Advertisement
Screener

COLEMAN CABLE, INC. Restructuring and Related Cost, Expected Cost (Deprecated 2014-01-31)

COLEMAN CABLE, INC. Restructuring and Related Cost, Expected Cost (Deprecated 2014-01-31)

COLEMAN CABLE, INC. reported Restructuring and Related Cost, Expected Cost (Deprecated 2014-01-31) of $1.01 million for the 12-month period ending 2012-12-31, per its 10-K filed 2013-03-08.

Discontinued › Expense Statement › Operating Expenses

us-gaap:RestructuringAndRelatedCostExpectedCost · last filed 2013-03-08

  • COLEMAN CABLE, INC. restructuring and related cost, expected cost (deprecated 2014-01-31) for fiscal 2012 was $1.01M.
Period endRestructuring and Related Cost, Expected Cost (Deprecated 2014-01-31) 12 month
2012-12-31$1.01M
10-K · filed 2013-03-08