Camber Energy, Inc. Due from Joint Ventures
Camber Energy, Inc. (CEIN) had Due from Joint Ventures of $6.57 million as of 2022-12-31, per its 10-K filed 2023-03-17.
Discontinued › Notes
us-gaap:DueFromJointVentures · last filed 2023-03-17
- 2022-12-31: Due from Joint Ventures $6.57M.
- 2021-12-31: Due from Joint Ventures $4.10M.
- 2020-12-31: Due from Joint Ventures $0.00.
| Period end | Due from Joint Ventures |
|---|---|
| 2022-12-31 | $6.57M 10-K · filed 2023-03-17 |
| 2021-12-31 | $4.10M 10-K · filed 2023-03-17 |
| 2020-12-31 | $0.00 10-K/A · filed 2022-06-08 |