ENBRIDGE INC. Accumulated Other Comprehensive Income
ENBRIDGE INC. (EBGEF) had Accumulated Other Comprehensive Income of CAD 6.73 billion as of 2026-06-30, per its 10-Q filed 2026-07-31.
Financial Statements › Balance Sheet › Equity › Equity, Including Portion Attributable to Noncontrolling Interest › Equity, Attributable to Parent
us-gaap:AccumulatedOtherComprehensiveIncomeLossNetOfTax · last filed 2026-07-31
- 2026-06-30: Accumulated Other Comprehensive Income (Loss), Net of Tax 6.73B CAD.
- 2026-03-31: Accumulated Other Comprehensive Income (Loss), Net of Tax 5.65B CAD.
- 2025-12-31: Accumulated Other Comprehensive Income (Loss), Net of Tax 4.68B CAD.
- 2025-09-30: Accumulated Other Comprehensive Income (Loss), Net of Tax 5.35B CAD.
| Period end | Accumulated Other Comprehensive Income (Loss), Net of Tax | Accumulated Other Comprehensive Income (Loss), Net of Tax as first filed |
|---|---|---|
| 2026-06-30 | 6.73B CAD 10-Q · filed 2026-07-31 | |
| 2026-03-31 | 5.65B CAD 10-Q · filed 2026-05-08 | |
| 2025-12-31 | 4.68B CAD 10-Q · filed 2026-07-31 | |
| 2025-09-30 | 5.35B CAD 10-Q · filed 2025-11-07 | |
| 2025-06-30 | 4.24B CAD 10-Q · filed 2025-08-01 | |
| 2025-03-31 | 7.19B CAD 10-Q · filed 2025-05-09 | |
| 2024-12-31 | 7.12B CAD 10-K · filed 2026-02-13 | |
| 2024-09-30 | 3.47B CAD 10-Q · filed 2024-11-01 | |
| 2024-06-30 | 4.23B CAD 10-Q · filed 2024-08-02 | |
| 2024-03-31 | 3.66B CAD 10-Q · filed 2024-05-10 | |
| 2023-12-31 | 2.30B CAD 10-K · filed 2025-02-14 | |
| 2023-09-30 | 3.83B CAD 10-Q · filed 2023-11-03 | |
| 2023-06-30 | 2.56B CAD 10-Q · filed 2023-08-04 | |
| 2023-03-31 | 3.43B CAD 10-Q · filed 2023-05-05 | |
| 2022-12-31 | 3.52B CAD 10-K · filed 2024-02-09 | |
| 2022-09-30 | 3.83B CAD 10-Q · filed 2022-11-04 | |
| 2022-06-30 | 538.00M CAD 10-Q · filed 2022-07-29 | |
| 2022-03-31 | -1.31B CAD 10-Q · filed 2022-05-06 | |
| 2021-12-31 | -1.10B CAD 10-K · filed 2023-02-10 | |
| 2021-09-30 | -1.36B CAD 10-Q · filed 2021-11-05 | |
| 2021-06-30 | -2.42B CAD 10-Q · filed 2021-07-30 | |
| 2021-03-31 | -1.68B CAD 10-Q · filed 2021-05-07 | |
| 2020-12-31 | -1.40B CAD 10-K · filed 2022-02-11 | |
| 2020-09-30 | 899.00M CAD 10-Q · filed 2020-11-06 | |
| 2020-06-30 | 1.75B CAD 10-Q · filed 2020-07-29 | |
| 2020-03-31 | 3.99B CAD 10-Q · filed 2020-05-07 | |
| 2019-12-31 | -272.00M CAD 10-K · filed 2021-02-12 | |
| 2019-09-30 | 582.00M CAD 10-Q · filed 2019-11-08 | |
| 2019-06-30 | 124.00M CAD 10-Q · filed 2019-08-02 | |
| 2019-03-31 | 1.45B CAD 10-Q · filed 2019-05-10 | |
| 2018-12-31 | 2.67B CAD 10-K · filed 2020-02-14 | |
| 2018-09-30 | 570.00M CAD 10-Q · filed 2018-11-02 | |
| 2018-06-30 | 1.28B CAD 10-Q · filed 2018-08-03 | |
| 2018-03-31 | 329.00M CAD 10-Q · filed 2018-05-10 | |
| 2017-12-31 | -973.00M CAD 8-K · filed 2019-05-10 | |
| 2017-06-30 | 408.00M CAD 6-K · filed 2017-08-03 | |
| 2016-12-31 | 1.06B CAD 10-K · filed 2018-02-16 | |
| 2016-06-30 | 254.00M CAD 6-K · filed 2016-07-29 | |
| 2015-12-31 | 1.63B CAD 40-F · filed 2017-02-17 | |
| 2015-06-30 | 213.00M CAD 6-K · filed 2015-08-28 | |
| 2014-12-31 | -435.00M CAD 6-K · filed 2016-05-12 | |
| 2014-06-30 | -886.00M CAD 6-K · filed 2015-08-28 | |
| 2013-12-31 | -599.00M CAD 6-K · filed 2015-08-28 | |
| 2013-06-30 | -968.00M CAD 6-K · filed 2014-08-29 | |
| 2012-12-31 | -1.76B CAD 40-F · filed 2015-02-19 | -1.80B CAD 40-F · filed 2013-02-15 |
| 2012-06-30 | -1.59B CAD 6-K/A · filed 2013-08-22 | |
| 2011-12-31 | -1.50B CAD 40-F · filed 2015-02-19 | -1.53B CAD 40-F · filed 2013-02-15 |
| 2010-12-31 | -984.00M CAD 40-F · filed 2014-02-14 | -1.03B CAD 40-F · filed 2013-02-15 |
| 2009-12-31 | -654.00M CAD 40-F · filed 2013-02-15 |