Advertisement
Screener

TUCSON ELECTRIC POWER CO Operating Lease, Liability, Noncurrent

TUCSON ELECTRIC POWER CO Operating Lease, Liability, Noncurrent

TUCSON ELECTRIC POWER CO had Operating Lease, Liability, Noncurrent of $3.00 million as of 2025-12-31, per its 10-K filed 2026-02-12.

Financial Statements › Balance Sheet › Liabilities › Liabilities, Noncurrent › Liabilities, Other than Long-Term Debt, Noncurrent

us-gaap:OperatingLeaseLiabilityNoncurrent · last filed 2026-02-12

  • 2025-12-31: Operating Lease, Liability, Noncurrent $3.00M.
  • 2024-12-31: Operating Lease, Liability, Noncurrent $3.00M.
  • 2023-12-31: Operating Lease, Liability, Noncurrent $4.00M.
  • 2022-12-31: Operating Lease, Liability, Noncurrent $5.00M.
Period endOperating Lease, Liability, Noncurrent
2025-12-31$3.00M
10-K · filed 2026-02-12
2024-12-31$3.00M
10-K · filed 2026-02-12
2023-12-31$4.00M
10-K · filed 2025-02-14
2022-12-31$5.00M
10-K · filed 2024-02-09
2021-12-31$6.00M
10-K · filed 2023-02-10
2020-12-31$7.00M
10-K/A · filed 2022-05-20
2019-12-31$6.00M
10-K · filed 2021-02-12
2019-09-30$6.00M
10-Q · filed 2019-11-01
2019-06-30$7.00M
10-Q · filed 2019-08-02
2019-03-31$7.00M
10-Q · filed 2019-05-01