AVIS BUDGET GROUP, INC. (CAR) Debt Components
- 2026-03-31: Short-term DebtUSD $23.00M; Debt, CurrentUSD $23.00M; Long-term Debt, Excluding Current MaturitiesUSD $6.02B; Long-term Line of CreditUSD $18.47B.
- 2025-12-31: Short-term DebtUSD $24.00M; Debt, CurrentUSD $24.00M; Long-term Debt, Excluding Current MaturitiesUSD $6.05B; Long-term Line of CreditUSD (m).
- 2025-12-31: Short-term DebtUSD (m); Debt, CurrentUSD (m); Long-term Debt, Excluding Current MaturitiesUSD (m); Long-term Line of CreditUSD $19.26B.
- 2025-09-30: Short-term DebtUSD $38.00M; Debt, CurrentUSD $38.00M; Long-term Debt, Excluding Current MaturitiesUSD $6.02B; Long-term Line of CreditUSD $19.34B.
AVIS BUDGET GROUP, INC. Debt Components
Filed components and totals, with each concept and unit kept separate. Components can overlap; they are not added together. Missing disclosures remain (m). Original concept pages retain their detailed breakdowns and history.
| Period end | Short-term Debt USD | Debt, Current USD | Long-term Debt, Excluding Current Maturities USD | Long-term Line of Credit USD | Line of Credit Facility, Maximum Borrowing Capacity EUR | Line of Credit Facility, Maximum Borrowing Capacity USD | Line of Credit Facility, Remaining Borrowing Capacity USD | Long-term Debt, Current Maturities USD | Long-term Debt USD | Long-Term Debt, Maturity, Year One USD | Long-Term Debt, Maturity, Year Two USD | Long-Term Debt, Maturity, Year Three USD | Long-Term Debt, Maturity, Year Four USD | Long-Term Debt, Maturity, Year Five USD | Long-Term Debt, Maturity, after Year Five USD | Line of Credit Facility, Current Borrowing Capacity USD | Line of Credit Facility, Interest Rate During Period pure | Long-term Debt, Gross USD | Debt Instrument, Interest Rate, Stated Percentage pure | Debt Instrument, Basis Spread on Variable Rate (Deprecated 2013-01-31) pure | Debt Instrument, Increase, Additional Borrowings (Deprecated 2013-01-31) USD | Debt Instrument, Interest Rate, Stated Percentage Rate Range, Maximum (Deprecated 2016-01-31) pure | Line of Credit Facility, Amount Outstanding (Deprecated 2014-01-31) USD | Line of Credit Facility, Increase, Additional Borrowings (Deprecated 2013-01-31) USD |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-03-31 | $23.00M | $23.00M | $6.02B | $18.47B | (m) | $21.38B | $2.91B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2025-12-31 | $24.00M | $24.00M | $6.05B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2025-12-31 | (m) | (m) | (m) | $19.26B | (m) | $21.35B | $2.09B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2025-09-30 | $38.00M | $38.00M | $6.02B | $19.34B | (m) | $21.27B | $1.93B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2025-06-30 | $39.00M | $39.00M | $6.04B | $19.99B | (m) | $21.68B | $1.69B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2025-03-31 | $508.00M | $508.00M | $5.43B | $17.31B | (m) | $20.31B | $3.00B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2024-12-31 | (m) | $20.00M | $5.37B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2024-12-31 | $20.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2024-12-31 | (m) | (m) | (m) | $17.61B | (m) | $20.43B | $2.81B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2024-09-30 | $540.00M | $540.00M | $5.46B | $17.98B | (m) | $21.96B | $3.99B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2024-06-30 | $28.00M | $28.00M | $5.23B | $19.63B | (m) | $22.53B | $2.90B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2024-03-31 | $405.00M | $405.00M | $5.03B | $19.29B | (m) | $23.05B | $3.76B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2023-12-31 | (m) | $32.00M | $4.79B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2023-12-31 | $32.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2023-12-31 | (m) | (m) | (m) | $19.01B | (m) | $19.89B | $881.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2023-09-30 | $30.00M | (m) | $4.74B | $18.73B | (m) | $19.80B | $1.07B | $30.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2023-06-30 | $34.00M | (m) | $4.67B | $17.84B | (m) | $18.96B | $1.12B | $34.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2023-03-31 | $34.00M | (m) | $4.66B | $14.83B | (m) | $17.12B | $2.29B | $34.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2022-12-31 | (m) | $27.00M | $4.64B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2022-12-31 | $27.00M | (m) | (m) | (m) | (m) | (m) | (m) | $27.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2022-12-31 | (m) | (m) | (m) | $13.86B | (m) | $15.79B | $1.93B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2022-09-30 | $27.00M | (m) | $4.56B | $13.16B | (m) | $15.74B | $2.58B | $27.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2022-06-30 | $27.00M | (m) | $4.62B | $14.15B | (m) | $16.06B | $1.91B | $27.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2022-03-31 | $27.00M | (m) | $4.68B | $12.14B | (m) | $13.89B | $1.75B | $27.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2021-12-31 | $19.00M | (m) | $3.99B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2021-12-31 | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $19.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2021-12-31 | (m) | (m) | (m) | (m) | (m) | $14.00B | $2.57B | (m) | $4.01B | $19.00M | $18.00M | $357.00M | $299.00M | $410.00M | $2.95B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2021-09-30 | $18.00M | (m) | $4.01B | $10.79B | (m) | $13.51B | $2.72B | $18.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2021-06-30 | $21.00M | (m) | $4.28B | $10.46B | (m) | $13.90B | $3.44B | $21.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2021-03-31 | $19.00M | (m) | $4.26B | $7.84B | (m) | $12.67B | $4.83B | $19.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2020-12-31 | (m) | (m) | $4.19B | (m) | (m) | (m) | (m) | $19.00M | $4.21B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2020-12-31 | $19.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2020-12-31 | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $19.00M | $18.00M | $18.00M | $732.00M | $1.18B | $2.29B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2020-09-30 | (m) | (m) | $4.14B | (m) | (m) | (m) | (m) | $19.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $1.80B | (m) | $1.20B | (m) | (m) | (m) | (m) | (m) | (m) |
| 2020-06-30 | (m) | (m) | $3.88B | (m) | (m) | (m) | (m) | $19.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $1.80B | (m) | $1.20B | (m) | (m) | (m) | (m) | (m) | (m) |
| 2020-03-31 | (m) | (m) | $3.40B | (m) | (m) | (m) | (m) | $118.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $1.80B | (m) | $1.20B | (m) | (m) | (m) | (m) | (m) | (m) |
| 2019-12-31 | (m) | (m) | $3.42B | (m) | (m) | (m) | (m) | $19.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2019-12-31 | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $19.00M | $17.00M | $16.00M | $216.00M | $701.00M | $2.50B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2019-09-30 | (m) | (m) | $3.39B | (m) | (m) | (m) | (m) | $95.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2019-06-30 | (m) | (m) | $3.12B | (m) | (m) | (m) | (m) | $420.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2019-03-31 | (m) | (m) | $3.50B | (m) | (m) | (m) | (m) | $23.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2018-12-31 | (m) | (m) | $3.53B | (m) | (m) | (m) | (m) | $23.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2018-12-31 | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $23.00M | $17.00M | $16.00M | $16.00M | $690.00M | $2.83B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2018-09-30 | (m) | (m) | $3.54B | (m) | (m) | (m) | (m) | $23.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2018-06-30 | (m) | (m) | $3.54B | (m) | (m) | (m) | (m) | $24.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2018-03-31 | (m) | (m) | $3.58B | (m) | (m) | (m) | (m) | $26.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2017-12-31 | (m) | (m) | $3.57B | (m) | (m) | (m) | (m) | $26.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2017-12-31 | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $26.00M | $20.00M | $16.00M | $14.00M | $1.49B | $2.08B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2017-09-30 | (m) | (m) | $3.56B | (m) | (m) | (m) | (m) | $26.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2017-06-30 | (m) | (m) | $3.55B | (m) | (m) | (m) | (m) | $26.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2017-03-31 | (m) | (m) | $3.51B | (m) | (m) | (m) | (m) | $474.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2016-12-31 | (m) | (m) | $3.24B | (m) | (m) | (m) | (m) | $279.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2016-12-31 | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $279.00M | $17.00M | $158.00M | $12.00M | $205.00M | $2.90B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2016-09-30 | (m) | (m) | $3.53B | (m) | (m) | (m) | (m) | $338.00M | $3.87B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2016-06-30 | (m) | (m) | $3.50B | (m) | (m) | (m) | (m) | $28.00M | $3.53B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2016-03-31 | (m) | (m) | $3.51B | (m) | (m) | (m) | (m) | $327.00M | $3.84B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2015-12-31 | (m) | (m) | $3.44B | (m) | (m) | (m) | (m) | $26.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2015-12-31 | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $3.46B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2015-12-31 | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $26.00M | $564.00M | $14.00M | $948.00M | $2.00M | $1.96B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2015-09-30 | (m) | (m) | $3.50B | (m) | (m) | (m) | (m) | $27.00M | $3.53B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2015-06-30 | (m) | (m) | $3.52B | (m) | (m) | (m) | (m) | $32.00M | $3.55B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2015-03-31 | (m) | (m) | $3.48B | (m) | (m) | (m) | (m) | $244.00M | $3.73B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2014-12-31 | (m) | (m) | $3.33B | (m) | (m) | (m) | (m) | $28.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2014-12-31 | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $3.42B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2014-12-31 | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $28.00M | $17.00M | $562.00M | $12.00M | $942.00M | $1.86B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2014-09-30 | (m) | (m) | $3.25B | (m) | (m) | (m) | (m) | $88.00M | $3.33B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2014-06-30 | (m) | (m) | $3.30B | (m) | (m) | (m) | (m) | $89.00M | $3.39B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2014-03-31 | (m) | (m) | $3.30B | (m) | (m) | (m) | (m) | $393.00M | $3.70B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2013-12-31 | (m) | (m) | $3.31B | (m) | (m) | (m) | (m) | $89.00M | $3.36B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2013-12-31 | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $89.00M | $17.00M | $16.00M | $561.00M | $11.00M | $2.70B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2013-09-30 | (m) | (m) | $3.20B | (m) | (m) | (m) | (m) | $181.00M | $3.38B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2013-06-30 | (m) | (m) | $3.19B | (m) | (m) | (m) | (m) | $221.00M | $3.42B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2013-03-31 | (m) | (m) | $3.32B | (m) | (m) | (m) | (m) | $29.00M | $3.35B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2012-12-31 | (m) | (m) | $2.85B | (m) | (m) | (m) | (m) | $57.00M | $2.84B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2012-12-31 | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | 12 month · 0.50% | (m) | (m) |
| 2012-12-31 | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $57.00M | $395.00M | $19.00M | $45.00M | $309.00M | $2.08B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2012-09-30 | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | 9 month · $500.00M | (m) | (m) | (m) |
| 2012-09-30 | (m) | (m) | $2.89B | (m) | (m) | (m) | (m) | $81.00M | $2.97B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2012-06-30 | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | 6 month · $500.00M | (m) | (m) | (m) |
| 2012-06-30 | (m) | (m) | $2.97B | (m) | (m) | (m) | (m) | $39.00M | $3.01B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $2.97B | (m) | (m) | (m) | (m) | (m) | (m) |
| 2012-03-31 | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | 3 month · $500.00M |
| 2012-03-31 | (m) | (m) | $3.07B | (m) | (m) | (m) | (m) | $227.00M | $3.30B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $3.27B | (m) | (m) | (m) | (m) | (m) | (m) |
| 2011-12-31 | (m) | (m) | $3.17B | (m) | (m) | (m) | (m) | $37.00M | $3.17B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2011-12-31 | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $3.17B | (m) | (m) | (m) | (m) | (m) | (m) |
| 2011-12-31 | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | 12 month · 4.14% | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2011-12-31 | (m) | (m) | (m) | (m) | 350.00M | (m) | (m) | (m) | (m) | $37.00M | $10.00M | $1.06B | $8.00M | $393.00M | $1.69B | (m) | (m) | (m) | 3.50% | 3.00% | (m) | (m) | (m) | (m) |
| 2011-09-30 | (m) | (m) | $2.49B | (m) | (m) | $1.20B | $416.00M | $6.00M | $2.50B | $2.25B | $815.00M | $658.00M | $771.00M | $741.00M | $897.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $0.00 | (m) |
| 2011-06-30 | (m) | (m) | $2.49B | (m) | (m) | (m) | (m) | $6.00M | $2.50B | $2.52B | $1.19B | $649.00M | $936.00M | $538.00M | $454.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2011-03-31 | (m) | (m) | $2.49B | (m) | (m) | (m) | (m) | $7.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2010-12-31 | (m) | (m) | $2.49B | (m) | (m) | (m) | (m) | $8.00M | $2.50B | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | $2.49B | (m) | (m) | (m) | (m) | (m) | (m) |
| 2010-09-30 | (m) | (m) | $2.12B | (m) | (m) | (m) | (m) | $9.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2010-06-30 | (m) | (m) | $2.12B | (m) | (m) | (m) | (m) | $8.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
| 2009-12-31 | (m) | (m) | $2.12B | (m) | (m) | (m) | (m) | $12.00M | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) | (m) |
Similar stocks
| Stock Name | Country | Market Cap | PE Ratio |
|---|---|---|---|
| HERTZ GLOBAL HOLDINGS, INC (HTZ) | United States | $0.556B | -2.29 |
| RYDER SYSTEM INC (R) | United States | $9.057B | 20.40 |