GOLD RESERVE LTD. Restructuring Costs
GOLD RESERVE LTD. (GDRZF) reported Restructuring Costs of $2.60 million for the 12-month period ending 2012-12-31, per its 40-F filed 2013-03-25.
Discontinued › Cash Flow › Other Cash Flow Items
us-gaap:RestructuringCosts · last filed 2013-03-25
| Period end | Restructuring Costs 12 month |
|---|---|
| 2012-12-31 | $2.60M 40-F · filed 2013-03-25 |