KEY ENERGY SERVICES INC Patent Applications Pending
22 applications still open at the USPTO, newest filing first, as the USPTO Open Data Portal records them; the company is the first-named applicant. The application number opens the full record at Patent Center.
- 2008-09-04: Application PCTUS2008075206; Invention METHOD AND SYSTEM FOR GOVERNING BLOCK SPEED; Applicant KEY ENERGY SERVICES, INC.; Status RO PROCESSING COMPLETED-PLACED IN STORAGE.
- 2008-09-04: Application PCTUS2008075204; Invention METHOD AND SYSTEM FOR EVALUATING ROD BREAKOUT BASED ON TONG PRESSURE DATA; Applicant KEY ENERGY SERVICES, INC.; Status RO PROCESSING COMPLETED-PLACED IN STORAGE.
- 2008-09-04: Application PCTUS2008075200; Invention METHOD AND SYSTEM FOR CONTROLLING A WELL SERVICE RIG BASED ON LOAD DATA; Applicant KEY ENERGY SERVICES, INC.; Status RO PROCESSING COMPLETED-PLACED IN STORAGE.
- 2007-03-27: Application PCTUS2007065032; Invention METHOD AND SYSTEM FOR DISPLAYING SCANNING DATA FOR OIL WELL TUBING BASED ON SCANNING SPEED; Applicant KEY ENERGY SERVICES, INC.; Status RO PROCESSING COMPLETED-PLACED IN STORAGE.
| Filed | Application | Invention | Applicant | Status | Published as | Inventor name | Inventor country | Examiner |
|---|---|---|---|---|---|---|---|---|
| 2008-09-04 | PCTUS2008075206 | METHOD AND SYSTEM FOR GOVERNING BLOCK SPEED | KEY ENERGY SERVICES, INC. | RO PROCESSING COMPLETED-PLACED IN STORAGE | FREDERIC M. NEWMAN | United States | YOUNG, LEE W | |
| 2008-09-04 | PCTUS2008075204 | METHOD AND SYSTEM FOR EVALUATING ROD BREAKOUT BASED ON TONG PRESSURE DATA | KEY ENERGY SERVICES, INC. | RO PROCESSING COMPLETED-PLACED IN STORAGE | FREDERIC M. NEWMAN | United States | YOUNG, LEE W | |
| 2008-09-04 | PCTUS2008075200 | METHOD AND SYSTEM FOR CONTROLLING A WELL SERVICE RIG BASED ON LOAD DATA | KEY ENERGY SERVICES, INC. | RO PROCESSING COMPLETED-PLACED IN STORAGE | FREDERIC M. NEWMAN | United States | YOUNG, LEE W | |
| 2007-03-27 | PCTUS2007065032 | METHOD AND SYSTEM FOR DISPLAYING SCANNING DATA FOR OIL WELL TUBING BASED ON SCANNING SPEED | KEY ENERGY SERVICES, INC. | RO PROCESSING COMPLETED-PLACED IN STORAGE | FREDERIC M. NEWMAN | United States | NGUYEN, HUNG T | |
| 2007-03-26 | PCTUS2007064964 | METHOD AND SYSTEM FOR CALIBRATING A TUBE SCANNER | KEY ENERGY SERVICES, INC. | RO PROCESSING COMPLETED-PLACED IN STORAGE | FREDERIC M. NEWMAN | United States | THOMAS, SHANE M | |
| 2007-03-26 | PCTUS2007064948 | METHODS AND SYSTEM FOR EVALUATING AND DISPLAYING DEPTH DATA | KEY ENERGY SERVICES, INC. | RO PROCESSING COMPLETED-PLACED IN STORAGE | FREDERIC M. NEWMAN | United States | THOMAS, SHANE M | |
| 2007-03-26 | PCTUS2007064894 | METHOD AND SYSTEM FOR INTERPRETING TUBING DATA | KEY ENERGY SERVICES, INC. | RO PROCESSING COMPLETED-PLACED IN STORAGE | FREDERIC M. NEWMAN | United States | YOUNG, LEE W | |
| 2007-03-23 | PCTUS2007064846 | METHOD AND SYSTEM FOR SCANNING TUBING | KEY ENERGY SERVICES, INC. | RO PROCESSING COMPLETED-PLACED IN STORAGE | FREDERIC M. NEWMAN | United States | THOMAS, SHANE M | |
| 2006-09-11 | PCTUS2006035293 | METHOD AND SYSTEM FOR EVALUATING TASK COMPLETION TIMES TO DATA | KEY ENERGY SERVICES, INC. | RO PROCESSING COMPLETED-PLACED IN STORAGE | FREDERIC M. NEWMAN | United States | THOMAS, SHANE M | |
| 2006-09-08 | PCTUS2006035202 | METHOD FOR DETERMINING BLOCK PROPERTIES OF A SERVICE RIG BY EVALUATING RIG DATA | KEY ENERGY SERVICES, INC. | RO PROCESSING COMPLETED-PLACED IN STORAGE | FREDERIC M. NEWMAN | United States | SCHECHTER, ANDREW M | |
| 2006-09-08 | PCTUS2006035109 | METHOD AND SYSTEM FOR EVALUATING WEIGHT DATA FROM SERVICE RIG | KEY ENERGY SERVICES, INC. | RO PROCESSING COMPLETED-PLACED IN STORAGE | FREDERICK M. NEWMAN | United States | THOMAS, SHANE M | |
| 2006-09-08 | PCTUS2006034994 | METHOD AND SYSTEM FOR SETTING AND ANALYZING TUBING TARGET PRESSURES FOR TONGS | KEY ENERGY SERVICES, INC. | RO PROCESSING COMPLETED-PLACED IN STORAGE | FREDERIC M. NEWMAN | United States | THOMAS, SHANE M | |
| 2006-09-08 | PCTUS2006034787 | BRAKE SYSTEM FOR A WELL SERVICE OR DRILLING HOIST | KEY ENERGY SERVICES, INC. | RO PROCESSING COMPLETED-PLACED IN STORAGE | FREDERIC M. NEWMAN | United States | THOMAS, SHANE M | |
| 2005-08-05 | PCTUS2005028113 | SYSTEM FOR ASSURING ENGAGEMENT OF A HYDROMATIC BRAKE ON A DRILLING OR WELL SERVICE RIG | KEY ENERGY SERVICES, INC. | PCT - IPER (International Preliminary Examination Report) 409-416 Mailed | FREDERIC M. NEWMAN | United States | WALKER, ANGELA E | |
| 2005-07-26 | PCTUS2005026484 | METHOD OF PUMPING AN IN-THE-FORMATION DIVERTING AGENT IN A LATERAL SECTION OF AN OIL OR GAS WELL | KEY ENERGY SERVICES, INC. | RO PROCESSING COMPLETED-PLACED IN STORAGE | JEFFERY M. WILKINSON | United States | WRIGHT, GIOVANNA COLLINS | |
| 2005-04-14 | PCTUS2005012688 | METHOD OF TREATING OIL AND GAS WELLS | KEY ENERGY SERVICES, INC. | RO PROCESSING COMPLETED-PLACED IN STORAGE | JEFFREY M. WILKINSON | United States | GAY, JENNIFER HAWKINS | |
| 2005-03-23 | PCTUS2005009729 | AN APPARATUS AND METHODOLOGY OF HYDROSTATICALLY TESTING OF OIL FIELD TUBING AND CASING | KEY ENERGY SERVICES, INC. | PCT - IPER (International Preliminary Examination Report) 409-416 Mailed | FREDERIC M. NEWMAN | United States | LARKIN, DANIEL SEAN | |
| 2005-02-25 | PCTUS2005006258 | SAFEMODE OPERATING SYSTEM FOR A DRILLING OR SERVICE RIG | KEY ENERGY SERVICES, INC. | PCT - IPER (International Preliminary Examination Report) 409-416 Mailed | FRED M. NEWMAN | United States | COY, NICOLE A | |
| 2004-10-01 | PCTUS2004032704 | ACTIVITY DATA CAPTURE SYSTEM FOR A WELL SERVICE VEHICLE | KEY ENERGY SERVICES, INC. | PCT - IPER (International Preliminary Examination Report) 409-416 Mailed | PAUL HERRING FREDERIC M. NEWMAN | United States United States | MCELHENY JR, DONALD E | |
| 2004-05-11 | PCTUS2004014715 | PORTABLE MEMORY DEVICE FOR MOBILE WORKOVER RIG | KEY ENERGY SERVICES, INC. | PCT - IPER (International Preliminary Examination Report) 409-416 Mailed | W. BRUCE LOWE JOHN CHARLES HOOD | United States United States | THOMPSON, KENNETH L | |
| 2004-02-13 | PCTUS2004004408 | ERGONOMICS SAFETY WARNING DEVICE AND A METHOD TO PREVENT CLUTCH BURNING ON A WELL SERVICE RIG | KEY ENERGY SERVICES, INC. | PCT - IPER (International Preliminary Examination Report) 409-416 Mailed | KEVIN NORTHCUTT FREDERIC M. NEWMAN | United States United States | PANG, ROGER L | |
| 2004-01-21 | PCTUS2004001577 | INVENTORY COUNTER FOR OIL AND GAS WELLS | KEY ENERGY SERVICES, INC. | PCT - IPER (International Preliminary Examination Report) 409-416 Mailed | FREDERIC M. NEWMAN | United States | AURORA, REENA |