Black Stone Minerals, L.P. Proved Developed and Undeveloped Reserve, Production (Energy)
Black Stone Minerals, L.P. (BSM) reported Proved Developed and Undeveloped Reserve, Production (Energy) of 13.52 thousand MBoe for the 12-month period ending 2017-12-31, per its 10-K filed 2018-02-28.
Discontinued › Notes
us-gaap:ProvedDevelopedAndUndevelopedReserveProductionEnergy · last filed 2018-02-28
- Black Stone Minerals, L.P. proved developed and undeveloped reserve, production (energy) for fiscal 2017 was 13.52K MBoe, a 16.55% increase from fiscal 2016.
- Black Stone Minerals, L.P. proved developed and undeveloped reserve, production (energy) for fiscal 2016 was 11.60K MBoe, a 10.83% increase from fiscal 2015.
- Black Stone Minerals, L.P. proved developed and undeveloped reserve, production (energy) for fiscal 2015 was 10.46K MBoe, a 4.10% increase from fiscal 2014.
- Black Stone Minerals, L.P. proved developed and undeveloped reserve, production (energy) for fiscal 2014 was 10.05K MBoe, a 1.39% decline from fiscal 2013.
| Period end | Proved Developed and Undeveloped Reserve, Production (Energy) 12 month |
|---|---|
| 2017-12-31 | 13.52K MBoe 10-K · filed 2018-02-28 |
| 2016-12-31 | 11.60K MBoe 10-K · filed 2018-02-28 |
| 2015-12-31 | 10.46K MBoe 10-K · filed 2018-02-28 |
| 2014-12-31 | 10.05K MBoe 10-K · filed 2017-03-01 |
| 2013-12-31 | 10.19K MBoe 10-K · filed 2016-03-08 |