The GEO Group, Inc. Capitalized Interest Costs, Including Allowance for Funds Used During Construction
The GEO Group, Inc. (GEO) reported Capitalized Interest Costs, Including Allowance for Funds Used During Construction of $1.20 million for the 12-month period ending 2012-12-31, per its 10-K filed 2014-03-03.
Discontinued › Expense Statement › Operating Expenses
us-gaap:InterestCostsIncurredCapitalized · last filed 2014-03-03
- The GEO Group, Inc. capitalized interest costs, including allowance for funds used during construction for fiscal 2012 was $1.20M, a 61.29% decline from fiscal 2012.
- The GEO Group, Inc. capitalized interest costs, including allowance for funds used during construction for fiscal 2012 was $3.10M, a 24.39% decline from fiscal 2011.
- The GEO Group, Inc. capitalized interest costs, including allowance for funds used during construction for fiscal 2011 was $4.10M.
| Period end | Capitalized Interest Costs, Including Allowance for Funds Used During Construction 12 month |
|---|---|
| 2012-12-31 | $1.20M 10-K · filed 2014-03-03 |
| 2012-01-01 | $3.10M 10-K · filed 2013-03-01 |
| 2011-01-02 | $4.10M 10-K · filed 2012-03-01 |
Similar stocks
| Stock Name | Country | Market Cap | PE Ratio |
|---|---|---|---|
| Installed Building Products, Inc. (IBP) | United States | $5.222B | 24.36 |
| BOXABL Inc. (BXBL) | United States | $0.041B |