KEYSIGHT TECHNOLOGIES, INC. (KEYS) Shareholder Equity
- 2026-07-31: Preferred Stock, Value, IssuedUSD $0.00; Common Stock, Value, IssuedUSD $2.00M; Additional Paid in CapitalUSD $3.06B; Treasury Stock, Common, ValueUSD $4.32B.
- 2026-04-30: Preferred Stock, Value, IssuedUSD $0.00; Common Stock, Value, IssuedUSD $2.00M; Additional Paid in CapitalUSD $2.98B; Treasury Stock, Common, ValueUSD $4.11B.
- 2026-01-31: Preferred Stock, Value, IssuedUSD $0.00; Common Stock, Value, IssuedUSD $2.00M; Additional Paid in CapitalUSD $2.93B; Treasury Stock, Common, ValueUSD $3.89B.
- 2025-10-31: Preferred Stock, Value, IssuedUSD $0.00; Common Stock, Value, IssuedUSD $2.00M; Additional Paid in CapitalUSD $2.85B; Treasury Stock, Common, ValueUSD $3.80B.
KEYSIGHT TECHNOLOGIES, INC. Shareholder Equity
Filed components and totals, with each concept and unit kept separate. Components can overlap; they are not added together. Missing disclosures remain (m). Original concept pages retain their detailed breakdowns and history.
| Period end | Preferred Stock, Value, Issued USD | Common Stock, Value, Issued USD | Additional Paid in Capital USD | Treasury Stock, Common, Value USD | Accumulated Other Comprehensive Income (Loss), Foreign Currency Translation Adjustment, Net of Tax USD | Accumulated Other Comprehensive (Income) Loss, Defined Benefit Plan, after Tax USD | Accumulated Other Comprehensive Income (Loss), Net of Tax USD | Retained Earnings (Accumulated Deficit) USD | Stockholders' Equity Attributable to Parent USD | Stockholders' Equity, Including Portion Attributable to Noncontrolling Interest USD | Treasury Stock, Common, Shares shares | Treasury Stock, Value, Acquired, Cost Method USD | APIC, Share-based Payment Arrangement, Increase for Cost Recognition USD | Adjustments to Additional Paid in Capital, Fair Value USD | Treasury Stock, Shares, Acquired shares | Noncontrolling Interest, Increase from Business Combination USD | Reclassification from Accumulated Other Comprehensive Income, Current Period, Net of Tax USD | Treasury Stock, Value USD | AOCI, Debt Securities, Available-for-sale, Adjustment, after Tax USD | Adjustments to Additional Paid in Capital, Other USD | Reclassification from Accumulated Other Comprehensive Income, Current Period, before Tax USD | Accumulated Other Comprehensive Income (Loss), Cumulative Changes in Net Gain (Loss) from Cash Flow Hedges, Effect Net of Tax USD | Adjustments to Additional Paid in Capital, Income Tax Benefit from Share-based Compensation USD | Adjustments to Additional Paid in Capital, Income Tax Deficiency from Share-based Compensation USD | Treasury Stock, Shares shares |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-07-31 | $0.00 | $2.00M | $3.06B | $4.32B | (m) | (m) | $-272.00M | $8.10B | $6.57B | $6.57B | 32.70M | 3 month · $211.00M 9 month · $520.00M | 3 month · $46.00M 9 month · $180.00M | 3 month · $36.00M 9 month · $68.00M | 9 month · 1.85M | (m) | 3 month · $6.00M 9 month · $18.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2026-04-30 | $0.00 | $2.00M | $2.98B | $4.11B | (m) | (m) | $-250.00M | $7.71B | $6.33B | $6.33B | 32.00M | 3 month · $222.00M 6 month · $309.00M | 3 month · $54.00M 6 month · $134.00M | 3 month · $0.00 6 month · $32.00M | 6 month · 1.20M | (m) | 3 month · $6.00M 6 month · $12.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2026-01-31 | $0.00 | $2.00M | $2.93B | $3.89B | (m) | (m) | $-199.00M | $7.36B | $6.21B | $6.21B | 31.20M | 3 month · $87.00M | 3 month · $80.00M | 3 month · $32.00M | 3 month · 423.06K | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2025-10-31 | $0.00 | $2.00M | $2.85B | $3.80B | $-66.00M | $264.00M | $-248.00M | $7.08B | $5.88B | $5.88B | 30.80M | 12 month · $377.00M | 12 month · $163.00M | 12 month · $63.00M | 12 month · 2.39M | (m) | 12 month · $10.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2025-07-31 | $0.00 | $2.00M | $2.82B | $3.70B | (m) | (m) | $-295.00M | $6.84B | $5.67B | $5.67B | 30.20M | 3 month · $50.00M 9 month · $276.00M | 3 month · $31.00M 9 month · $130.00M | 3 month · $32.00M 9 month · $63.00M | 9 month · 1.79M | (m) | 3 month · $1.00M 9 month · $7.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2025-04-30 | $0.00 | $2.00M | $2.77B | $3.65B | (m) | (m) | $-293.00M | $6.65B | $5.48B | $5.48B | 29.90M | 3 month · $151.00M 6 month · $226.00M | 3 month · $34.00M 6 month · $99.00M | 3 month · $0.00 6 month · $31.00M | 6 month · 1.49M | (m) | 3 month · $1.00M 6 month · $6.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2025-01-31 | $0.00 | $2.00M | $2.73B | $3.50B | (m) | (m) | $-443.00M | $6.39B | $5.19B | $5.19B | 28.90M | 3 month · $75.00M | 3 month · $65.00M | 3 month · $31.00M | 3 month · 448.41K | (m) | 3 month · $5.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2024-10-31 | $0.00 | $2.00M | $2.66B | $3.42B | $-136.00M | $317.00M | $-364.00M | $6.22B | $5.11B | $5.11B | 28.40M | 12 month · $442.00M | 12 month · $138.00M | 12 month · $66.00M | 12 month · 2.97M | (m) | 12 month · $-5.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2024-07-31 | $0.00 | $2.00M | $2.64B | $3.27B | (m) | (m) | $-437.00M | $6.30B | $5.23B | $5.23B | 27.50M | 3 month · $151.00M 9 month · $290.00M | 3 month · $28.00M 9 month · $112.00M | 3 month · $32.00M 9 month · $65.00M | 9 month · 2.00M | 9 month · $458.00M | 3 month · $0.00 9 month · $-1.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2024-04-30 | $0.00 | $2.00M | $2.58B | $3.12B | (m) | (m) | $-469.00M | $5.91B | $4.90B | $4.90B | 26.40M | 3 month · $46.00M 6 month · $139.00M | 3 month · $32.00M 6 month · $84.00M | 3 month · $1.00M 6 month · $33.00M | 6 month · 926.86K | 6 month · $458.00M | 3 month · $-2.00M 6 month · $-1.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2024-01-31 | $0.00 | $2.00M | $2.55B | $3.07B | (m) | (m) | $-442.00M | $5.78B | $4.82B | $4.82B | 26.10M | 3 month · $93.00M | 3 month · $52.00M | 3 month · $32.00M | 3 month · 624.96K | 3 month · $458.00M | 3 month · $1.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2023-10-31 | $0.00 | $2.00M | $2.49B | $2.98B | $-167.00M | $388.00M | $-466.00M | $5.61B | $4.65B | $4.65B | 25.40M | 12 month · $706.00M | 12 month · $136.00M | 12 month · $67.00M | 12 month · 4.91M | (m) | 12 month · $-10.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2023-07-31 | $0.00 | $2.00M | $2.46B | (m) | (m) | (m) | $-402.00M | $5.38B | $4.90B | $4.90B | 22.20M | 3 month · $151.00M 9 month · $276.00M | 3 month · $26.00M 9 month · $111.00M | 3 month · $34.00M 9 month · $67.00M | 9 month · 1.64M | (m) | 3 month · $-4.00M 9 month · $-9.00M | $2.55B | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2023-04-30 | $0.00 | $2.00M | $2.40B | (m) | (m) | (m) | $-399.00M | $5.10B | $4.71B | $4.71B | 21.20M | 3 month · $0.00 6 month · $125.00M | 3 month · $27.00M 6 month · $85.00M | 3 month · $0.00 6 month · $33.00M | 6 month · 710.74K | (m) | 3 month · $-2.00M 6 month · $-5.00M | $2.40B | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2023-01-31 | $0.00 | $2.00M | $2.38B | (m) | (m) | (m) | $-391.00M | $4.81B | $4.40B | $4.40B | (m) | 3 month · $125.00M | 3 month · $58.00M | 3 month · $33.00M | 3 month · 710.74K | (m) | 3 month · $-3.00M | $2.40B | (m) | (m) | (m) | (m) | (m) | (m) | 21.20M |
| 2022-10-31 | $0.00 | $2.00M | $2.33B | $2.27B | $-185.00M | $379.00M | $-454.00M | $4.55B | $4.16B | $4.16B | 20.50M | 12 month · $849.00M | 12 month · $125.00M | 12 month · $63.00M | 12 month · 5.44M | (m) | 12 month · $-39.00M | $2.27B | (m) | (m) | (m) | (m) | (m) | (m) | 20.50M |
| 2022-07-31 | $0.00 | $2.00M | $2.31B | (m) | (m) | (m) | $-500.00M | $4.25B | $3.92B | $3.92B | (m) | 3 month · $228.00M 9 month · $723.00M | 3 month · $25.00M 9 month · $102.00M | 3 month · $32.00M 9 month · $63.00M | 9 month · 4.65M | (m) | (m) | $2.15B | (m) | (m) | (m) | (m) | (m) | (m) | 19.70M |
| 2022-04-30 | $0.00 | $2.00M | $2.25B | (m) | (m) | (m) | $-474.00M | $3.92B | $3.78B | $3.78B | (m) | 3 month · $289.00M 6 month · $495.00M | 3 month · $24.00M 6 month · $77.00M | 3 month · $0.00 6 month · $31.00M | 6 month · 3.01M | (m) | (m) | $1.92B | (m) | (m) | (m) | (m) | (m) | (m) | 18.10M |
| 2022-01-31 | $0.00 | $2.00M | $2.23B | (m) | (m) | (m) | $-451.00M | $3.66B | $3.81B | $3.81B | (m) | 3 month · $206.00M | 3 month · $53.00M | 3 month · $31.00M | 3 month · 1.13M | (m) | (m) | $1.63B | (m) | (m) | (m) | (m) | (m) | (m) | 16.20M |
| 2021-10-31 | $0.00 | $2.00M | $2.22B | $1.43B | $-20.00M | $462.00M | $-442.00M | $3.43B | $3.78B | $3.78B | 15.10M | 12 month · $673.00M | 12 month · $103.00M | 12 month · $59.00M | 12 month · 4.36M | (m) | (m) | $1.43B | (m) | (m) | (m) | (m) | (m) | (m) | 15.10M |
| 2021-07-31 | $0.00 | $2.00M | $2.20B | (m) | (m) | (m) | $-528.00M | $3.15B | $3.75B | $3.75B | (m) | 3 month · $80.00M 9 month · $320.00M | 3 month · $19.00M 9 month · $83.00M | 3 month · $30.00M 9 month · $59.00M | 9 month · 2.30M | (m) | (m) | $1.07B | (m) | (m) | (m) | (m) | (m) | (m) | 13.00M |
| 2021-04-30 | $0.00 | $2.00M | $2.15B | (m) | (m) | (m) | $-511.00M | $2.89B | $3.54B | $3.54B | (m) | 3 month · $220.00M 6 month · $240.00M | 3 month · $19.00M 6 month · $64.00M | 3 month · $1.00M 6 month · $29.00M | 6 month · 1.73M | (m) | (m) | $992.00M | (m) | (m) | (m) | (m) | (m) | (m) | 12.50M |
| 2021-01-31 | $0.00 | $2.00M | $2.13B | (m) | (m) | (m) | $-536.00M | $2.71B | $3.54B | $3.54B | (m) | 3 month · $20.00M | 3 month · $45.00M | 3 month · $28.00M | 3 month · 137.20K | (m) | (m) | $772.00M | (m) | (m) | (m) | (m) | (m) | (m) | 10.90M |
| 2020-10-31 | $0.00 | $2.00M | $2.11B | $752.00M | $-10.00M | $605.00M | $-599.00M | $2.54B | $3.30B | $3.30B | 10.70M | 12 month · $410.00M | 12 month · $92.00M | 12 month · $58.00M | 12 month · 4.27M | (m) | (m) | $752.00M | (m) | (m) | (m) | $16.00M | (m) | (m) | 10.70M |
| 2020-07-31 | $0.00 | $2.00M | $2.09B | (m) | (m) | (m) | $-520.00M | $2.32B | $3.35B | $3.35B | (m) | 3 month · $0.00 9 month · $195.00M | 3 month · $17.00M 9 month · $72.00M | 3 month · $31.00M 9 month · $57.00M | 9 month · 2.05M | (m) | (m) | $537.00M | (m) | (m) | (m) | (m) | (m) | (m) | 8.50M |
| 2020-04-30 | $0.00 | $2.00M | $2.04B | (m) | (m) | (m) | $-567.00M | $2.14B | $3.08B | $3.08B | (m) | 3 month · $120.00M 6 month · $195.00M | 3 month · $14.00M 6 month · $55.00M | 3 month · $0.00 6 month · $26.00M | 6 month · 2.05M | (m) | (m) | $537.00M | (m) | (m) | (m) | (m) | (m) | (m) | 8.50M |
| 2020-01-31 | $0.00 | $2.00M | $2.03B | (m) | (m) | (m) | $-561.00M | $2.07B | $3.13B | $3.13B | (m) | 3 month · $75.00M | 3 month · $41.00M | 3 month · $26.00M | 3 month · 731.92M | (m) | (m) | $417.00M | (m) | (m) | (m) | (m) | (m) | (m) | 7.20M |
| 2019-10-31 | $0.00 | $2.00M | $2.01B | $342.00M | $-43.00M | $532.00M | $-578.00M | $1.91B | $3.00B | $3.00B | 6.50M | 12 month · $160.00M | 12 month · $82.00M | 12 month · $68.00M | 12 month · 2.09M | (m) | (m) | $342.00M | $0.00 | (m) | (m) | $-3.00M | (m) | (m) | 6.50M |
| 2019-07-31 | $0.00 | $2.00M | $1.99B | (m) | (m) | (m) | $-460.00M | $1.71B | $2.94B | $2.94B | (m) | 3 month · $60.00M 9 month · $130.00M | 3 month · $16.00M 9 month · $66.00M | 3 month · $26.00M 9 month · $65.00M | 9 month · 1.79B | (m) | (m) | $312.00M | (m) | (m) | (m) | (m) | (m) | (m) | 6.20M |
| 2019-04-30 | $0.00 | $2.00M | $1.95B | (m) | (m) | (m) | $-461.00M | $1.55B | $2.80B | $2.80B | (m) | 3 month · $30.00M 6 month · $70.00M | 3 month · $22.00M 6 month · $50.00M | 3 month · $9.00M 6 month · $39.00M | 6 month · 1.03B | (m) | (m) | $252.00M | (m) | (m) | (m) | (m) | (m) | (m) | 5.40M |
| 2019-01-31 | $0.00 | $2.00M | $1.93B | (m) | (m) | (m) | $-449.00M | $1.40B | $2.66B | $2.66B | (m) | 3 month · $40.00M | 3 month · $28.00M | 3 month · $30.00M | 3 month · 686.40M | (m) | (m) | $222.00M | (m) | (m) | (m) | (m) | (m) | (m) | 5.10M |
| 2018-11-01 | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $1.29B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2018-10-31 | $0.00 | $2.00M | $1.89B | $182.00M | $-60.00M | $426.00M | $-488.00M | $1.21B | $2.43B | $2.43B | 4.40M | 12 month · $120.00M | 12 month · $59.00M | 12 month · $62.00M | 12 month · 2.08M | (m) | (m) | $182.00M | $0.00 | (m) | (m) | $-2.00M | (m) | (m) | 4.40M |
| 2018-07-31 | $0.00 | $2.00M | $1.88B | $80.00M | (m) | (m) | $-449.00M | $1.33B | $2.61B | $2.61B | (m) | 3 month · $40.00M 9 month · $80.00M | 3 month · $14.00M 9 month · $48.00M | 3 month · $25.00M 9 month · $42.00M | 9 month · 1.44M | (m) | (m) | $142.00M | (m) | (m) | (m) | (m) | (m) | (m) | 3.70M |
| 2018-04-30 | $0.00 | $2.00M | $1.84B | $40.00M | (m) | (m) | $-419.00M | $1.21B | $2.52B | $2.52B | (m) | 3 month · $40.00M 6 month · $40.00M | 3 month · $14.00M 6 month · $34.00M | 3 month · $8.00M 6 month · $17.00M | 6 month · 773.35K | (m) | (m) | $102.00M | (m) | (m) | (m) | (m) | (m) | (m) | 3.10M |
| 2018-01-31 | $0.00 | $2.00M | $1.81B | (m) | (m) | (m) | $-412.00M | $1.14B | $2.48B | $2.48B | (m) | 3 month · $0.00 | 3 month · $20.00M | 3 month · $9.00M | 3 month · 0.00 | (m) | (m) | $62.00M | (m) | (m) | (m) | (m) | (m) | (m) | 2.30M |
| 2017-10-31 | $0.00 | $2.00M | $1.79B | $62.00M | $-39.00M | $433.00M | $-457.00M | $1.04B | $2.31B | $2.31B | 2.30M | (m) | 12 month · $56.00M | (m) | 12 month · 0.00 | (m) | (m) | $62.00M | $14.00M | (m) | (m) | $1.00M | 12 month · $3.00M | (m) | 2.29M |
| 2017-07-31 | $0.00 | $2.00M | $1.77B | (m) | (m) | (m) | $-572.00M | $1.08B | $2.22B | (m) | (m) | (m) | (m) | (m) | 3 month · 0.00 9 month · 0.00 | (m) | (m) | $62.00M | (m) | (m) | (m) | (m) | (m) | (m) | 2.30M |
| 2017-04-30 | $0.00 | $2.00M | $1.73B | (m) | (m) | (m) | $-595.00M | $1.10B | $2.17B | (m) | (m) | (m) | (m) | (m) | 3 month · 0.00 6 month · 0.00 | (m) | (m) | $62.00M | (m) | (m) | (m) | (m) | (m) | (m) | 2.00M |
| 2017-01-31 | $0.00 | $2.00M | $1.27B | (m) | (m) | (m) | $-611.00M | $1.05B | $1.65B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $62.00M | (m) | (m) | (m) | (m) | (m) | (m) | 2.00M |
| 2016-10-31 | $0.00 | $2.00M | $1.24B | $62.00M | $-29.00M | $596.00M | $-618.00M | $949.00M | $1.51B | $1.51B | 2.30M | 12 month · $62.00M | 12 month · $48.00M | (m) | 12 month · 2.30M | (m) | (m) | $62.00M | $10.00M | (m) | (m) | $-3.00M | 12 month · $5.00M | 12 month · $-5.00M | 2.29M |
| 2016-07-31 | $0.00 | $2.00M | $1.23B | (m) | (m) | (m) | $-433.00M | $857.00M | $1.60B | (m) | (m) | 9 month · $62.00M | (m) | (m) | 9 month · 2.30M | (m) | (m) | $62.00M | (m) | (m) | (m) | (m) | (m) | (m) | 2.30M |
| 2016-04-30 | $0.00 | $2.00M | $1.21B | (m) | (m) | (m) | $-437.00M | $766.00M | $1.50B | (m) | (m) | 6 month · $42.00M | (m) | (m) | 6 month · 1.60M | (m) | (m) | $42.00M | (m) | (m) | (m) | (m) | (m) | (m) | 1.60M |
| 2016-01-31 | $0.00 | $2.00M | $1.20B | (m) | $-73.00M | (m) | $-497.00M | $678.00M | $1.38B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | 3 month · $-8.00M | (m) | $15.00M | (m) | 3 month · $12.00M | $-2.00M | (m) | (m) | (m) |
| 2015-10-31 | $0.00 | $2.00M | $1.17B | $0.00 | $-48.00M | $446.00M | $-479.00M | $614.00M | $1.30B | $1.30B | 0.00 | (m) | 12 month · $54.00M | (m) | (m) | (m) | 12 month · $-10.00M | $0.00 | $21.00M | (m) | (m) | $-6.00M | 12 month · $4.00M | (m) | 0.00 |
| 2015-07-31 | $0.00 | $2.00M | $1.14B | (m) | $-40.00M | (m) | $-376.00M | $337.00M | $1.10B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | 3 month · $-2.00M 9 month · $-8.00M | (m) | $17.00M | (m) | 3 month · $3.00M 9 month · $9.00M | $-2.00M | (m) | (m) | (m) |
| 2015-04-30 | $0.00 | $2.00M | $1.12B | (m) | $-28.00M | (m) | $-357.00M | $267.00M | $1.04B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | 3 month · $-3.00M 6 month · $-6.00M | (m) | $24.00M | (m) | 3 month · $3.00M 6 month · $6.00M | $0.00 | (m) | (m) | (m) |
| 2015-01-31 | $0.00 | $2.00M | $1.11B | (m) | $-27.00M | (m) | $-369.00M | $171.00M | $918.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | 3 month · $-3.00M | (m) | $16.00M | (m) | 3 month · $3.00M | $-1.00M | (m) | (m) | 0.00 |
| 2014-10-31 | $0.00 | $2.00M | $1.00B | (m) | $6.00M | $361.00M | $-336.00M | $101.00M | $769.00M | $769.00M | (m) | (m) | (m) | (m) | (m) | (m) | 12 month · $-1.00M | (m) | $16.00M | (m) | (m) | $3.00M | (m) | (m) | 0.00 |
| 2014-08-01 | (m) | (m) | (m) | (m) | (m) | $-270.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2014-07-31 | (m) | (m) | (m) | (m) | $9.00M | (m) | $23.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | 3 month · $0.00 9 month · $0.00 | (m) | $14.00M | (m) | 3 month · $0.00 9 month · $0.00 | $0.00 | (m) | (m) | (m) |
| 2014-04-30 | (m) | (m) | (m) | (m) | $15.00M | (m) | $20.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | 3 month · $0.00 6 month · $0.00 | (m) | $5.00M | (m) | 3 month · $0.00 6 month · $0.00 | $0.00 | (m) | (m) | (m) |
| 2014-01-31 | (m) | (m) | (m) | (m) | $14.00M | (m) | $17.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | 3 month · $0.00 | (m) | $3.00M | (m) | (m) | $0.00 | (m) | (m) | (m) |
| 2013-10-31 | (m) | (m) | (m) | (m) | $26.00M | (m) | $31.00M | (m) | (m) | $1.25B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $5.00M | 12 month · $-447.00M | (m) | $0.00 | (m) | (m) | (m) |
| 2012-10-31 | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $1.30B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
Similar stocks
| Stock Name | Country | Market Cap | PE Ratio |
|---|---|---|---|
| AMETEK INC/ (AME) | United States | $56.772B | 35.17 |
| ROPER TECHNOLOGIES INC (ROP) | United States | $36.012B | 13.63 |
| MKS INC (MKSI) | United States | $17.440B | 68.37 |
| Fortive Corp (FTV) | United States | $16.897B | 31.51 |
| COGNEX CORP (CGNX) | United States | $9.711B | 65.26 |
| Ralliant Corp (RAL) | United States | $7.737B | -6.14 |
| Sensata Technologies Holding plc (ST) | $5.976B | 77.15 | |
| MESA LABORATORIES INC /CO/ (MLAB) | United States | $0.768B | 116.22 |
| Senseonics Holdings, Inc. (SENS) | United States | $0.546B | -2.74 |
| HURCO COMPANIES INC (HURC) | United States | $0.140B | -20.39 |