00M
3 month · 131.68
6 month · 130.31
(m)(m)(m)
2022-03-31(m)$9.86M$462.22M(m)$-259.51M$3.06B$863.06M$863.06M(m)3 month · $104.58M$2.41B(m)(m)3 month · 800.00K3 month · 129.97(m)(m)(m)
2021-12-31$0.00$9.86M$451.27M(m)$-257.39M$2.97B$863.91M$863.91M(m)12 month · $164.53M$2.31B(m)(m)12 month · 1.20M12 month · 132.32(m)(m)39.79M
2021-09-30(m)$9.86M$434.79M(m)$-265.82M$2.93B$857.99M$857.89M(m)3 month · $50.16M$2.25B(m)(m)3 month · 400.00K
9 month · 800.00K
3 month · 134.62
9 month · 129.11
(m)(m)(m)
2021-06-30(m)$9.86M$427.58M(m)$-305.19M$2.93B$859.66M$859.62M(m)3 month · $25.23M$2.20B(m)(m)3 month · 200.00K
6 month · 400.00K
3 month · 127.73
6 month · 124.04
(m)(m)(m)
2021-03-31(m)$9.86M$418.53M(m)$-312.42M$2.86B$803.51M$803.41M(m)3 month · $28.46M$2.18B(m)(m)3 month · 200.00K3 month · 120.553 month · $-4.68M(m)(m)
2020-12-31$0.00$9.86M$409.96M(m)$-302.19M$2.82B$790.25M$790.25M(m)12 month · $113.45M$2.15B(m)(m)12 month · 1.40M12 month · 80.2212 month · $-10.54M(m)38.94M
2020-09-30(m)$9.86M$404.09M(m)$-343.28M$2.79B$709.83M$710.74M(m)3 month · $223.00K$2.15B(m)(m)9 month · 1.40M9 month · 80.223 month · $-3.85M
9 month · $-8.49M
(m)(m)
2020-06-30(m)$9.86M$394.69M(m)$-355.62M$2.76B$659.25M$660.11M(m)3 month · $3.21M$2.15B(m)(m)3 month · 43.10K
6 month · 1.40M
3 month · 69.62
6 month · 80.22
3 month · $-4.09M
6 month · $-4.64M
(m)(m)
2020-03-31(m)$9.86M$387.10M(m)$-348.18M$2.77B$667.10M$667.96M(m)3 month · $109.76M$2.15B(m)(m)3 month · 1.30M3 month · 80.573 month · $-552.00K(m)(m)
2019-12-31$0.00$9.86M$389.45M(m)$-275.85M$2.74B$818.17M$819.08M(m)12 month · $292.69M$2.04B(m)(m)12 month · 3.40M12 month · 85.5212 month · $-2.21M(m)37.99M
2019-09-30(m)$9.86M$377.58M(m)$-305.87M$2.70B$812.92M$813.81M(m)3 month · $61.03M$1.97B(m)(m)3 month · 700.00K
9 month · 2.60M
3 month · 82.80
9 month · 83.18
3 month · $533.00K
9 month · $-1.65M
(m)(m)
2019-06-30(m)$9.86M$368.92M(m)$-281.85M$2.66B$845.43M$846.06M(m)3 month · $85.33M$1.91B(m)(m)3 month · 1.00M
6 month · 1.90M
3 month · 82.51
6 month · 83.33
3 month · $683.00K
6 month · $-1.12M
(m)(m)
2019-03-31(m)$9.86M$364.42M(m)$-287.52M$2.61B$863.99M$864.66M(m)3 month · $75.58M$1.83B(m)(m)3 month · 845.99K3 month · 84.343 month · $-434.00K(m)(m)
2018-12-31$0.00$9.86M$360.31M(m)$-293.74M$2.56B$886.94M$887.59M(m)12 month · $201.65M$1.75B(m)(m)12 month · 2.25M12 month · 88.8412 month · $-7.82M(m)35.04M
2018-09-30(m)$9.86M$357.75M(m)$-271.61M$2.51B$927.16M$927.87M(m)3 month · $71.25M
9 month · $121.48M
$1.67B(m)(m)(m)(m)3 month · $-4.05M
9 month · $-5.92M
(m)(m)
2018-06-30(m)$9.86M$351.63M(m)$-276.48M$2.46B$942.73M$943.51M(m)3 month · $35.51M
6 month · $50.23M
$1.60B(m)(m)(m)(m)3 month · $-730.00K
6 month · $-1.86M
(m)(m)
2018-03-31(m)$9.86M$345.61M(m)$-225.72M$2.42B$979.80M$980.67M(m)3 month · $14.72M$1.57B(m)(m)(m)(m)3 month · $-1.13M(m)(m)
2017-12-31$0.00$9.86M$334.31M(m)$-247.19M$2.39B$931.64M$932.45M(m)12 month · $43.16M$1.55B(m)(m)12 month · 459.90K12 month · 89.5812 month · $-10.29M(m)32.92M
2017-09-30(m)$9.86M$330.52M(m)$-250.35M$2.39B$945.15M$945.93M(m)9 month · $23.01M$1.53B(m)(m)(m)(m)3 month · $-5.09M
9 month · $-7.49M
(m)(m)
2017-06-30(m)$9.86M$326.46M(m)$-272.52M$2.31B$851.02M$851.78M(m)6 month · $7.75M$1.52B(m)(m)(m)(m)3 month · $-1.71M
6 month · $-2.41M
(m)(m)
2017-03-31(m)$9.86M$317.14M(m)$-298.29M$2.27B$783.37M$784.12M(m)3 month · $403.00K$1.51B(m)(m)3 month · 4.68K(m)3 month · $-695.00K(m)(m)
2016-12-31$0.00$9.86M$309.42M(m)$-329.04M$2.24B$711.48M$712.21M(m)12 month · $342.00M$1.51B(m)(m)12 month · 5.86M12 month · 58.3412 month · $-3.12M(m)32.91M
2016-09-30(m)$9.86M$290.79M(m)$-288.44M$2.21B$752.13M$752.92M(m)9 month · $288.59M$1.47B(m)(m)3 month · 1.41M
9 month · 5.03M
(m)3 month · $-968.00K
9 month · $-6.89M
(m)(m)
2016-06-30(m)$9.86M$283.17M(m)$-286.55M$2.17B$791.61M$792.41M(m)6 month · $202.93M$1.38B(m)(m)3 month · 1.67M
6 month · 3.62M
(m)3 month · $-5.15M
6 month · $-5.92M
(m)(m)
2016-03-31(m)$9.86M$276.85M(m)$-269.58M$2.16B$891.81M$892.67M(m)3 month · $102.49M$1.28B(m)(m)3 month · 1.95M(m)3 month · $-775.00K(m)(m)
2015-12-31$0.00$9.86M$272.91M(m)$-296.27M$2.13B$931.59M$932.45M(m)12 month · $399.49M$1.18B(m)(m)12 month · 6.56M12 month · 60.7012 month · $-99.33M(m)27.89M
2015-09-30(m)$9.86M$269.18M(m)$-288.47M$2.10B$1.01B$1.01B(m)9 month · $297.80M$1.08B(m)(m)3 month · 2.37M
9 month · 4.72M
(m)3 month · $-80.61M
9 month · $-87.81M
(m)(m)
2015-06-30(m)$9.86M$266.58M(m)$-321.88M$2.18B$1.20B$1.20B(m)6 month · $158.47M$940.69M(m)(m)3 month · 846.46K
6 month · 2.35M
(m)3 month · $-3.88M
6 month · $-7.20M
(m)(m)
2015-03-31(m)$9.86M$261.99M(m)$-340.00M$2.13B$1.18B$1.18B(m)3 month · $102.85M$885.48M(m)(m)3 month · 1.50M(m)3 month · $-3.32M(m)(m)
2014-12-31$0.00$9.86M$258.82M(m)$-288.62M$2.09B$1.28B$1.29B(m)12 month · $307.18M$783.68M(m)(m)12 month · 4.40M12 month · 69.8412 month · $-11.95M(m)21.58M
2014-09-30(m)$9.86M$252.14M(m)$-194.78M$2.03B$1.37B$1.38B(m)9 month · $249.40M$727.17M(m)(m)3 month · 1.86M
9 month · 3.56M
(m)3 month · $-2.83M
9 month · $-8.19M
(m)(m)
2014-06-30(m)$9.86M$248.50M(m)$-148.39M$2.01B$1.52B$1.52B(m)6 month · $119.33M$597.90M(m)(m)3 month · 1.01M
6 month · 1.70M
(m)3 month · $-2.53M
6 month · $-5.37M
(m)(m)
2014-03-31(m)$9.86M$244.82M(m)$-162.86M$1.95B$1.51B$1.51B(m)3 month · $51.02M$530.08M(m)(m)3 month · 686.39K(m)3 month · $-2.83M(m)(m)
2013-12-31$0.00$9.86M$240.52M(m)$-151.94M$1.91B$1.53B$1.53B(m)12 month · $167.88M$480.30M(m)(m)12 month · 2.67M12 month · 61.6712 month · $-20.07M(m)17.57M
2013-09-30(m)$9.86M$230.09M(m)$-236.43M$1.84B$1.41B$1.43B(m)9 month · $113.64M$427.64M(m)(m)3 month · 710.73K
9 month · 1.92M
(m)3 month · $-4.78M
9 month · $-15.31M
(m)(m)
2013-06-30(m)$9.86M$224.33M(m)$-259.79M$1.79B$1.38B$1.39B(m)6 month · $69.68M$384.85M(m)(m)3 month · 1.01M
6 month · 1.21M
(m)3 month · $-4.96M
6 month · $-9.59M
(m)(m)
2013-03-31(m)$9.86M$218.12M(m)$-244.04M$1.73B$1.39B$1.40B(m)3 month · $12.78M$329.37M(m)(m)3 month · 199.06K(m)3 month · $-4.62M(m)(m)
2012-12-31$0.00$9.86M$205.12M(m)$-235.40M$1.68B$1.34B$1.36B(m)12 month · $81.02M$319.88M$26.36M$261.84M(m)(m)12 month · $-21.30M$80.00K15.64M
2012-09-30(m)$9.86M$197.73M(m)$-222.17M$1.64B$1.32B$1.34B(m)9 month · $60.16M$302.31M(m)(m)(m)(m)3 month · $-4.90M
9 month · $-14.96M
(m)(m)
2012-06-30(m)$9.86M$195.09M(m)$-243.68M$1.59B$1.27B$1.28B(m)6 month · $40.14M$282.52M(m)(m)(m)(m)3 month · $-4.82M
6 month · $-10.06M
(m)(m)
2012-03-31(m)$9.86M$188.14M(m)$-218.04M$1.53B$1.25B$1.27B(m)3 month · $20.10M$265.01M(m)(m)(m)(m)(m)(m)(m)
2011-12-31$0.00$9.86M$179.10M(m)$-247.88M$1.48B$1.18B$1.19B(m)12 month · $37.00M$248.53M$6.58M$255.37M(m)(m)(m)$912.00K14.82M
2011-09-30(m)$9.86M$174.03M(m)$-154.64M$1.44B$1.23B$1.25B(m)9 month · $27.63M$241.15M(m)(m)(m)(m)(m)(m)(m)
2011-06-30(m)$9.86M$171.38M(m)$-101.01M$1.40B$1.25B$1.27B(m)6 month · $13.31M$227.28M(m)(m)(m)(m)(m)(m)(m)
2011-03-31(m)$4.93M$171.59M(m)$-118.35M$1.35B$1.20B$1.21B(m)3 month · $905.00K$216.85M(m)(m)(m)(m)(m)(m)(m)
2010-12-31(m)$9.86M$162.45M(m)$-141.95M$1.32B$1.13B$1.15B(m)12 month · $39.68M$217.41M$33.84M$175.43M(m)(m)(m)$-352.00K14.34M
2010-09-30(m)$4.93M$165.77M(m)$-128.32M$1.29B$1.13B$1.15B(m)9 month · $22.96M$203.48M(m)(m)(m)(m)(m)(m)(m)
2010-06-30(m)$4.93M$164.36M(m)$-170.48M$1.27B$1.08B$1.09B(m)6 month · $12.92M$193.75M(m)(m)(m)(m)(m)(m)(m)
2009-12-31(m)$4.93M$159.44M(m)$-149.40M$1.24B$1.07B$1.09B(m)12 month · $343.00K$181.62M(m)(m)(m)(m)(m)(m)6.65M
2008-12-31(m)(m)(m)(m)(m)(m)(m)$1.01B(m)12 month · $42.34M(m)(m)(m)(m)(m)(m)(m)(m)
2007-12-31(m)(m)(m)(m)(m)(m)(m)$1.09B(m)(m)(m)(m)(m)(m)(m)(m)(m)(m)

Similar stocks

Stock NameCountryMarket CapPE Ratio
SPX Technologies, Inc. (SPXC)United States$8.642B41.57
NN INC (NNBR)United States$0.296B-6.65
CHICAGO RIVET & MACHINE CO (CVR)United States$0.010B-4.12