AIOS Tech Inc. Construction in Progress, Gross
AIOS Tech Inc. (AIOS) had Construction in Progress, Gross of $0 as of 2017-12-31, per its 20-F filed 2018-04-26.
Discontinued › Balance Sheet › Assets › Assets, Noncurrent
us-gaap:ConstructionInProgressGross · last filed 2018-04-26
- 2017-12-31: Construction in Progress, Gross $0.00.
- 2016-12-31: Construction in Progress, Gross $9.12M.
- 2015-12-31: Construction in Progress, Gross $8.76M.
| Period end | Construction in Progress, Gross |
|---|---|
| 2017-12-31 | $0.00 20-F · filed 2018-04-26 |
| 2016-12-31 | $9.12M 20-F · filed 2018-04-26 |
| 2015-12-31 | $8.76M 20-F/A · filed 2018-02-05 |