Azure Power Global Limited Operating Lease Cost
Azure Power Global Limited reported Operating Lease Cost of INR 436.00 million for the 12-month period ending 2023-03-31, per its 20-F filed 2024-03-28.
Discontinued › Expense Statement › Operating Expenses
us-gaap:OperatingLeaseCost · last filed 2024-03-28
INR
| Period end | Operating Lease, Cost 12 month |
|---|---|
| 2023-03-31 | 436.00M INR 20-F · filed 2024-03-28 |
| 2022-03-31 | 439.00M INR 20-F · filed 2024-03-28 |
| 2021-03-31 | 502.00M INR 20-F · filed 2023-10-12 |
| 2020-03-31 | 540.00M INR 20-F · filed 2021-07-28 |
USD
| Period end | Operating Lease, Cost 12 month |
|---|---|
| 2023-03-31 | $5.30M 20-F · filed 2024-03-28 |
| 2022-03-31 | $5.80M 20-F · filed 2023-10-12 |
| 2021-03-31 | $6.90M 20-F · filed 2021-07-28 |
| 2020-03-31 | $7.20M 20-F · filed 2020-06-19 |