Advertisement
Screener

Thunder Power Holdings, Inc. (AIEV) Deferred Offering Costs

2.8 / 5 stars · 68/120 Roast Me

Thunder Power Holdings, Inc. Deferred Offering Costs

Thunder Power Holdings, Inc. (AIEV) had Deferred Offering Costs of $5.97 million as of 2024-03-31, per its 10-Q filed 2024-05-15.

Discontinued › Balance Sheet › Assets › Assets, Current

us-gaap:DeferredOfferingCosts · last filed 2024-09-04

  • 2024-03-31: Deferred Offering Costs $5.97M.
  • 2023-12-31: Deferred Offering Costs $429.75K; Deferred Offering Costs as first filed $5.97M.
  • 2023-09-30: Deferred Offering Costs $5.97M.
  • 2022-03-31: Deferred Offering Costs $212.31K.
Period endDeferred Offering CostsDeferred Offering Costs as first filed
2024-03-31$5.97M
10-Q · filed 2024-05-15
2023-12-31$429.75K
10-Q · filed 2024-09-04
$5.97M
10-K · filed 2024-03-06
2023-09-30$5.97M
10-Q · filed 2023-11-08
2022-03-31$212.31K
10-Q · filed 2022-07-29