HIGH TIDE INC. Construction In Progress
HIGH TIDE INC. (HITI) had Construction In Progress of CAD 711.00 thousand as of 2023-10-31, per its 40-F filed 2024-01-29.
Discontinued › Notes
ifrs-full:ConstructionInProgress · last filed 2024-01-29
- 2023-10-31: Construction In Progress 711.00K CAD.
- 2022-10-31: Construction In Progress 178.00K CAD.
| Period end | Construction In Progress |
|---|---|
| 2023-10-31 | 711.00K CAD 40-F · filed 2024-01-29 |
| 2022-10-31 | 178.00K CAD 40-F · filed 2024-01-29 |