Thunder Power Holdings, Inc. Temporary Equity, Other Changes
Thunder Power Holdings, Inc. (AIEV) reported Temporary Equity, Other Changes of -$4.16 million for the 12-month period ending 2023-12-31, per its 10-K filed 2024-03-06.
Discontinued › Shareholders' Equity
us-gaap:TemporaryEquityOtherChanges · last filed 2024-03-06
- Thunder Power Holdings, Inc. temporary equity, other changes for fiscal 2023 was -$4.16M.
- Thunder Power Holdings, Inc. temporary equity, other changes for fiscal 2022 was -$10.47M.
| Period end | Temporary Equity, Other Changes 11 month | Temporary Equity, Other Changes 12 month |
|---|---|---|
| 2023-12-31 | -$4.16M 10-K · filed 2024-03-06 | |
| 2022-12-31 | -$10.47M 10-K/A · filed 2023-08-18 | -$10.47M 10-K · filed 2024-03-06 |