WaterBridge Infrastructure LLC Noncash Project Abandonment Costs
WaterBridge Infrastructure LLC (WBI) reported Noncash Project Abandonment Costs of $1.50 million for the 12-month period ending 2025-12-31, per its 10-K filed 2026-03-16.
Financial Statements › Cash Flow › Operating Activities
us-gaap:NoncashProjectAbandonmentCosts · last filed 2026-03-16
- WaterBridge Infrastructure LLC noncash project abandonment costs for fiscal 2025 was $1.50M, a 91.94% increase from fiscal 2024.
- WaterBridge Infrastructure LLC noncash project abandonment costs for fiscal 2024 was $782.00K, a 8.11% decline from fiscal 2023.
- WaterBridge Infrastructure LLC noncash project abandonment costs for fiscal 2023 was $851.00K.
| Period end | Noncash Project Abandonment Costs 12 month |
|---|---|
| 2025-12-31 | $1.50M 10-K · filed 2026-03-16 |
| 2024-12-31 | $782.00K 10-K · filed 2026-03-16 |
| 2023-12-31 | $851.00K 10-K · filed 2026-03-16 |