ENBRIDGE INC. Deferred Costs and Other Assets
ENBRIDGE INC. (ENBNF) had Deferred Costs and Other Assets of CAD 11.33 billion as of 2026-06-30, per its 10-Q filed 2026-07-31.
Financial Statements › Notes
us-gaap:DeferredCostsAndOtherAssets · last filed 2026-07-31
- 2026-06-30: Deferred Costs and Other Assets 11.33B CAD.
- 2026-03-31: Deferred Costs and Other Assets 11.03B CAD.
- 2025-12-31: Deferred Costs and Other Assets 11.15B CAD.
- 2025-09-30: Deferred Costs and Other Assets 10.74B CAD.
| Period end | Deferred Costs and Other Assets | Deferred Costs and Other Assets as first filed |
|---|---|---|
| 2026-06-30 | 11.33B CAD 10-Q · filed 2026-07-31 | |
| 2026-03-31 | 11.03B CAD 10-Q · filed 2026-05-08 | |
| 2025-12-31 | 11.15B CAD 10-Q · filed 2026-07-31 | |
| 2025-09-30 | 10.74B CAD 10-Q · filed 2025-11-07 | |
| 2025-06-30 | 10.44B CAD 10-Q · filed 2025-08-01 | |
| 2025-03-31 | 10.92B CAD 10-Q · filed 2025-05-09 | |
| 2024-12-31 | 11.03B CAD 10-K · filed 2026-02-13 | |
| 2024-09-30 | 10.44B CAD 10-Q · filed 2024-11-01 | |
| 2024-06-30 | 10.20B CAD 10-Q · filed 2024-08-02 | |
| 2024-03-31 | 9.78B CAD 10-Q · filed 2024-05-10 | |
| 2023-12-31 | 8.04B CAD 10-K · filed 2025-02-14 | |
| 2023-09-30 | 9.28B CAD 10-Q · filed 2023-11-03 | |
| 2023-06-30 | 9.19B CAD 10-Q · filed 2023-08-04 | |
| 2023-03-31 | 9.15B CAD 10-Q · filed 2023-05-05 | |
| 2022-12-31 | 9.54B CAD 10-K · filed 2024-02-09 | |
| 2022-09-30 | 9.94B CAD 10-Q · filed 2022-11-04 | |
| 2022-06-30 | 9.36B CAD 10-Q · filed 2022-07-29 | |
| 2022-03-31 | 9.12B CAD 10-Q · filed 2022-05-06 | |
| 2021-12-31 | 8.61B CAD 10-K · filed 2023-02-10 | |
| 2021-09-30 | 8.41B CAD 10-Q · filed 2021-11-05 | |
| 2021-06-30 | 8.58B CAD 10-Q · filed 2021-07-30 | |
| 2021-03-31 | 8.54B CAD 10-Q · filed 2021-05-07 | |
| 2020-12-31 | 8.45B CAD 10-K · filed 2022-02-11 | |
| 2020-09-30 | 8.09B CAD 10-Q · filed 2020-11-06 | |
| 2020-06-30 | 7.92B CAD 10-Q · filed 2020-07-29 | |
| 2020-03-31 | 8.15B CAD 10-Q · filed 2020-05-07 | |
| 2019-12-31 | 7.43B CAD 10-K · filed 2021-02-12 | |
| 2019-09-30 | 9.87B CAD 10-Q · filed 2019-11-08 | |
| 2019-06-30 | 9.55B CAD 10-Q · filed 2019-08-02 | |
| 2019-03-31 | 9.51B CAD 10-Q · filed 2019-05-10 | |
| 2018-12-31 | 8.56B CAD 10-K · filed 2020-02-14 | |
| 2018-09-30 | 10.64B CAD 10-Q · filed 2018-11-02 | |
| 2018-06-30 | 6.50B CAD 10-Q · filed 2018-08-03 | |
| 2018-03-31 | 5.61B CAD 10-Q · filed 2018-05-10 | |
| 2018-01-01 | 6.27B CAD 8-K · filed 2019-05-10 | |
| 2017-12-31 | 6.44B CAD 8-K · filed 2019-05-10 | |
| 2017-06-30 | 6.10B CAD 6-K · filed 2017-08-03 | |
| 2016-12-31 | 3.39B CAD 10-K · filed 2018-02-16 | 3.11B CAD 40-F · filed 2017-02-17 |
| 2016-06-30 | 3.22B CAD 6-K · filed 2016-07-29 | |
| 2015-12-31 | 3.16B CAD 40-F · filed 2017-02-17 | 3.31B CAD 40-F · filed 2016-02-19 |
| 2015-06-30 | 3.22B CAD 6-K · filed 2015-08-28 | |
| 2014-12-31 | 3.09B CAD 6-K · filed 2016-05-12 | 3.21B CAD 40-F · filed 2015-02-19 |
| 2014-06-30 | 2.91B CAD 6-K · filed 2014-08-29 | |
| 2013-12-31 | 2.66B CAD 40-F · filed 2015-02-19 | |
| 2013-06-30 | 2.63B CAD 6-K/A · filed 2013-08-22 | |
| 2012-12-31 | 2.46B CAD 40-F · filed 2014-02-14 | 2.62B CAD 40-F · filed 2013-02-15 |
| 2011-12-31 | 2.38B CAD 6-K/A · filed 2013-08-22 | 2.50B CAD 40-F · filed 2013-02-15 |