XTREME GREEN ELECTRIC VEHICLES INC. Proceeds from Construction Loans Payable
XTREME GREEN ELECTRIC VEHICLES INC. reported Proceeds from Construction Loans Payable of $81.35 thousand for the 9-month period ending 2011-09-30, per its 10-Q filed 2011-11-14.
Discontinued › Cash Flow › Financing Activities
us-gaap:ProceedsFromConstructionLoansPayable · last filed 2011-11-14
- XTREME GREEN ELECTRIC VEHICLES INC. proceeds from construction loans payable for the quarter ending 2011-09-30 was -$8.93K.
| Period end | Proceeds from Construction Loans Payable 3 month | Proceeds from Construction Loans Payable 6 month | Proceeds from Construction Loans Payable 9 month |
|---|---|---|---|
| 2011-09-30 | -$8.93K derived: 10-Q 9 month − 10-Q/A 6 month · filed 2011-11-14 | $81.35K 10-Q · filed 2011-11-14 | |
| 2011-06-30 | $90.28K 10-Q/A · filed 2011-08-10 | ||
| 2010-09-30 | $1.00M 10-Q · filed 2011-11-14 |