Advertisement
Screener

WaterBridge Infrastructure LLC (WBI) Noncash Project Abandonment Costs

3.8 / 5 stars · 3/4 Roast Me

WaterBridge Infrastructure LLC Noncash Project Abandonment Costs

WaterBridge Infrastructure LLC (WBI) reported Noncash Project Abandonment Costs of $1.50 million for the 12-month period ending 2025-12-31, per its 10-K filed 2026-03-16.

Financial Statements › Cash Flow › Operating Activities

us-gaap:NoncashProjectAbandonmentCosts · last filed 2026-03-16

  • WaterBridge Infrastructure LLC noncash project abandonment costs for fiscal 2025 was $1.50M, a 91.94% increase from fiscal 2024.
  • WaterBridge Infrastructure LLC noncash project abandonment costs for fiscal 2024 was $782.00K, a 8.11% decline from fiscal 2023.
  • WaterBridge Infrastructure LLC noncash project abandonment costs for fiscal 2023 was $851.00K.
Period endNoncash Project Abandonment Costs 12 month
2025-12-31$1.50M
10-K · filed 2026-03-16
2024-12-31$782.00K
10-K · filed 2026-03-16
2023-12-31$851.00K
10-K · filed 2026-03-16