EDISON MISSION ENERGY Defined Contribution Plan, Cost
EDISON MISSION ENERGY reported Defined Contribution Plan, Cost of $8.00 million for the 12-month period ending 2013-12-31, per its 10-K filed 2014-03-12.
Discontinued › Expense Statement › Operating Expenses
us-gaap:DefinedContributionPlanCostRecognized · last filed 2014-03-12
- EDISON MISSION ENERGY defined contribution plan, cost for fiscal 2013 was $8.00M, a 52.94% decline from fiscal 2012.
- EDISON MISSION ENERGY defined contribution plan, cost for fiscal 2012 was $17.00M, a 13.33% increase from fiscal 2011.
- EDISON MISSION ENERGY defined contribution plan, cost for fiscal 2011 was $15.00M, a 7.14% increase from fiscal 2010.
- EDISON MISSION ENERGY defined contribution plan, cost for fiscal 2010 was $14.00M.
| Period end | Defined Contribution Plan, Cost 12 month |
|---|---|
| 2013-12-31 | $8.00M 10-K · filed 2014-03-12 |
| 2012-12-31 | $17.00M 10-K · filed 2014-03-12 |
| 2011-12-31 | $15.00M 10-K · filed 2014-03-12 |
| 2010-12-31 | $14.00M 10-K · filed 2013-03-18 |