Azure Power Global Limited Capitalized Contract Cost, Net
Azure Power Global Limited had Capitalized Contract Cost, Net of INR 141.00 million as of 2021-03-31, per its 20-F filed 2021-07-28.
Discontinued › Balance Sheet › Assets
us-gaap:CapitalizedContractCostNet · last filed 2021-07-28
- 2021-03-31: Capitalized Contract Cost, Net 141.00M INR.
- 2020-03-31: Capitalized Contract Cost, Net 147.00M INR.
- 2019-03-31: Capitalized Contract Cost, Net 152.00M INR; Capitalized Contract Cost, Net as first filed 152.48M INR.
INR
| Period end | Capitalized Contract Cost, Net | Capitalized Contract Cost, Net as first filed |
|---|---|---|
| 2021-03-31 | 141.00M INR 20-F · filed 2021-07-28 | |
| 2020-03-31 | 147.00M INR 20-F · filed 2021-07-28 | |
| 2019-03-31 | 152.00M INR 20-F · filed 2020-06-19 | 152.48M INR 20-F · filed 2019-06-10 |
USD
| Period end | Capitalized Contract Cost, Net |
|---|---|
| 2021-03-31 | $1.90M 20-F · filed 2021-07-28 |
| 2020-03-31 | $1.90M 20-F · filed 2020-06-19 |
| 2019-03-31 | $2.21M 20-F · filed 2019-06-10 |