AGNICO EAGLE MINES LIMITED Business
The company's own words from the Business item of each annual report, in the filing's order. Some sections could not be read exactly.
- 2012: Section Item 4. Information on the Company; Text History and Development of the Company; Document 20-F.
- 2011: Section Item 4. Information on the Company; Text History and Development of the Company; Document 20-F.
- 2010: Section Item 4. Information on the Company; Text History and Development of the Company; Document 20-F.
- 2009: Section Item 4. Information on the Company; Text History and Development of the Company; Document 20-F.
Business, as filed
The company's own words from the Business item of each annual report, verbatim and in the filing's order, split at the filing's own headings. Nothing is summarised or reworded. Tables and images are not shown; the document has them.
| Fiscal year | Section | Text | Document |
|---|---|---|---|
| 2012 | Item 4. Information on the Company | History and Development of the Company The Company is an established Canadian-based international gold producer with mining operations in northwestern Quebec, northern Mexico, northern Finland and Nunavut and exploration activities in Canada, Europe, Latin America and the United States. The Company's operating history includes over three decades of continuous gold production primarily from underground operations. Since its formation on June 1, 1972, the Company has produced approximately 8.5 million ounces of gold. For definitions of certain technical terms used in the following discussion, see "– Glossary of Selected Mining Terms" in this Item 4. The Company's strategy is to focus on the continued exploration, development and expansion of its properties, all of which are located in politically stable jurisdictions. The Company has spent approximately $3.1 billion on mine development over the last five years. Through this development program, the Company transformed itself from a regionally focused, single mine producer to a multi-mine international gold producer with five operating, 100% owned mines, two mine development projects and one advanced exploration project. Since 1988, the LaRonde mine, in the Abitibi region of Quebec, has been the Company's flagship operation, producing approximately 4.5 million ounces of gold as well as valuable byproducts. The Lapa mine, one of the Company's highest grade metals mines, is 11 kilometres east of the LaRonde mine, and the Goldex mine project, where mine construction on the M and E zones was approved in July 2012, is 60 kilometres east of the LaRonde mine. The synergies between these sites contribute to the Company's efforts to reduce costs. The Kittila mine in Finland, which achieved commercial production in May 2009, has a long reserve life and has significant production expansion potential. In February 2012, the Board approved expansion of mining operations at the Kittila mine to a capacity of 3,750 tonnes per day. The Pinos Altos mine, in Mexico, achieved commercial production in November 2009 and also has significant production expansion potential. The Company's fifth mine, Meadowbank, in Nunavut, achieved commercial production in March 2010 and is expected to produce the most gold (approximately 360,000 ounces) in 2013. In September 2012, the Company began the development and construction at the La India mine project in Mexico. The La India mine project and the Goldex mine project are both expected to achieve commercial production in the second quarter of 2014. In addition, the Company plans to pursue opportunities for growth in gold production and gold reserves through the prudent acquisition or development of exploration properties, development properties, producing properties and other mining businesses in the Americas and Europe. 2012 ANNUAL REPORT 17 Table of Contents In 2012, the Company produced 1,043,811 ounces of gold at total cash costs per ounce of $640 net of revenues from byproduct metals. For 2013, the Company expects to produce between 970,000 and 1,010,000 ounces of gold at a total cash cost per ounce of gold produced of between $700 and $750 net of byproduct revenue. These expected higher total cash costs compared to 2012 reflect the high proportion of production coming from the Meadowbank mine, which is expected to have higher total cash costs per ounce compared to the Company's average; higher costs associated with the transition to underground mining operations at the Pinos Altos mine and the Kittila mine; and increased production from the Company's mines that do not contain byproduct metals, revenue from which reduces total cash costs per ounce. In addition, the higher total cash costs per ounce also reflect the strength of the Canadian dollar against the U.S. dollar and continued escalations in labour, shipping and transportation costs. See "Note to Investors Concerning Certain Measures of Performance" for a discussion of the use of the non-US GAAP measure total cash costs per ounce. The Company has traditionally sold all of its production at the spot price of gold due to its general policy not to sell forward its future gold production. The Company expects its all-in sustaining costs for 2013 to be approximately $1,075 per ounce of gold. The Company calculates all-in sustaining costs as the aggregate of total cash costs (net of byproduct credits), sustaining capital expense, corporate, general and administrative expense (net of stock option expense) and exploration expenses divided by the number of ounces produced. All-in sustaining costs is a non-US GAAP measure and is used to show the full cost of gold production from current operations. The Company's methodology for calculating all-in sustaining costs may not be similar to the methodology used by other producers that disclose all-in sustaining costs. The Company may change the methodology it uses to calculate all-in sustaining costs in the future, including in response to the adoption of formal industry guidance regarding this measure by the World Gold Council. The Company operates through four segments: Canada, Europe, Latin America and Exploration. The Canadian Segment is comprised of the Company's operations in the Province of Quebec and the Nunavut Territory. The Company's Quebec properties include the LaRonde mine, the Lapa mine and the Goldex mine project, each of which is held directly by the Company. In 2012, the Quebec properties accounted for approximately 25% of the Company's gold production, comprised of approximately 15% from the LaRonde mine and approximately 10% from the Lapa mine. In 2013, the Company anticipates that its Quebec properties will account for approximately 28% of the Company's gold production, of which 18% and 10% of the Company's gold production will come from the LaRonde mine and the Lapa mine, respectively. The Company's Nunavut properties are comprised of the Meadowbank mine and the Meliadine project, which are both held directly by the Company. In 2012, the Meadowbank mine accounted for approximately 35% of the Company's gold production and the Company anticipates that in 2013 the Meadowbank mine will account for approximately 36% of the Company's gold production. The Company's operations in the European Segment are conducted through its indirect subsidiary, Agnico Eagle Finland Oy, which owns the Kittila mine in Finland. In 2012, the Kittila mine accounted for approximately 17% of the Company's gold production and the Company anticipates that in 2013 the Kittila mine will again account for approximately 17% of the Company's gold production. In the Latin American Region, the Company's mining at Pinos Altos are conducted through its subsidiary, Agnico Eagle Mexico S.A. de C.V., which owns the Pinos Altos mine, including the Creston Mascota deposit. The La India mine project is owned by the Company's indirect subsidiary, Agnico Sonora, S.A. de C.V. In 2012, the Pinos Altos mine accounted for approximately 23% of the Company's gold production and the Company anticipates that in 2013 the Pinos Altos mine will account for approximately 19% of the Company's gold production. The Exploration Segment includes the Company's grassroots exploration operations in the United States, the European exploration office, the Canadian exploration offices and the Latin American exploration office. In addition, the Company has international exploration offices in Reno, Nevada and Vancouver, Canada. 18 AGNICO-EAGLE MINES LIMITED Table of Contents The following table sets out the date of acquisition, the date of commencement of construction and the date of achieving commercial production for the Company's mines and mine projects. Date of Acquisition (1) Date of Commencement of Construction Date of achieving Commercial Production LaRonde mine 1992 1985 1988 Lapa mine June 2003 June 2006 May 2009 Goldex mine project (2) December 1993 July 2012 Second quarter of 2014 (3) Kittila mine November 2005 June 2006 May 2009 Pinos Altos mine March 2006 August 2007 November 2009 La India mine project November 2011 September 2012 Second quarter of 2014 (3) Meadowbank mine April 2007 Pre-April 2007 March 2010 Notes: (1)Date when 100% ownership was acquired. (2)Construction of infrastructure for purposes of mining the Goldex Extraction Zone (the "GEZ") commenced in July 2005 and the GEZ achieved commercial production in August 2008. Mining operations on the GEZ were suspended in October 2011. In July 2012, the Company approved the construction of a mine at the M and E Zones at Goldex. (3)Anticipated. The Company's exploration program focuses primarily on the identification of new mineral reserves and resources and new development opportunities in proven gold producing regions. Current exploration activities are concentrated in Canada, Europe, Latin America and the United States. Several projects were evaluated during 2012 in other countries where the Company believes the potential for gold occurrences is excellent and which the Company believes to be politically stable and supportive of the mining industry. The Company currently manages 69 properties in Canada, four properties in the United States, three groups of properties in Finland, one property in Sweden, eight projects in Mexico and one project in Argentina. Exploration activities are managed from offices in Val d'Or, Quebec; Reno, Nevada; Chihuahua, Mexico; Kittila, Finland; and Vancouver, British Columbia. In addition, the Company continuously evaluates opportunities to make strategic acquisitions. Five of the Company's new mines or projects came from relatively recent acquisitions. In the second quarter of 2004, the Company acquired an approximate 14% ownership interest in Riddarhyttan Resources AB ("Riddarhyttan"), a Swedish precious and base metals exploration and development company that was at the time listed on the Stockholm Stock Exchange. In November 2005, the Company completed a tender offer (the "Riddarhyttan Offer") for all of the issued and outstanding shares of Riddarhyttan that it did not own. The Company issued 10,023,882 of its common shares and paid and committed an aggregate of $5.1 million cash as consideration to Riddarhyttan shareholders in connection with the Riddarhyttan Offer. On March 28, 2011, Riddarhyttan was merged with Agnico-Eagle AB and Agnico-Eagle Sweden AB, with Agnico-Eagle Sweden AB as the continuing entity. The Kittila mine, located approximately 900 kilometres north of Helsinki near the town of Kittila in Finnish Lapland, is currently 100% owned by Agnico-Eagle Finland Oy, which is owned by Agnico-Eagle Sweden AB. In the first quarter of 2005, the Company entered into an exploration and option agreement with Industrias Penoles S.A. de C.V. ("Penoles") to acquire the Pinos Altos property in northern Mexico. The Pinos Altos property is comprised of approximately 11,000 hectares in the Sierra Madre gold belt, approximately 225 kilometres west of the city of Chihuahua in the state of Chihuahua in northern Mexico. In February 2006, the Company exercised its option and acquired the Pinos Altos property on March 15, 2006. Under the terms of the exploration and option agreement, the purchase price of $66.8 million was comprised of $32.5 million in cash and 2,063,635 common shares of the Company. In February 2007, the Company made an exchange offer for all of the outstanding shares of Cumberland Resources Ltd. ("Cumberland") not already owned by the Company. At the time, Cumberland was a pre-production development stage company listed on the Toronto Stock Exchange (the "TSX") and American Stock Exchange whose primary asset was the Meadowbank property. In May 2007, the Company acquired approximately 92% of the issued and outstanding shares of Cumberland that it did not previously own and, in July 2007, the Company completed the acquisition of all Cumberland 2012 ANNUAL REPORT 19 Table of Contents shares by way of a compulsory acquisition. The Company issued 13,768,510 of its common shares and paid $9.6 million in cash as consideration to Cumberland shareholders in connection with its acquisition of Cumberland. In April 2010, the Company entered into an agreement in principle with Comaplex Minerals Corp. ("Comaplex") to acquire all of the outstanding shares of Comaplex that it did not already own. At the time, Comaplex owned a 100% interest in the advanced stage Meliadine gold property, which is located approximately 300 kilometres southeast of the Company's Meadowbank mine. In May 2010, the Company executed the definitive agreements with Comaplex and, in July 2010 by plan of arrangement, the Company acquired 100% of the Meliadine gold property through the acquisition of Comaplex, which was renamed Meliadine Holdings Inc. ("Meliadine"). Pursuant to the arrangement, Comaplex transferred to Geomark Exploration Ltd. all assets and related liabilities other than those relating to the Meliadine project. In connection with the arrangement, the Company issued 10,210,848 of its common shares as consideration to Comaplex shareholders. In September 2011, the Company entered into an acquisition agreement with Grayd Resource Corporation ("Grayd"), a Canadian-based natural resource company listed on the TSX Venture Exchange, pursuant to which the Company agreed to make an offer to acquire all of the issued and outstanding common shares of Grayd. At the time, Grayd held a 100% interest in the La India property located in the Mulatos Gold Belt of Sonora, Mexico and had recently discovered the Tarachi gold porphyry prospect located approximately ten kilometres north of the La India property. In October 2011, the Company made the offer by way of a take-over bid circular, as amended and supplemented, and, in November 2011, acquired approximately 95% of the outstanding common shares of Grayd. In January 2012, the Company completed a compulsory acquisition of the remaining outstanding common shares of Grayd and Grayd became a wholly-owned subsidiary of the Company. In aggregate, the Company issued 1,319,418 of its common shares and paid C$179.7 million in cash as consideration to Grayd shareholders in connection with the transaction. In 2012, the Company's capital expenditures were $445.6 million. The 2012 capital expenditures included $75.2 million at the LaRonde mine, $18.5 million at the Lapa mine, $26.8 million at the Goldex mine project, $60.0 million at the Kittila mine, $30.0 million at the Pinos Altos mine (which included approximately $5.8 million related to the Creston Mascota deposit), $39.2 million at the La India mine project, $105.1 million at the Meadowbank mine, $83.3 million at the Meliadine project and $7.5 million at other minor projects. In addition, the Company spent $5.0 million on mine site exploration and $104.5 million on exploration activities at the Company's grassroots exploration properties, including corporate development expenses. Budgeted 2013 capital expenditures of $596 million include $91 million at the LaRonde mine, $19 million at the Lapa mine, $63 million at the Goldex mine project (M and E Zones), $75 million at the Pinos Altos mine, $92 million at the La India mine project, $73 million at the Kittila mine, $79 million at the Meadowbank mine and $38 million in capitalized exploration expenditures. In addition, the Company plans exploration expenditures on grassroots exploration projects of approximately $71 million, including $17 million at the Meliadine project. Depending on the success of the exploration programs at these and other properties, the Company may be required to make additional capital expenditures for exploration, development and pre-production. The funds for the expenditures set out above are expected to be from internally generated cash flow from operations, from the Company's existing cash balances and from drawdowns of the Company's bank credit facility. Please see "Item 10 Additional Information – Material Contracts – Credit Agreement". Based on current funding available to the Company and expected cash flows from operations, the Company believes it has sufficient funds available to fund its 2013 projected capital expenditures for all its properties. Capital expenditures by the Company in 2011 and 2010 were $482.8 million and $512 million, respectively. The 2011 capital expenditures included $90.7 million at the LaRonde mine (which included approximately $49.5 million of expenditures relating to the LaRonde mine extension), $18.4 million at the Lapa mine, $42.2 million at Goldex, $86.5 million at the Kittila mine, $40.0 million at the Pinos Altos mine (which included approximately $7.6 million related to the Creston Mascota deposit), $116.9 million at the Meadowbank mine and $73.9 million at the Meliadine project. In addition, the Company spent $11.0 on mine site exploration and $64.7 million on exploration activities at the Company's grassroots exploration properties. The 2010 capital expenditures included $97 million at the LaRonde mine (which included approximately $62 million of expenditures relating to the LaRonde mine extension), $33 million at the Lapa mine, $24 million at Goldex, $72 million at the Kittila mine, $104 million at the Pinos Altos mine (which included approximately $43 million related to the Creston Mascota deposit), $174 million at the Meadowbank mine and $8 million at the Meliadine project and other minor properties. In addition, the Company spent $35 million on exploration activities at the Company's grassroots exploration properties. The Company was formed by articles of amalgamation under the laws of the Province of Ontario on June 1, 1972, as a result of the amalgamation of Agnico Mines Limited ("Agnico Mines") and Eagle Gold Mines Limited ("Eagle"). Agnico 20 AGNICO-EAGLE MINES LIMITED Table of Contents Mines was incorporated under the laws of the Province of Ontario on January 21, 1953 under the name "Cobalt Consolidated Mining Corporation Limited". Eagle was incorporated under the laws of the Province of Ontario on August 14, 1945. On December 19, 1989, Agnico-Eagle acquired the remaining 57% interest in Dumagami Mines Limited not already owned by it, as a consequence of the amalgamation of Dumagami Mines Limited with a wholly-owned subsidiary of Agnico-Eagle, to continue as one company under the name Dumagami Mines Inc. ("Dumagami"). On December 29, 1992, Dumagami transferred all of its property and assets, including the LaRonde mine, to Agnico-Eagle and was subsequently dissolved. On December 8, 1993, the Company acquired the remaining 46.3% interest in Goldex Mines Limited not already owned by it, as a consequence of the amalgamation of Goldex Mines Limited with a wholly-owned subsidiary of the Company, to continue as one company under the name Goldex Mines Limited. On January 1, 1996, the Company amalgamated with two wholly-owned subsidiaries, including Goldex Mines Limited. In October 2001, under a plan of arrangement, the Company amalgamated with an associated corporation, Mentor Exploration and Development Co., Limited ("Mentor"). In connection with the arrangement, the Company issued 369,348 of its common shares in consideration for the acquisition of all of the issued and outstanding shares of Mentor that it did not already own. On August 1, 2007, the Company, Agnico-Eagle Acquisition Corporation, Cumberland and a wholly-owned subsidiary of Cumberland, Meadowbank Mining Corporation, amalgamated under the laws of the Province of Ontario and continued under the name of Agnico-Eagle Mines Limited. On January 1, 2011, the Company and 1816276 Ontario Inc. (the successor corporation to Meliadine, which in turn was the successor corporation to Comaplex) amalgamated under the laws of the Province of Ontario and continued under the name of Agnico-Eagle Mines Limited. On January 1, 2013, the Company and its wholly-owned subsidiary, 1886120 Ontario Inc. (the successor corporation to 9237-4925 Québec Inc.), amalgamated under the laws of the Province of Ontario and continued under the name of Agnico-Eagle Mines Limited. The Company's executive and registered office is located at Suite 400, 145 King Street East, Toronto, Ontario, Canada M5C 2Y7; telephone number (416) 947-1212; website: http://www.agnico-eagle.com. The information contained on the website is not part of this Form 20-F. The Company's principal place of business in the United States is located at 1675 E. Prater Way, Suite 102, Sparks, Nevada 89434. Business Overview The Company believes that it has a number of key operating strengths that provide distinct competitive advantages. Growth Profile. The Company has a proven track record of increasing production capacity through a combination of acquisitions, operational improvements, expansions and development. The suspension of mining operations at the Goldex mine in October 2011 had a negative impact on the growth profile, however, the Company anticipates production of between 970,000 and 1,010,000 ounces of gold in 2013 and growth in 2014 with the expected commencement of production at the La India and Goldex mine projects. Over the last five years, the Company has spent over $2.7 billion on the development of five new mines and the significant extension of the LaRonde mine at depth. Future capital expenditures are expected to be primarily for incremental expansion projects and exploration and development of the La India and Goldex mine projects and the Meliadine project. Operations in Politically Stable, Mining Friendly Regions. The Company and its predecessors have over three decades of continuous gold production experience and expertise in metals mining. The Company's operations and exploration and development projects are located in regions that the Company believes are supportive of the mining industry. The Company's LaRonde and Lapa mines and Goldex mine project are located in the Abitibi region of northwestern Quebec, one of North America's principal gold-producing regions. The Company's Kittila mine in northern Finland, Pinos Altos mine and La India mine project in northern Mexico and Meadowbank mine and Meliadine project in Nunavut are also located in regions which the Company believes are supportive of the mining industry. Strong Operating Base. Through its acquisition, exploration and development program, the Company has been transformed from a regionally focused, single mine producer to a multi-mine international gold producer with five operating, 100% owned mines. The Company's operations at its existing mines provide a strong base for additional 2012 ANNUAL REPORT 21 Table of Contents mineral reserve and production development at these properties and for the development of its mines and growth projects in Nunavut, Finland, Mexico and the Abitibi region. The experience gained through building and operating the LaRonde mine has assisted with the Company's development of its other mine projects. In addition, the extensive infrastructure associated with the LaRonde mine supports the nearby Lapa mine and Goldex mine project. Experience gained at the Meadowbank mine in Nunavut is assisting with the Company's permitting and exploration work at the nearby Meliadine project. Similarly, experience building and operating the Pinos Altos mine in Chihuahua, Mexico has assisted the Company's efforts to develop the La India mine project 70 kilometres away in Sonora, Mexico. Highly Experienced Management Team. The members of the Company's senior management team have an average of over 22 years of experience in the mining industry. Management's significant experience has underpinned the Company's historical growth and provides a solid base upon which to expand the Company's operations. Based on these strengths, the Company's corporate strategy is to grow production and reserves in mining-friendly regions. Optimize and Further Expand Operations. The Company continues to focus its resources and efforts on the exploration and development of its properties in Quebec, Nunavut, Finland and Mexico with a view to increasing annual gold production and gold mineral reserves. Leverage Mining Experience. The Company believes it can benefit not only from the existing infrastructure at its mines but also from the geological knowledge that it has gained in mining and developing its properties. The Company's strategy is to capitalize on its mining expertise to exploit fully the potential of its properties. Expand Gold Reserves. The Company is conducting drilling programs at all of its properties with a goal of further increasing its gold reserves. In 2012, on a contained gold ounces basis, the gold reserves of the Company were 18.68 million ounces (184 million tonnes grading 3.16 grams of gold per tonne), essentially unchanged from the 18.75 million ounces reported as at December 31, 2011. Growth Through Primary Exploration and Acquisitions. The Company's growth strategy has been to pursue the expansion of its development base through the acquisition of additional properties in the Americas and Europe. Historically, the Company's producing properties have resulted from a combination of investments in advanced exploration companies and primary exploration activities. By investing in pre-development stage companies, the Company believes that it has been able to acquire control of projects at favourable prices and reasonable valuations. Mining Legislation and Regulation Canada The mining industry in Canada operates under both federal and provincial or territorial legislation governing prospecting and the exploration, development, operation and decommissioning of mines and mineral processing facilities. Such legislation relates to the method of acquisition and ownership of mining rights, labour, occupational or worker health and safety standards, royalties, mining, exports, reclamation, closure and rehabilitation of mines and other matters. Laws and regulations regarding the decommissioning, reclamation and rehabilitation of mines may require approval by provincial or territorial authorities of reclamation plans, provision of financial guarantees and long-term management of closed mines and related waste and tailings. Obligations under mining legislation may arise with respect to proposed, operating and closed facilities (including those that the Company owns but never operated). The mining industry in Canada is also subject to extensive laws and regulations at both the federal and provincial or territorial levels concerning the protection of the environment. The primary federal regulatory authorities with jurisdiction over the Company's mining operations in respect of environmental matters are the Department of Fisheries and Oceans (Canada) and Environment Canada. The construction, development and operation of a mine, mill or refinery requires compliance with applicable environmental laws and regulations and/or review processes, including obtaining land use permits, water permits, air emissions certifications, industrial depollution attestations, hazardous substances management and similar authorizations from various governmental agencies. Environmental laws and regulations impose high standards on the mining industry to reduce or eliminate the effects of waste generated by mining and processing operations and subsequently deposited on the ground or affecting the air or water. Quebec In Quebec, mining rights are governed by the Mining Act (Quebec) and, subject to limited exceptions, are owned by the province. A mining claim entitles its holder to explore for minerals on the subject land. It remains in force for a term of two 22 AGNICO-EAGLE MINES LIMITED Table of Contents years from the date it is registered and may be renewed indefinitely subject to continued exploration works in relation thereto. In order to retain title to mining claims, in addition to paying a small bi-annual rental fee currently ranging from C$27.75 to C$126 per claim, depending on its location and area (as set by Quebec government regulations), exploration work (or an equivalent value cash payment) has to be completed in advance (either on the claim or on adjacent mining claims, concessions or leases) and filed with the Ministry of Natural Resources (Quebec) prior to the date of expiry of the claim. The amount of exploration work required bi-annually currently ranges from C$48 to C$3,600 per claim, depending on its location, area and period of validity (as set by Quebec government regulations). In 1966, the mining concession system set out for lands containing mineralized zones in the Mining Act (Quebec) was replaced by a system of mining leases, but the mining concessions sold prior to such replacement remain in force. A mining lease entitles its holder to mine and remove valuable mineral substances from the subject land, provided it pays the annual rent set by Quebec government regulations, which currently ranges from C$21.50 per hectare (on privately held land) to C$45 per hectare (on land owned by the province). Leases are granted initially for a term of 20 years and are renewable up to three times, each for a duration of ten years. After the third renewal, the Minister of Natural Resources (Quebec) may grant an extension thereof on the conditions, for the rental and for the term he or she determines. In Quebec, the primary provincial regulatory authorities with jurisdiction over the Company's mining operations in respect of environmental matters are the Ministry of Sustainable Development, Environment, Wildlife and Parks (Quebec) and the Ministry of Natural Resources (Quebec). Nunavut Under the Nunavut Land Claims Agreement (the "Land Claims Agreement"), ownership of large tracts of land in Nunavut was granted to the Inuit. These Inuit-owned lands include areas with high mineral potential. Further, as a result of other rights granted to the Inuit under the Land Claims Agreement, Inuit organizations play an important role in the management of natural resources and the environment in Nunavut. These duties are shared among the federal and territorial governments and Inuit organizations. Under the Land Claims Agreement, the Inuit own surface rights to certain lands representing approximately 16% of Nunavut. For a portion of the Inuit-owned lands representing approximately 2% of Nunavut, the Inuit also own mineral (subsurface) rights in addition to the surface rights. In Nunavut, the Crown's mineral rights are administered by the Aboriginal Affairs and Northern Development Canada in accordance with the Northwest Territories and Nunavut Mining Regulations (the "Territorial Mining Regulations") under the Territorial Lands Act (Canada). The Inuit mineral rights in subsurface Inuit-owned lands are owned and administered by Nunavut Tunngavik Incorporated ("Nunavut Tunngavik"), a corporation representing the Inuit people of Nunavut. Future production from Nunavut Tunngavik-administered mineral claims is subject to production leases which include a 12% net profits interest royalty from which annual deductions are limited to 85% of gross revenue. Production from Crown mining leases is subject to a royalty of up to 14% of adjusted net profits, as defined in the Territorial Mining Regulations. Before the operation of a Major Development Project, as defined in the Land Claims Agreement, can begin, developers must also negotiate an Inuit Impact and Benefit Agreement ("IIBA") with the regional Inuit Association. The Kivalliq Inuit Association ("KIA")is the Inuit organization that holds surface title to the Inuit-owned lands in the Kivalliq region and is responsible for administering surface rights on these lands on behalf of the Inuit of the region. In order to conduct exploration work on Inuit-owned lands, the Company is required to submit a project proposal or work plan. This proposal is subject to approval by the KIA for surface land tenure and to review by other boards established by the Land Claims Agreement to determine environmental effects and, if needed, to grant water rights. Federal and territorial government departments participate in the reviews conducted by these boards. For mine development, the Company requires a surface lease and water compensation agreement with the KIA and a licence under federal legislation for the use of water, including the deposit of waste. During mine construction and operations, the Company is subject to additional Nunavut and federal government regulations related to environmental, safety, fire and other operational matters. Finland Mining legislation in Finland consists of the Mining Act, the Mining Decree, the Mining Safety Decree and the Mining Hoisting Equipment Decree. The new Mining Act was implemented on July 1, 2011 and replaced the previous Mining Act (503/1965) as a result of still on-going overall reform of mining legislation in Finland. Set out below is a general, brief overview of certain relevant aspects of Finnish mining legislation. 2012 ANNUAL REPORT 23 Table of Contents In Finland, subject to certain area restrictions, anyone has a right irrespective of land ownership to conduct survey work and make geological measurements and observations, with the right to take small samples from the soil provided that these measures do not cause other than only minor damage or inconvenience. However, before sampling, a notice must be given to the owner of the respective land. A prospecting permit is required for more comprehensive survey work. The prospecting permit entitles its holder to conduct necessary research and exploration in a defined area in order to discover the quality and extent of a deposit and to build or move temporary facilities and machinery onto the prospecting area for such purposes. The prospecting permit does not grant a right to exploit a deposit, for which purpose a mining permit is required, but it does grant its holder a priority to receive the mining permit on the prospecting area. A mining permit entitles its holder to exploit all minerals found on the mining area defined in the permit as well as all organic and non-organic surface material and the soil and bedrock, as considered necessary for the purposes of the mining work. In addition to the mining permit, a mining safety permit regarding safety measures of the contemplated mining operations is required in order to build and operate a mine. Generally, the mining area must either be owned or leased by the permit holder. However, provided that the mining project is required by the public interest, the Council of State of Finland may in certain cases grant a mining area redemption permit, which entitles the holder to establish a mining area without the consent of the landowner if the mining operator and the landowner cannot come to a voluntary agreement regarding use of the land. The Finnish Safety and Chemicals Agency is responsible for granting prospecting permits, mining permits and mining safety permits upon an application, provided that statutory requirements are fulfilled. Prospecting permits and mining permits are transferrable and eligible to be pledged as security under Finnish law. Prospecting permits are issued for fixed periods of time (a maximum period of four years at a time, which can be extended for three-year periods, up to a maximum of 15 years). Mining permits are generally granted without an expiry date. However, the Safety and Chemicals Agency investigates grounds for the continued existence of the permit at least once every ten years. In some cases, depending on the prevailing circumstances and the deposit, mining permits may only be granted for a fixed period of time (to a maximum period of ten years at a time). Prospecting permits and mining permits may be cancelled if the holder of the permit does not perform mining operations in accordance with the terms of the permit or the permit holder violates rules of the Mining Act. Without specific permission of the National Board of Patents and Registrations of Finland, a right to apply for and acquire a prospecting permit and/or mining permit is limited to Finnish corporations and individuals and foreign individuals and corporations domiciled in a state belonging to the European Economic Area. In addition to compliance with mining legislation, all mining operations must be carried out in accordance with the permit terms and with laws and regulations concerning conservation and environmental protection issues. Under the Finnish Environmental Protection Act, mining activities require an environmental permit which may be issued either for a definite or indefinite period of time. The Environmental Protection Act is based on the principles of prevention and minimization of damages and hazards, the application of the best available technology, the application of the best environmental practice and the "polluter pays" principle. The Act on Compensation for Environmental Damage includes provisions on the compensation for damage to a person or a property resulting from pollution of water, air, soil, noise, vibration, radiation, light, heat, smell or other similar nuisances, caused by an activity carried out at a fixed location. This act is based on the principle of strict liability. In addition to the permits listed above, mining operators may require several other permits and may be subject to other obligations under Finnish legislation. According to the Act on Environmental Impact Assessment Procedure, certain projects require compliance with an environmental impact assessment procedure. These include major projects with a considerable impact on the environment, such as the excavation, enrichment and handling of metals and other minerals in cases where the excavated material is estimated to exceed 550,000 tonnes annually or the operating area exceeds 25 hectares. An environmental permit authority may not give its approval to an activity covered by the scope of the Act on the Environmental Impact Assessment Procedure without having taken an environmental impact assessment report into consideration. Mexico Mining in Mexico is subject to the Mining Law, a federal law. Under the Mexican Constitution, all minerals belong to the Mexican Nation. Private parties may explore and extract minerals pursuant to mining concessions granted by the 24 AGNICO-EAGLE MINES LIMITED Table of Contents executive branch of the Mexican government, which as a general rule, are granted to whoever first claims them. While the Mining Law touches briefly upon labour, occupational and worker health and safety standards, these are primarily dealt with by the Federal Labour Law. The Mining Law also briefly addresses environmental matters, which are primarily regulated by the General Law of Ecological Balance and Protection of the Environment, also of federal jurisdiction. The primary agencies with jurisdiction over mining activities are the Ministry of the Economy, the Ministry of Labor and Social Welfare and the Ministry of the Environment and Natural Resources. The National Water Commission has jurisdiction regarding the granting of water rights and the Ministry of Defense with respect to the use of explosives. Concessions are granted for 50 years, renewable once. The main obligations to keep concessions current are the semi-annual payment of mining duties (taxes), based on the surface area of the concession, and the performance of work in the areas covered by the concessions, which is evidenced by minimum expenditures or by the extraction of ore. Organizational Structure The Company's significant subsidiaries (all of which are directly or indirectly wholly-owned by the Company, unless otherwise indicated) are 1715495 Ontario Inc., Agnico-Eagle Mines Sweden Cooperatie U.A., which owns all of the shares of Agnico-Eagle Sweden AB, a Swedish company through which the Company holds its interest in Oijarvi Resources Oy, and Agnico-Eagle Finland Oy, a Finnish company through which the Kittila mine is held. The Company's interest in the Pinos Altos mine in northern Mexico is held through its direct and indirect wholly-owned Mexican subsidiary, Agnico Eagle Mexico, S.A. de C.V., which is, in turn, owned, in part, by 1641315 Ontario Inc. and Tenedora Agnico Eagle Mexico, S.A. de C.V., which is, in turn, owned in part by Agnico-Eagle Mines Mexico Cooperatie U.A. The Company's interest in the La India mine project in Mexico is held through its indirect wholly-owned Mexican subsidiary, Agnico Sonora, S.A. de C.V., which is owned by Grayd, Agnico Eagle Mexico, S.A. de C.V. and Tenedora Agnico Eagle Mexico, S.A. de C.V. The LaRonde mine, the Lapa mine, the Goldex mine project, the Meadowbank mine and the Meliadine project are owned directly by the Company. Certain of the Company's subsidiaries, Servicios Agnico Eagle Mexico, S.A. de C.V., Servicios Pinos Altos, S.A. de C.V. and Minera Agave, S.A. de C.V., provide services in connection with the Company's operations in Mexico. The Company's operations in the United States are conducted through Agnico-Eagle (USA) Limited. 2012 ANNUAL REPORT 25 Table of Contents The following chart sets out the corporate structure of the Company, each of its significant subsidiaries and certain other subsidiaries, together with the jurisdiction of organization of the Company and each such subsidiary as at March 11, 2013: Agnico-Eagle Organizational Chart 26 AGNICO-EAGLE MINES LIMITED Table of Contents Property, Plant and Equipment Location Map of the Abitibi Region (as at December 31, 2012) LaRonde Mine The LaRonde mine is situated approximately halfway between the City of Rouyn-Noranda and the City of Val d'Or in northwestern Quebec (approximately 470 kilometres northwest of Montreal, Quebec) in the municipalities of Preissac and Cadillac. At December 31, 2012, the LaRonde mine was estimated to have proven and probable mineral reserves containing approximately 4.2 million ounces of gold comprised of 28.8 million tonnes of ore grading 4.54 grams per tonne. The Company's LaRonde mine consists of the LaRonde property and the adjacent El Coco and Terrex properties, each of which is 100% owned and operated by the Company. The LaRonde mine can be accessed either from Val d'Or in the east or from Rouyn-Noranda in the west, each of which are located approximately 60 kilometres from the LaRonde mine via Quebec provincial highway No. 117. The LaRonde mine is situated approximately two kilometres north of highway No. 117 on Quebec regional highway No. 395. The Company has access to the Canadian National Railway at Cadillac, Quebec, approximately six kilometres from the LaRonde mine. The LaRonde mine operates under mining leases obtained from the Ministry of Natural Resources (Quebec) and under certificates of approval granted by the Ministry of Sustainable Development, Environment, Wildlife and Parks (Quebec). The LaRonde property consists of 36 contiguous mining claims and one provincial mining lease and covers in total 1,047.4 hectares. The El Coco property consists of 22 contiguous mining claims and one provincial mining lease and covers in total 356.7 hectares. The Terrex property consists of 21 mining claims that cover in total 424.4 hectares. The mining leases on the LaRonde and El Coco properties expire in 2018 and 2021, respectively, and are automatically renewable for three further ten-year terms upon payment of a small fee. The Company also has three surface rights leases that cover in total approximately 301.5 hectares that relate to the water pipeline right of way from Lake Preissac and the eastern extension of the LaRonde tailings pond #7 on the El Coco property. The surface rights leases are renewable annually. 2012 ANNUAL REPORT 27 Table of Contents Location Map of the LaRonde Mine (as at December 31, 2012) The LaRonde mine includes underground operations at the LaRonde and El Coco properties that can both be accessed from the Penna Shaft, a mill, a treatment plant, a secondary crusher building and related facilities. The El Coco property is subject to a 50% net profits interest in favour of Barrick Gold Corporation ("Barrick") on future production from approximately 500 metres east of the LaRonde property boundary. The remaining 1,500 metres is subject to a 4% net smelter return royalty. This area of the property is now substantially mined out and the Company has not paid royalties since 2004 and does not expect to pay royalties in 2013. In 2003, exploration work started to extend outside of the LaRonde property onto the Terrex property where a down-plunge extension of Zone 20 North was discovered. The Terrex property is subject to a 5% net profits royalty to Delfer Gold Mines Inc. and a 2% net smelter return royalty to Barrick. The Company does not expect to pay royalties in respect of this part of the property in 2013. In addition, the Company owns 100% of the Sphinx property immediately to the east of the El Coco property. In 2012, 18% of the ore processed from the LaRonde mine was extracted from the deeper portion of the LaRonde mine (that is, below Level 245), that was previously referred to as the "LaRonde extension". In 2013, the Company anticipates that approximately 49% of the ore processed will be from this deeper part of the mine. In 2013, payable gold production at the LaRonde mine is expected to increase to approximately 177,000 ounces, and total cash costs per ounce are expected to be approximately $650. The Company expects future byproduct metal recoveries at the LaRonde mine to decline as production continues to shift towards deeper sections of the mine where gold grades are higher and byproduct metals are less prevalent. The decreased byproduct revenues will result in higher total cash costs per ounce attributable to ore extracted from these parts of the mine. The Abitibi region has a continental climate with average annual rainfall of 64 centimetres and average annual snowfall of 318 centimetres. The average monthly temperatures range from a minimum of -23 degrees Celsius in January to a maximum of 23 degrees Celsius in July. Under normal circumstances, mining operations are conducted year-round without interruption due to weather conditions. The Company believes that the Abitibi region of northwestern Quebec has sufficient experienced mining personnel to staff its operations in the Abitibi region. The elevation is 337 metres above sea level. The LaRonde property is relatively flat with a maximum relief of approximately 40 metres. The topography gently slopes down from north to south and is characterized by boreal-type forest at LaRonde and the nearby properties. All of the LaRonde mine's power requirements are supplied by Hydro-Quebec through connections to its main power transmission grid. Water used in the LaRonde mine's operations is sourced from Lake Preissac and is transported approximately four kilometres to the minesite through a surface pipeline. 28 AGNICO-EAGLE MINES LIMITED Table of Contents Mining and Milling Facilities Surface Plan of the LaRonde Mine (as at December 31, 2012) The LaRonde mine was originally developed utilizing a 1,207-metre shaft (Shaft #1) and an underground ramp access system. The ramp access system is available down to Level 25 of Shaft #1 and continues down to Level 248 at the Penna Shaft. The mineral reserve accessible from Shaft #1 was depleted in September 2000 and Shaft #1 is no longer in use. A second production shaft (Shaft #2), located approximately 1.2 kilometres to the east of Shaft #1, was completed in 1994 to a depth of 525 metres and was used to mine Zones 6 and 7. Both ore zones were depleted in March 2000 and the workings were allowed to flood up to Level 6 (approximately 280 metres). A third shaft (the Penna Shaft), located approximately 800 metres to the east of Shaft #1, was completed down to a depth of 2,250 metres in March 2000. The Penna Shaft is used to mine Zones 20 North, 20 South, 6 and 7. In 2009, as part of the LaRonde mine extension, the Company completed construction of an 823-metre internal shaft from Level 203 to access the ore below Level 245, approximately 2,858 metres below surface. Production from the deeper levels of the LaRonde mine has only recently started to ramp-up to anticipated steady state levels and there is currently only limited development of stopes in this portion of the mine. As a result, logistical problems, such as congestion in the underground workings, occur from time to time. The Company anticipates that these issues, and any other issues that may prevent or delay extraction and transportation of ore from a particular stope, will be less prevalent when the stope development work at depth is more advanced. Mining Methods Four mining methods have historically been used at the LaRonde mine: open pit for the three surface deposits; sublevel retreat; longitudinal retreat with cemented rock backfill or paste backfill; and transverse open stoping with paste, cemented rock backfill or unconsolidated backfill. The primary source of ore at the LaRonde mine continues to be from 2012 ANNUAL REPORT 29 Table of Contents underground mining methods. During 2012, two of the traditional mining methods were used: longitudinal retreat with cemented rock backfill or paste backfill and transverse open stoping with cemented rock backfill, paste or unconsolidated backfill. In addition, to address concerns regarding the frequency and intensity of seismic events encountered at the lower levels of the LaRonde mine, a hybrid of these two methods was developed and used. In the underground mine, sublevels are driven at between 30-metre and 40-metre vertical intervals, depending on the depth. Stopes are undercut in 15-metre wide panels. In the longitudinal method, panels are mined in 15-metre sections and backfilled with 100% cemented rock backfill or paste backfill. The paste backfill plant was completed in 2000 and is located on the surface at the processing facility. In the transverse open stoping method, approximately 50% of the ore is mined in the first pass and filled with cemented rock backfill or paste backfill. On the second pass, the remainder of the ore is mined and filled with unconsolidated waste rock backfill or cemented paste backfill. The throughput at LaRonde in 2012 averaged 6,444 tonnes per day compared with 6,593 tonnes per day in 2011. The reduced throughput in 2012 was largely due to the transition to the lower mine, where factors such as heat, congestion and lack of operational flexibility underground negatively impacted the mine's ability to provide the planned tonnage to the mill. Surface Facilities Surface facilities at the LaRonde mine include a processing plant with a daily capacity of 7,200 tonnes of ore, which has been expanded four times since 1987 from the original rate of 1,630 tonnes per day. Beginning in 1999, transition to the LaRonde mine's poly metallic massive sulphide orebody required several modifications to the processing plant, including a new coarse-ore handling system, new SAG and ball mills, the addition of a zinc flotation circuit and capacity increases to the existing copper flotation and precious metals circuits. In 2008, the installation of a limited copper/lead separation flotation circuit, following the copper flotation circuit, was completed. Also in 2008, a cyanidation plant began operation for the treatment of sulphide concentrate from the Goldex mine. A new carbon-in-leach ("CIL") circuit is under construction and is expected to replace the existing LaRonde precious metal Merrill-Crowe circuit at the end of March 2013. The LaRonde mine is also the site for the Lapa mine ore processing plant (1,500 tonnes per day) that was commissioned in the second quarter of 2009. The ore requires a series of grinding, copper/lead flotation and separation, zinc flotation and zinc tails precious metals leaching circuits, followed by a counter-current decantation circuit and Merrill-Crowe precipitation (which will be replaced by CIL recovery in 2013). Paste backfill and cyanide destruction plants operate intermittently. The tailings area has a dedicated cyanide destruction and metals precipitation plant that water passes through prior to recirculating to the mill. A biological water treatment plant was commissioned in 2005 to address the build-up of thiocyanate in the tailings ponds at the LaRonde mine. This build-up was the result of the high sulphide content of the LaRonde mine ore and 90% recirculation of the process water. The plant uses bacteria to oxidize and destroy thiocyanate and removes phosphate from the water before it is released to the environment. The Goldex concentrate circuit consists of pulp received from the Goldex mill via truck and subsequent leaching of the pulp with cyanide. The leached material was sent to the Lapa CIL circuit for gold recovery along with Lapa residual pulp until the Goldex circuit ceased to operate in November 2011 following the suspension of mining operations at Goldex on October 19, 2011. The Goldex circuit is currently on standby until mining begins at the M and E Zones of the Goldex mine, which is expected to occur in the second quarter of 2014. At that time, the Goldex circuit tails will be pumped directly into the new LaRonde CIL circuit, which has been designed to handle leached material from both LaRonde and Goldex. The Lapa CIL circuit is expected to be operating near full capacity by then with material from Lapa alone. The Lapa process consists of a two-stage grinding circuit to reduce the granularity of the ore. A gravity recovery circuit that is incorporated into the grinding circuit recovers up to 45% of the available gold, depending on feed grades. The residual pulp is leached in a conventional CIL circuit to dissolve the balance of the precious metal. A carbon strip circuit recovers the gold from the carbon which is recycled to the leach circuit. Annual production at the LaRonde mill in 2013 is expected to consist of approximately 2,097,023 ounces of silver, 5,223.4 tonnes of copper, up to 1,176.9 tonnes of lead and 27,298.6 tonnes of zinc. Gold recovery at the LaRonde mine is distributed approximately as follows: 57.7% in the copper concentrate, 6.56% in the lead concentrate, 4.25% in the zinc concentrate and 23.49% via leaching. Mineral Recoveries During 2012, gold and silver recovery averaged 89.8% and 85.49%, respectively. Zinc recovery averaged 87.13% with a concentrate quality of 56.13% zinc. Copper recovery averaged 78.56% with a concentrate quality of 11.88% copper. 30 AGNICO-EAGLE MINES LIMITED Table of Contents Approximately 2.36 million tonnes of ore were processed averaging 6,780 tonnes of ore per day at 95.39% of available time. The following table sets out the metal recoveries, concentrate grades and contained metals for the 2,358,499 tonnes of ore extracted by the Company at the LaRonde mine in 2012. Copper Concentrate (37,918 tonnes produced) Zinc Concentrate (80,987 tonnes produced) Lead Concentrate (2,096 tonnes produced) Head Grades Grade Recovery Grade Recovery Grade Recovery Overall Metal Recoveries Payable Production Gold 2.362 g/t 79.55 g/t 54.25% 3.25 g/t 4.81% 200.4 g/t 8.01% 89.8% 160,854 oz Silver 40.156 g/t 1,073 g/t 43.26% 177 g/t 14.78% 3,529.9 g/t 7.22% 85.49% 2,243,674 oz Copper 0.242% 11.88% 78.56% 0.42% 5.96% 4.56% 1.87% 81.03% 4,126 t Lead 0.252% 7.14% 45.68% 0.53% 7.22% 53.47% 18% 64.38% 1,058 t Zinc 2.203% 4.15% 2.98% 56.13% 87.13% 2.89% 0.2% 90.61% 38,637 t Environmental Matters Currently, water is treated at various facilities at the LaRonde mine operations. Water contained in the tailings to be used as underground backfill is treated to degrade cyanide using a sulphur dioxide and air process. The tailings entering the tailings pond are first decanted and the clear water subjected to natural cyanide degradation. This water is then transferred to sedimentation pond #1 to undergo a secondary treatment at a plant located between sedimentation ponds #1 and #2 that uses a peroxy-silicate process to destroy cyanide, lime and coagulant to precipitate metals. The tailings pond occupies an area of about 175 hectares. Waste rock that is not used underground for backfill is brought up to the surface and stored in close proximity to the tailings pond to be used to build coffer dams inside the pond. A waste rock pile containing approximately 500,000 tonnes of waste and occupying about nine hectares is located west of the mill. Due to the high sulphur content of the LaRonde mine ore, the Company has had to address toxicity issues in the tailings ponds since the 1990s. Since introducing and optimizing a biological treatment plant in 2004, the treatment process is now stable and the effluent has remained non-toxic since 2006. In 2006, the Company commenced an ammonia stripping operation involving an effluent partially treated by the biological treatment plant which allowed an increase in treatment flow rate, while keeping the final effluent toxicity-free. Since 2010, the Company has operated ammonia stripping towers to further increase the treatment flow rate of the biological plant. In addition, water from mine dewatering and drainage water are treated to remove metals prior to discharge at a high-density sludge lime treatment plant located at the LaRonde mill. Capital Expenditures In 2006, the Company initiated construction to extend the infrastructure at the LaRonde mine to access the ore below Level 245. Hoisting from this deeper part of the LaRonde mine began in the fourth quarter of 2011 and commercial production was achieved in November 2011. Access to the deeper part of the LaRonde mine is provided through a 823-metre internal shaft (completed in November 2009) starting from Level 203, for a total depth of 2,858 metres from surface. A ramp is used to access the lower part of the orebody down to 3,110 metres in depth. The internal winze system is used to hoist ore from depth to facilities on Level 215, approximately 2,150 metres below surface, where it is transferred to the Penna Shaft hoist. Capital expenditures at the LaRonde mine during 2012 were approximately $75.2 million, which included $22.2 million on sustaining capital expenditures and $41.9 million in deferred expense. Budgeted 2013 capital expenditures at the LaRonde mine are $91.3 million. Another $3 million will be added to the carbon-in-pulp ("CIP") project. Total capital expenditures for the LaRonde mine are estimated at $572.1 million from 2013 to 2026 (including the CIP project). 2012 ANNUAL REPORT 31 Table of Contents Development In 2012, a total of 13,113 metres of lateral development was completed. Development was focused on stope preparation of mining blocks for production in 2012 and 2013, especially the preparation of the lower mine production horizon. A total of 5,213 metres of development work was completed for the LaRonde mine extension infrastructure and the ramp to access the LaRonde mine extension. A total of 13,500 metres of lateral development is planned for 2013. The main focus of development work continues to be stope preparation and the LaRonde mine extension access toward the orebody. Geology, Mineralization and Exploration Geology The LaRonde property is located near the southern boundary of the Archean-age (2.7 billion years old) Abitibi Subprovince and the Pontiac Subprovince within the Superior Geological Province of the Canadian Shield. The most important regional structure is the Cadillac-Larder Lake ("CLL") fault zone marking the contact between the Abitibi and Pontiac Subprovinces, located approximately two kilometres to the south of the LaRonde property. The geology that underlies the LaRonde mine consists of three east-west-trending, steeply south-dipping and generally south-facing regional groups of rock formations. From north to south, they are: (i) 400 metres (approximate true thickness) of the Kewagama Group, which is made up of a thick band of interbedded wacke; (ii) 1,500 metres of the Blake River Group, a volcanic assemblage that hosts all the known economic mineralization on the property; and (iii) 500 metres of the Cadillac Group, made up of a thick band of wacke interbedded with pelitic schist and minor iron formation. Zones of strong sericite and chlorite alteration that enclose massive to disseminated sulphide mineralization (including the ore that is mined for gold, silver, zinc, copper and lead at the LaRonde mine) follow steeply dipping, east-west-trending, anastomosing shear zone structures within the Blake River Group volcanic units across the property. These shear zones are part of the larger Doyon-Dumagami Structural Zone that hosts several important gold occurrences (including the Doyon gold mine, the Westwood project and the former Bousquet mines) and has been traced for over ten kilometres within the Blake River Group, from the LaRonde mine westward to the Mouska gold mine. Mineralization The gold-bearing zones at the LaRonde mine are lenses of disseminated stringers through to massive, aggregates of coarse pyrite with zinc, copper and silver content. Ten zones that vary in size from 50,000 to 40,000,000 tonnes have been identified, of which four are (or are believed to be) economic. Gold content is not proportional to the total sulphide content but does increase with copper content. Gold values are also higher in areas where the pyrite lenses are crosscut by tightly spaced north-south fractures. These historical relationships, which were noted at LaRonde Shaft #1's Main Zone, are maintained at the Penna Shaft zones. The zinc-silver (i.e. Zone 20 North) mineralization with lower gold values, common in the upper mine, grades into gold-copper mineralization within the lower mine. The predominant base metal sulphides within the LaRonde mine are chalcopyrite (copper) and sphalerite (zinc). The Company believes that Zone 20 North is one of the largest gold-bearing massive sulphide mineralized zones in the world and one of the largest known mineralized zones in the Abitibi region of Ontario and Quebec. Zone 20 North contains the majority of the mineral reserves and resources at the LaRonde mine, including 27.3 million tonnes of proven and probable mineral reserves grading 4.64 grams of gold per tonne, representing 95% of the total proven and probable mineral reserves at the LaRonde mine, 4.4 million tonnes of indicated mineral resources grading 1.80 grams of gold per tonne, representing 82% of the total measured and indicated mineral resources at the LaRonde mine, and 9.6 million tonnes of inferred mineral resources grading 4.02 grams of gold per tonne, representing 81% of the total inferred mineral resources at LaRonde. Zone 20 North extends between 700 metres below surface and at least 3,500 metres below surface, and remains open at depth. With increased access on the lower levels of the mine (i.e., below Level 215 and from the internal shaft on levels 257 and 278), the transformation from a "zinc/silver" orebody to a "gold/copper" deposit is expected to continue during 2013. Zone 20 North can be divided into an upper zinc/silver-enriched gold-poor zone and a lower gold/copper-enriched zone. The zinc zone has been traced over a vertical distance of 1,700 metres and a horizontal distance of 570 metres, with thicknesses approaching 40 metres. The gold zone has been traced over a vertical distance of over 2,200 metres and a 32 AGNICO-EAGLE MINES LIMITED Table of Contents horizontal distance of 900 metres, with thicknesses varying from three to 40 metres. The zinc zone consists of massive zinc/silver mineralization containing 50% to 90% massive pyrite and 10% to 50% massive light brown sphalerite. The gold zone mineralization consists of 30% to 70% finely disseminated to massive pyrite containing 1% to 10% chalcopyrite veinlets, minor disseminated sphalerite and rare specks of visible gold. Gold grades are generally related to the chalcopyrite or copper content. At depth, the massive sulphide lens becomes richer in gold and copper. During 2012, 2.0 million tonnes of ore grading 2.34 grams of gold per tonne, 43.35 grams of silver per tonne, 2.41% zinc, 0.26% copper and 0.28% lead were mined from Zone 20 North. Exploration The combined tonnage of proven and probable mineral reserves at the LaRonde mine for year-end 2012 is 28.8 million tonnes, which represents a 13% decrease in the amount compared to year-end 2011 (33.2 million tonnes). This mineral reserve includes the replacement of 2.4 million tonnes of ore that were mined in 2012. The reduction in reserves is principally associated with ore mined during 2012 and application of a mining recovery factor of 95% on the remaining reserves. Diamond drilling is used for exploration on the LaRonde property. In 2012, a total of 252 holes were drilled on the LaRonde property for a total length of 22,255 metres, compared to 181 holes for a total length of 16,190 metres in 2011. Of the drilling in 2012, 222 holes (10,194 metres) were for production stope delineation, 26 holes (8,261 metres) were for definition drilling and 4 holes (3,701 metres) were for exploration. In 2011, 165 holes (8,181 metres) were for production stope delineation, 12 holes (2,614 metres) were for definition drilling and 4 holes (5,396 metres) were for exploration. Expenditures on diamond drilling at the LaRonde mine during 2012 were approximately C$2.8 million, including C$1.6 million in definition and delineation drilling expenses charged to operating costs at the LaRonde mine. Expenditures on exploration in 2012 were C$1.2 million, and are expected to be C$2.1 million in 2013. The main focus of the 2012 exploration program was continuing the investigation of Zone 20 North and Zone 6-7 horizons at depth. This program was conducted from the level 215 exploration drift, approximately 2,150 metres below the surface. The first deep hole of the program was completed at the end of 2009 to a final length of 1,852 metres. This hole intersected Zone 20 North at a depth of 3,520 metres below surface, which is approximately 410 metres below the current reserve envelope. The intersection returned 14.3 metres (true width) grading 3.03 grams of gold per tonne. In 2010, a second branch was drilled from this mother hole and returned 4.1 metres grading 1.77 grams of gold per tonne at a depth of 3,595 metres below surface. Another deep hole was initiated in 2011 and intersected Zone 6 horizon in 2012 at a depth of 3,551 meters below surface. The 22.8-meters-thick massive sulfide zone returned 1.58 grams of gold per tonne, 27.1 grams of silver per tonne, 0.38% copper and 3.36% zinc and has the same characteristics as other deposits on the property. A follow-up campaign is planned in 2013 from level 278 to determine the extent of the deposit. In addition, definition and delineation drilling was undertaken in the 20 North and 20 South Zones to assist in finalizing mining stope designs. Zone 20 North was the main focus of the definition drilling in 2012. Infill drilling mainly from Level 272 to Level 245 confirmed the previous Zone 20 North reserves. Bousquet and Ellison Properties The Bousquet property is located immediately west of the LaRonde mine and consists of two mining leases covering 80.0 hectares and 31 claims covering 384.9 hectares. The property, along with various equipment and other mining properties, was acquired from Barrick in September 2003 for $2.9 million in cash, $1.1 million in common shares of the Company and the assumption of specific reclamation and other obligations related to the Bousquet property. The property is subject to a 2% net smelter return royalty interest in favour of Barrick. From 2004 to 2007, the Company recovered 108,407 tonnes of ore grading 2.33 grams of gold per tonne from Zone 4 in a small open pit. In 2006 and 2007, the Company recovered 99,342 tonnes of ore grading 7.02 grams of gold per tonne from two small ore blocks underground at Bousquet. There has been no mining of this property since 2007. In 2011, the Company completed a diamond drilling program consisting primarily of twinning and resampling historic holes to evaluate the production potential of an open pit at Bousquet Zone 5. This work led to a new resource estimate for Zone 5 and an internal feasibility study has been conducted for a resumption of production in the Zone 5 open pit. This study led to a positive scenario. For the whole Bousquet property, including Zone 5, as at December 31, 2012, probable reserves totalled approximately 0.2 million ounces of gold comprised of 2.9 million tonnes grading 1.88 grams per tonne, as well as indicated mineral resources totalling approximately 9.8 million tonnes grading 2.44 grams of gold per tonne and inferred mineral resources totalling approximately 4.6 million tonnes grading 4.04 grams of gold per tonne. 2012 ANNUAL REPORT 33 Table of Contents The Ellison property is located immediately west of the Bousquet property and consists of eight claims covering 101.0 hectares. The property was acquired in August 2002 for $0.32 million in cash and a commitment to spend $0.49 million in exploration over four years. The commitment was fulfilled in 2004 and the property is 100% owned by the Company. The property is subject to a net smelter return royalty interest in favour of Yorbeau Resources Inc. that varies between 1.5% and 2.5% depending on the price of gold. Should commercial production from the Ellison property commence, the Company will be required to pay Yorbeau Resources Inc. an additional C$0.5 million in cash. Expenditures on exploration in 2012 on both the Bousquet and Ellison properties were C$1.4 million, which includes the cost of drilling 3,850 metres in 12 holes drilled on the Ellison property. In 2013, the Company expects to spend C$0.84 million to continue the optimization of the internal feasibility study completed in March 2012 regarding the Bousquet property. The December 31, 2012 indicated mineral resources at Ellison were approximately 0.4 million tonnes grading 5.68 grams of gold per tonne, and the inferred mineral resources were approximately 0.8 million tonnes grading 5.81 grams of gold per tonne. Lapa Mine The Lapa mine, which achieved commercial production in May 2009, is located approximately 11 kilometres east of the LaRonde mine near Cadillac, Quebec. At December 31, 2012, the Lapa mine was estimated to contain proven and probable mineral reserves of 0.4 million ounces of gold comprised of 2 million tonnes of ore grading 6.0 grams per tonne. The Lapa property is made up of the Tonawanda property, which consists of 44 contiguous mining claims and one provincial mining lease covering an aggregate of 702.4 hectares, and the Zulapa property, which consists of one mining concession of 93.5 hectares. The mining lease at Lapa expires in 2029. Location Map of the Lapa Mine (as at December 31, 2012) The Company's initial interest in the Lapa property was acquired in 2002 through an option agreement with Breakwater Resources Ltd. ("Breakwater"). The Company undertook an aggressive exploration program and discovered a new gold deposit almost 300 metres below the surface. In 2003, the Company purchased the Lapa property from Breakwater for a payment of $8.9 million, a 1% net smelter return royalty on the Tonawanda property and a 0.5% net smelter return royalty on the Zulapa property. In 2008, the Company purchased all royalties from Breakwater for C$6.35 million. In addition, both the Zulapa and Tonawanda properties are subject to a 5% net profit royalty payable to Alfer Inc. and René Amyot. In 34 AGNICO-EAGLE MINES LIMITED Table of Contents 2004, an additional claim of 9.4 hectares was added to the Company's holdings at the Lapa mine. In January 2009, a mining lease covering 66.8 hectares was entered into with the Ministry of Natural Resources (Quebec). The Lapa mine is accessible by provincial highway. The elevation varies between approximately 320 and 390 metres above sea level. All of the Lapa mine's power requirements are supplied by Hydro-Quebec through connections to its main power transmission grid. All of the water required at the Lapa mine is sourced from the Heva river located 3.5 kilometres to the south of the mine. The water is pumped into an existing open pit nearby the property that has been allowed to flood and from which the mine is supplied. The topography slopes relatively gently from north to south. The property is generally covered by a boreal-type forest consisting mainly of black spruce and white pine with minor amounts of birch and poplar. For additional information regarding the Abitibi region in which the Lapa mine is located, see "– Property, Plant and Equipment – LaRonde Mine". Gold production during 2013 at the Lapa mine is expected to be approximately 105,000 ounces at estimated total cash costs per ounce of approximately $787. Mining and Milling Facilities Surface Plan of the Lapa Mine (as at December 31, 2012) The Lapa site hosts an underground mining operation and the ore is trucked to the processing facility at the LaRonde mine, which has been modified to treat the ore, recover the gold and store the residues. Tailings from the Lapa mine are deposited in the tailings pond at the LaRonde mine. 2012 ANNUAL REPORT 35 Table of Contents In July 2004, the Company initiated the sinking of an 825-metre deep shaft at the Lapa property. In April 2006, 2,800 tonnes of development ore was extracted at Lapa and was estimated to contain on average 10.65 grams of gold per tonne. These results and results from other sampling methods were incorporated into a feasibility study and in June 2006, the Company accelerated construction of the Lapa mine. This construction included extending the shaft to a depth of 1,369 metres, which was completed in October 2007. Significant additional construction was required in order for the Lapa mine to achieve commercial production in May 2009, including the construction of the mill. Mining Methods Two underground mining methods are used at the Lapa mine: longitudinal retreat with cemented backfill and locally transverse open stoping with cemented backfill. Sublevels are driven at 30-metre vertical intervals. Stopes are mined in 12-metre sections and backfilled with 100% cemented rock backfill. Excavated ore from the Lapa site is trucked via provincial highway to the processing facility at the LaRonde mine. Surface Facilities The infrastructure on the Lapa property includes the refurbished former LaRonde Shaft #1 headframe and shafthouse, service buildings, offices, a settling pond for waste water, dry facilities, an ore bin, a diesel reservoir and a water treatment plant. In November 2007, lateral development began on three horizons. A backfill plant was commissioned in December 2008 and the sedimentation pond was extended in 2007 to control suspended solids from underground dewatering discharge. Ore at the Lapa mine is processed through grinding, gravity and leaching circuits. Dedicated milling facilities have been integrated into the mill at the LaRonde mine. Based on an average ore head grade of 6.49 grams per tonne, gold recovery averaged 79.7% in 2012. With an average production of 1,750 tonnes per day in 2012, the mine operated consistently above its design rate of 1,500 tonnes per day. Dilution averaged 64% in 2012, a significant improvement over previous years. Mineral Recoveries In 2012, the Lapa mine produced 640,832 tonnes of ore grading 6.49 grams of gold per tonne. The Lapa processing facility treated 640,305 tonnes of ore in 2012 (approximately 1,749 tonnes per day) and operated at about 97.6% of available time. Head Grades Overall Metal Recoveries Payable Production Gold 6.49 g/t 79.7% 106,191 oz Environmental Matters Water used underground at the Lapa mine was initially re-circulated from mine dewatering after settling in the sedimentation pond. The re-circulation led to ammonia concentration in the water, and the Company experienced occasional toxicity problems in the water pond in 2008 and 2009. To address the ammonia content in the water, the Company built a 3.5-kilometre pipeline to obtain fresh water from the Heva River. The pipeline was commissioned in November 2009. The Company also commissioned a water treatment plant on site in the fourth quarter of 2010 to reduce the ammonia from mine dewatering. Output is currently within the target range at approximately eight parts per million of ammonia and average efficiency is at approximately 70%. Optimization of the plant is ongoing. In the second quarter of 2012, an Oberlin filtration unit located inside the treatment plant was installed to improve the removal of suspended solids from water coming from the underground operation. A sedimentation pond also is used to remove suspended solids from the dewatering water before either release to the environment or re-use in the underground mining operation. The waste rock pile naturally drains towards the sedimentation pond. A waste rock sampling program implemented during the shaft sinking phase verified the non-acid generating nature of the waste rock. Water effluent from the sedimentation pond is being sampled as required under the Quebec mining effluent guidelines, and is expected to comply with the water quality criteria. The mill residues will be sent to the LaRonde mine tailings area. 36 AGNICO-EAGLE MINES LIMITED Table of Contents There are no known environmental liabilities associated with the Lapa site. The Certificates of Authorization to proceed with mine production and with mill construction were issued by the Ministry of Sustainable Development, Environment and Parks (Quebec) in October and December 2007, respectively. The Certificate of Authorization for mill and tailings production was received in 2008. Capital Expenditures The Company incurred approximately $18.4 million in capital expenditures at the Lapa mine in 2012 and expects to incur approximately $20.7 million in 2013, including $13.7 million for deferred development, $5.4 million for sustaining capital expenditures (including underground construction and mining equipment) and $1.6 million for exploration. Development In 2012, a total of 6,062 metres of lateral development was completed. Development focused on permanent drifts (ramps and haulage way), stope preparation of mining blocks set for production in 2012 and 2013 and access to the East zone and the Deep Project, which is expected to begin production in 2013. Geology, Mineralization and Exploration Geology The Lapa property is located near the southern boundary of the Archean-age (2.7 billion years old) Abitibi Subprovince and the Pontiac Subprovince within the Superior Province of the Canadian Shield. The most important regional structure is the CLL fault zone marking the contact between the Abitibi and Pontiac Subprovinces. The fault zone passes through the property from west to east, and is marked by schists and mafic to ultramafic volcanic flows that comprise the Piché group (up to approximately 300 metres thick in the mine area). On the Lapa property, the fault zone displays a "Z" shaped fold to which all of the lithologic groups in the region conform. Feldspathic dykes cut the Piché group, especially near the fold. North of the Piché group lies the Cadillac sedimentary group, which consists of 500 metres or more of well-banded wacke, conglomerate and siltstone with intercalations of iron formation. The Pontiac group sedimentary rocks (up to approximately 300 metres thick) that occur to the south of the Piché group are similar to the Cadillac group but do not contain conglomerate nor iron formation. Mineralization All of the known gold mineralization along the CLL fault zone is epigenetic (late) vein type, controlled by the structure. The mineralization is associated with the fault zone and occurs within or immediately adjacent to the Piché group rocks. The Lapa deposit is comprised of the Contact zone and five satellite zones. The Contact zone accounts for approximately 84% of the mineral reserves. The ore zones are made up of multiple quartz veins and veinlets, often smoky and anastomosing, within a sheared and altered envelope containing minor sulphides and visible gold. The Contact zone is generally located at the contact between the Piché group and the Cadillac group. The satellite zones are located within the Piché group at a distance varying from ten to 50 metres from the contact with the Cadillac group, except for the Contact North zone, which is located approximately ten metres north of the Contact zone within the Cadillac group. The sheared envelope consists of millimetre-thick foliation bands of biotite or sericite with silica and, in places, cuts across rock units. Quartz veins and millimetre-sized veinlets parallel to the foliation account for 5% to 25% of the mineralization. Visible gold is common in the veins and veinlets but can also be found in the altered host rock. Sulphides account for 1% to 3% of the mineralization; the most common sulphides, in order of decreasing importance, are arsenopyrite, pyrite, pyrrhotite and stibnite. Graphite is also rarely observed as inclusions in smoky quartz veins. The Contact and satellite zones are tabular mineralized envelopes oriented east-west and dipping very steeply to the north, turning south at depth. The economic portion of the zone has been traced from depths of approximately 450 metres to more than 1,300 metres below surface. The Contact zone has an average strike length of 300 metres, varies in thickness from 2.8 to 5.0 metres and is open at depth. Locally some thicker intervals have been intersected but their continuity has not been demonstrated. The satellite zones have thicknesses similar to the Contact zone. Exploration Two exploration diamond drilling programs were completed at the Lapa mine during 2012. The first program concentrated on confirming and expanding the known orebodies (in the Contact zone and the other satellite zones) in the immediate 2012 ANNUAL REPORT 37 Table of Contents vicinity of the ore zones. The drilling tested the eastern area of the Contact zone reserve from 1,000 metres to 1,500 metres depth below the surface and 300 metres east of the Contact zone reserve limit. The 2013 program will focus on expanding mineral resources in this area. Additional drilling was done below Level 128 (the deepest producing level) targeting the Zulapa corridor, which returned good results and allowed for the identification of new resources. Further drilling will be need to be completed in 2013 to evaluate the economics of this area. The second program was executed from the exploration track drift on Level 101 (one kilometre deep) toward the east and from the newly excavated west exploration track drift on Level 101. This program will continue through 2013. Overall, there was a reduction of approximately 106,000 ounces of gold in reserves at Lapa in 2012 after mining 129,000 ounces of gold. The net reduction of 106,000 ounces in reserves was a result of a lower-than-expected grade from 2012 delineation diamond drilling and a decrease in the mining recovery factor for sill stopes, offset by additional ounces from the deep drilling project. Mineral underground resources at the Lapa mine decreased by 0.8 million tonnes (decrease of 0.4 million tonnes due to conversion of resources below Level 128 of the Contact zone and below Level 113 of the East zone and decrease of 0.4 million tonnes following the re-interpretation of drilling results and new drilling on the Lapa property). Approximately 0.2 million tonnes of inferred resources were added following underground drilling in 2012. Drilling and evaluation will continue in 2013. In 2012, a total of 234 holes were drilled on the Lapa property for a total length of 37,699 metres, compared to 231 holes for a total length of 28,386 metres in 2011. Of the drilling in 2012, 177 holes (11,026 metres) were for production stope delineation and 57 holes (26,672 metres) were for exploration. In 2011, 165 holes (9,257 metres) were for production stope delineation, and 66 holes (19,129 metres) were for exploration. Expenditure on diamond drilling at the Lapa mine during 2012 was approximately $3.0 million, including $0.9 million in definition and delineation drilling expenses charged to operating costs. In 2013, the Company expects to spend $2.6 million on exploration. In 2013, 61% of the exploration drilling budget will be used for exploration in close vicinity of the mine infrastructure and 39% will be used for drilling from the exploration drift. Goldex Mine Project The Goldex mine project, which achieved commercial production in August 2008, is located in the City of Val d'Or, Quebec, approximately 60 kilometres east of the LaRonde mine. On October 19, 2011, the Company suspended mining operations and gold production from the GEZ at Goldex, following the receipt of recommendations from independent consultants to halt underground mining operations during the investigation into geotechnical concerns with the rock above the mining horizon. As a result, the Company wrote off substantially all of its investment in the Goldex mine (approximately $254 million), took a closure provision of approximately $44 million and reclassified all of the remaining 1.6 million ounces of proven and probable gold reserves (approximately 0.9 million ounces of gold in proven reserves (14.8 million tonnes grading 1.87 grams of gold per tonne) and approximately 0.7 million ounces of gold in probable reserves (13.0 million tonnes grading 1.6 grams of gold per tonne) estimated as of December 31, 2010), other than the ore stockpiled on surface, as mineral resources in the third quarter of 2011. The surface stockpile was processed in the Goldex mill by October 30, 2011. In July 2012, the Company approved the development of the M Zone and the E Zone of the Goldex mine project. Production from these zones is expected to be achieved in the second quarter of 2014. Development work is continuing underground on the M and E Zones. Exploration on the D Zone continues with underground diamond drilling. The proven and probable reserves at Goldex as at December 31, 2012 were approximately 0.3 million ounces of gold comprised of 7.0 million tonnes grading 1.55 grams per tonne, all in the M and E Zones. Goldex also had measured and indicated resources of approximately 27.2 million tonnes grading 1.84 grams of gold per tonne, and inferred resources of approximately 34.6 million tonnes grading 1.52 grams of gold per tonne as at December 31, 2012. The Company anticipates that 5,100 tonnes of ore per day grading 1.54 grams per tonne (diluted) will be extracted and processed at the M and E Zones over the next 3.5 years. Commercial production is expected to be achieved during the second quarter of 2014. Total cash costs per ounce are estimated to be approximately $900 in 2013 and estimated 2013 capital expenditures are $70 million. Certain satellite zones at the Goldex mine project are under evaluation to give more flexibility for the operation and/or extend the mine life. 38 AGNICO-EAGLE MINES LIMITED Table of Contents Location Map of the Goldex Mine Project (as at December 31, 2012) The Goldex property is accessible by provincial highway. The elevation is approximately 302 metres above sea level. All of the Goldex mine project's power requirements were supplied by Hydro-Quebec through connections to its main power transmission grid. All of the water that was required at the Goldex mine project was sourced directly by aqueduct from the Thompson River immediately adjacent to the minesite or through recirculation of water from the surface pond and the auxiliary tailings pond. For additional information regarding the Abitibi region in which the Goldex mine project is located, including information with respect to climate, topography, vegetation and mining personnel, see "– Property, Plant and Equipment – LaRonde Mine". The Goldex mine project operates under a mining lease obtained from the Ministry of Natural Resources (Quebec) and under certificates of approval granted by the Ministry of Sustainable Development, Environment and Parks (Quebec). The Goldex property, in which the Company has a 100% working interest, consists of 22 contiguous mining claims and, since April 2006, one provincial mining lease (98.6 hectares), covering an aggregate of 331.2 hectares. The property is made up of three blocks: the Probe block (130.7 hectares); the Dalton block (10.4 hectares); and the Goldex Extension block (190.1 hectares). The claims are renewable every second year upon payment of a small fee. The mining lease expires in 2028 and is automatically renewable for three further ten-year terms upon payment of a small fee. The Company also has one lease covering 418.5 hectares of surface rights that are used for the auxiliary tailings pond. This lease is renewable annually upon payment of a small fee. The Goldex property includes underground operations that can be accessed from two shafts, a processing plant, an ore storage facility and other related facilities. The GEZ, which was the gold deposit on which the Company was focusing its production efforts before production was suspended indefinitely on October 19, 2011, was discovered in 1989 on the Goldex Extension block (although the Company believes a small portion of the GEZ occurs on the Probe block). On November 29, 2012, the Company purchased the 5% net smelter return royalty interest on the Probe block from Probe Mines Limited ("Probe") for cash consideration of C$14 million. Up to an additional C$4 million (in cash or common shares of the Company, at the election of Probe) may become payable by the Company to Probe if certain production 2012 ANNUAL REPORT 39 Table of Contents thresholds are achieved on the Probe block. In 2012, exploration and development work continued on the M Zone and the E Zone. In late 1997, the Company completed a mining study that indicated the deposit was not economically viable to mine at the then-prevailing gold price (approximately $323 per ounce of gold) using the mining approach chosen and drill-hole-indicated grade. The property was placed on care and maintenance and the workings were allowed to flood. In February 2005, a new mineral reserve and resource estimate was completed for the GEZ which, coupled with a feasibility study, led to a probable mineral reserve estimate of 1.6 million ounces of gold contained in 20.1 million tonnes of ore grading 2.54 grams of gold per tonne. The GEZ resource model was revised and, in March 2005, the Company approved a feasibility study and the construction of the Goldex mine. The mine achieved commercial production on August 1, 2008 and consistently operated at or above the designed rate of 6,900 tonnes per day until its operations were suspended in October 2011. Based on the results of a scoping study completed in July 2009, the Company determined to expand the mine and mill operations at Goldex to 8,000 tonnes per day. This project was completed in 2010. Capital costs in connection with the expansion totalled $10 million. The crusher for the expansion was commissioned at the end of the first quarter of 2010 at a rate of 7,811 tonnes per day. The Goldex mine produced 135,478 ounces of gold in 2011 at total cash costs of $472 per ounce. The Goldex mine project is not expected to produce more gold from the GEZ until at least the geotechnical concerns with the rock above the mining horizon are resolved. Mining and Milling Facilities Surface Plan of the Goldex Mine Project (as at December 31, 2012) 40 AGNICO-EAGLE MINES LIMITED Table of Contents At the time the Company commenced construction of the Goldex mine, the surface facilities included a headframe, a hoistroom, a surface building containing a mechanical shop, a warehouse and an office. In addition, the Goldex property had a 790-metre deep shaft (Shaft #1), which provided access to underground workings. Shaft #1 is predominantly used to hoist waste rock from development activities. The sinking of a new production shaft was completed in 2007. This shaft (Shaft #2) is a 5.5-metre diameter shaft with a 50-centimetre thick concrete lining and is used for ventilation as well as hoisting services. Shaft #2 is 865 metres deep and includes five stations. A refurbished friction hoist was installed for production and service duties, and an auxiliary hoist was installed for emergency and personnel service. The production hoist is equipped with one cageskip. Each skip has a 21.5-tonne capacity and the shaft can hoist an average of 7,000 to 8,000 tonnes of ore per day. Mining Methods Prior to the suspension of mining operations on October 19, 2011, the Goldex mine used a high volume bulk mining method, which was made possible through the use of large mining stopes. Drilling and blasting of 165-millimetre production holes was used to obtain a muck size large enough to be economically efficient. Using this method required a percentage of the broken ore to be kept in the stope to reduce the backfilling cost and to reduce sloughing on the walls. Little ore and waste development was necessary to mine out the deposit. The Company expects to mine the M and E Zones using primary and secondary stope methods. The Company also plans to paste fill to ensure long term stability. For both zones, stopes are planned to be 55 metres high. The width and length will depend on rock mass quality, but an average stope should be approximately 100,000 tonnes. Ore pass systems and scoop trams will be used for the M Zone, while trucks and scoop trams are planned for the E Zone. Surface Facilities Plant construction at Goldex commenced in the second quarter of 2006 and was completed in the first quarter of 2008. The plant reached design capacity in the second quarter of 2009. Grinding at the Goldex mill was done through a two-stage circuit comprised of a SAG mill and a ball mill. As part of the expansion project commenced in 2009, a surface crusher was added to reduce the size of ore transferred to the surface from 150 millimetres to 50 millimetres. A lamellar decanter was also added to recover small particles present in the water overflow of the concentrate thickener. The underflow pump of this thickener was upgraded following flotation circuit modification to increase the pull rate of the small particles. Approximately two-thirds of the gold was recovered through a gravity circuit, passed over shaking tables and smelted on site. The remainder of the gold and pyrite was recovered by a flotation process. The concentrate was then thickened and trucked to the mill at the LaRonde mine where it was further treated by cyanidation. Gold recovered was consolidated with precious metals from the LaRonde and Lapa mines. The Company reached an average gold recovery of 93.38% in 2011, prior to the suspension of mining. A new backfill plant is currently under construction at the surface. The plant will fill stope in the M and E Zones. The tailing thickener underflow will feed the backfill plant and two disk filters will increase the density before the continuous mixer. Cement will be added at a ratio of 6% and then sent to the underground mine with a positive displacement pump. The capacity of the paste production is expected to be 5,500 tonnes per day. Following the metallurgical tests that have been performed on the M and E Zones, the results show no significant change on the performance obtained. The only factor that will influence the flotation circuit is the cement present in the backfill stope that will be sloping with the ore as dilution. This will require a pH control (using sulphuric acid), a chemicals reservoir and pumps to be added to the mill. In addition, surface facilities at the Goldex property include an electrical sub-station, a compressor building, a service building for administration and changing rooms, a warehouse building, a concrete headframe above Shaft #2, a hazardous waste storage facility and a dome covering the ore stockpile. 2012 ANNUAL REPORT 41 Table of Contents Mineral Recoveries Prior to the suspension of mining operations on October 19, 2011, the Goldex mill processed approximately 2.48 million tonnes of ore, averaging approximately 8,173 tonnes of ore treated per day and operating at approximately 95% of available time. The following table sets out the metal recoveries at the Goldex mine in 2011. Head Grades Gravity Recovery Flotation-Cyanidation Recovery Global Recovery Payable Production Gold 1.82 g/t 67.76% 25.63% 93.38% 135,478 oz The Company expects that approximately 5,100 tonnes of ore per day will be mined at the M and E Zones. Environmental Matters Environmental permits for the construction and operation of an ore extracting infrastructure at the Goldex mine were received from the Ministry of Sustainable Development, Environment and Parks (Quebec) in October 2005. The permits also covered the construction and operation of a sedimentation pond for mine water treatment and sewage facilities, and these facilities were built at the Goldex mine site. In June 2009, the permits were revised to allow the expansion of the mine and mill operations to 8,500 tonnes per day. In June 2012, environmental permits were received for the construction and operation of a paste backfill plant in connection with the development of the M and E Zones. In November 2006, the Company and the Quebec government signed an agreement permitting the Company to dispose of the Goldex tailings at the Manitou minesite, a tailings site formerly used by an unrelated third party and abandoned to the Quebec government. The Manitou tailings site has issues relating to acid drainage, and the construction of tailings facilities by the Company and the deposit of tailings from the Goldex plant on the Manitou tailings site was accepted by the Ministry of Sustainable Development, Environment and Parks (Quebec) as a valid rehabilitation plan to address the acid generation problem at Manitou. Under the agreement, the Company managed the construction and operation of the tailings facilities and the Quebec government paid all additional costs above the Company's budget for tailings facilities set out in the Goldex feasibility study. The Quebec government retains responsibility for all environmental contamination at the Manitou tailings site and for final closure of the facilities. In addition, the Company built a separate tailings deposit area (auxiliary tailings pond) near the Goldex mine. Environmental permits for the construction and operation of the auxiliary tailings pond were received in March 2007. In 2011, 237,615 tonnes of Goldex tailings were discharged to the auxiliary pond for a total to date of 764,077 tonnes. At the Manitou site, 2.20 million tonnes of Goldex tailings were discharged for a total to date of 8.095 million tonnes. In 2012, no tailings were sent to the auxiliary tailings pond or to the Manitou tailings site. A new dyke was built in the summer of 2011 in the auxiliary tailings pond to create a second polishing basin to reduce total suspended solids in the discharged water during spring time. Construction of this dyke was necessary following a notice of infraction received in 2011 from the Quebec Ministry of Environment for exceeding of the permitted total suspended solids. Following suspension of mining operations at the Goldex property, the mine closure costs were revised to account for the change in conditions at the site. The estimated total for the closure costs of the Goldex mine is approximately $51.4 million, comprised of the following: $1.2 million for demolition, $1 million for engineering, $0.45 million for site preliminary works, $5.4 million for mining site rehabilitation (primarily for backfilling of the zone with high subsidence), $23.2 million for rock grouting and soil improvement, $0.26 million for revegetation of the site, $0.06 million to rehabilitate the sedimentation pond, $0.2 million to rehabilitate the waste rock pile, $1.03 million to rehabilitate the South Tailings basin area, $0.7 million for geotechnical and environmental monitoring, $17.6 million for property purchases and $0.3 million for Baie-Dorée road rehabilitation. In addition, a separate provision of approximately $4.6 million exists for the remaining participation of the Company in the rehabilitation of the Manitou site. In 2011 and 2012, the Company spent $7.7 million and $21.5 million, respectively, on mine closure costs at Goldex. Capital Expenditures As a result of the Goldex mine closure, from January to mid-October 2012, Goldex was considered an exploration project and, accordingly, none of the expenses incurred at Goldex were capitalized. A feasibility study for the M and E Zones was completed in mid-October 2012, which demonstrated the potential for a new mining project at the M and E Zones. 42 AGNICO-EAGLE MINES LIMITED Table of Contents Accordingly, from mid-October until the end of 2012, all expenses were capitalized at Goldex. Total expenditures at Goldex in 2012 were $26.7 million for development of the M and E Zones and $14.3 million for remediation. Capital expenditures of $70 million have been approved to further develop the M Zone and the E Zone in 2013. This amount includes $21 million for the paste plant and $5 million for new mining equipment and infrastructure refurbishing. The sustaining capital for the life of mine is approximately $26 million. Development During 2011, approximately 4,256 metres of lateral and vertical development were completed at a cost of $15.3 million, including development following the suspension of mining operations on October 19, 2011. At the present time, development work continues underground on the M Zone, and exploration continues with diamond drilling. In 2012, 4,534 metres of development were completed at a total cost of $23.7 million to develop the M Zone and the E Zone and for exploration of the D Zone. Development work continues underground on the M and E Zones. A total of 4,800 metres of development at a cost of approximately $23 million is planned for both zones in 2013. In 2014, 4,320 metres will be required to complete the development of the M and E Zones. Geology, Mineralization and Exploration Geology The Goldex property is located near the southern boundary of the Archean-age (2.7 billion years old) Abitibi Subprovince, a typical granite-greenstone terrane located within the Superior Province of the Canadian Shield. The southern contact of the Abitibi Subprovince with the Pontiac Subprovince is marked by the east-southeast trending CLL Fault Zone, the most important regional structural feature. The Goldex deposit is hosted within a quartz diorite sill, the "Goldex Granodiorite", located in a succession of mafic to ultramafic volcanic rocks that are all generally oriented west-northwest. The GEZ extends from 500 to 800 metres below the surface and is entirely hosted by the Goldex Granodiorite. The limits of the zone are defined by the intensity of the quartz vein stockwork envelope and by gold assays. The zone is almost egg-shaped; it is over 300 metres tall by 450 metres long (in a west-northwest direction) and its thickness increases rapidly from 25 metres along the east-west edges to almost 150 metres in the centre. In 2012, exploration efforts at Goldex were focused on the M Zone, E Zone and D Zone. These zones are defined by quartz tourmaline veins and gold assays are similar to the GEZ. The M Zone has been defined as having a length of 160 metres, a height of 120 metres and a thickness of 115 metres. The E Zone is adjacent to the eastern end of the GEZ, and has a length of 150 metres, a height of 150 metres and a thickness of 100 metres. The D Zone is approximately 150 metres below the GEZ and close to 1,500 metres below the surface. It appears to have an approximate length of 500 metres. Mineralization Gold mineralization at Goldex corresponds to the quartz-tourmaline vein deposit type. The Goldex gold-bearing quartz-tourmaline-pyrite veins and veinlets have strong structural control. The most significant structure directly related to mineralization is a discrete shear zone, the Goldex Mylonite, that is up to five metres wide and occurs within the Goldex Granodiorite, just south of the GEZ and north of the M Zone. The quartz-tourmaline-pyrite vein mineralization is controlled by minor fracture zones that are oriented west-northwest and dip steeply north or south. The fractures are parallel to, but north of, the Goldex Mylonite. Within the GEZ and the M and E Zones are three vein sets, the most important of which are extensional-shear veins dipping 30 degrees south and usually less than 10 centimetres thick. The vein sets and associated alteration combine to form stacked envelopes up to 30 metres thick. 2012 ANNUAL REPORT 43 Table of Contents Strong albite-sericite alteration of the host-rock quartz diorite surrounds the quartz-tourmaline-pyrite veins and covers almost 80% of the mineralized zone; outside of the envelopes, prior chlorite alteration affects the quartz diorite and gives it a darker grey-green colour. Occasionally, enclaves of relatively unaltered medium grey-green-coloured quartz diorite (with no veining or gold) are found within the GEZ and the M and E Zones; they are included exceptionally as internal waste to allow for a smooth shape, required for mining purposes. Most of the gold occurs as microscopic particles that are almost always associated with pyrite, generally adjacent to grains and crystals but also 20% included within the pyrite. The gold-bearing pyrite occurs in the quartz-tourmaline veins and in narrow fractures in the sericite-albite-altered quartz diorite (generally immediately adjacent to the veins). Less than 1.5% of the gold occurs as the mineral calaverite, a gold telluride. Exploration Three different zones in the Goldex granodiorite intrusive were drilled in 2012. The main exploration focus was the D Zone, with 41.9 kilometres of drilling (representing approximately 60% of total drilling). 12.7 kilometres (18%) were drilled in the satellite zones above the M Zone and 15.5 kilometres (22%) were drilled in the E Zone sector to the east of the GEZ. In 2012, $14.1 million was spent on exploration at Goldex. A total of 202 holes were drilled using diamond drilling methods for a total length of approximately 70.1 kilometres, compared to 107 holes for a total length of approximately 47 kilometres in 2011. Expenses in 2012 included the extension of the exploration ramp to level 95 and general costs for underground activities (such as electricity and pumping expenses) amounting to approximately $5 million and a study of the D Zone at a cost of $0.32 million. The 2013 exploration program is budgeted to include 21.6 kilometres of diamond drilling at a cost of $3.5 million. The primary target is the upper portion of the D Zone, where 17 kilometres of drilling is planned. An additional 4.6 kilometres of drilling is planned for the satellites zones above the M Zone (M2-M5) and the S Zone. In 2013, a geo-mechanical study relating to mineralized zones is also planned at an expected cost of $0.5 million. Accordingly, the aggregate cost of the 2013 exploration program is expected to be $4 million. Kittila Mine The Kittila mine, which commenced commercial production in May 2009, is located approximately 900 kilometres north of Helsinki and 50 kilometres northeast of the town of Kittila in northern Finland. At December 31, 2012, the Kittila mine was estimated to contain proven and probable mineral reserves of 4.8 million ounces of gold comprised of 33.1 million tonnes of ore grading 4.49 grams per tonne. The Kittila mine is accessible by paved road from the village of Kiistala, which is located on the southern portion of the main claim block. The gold deposit is located near the small village of Rouravaara, approximately ten kilometres north of the village of Kiistala, accessible via a paved road. The property is close to infrastructure, including hydro power, an airport and the town of Kittila. The project also has access to a qualified labour force, including mining and construction contractors. The total landholdings surrounding and including the Kittila mine comprise one mining licence (licence area of 845 hectares and licence extension application area of 288 hectares) and 236 tenements covering approximately 21,212 hectares. The mineral titles form a continuous block around the Kittila mining licence. The block has been divided into the Suurikuusikko area, the Suurikuusikko West area, the Suurikuusikko East area and the Kittila mining licence centred at 25.4110 degrees longitude east and 67.9683 degrees latitude north. The boundary of the mining licence is determined by ground-surveyed points whereas the boundaries of the other tenements are not required to be surveyed. All of the tenements in the Kittila mine are registered in the name of Agnico-Eagle Finland Oy, an indirect, wholly-owned subsidiary of the Company. According to the Finnish government's land tenure records, all tenements are in good standing. The expiry dates of the tenements vary from June 2013 to August 2017. Tenements are initially valid for four years, provided exploration work in the area is reported annually and a small annual fee is paid to maintain title; extensions for titles can be granted for 11 additional years on payment of a slightly higher fee and active exploration in the area. Agnico-Eagle Finland Oy also holds the mining licence in respect of the Kittila mine. The mine is subject to a 2.0% net smelter return royalty payable to the Republic of Finland. The Kittila mine area is sparsely populated and is situated between 200 and 245 metres above sea level. The topography is characterized by low rolling forested hills separated by marshes, lakes and interconnected rivers. The gold deposit is situated on an area of land that has no special use at present and there is sufficient land available for tailings facilities. Water requirements for the Kittila mine are sourced from the nearby Seurujoki River, recirculation of water from pit 44 AGNICO-EAGLE MINES LIMITED Table of Contents dewatering and tailings pond water. The Kittila region is located within the South-West Lapland zone of the northern boreal vegetation zone characterized by spruce forests, marshes and bogs. The mine is located within the Arctic Circle but the climate is moderated by the Gulf Stream off the coast of Norway such that northern Finland's climate is comparable to that of eastern Canada. Winter temperatures range from -10 to -30 degrees Celsius, whereas summer temperatures range from 10 degrees Celsius to the mid-20s. Exploration and mining work can be carried out year-round. Because of its northern latitude, winter days are extremely short with a brief period of 24-hour darkness around the winter solstice. Conversely, summer days are very long with a brief period of 24-hour daylight in early summer around the summer solstice. Annual precipitation varies between five and 50 centimetres, one-third of which falls as snow. Snow accumulation usually begins in November and remains until March or April. Location Map of the Kittila Mine (as at December 31, 2012) The Company acquired its 100%, indirect interest in the Kittila mine through the acquisition of Riddarhyttan completed in November 2005. See "– History and Development of the Company". In June 2006, on the basis of an independently reviewed feasibility study, the Company approved construction of the Kittila mine. Mining at Kittila started initially as open pit mining. This open pit mining was completed in November 2011 and all mining is currently carried out from the underground via ramp access. The initial underground stope was mined in early 2010. Ore is processed in a 3,000-tonne per day surface processing plant that was commissioned in late 2008. Limited gold concentrate production started in September 2008 and gold dore bar production commenced in January 2009. During 2010, throughput at the Kittila mine occurred at design levels and gold recoveries continued to improve. The Kittila mine is anticipated to produce approximately 173,708 ounces of gold in 2013 at estimated total cash costs per ounce of approximately $565. Over the period of 2013 to 2043, total annual average gold production of approximately 141,442 ounces is anticipated. A scoping study is underway to assess the feasibility of significantly increasing the annual gold production. 2012 ANNUAL REPORT 45 Table of Contents Mining and Milling Facilities Surface Plan of the Kittila Mine (as at December 31, 2012) The orebodies at Kittila were mined initially from two open pits, followed by underground operations to mine the deposits at depth. Additional, smaller open pits will be used to mine any remaining mineral reserves close to the surface in the future. Open pit mining started in May 2008 and the extracted ore was stockpiled. As of December 2012, a total of 3.9 million 46 AGNICO-EAGLE MINES LIMITED Table of Contents tonnes of ore have been processed, including ore both from the open pits and underground, 0.46 million tonnes of ore are currently stockpiled and 33.1 million tonnes of waste rock have been excavated. Work on the ramp and other work to access the reserves underground continued throughout 2012. Total underground (lateral and vertical) development at the end of 2012 is approximately 29,000 metres. Underground mining commenced in the fourth quarter of 2010 and, at the end of 2012, a total of 0.93 million tonnes of ore has been mined from the underground portion of the mine. Mining Methods At the Kittila mine, the Suurikuusikko and the Rouravaara orebodies are currently mined by underground mining methods and access to the underground mine is via ramp. Approximately 3,000 tonnes of ore per day are fed to the concentrator. The underground mining method is open stoping with delayed backfill. Stopes are between 25 and 40 metres high and yield approximately 10,000 tonnes of ore per stope. To ensure sufficient ore production is available to supply the mill, over 6,000 metres of tunnels will be developed each year. After extraction, stopes are filled with paste backfill or cemented backfill to enable the safe extraction of ore in adjacent stopes. Ore will be trucked to the surface crusher via the ramp access system. Surface mining finished in 2012; mining stopped at the Rouvaara open pit in April 2012 and mining at the Suurikuusikko pit was completed in early November. Surface Facilities Construction of the processing plant and associated equipment was completed in 2008 and facilities on site include an office building, a maintenance facility for the open pit equipment, a warehouse, a maintenance shop, an oxygen plant, a processing plant, a paste backfill plant, a tank farm, a crusher, conveyor housings and an ore bin. In addition, some temporary structures house contractor offices and work areas. The ore at Kittila is treated by grinding, flotation, pressure oxidation and CIL circuits. Gold is recovered from the carbon in a Zadra elution circuit and is recovered from the solution using electrowinning and then poured into dore bars using an electric induction furnace. Mineral Recoveries In 2012, the Kittila mill processed 1,090,365 million tonnes of ore with an availability of 86% for an average throughput of 2,996 tonnes per day. The following table sets out the gold production at the Kittila mine in 2012: Head Grade Overall Metal Recovery Payable Production Gold 5.68 g/t 88.3% 175,878 oz Ore processing at Kittila consists of two stages. In the first stage, ore is enriched by flotation and in the second stage the gold is extracted by pressure oxidation and cyanide-in-leach processes. Flotation recoveries were very stable and continued to improve during 2012. They averaged 94.8% during the year. Recoveries in the second stage of the process were also very stable and good in 2012, averaging 93.2% over the year. Modifications done in 2012 inside the autoclave resulted in better oxygen distribution and sludge flow resulting in improved recoveries. Test work will continue in 2012 to try to further improve the control of the process. Environmental Matters The Company currently holds a mining licence, an environmental permit and operational permits in respect of the Kittila mine. All permits necessary to begin production were received during 2008. The construction of the first phase of the tailings dam and waterproof bottom layer was completed in the fall of 2008. This first phase is sufficient to hold tailings from three years of production. Work began on the second phase in 2009 and continues according to plans and permit requirements. Water from dewatering the mine and water used in the mine and 2012 ANNUAL REPORT 47 Table of Contents mill is collected and treated by sedimentation. Emissions and environmental impact are monitored in accordance with the comprehensive monitoring program that has been approved by the Finnish environmental authorities. Work on enhancing the scrubbing of mill gases initiated in 2012 was postponed to 2014 due to reviews by authorities of the permit levels. There are no material environmental liabilities related to the Kittila mine. Capital Expenditures Capital expenditures at the Kittila mine during 2012 totaled approximately 59.9 million, which included paste backfill plant construction, mill modification, underground development, exploration and conversion drilling costs within the mining licence area and sustaining capital costs. The Company expects capital expenditures at the Kittila mine to be approximately $49 million in 2013, most of which will be used for mining equipment, development and construction of underground infrastructure and exploration and conversion drilling on the mining licence area. Development Open pit mining was completed at the Roura pit in April 2012 and at the Suurikuusikko pit in November 2012. A total of 492,178 tonnes of ore were mined from the Suurikuusikko pit and 86,130 tonnes of ore were mined from the Roura pit in 2012. In 2012, underground development continued in both the Suurikuusikko and Rouravaara zones. 7,518 metres of ramp and sublevel access development was completed during the year. A total of 118,000 tonnes of ore from development and 523,000 tonnes of stope ore were mined in 2012. The Company expects to complete 8,223 metres of lateral development and 635 metres of vertical development during 2013. Geology, Mineralization and Exploration Geology The Kittila mine is situated within the Kittila Greenstone belt, part of the Lapland Greenstone belt in the Proterozoic-age Svecofennian geologic province. The appearance and geology of the area is similar to that of the Abitibi region of the Canadian Shield. In northern Finland, the bedrock is typically covered by a thin but uniform blanket of unconsolidated glacial till. Bedrock exposures are scarce and irregularly distributed. The mine area is underlain by mafic volcanic and sedimentary rocks metamorphosed to greenschist assemblages and assigned to the Kittila group. The major rock units trend north to north-northeast and are near-vertical. The volcanics are further sub-divided into iron-rich tholeiitic basalts (Kautoselka Formation) located to the west and magnesium-rich tholeiitic basalt, coarse volcaniclastic units, graphitic schist and minor chemical sedimentary rocks (Vesmajarvi Formation) located to the east. The contact between these two rock units consists of a transitional zone (the Porkonen Formation) varying between 50 and 200 metres in thickness. This zone is strongly sheared, brecciated and characterized by intense hydrothermal alteration and gold mineralization, features consistent with major brittle-ductile deformation zones. It includes the north-northeast-oriented Suurikuusikko Trend. Mineralization The Porkonen Formation hosts the Kittila gold deposit, which contains multiple mineralized zones stretching over a strike length of more than 25 kilometres. Most of the work has been focused on the 4.5-kilometre stretch that hosts the known gold reserves and resources. From north to south, the zones are Rimminvuoma ("Rimpi-S"), the deep extension of Rimminvuoma ("Rimpi Deep"), North Rouravaara ("Roura-N"), Central Rouravaara ("Roura-C"), depth extension of Rouravaara and Suurikuusikko ("Suuri/Roura Deep"), Suurikuusikko ("Suuri"), Etela and Ketola. The Suuri and Suuri/Roura Deep zones include several parallel sub-zones that have previously been referred to as Main East, Main Central and Main West. The Suuri zone hosts approximately 26% of the current probable gold reserve estimate on a contained-gold basis, while Suuri Deep has approximately 19%, Roura-C approximately 7%, Roura Deep approximately 22%, Roura-N approximately 1%, Rimpi Deep approximately 19%, Rimpi-S approximately 5%, Ketola approximately 1% and Etela approximately 0.2%. Gold mineralization in these zones is associated with intense hydrothermal alteration (carbonate-albite-sulphide), and is almost exclusively refractory, locked inside fine-grained sulphide minerals: arsenopyrite (approximately 73%) or pyrite (approximately 23%). The rest is "free gold", which is manifested as extremely small grains of gold in pyrite. 48 AGNICO-EAGLE MINES LIMITED Table of Contents Exploration In 1986, the discovery of coarse visible gold in quartz-carbonate veining along a road cut near the village of Kiistala alerted the Geological Survey of Finland ("GTK") to the gold exploration potential of the area. Following this discovery, GTK initiated regional exploration over the area and deployed a wide range of indirect exploration tools to explore this relatively unexplored area. From 1987 to 2005, GTK, and later Riddarhyttan, undertook drilling programs and other testing on the property. After it acquired the property in 1998, Riddarhyttan continued to investigate the metallurgical properties of the refractory gold mineralization with the objective of demonstrating its recoverability and assessing suitable processing scenarios and initiated engineering and environmental studies to assess the feasibility of a mining project. Diamond drilling is used for exploration on the Kittila property. Most of the work on the mining licence area has focused on the Suuri and Roura zones. As of December 31, 2012, a total of 2,625 drill holes, totalling 762,554 metres, have been completed on the property. In 2012, between three and eight drill machines worked on the Kittila property: one to two drills on underground infill drilling; two to six drills on mine exploration; and one to two drills on resource-to-reserve conversion drilling. A total of 330 drill holes were completed for a length of 70,897 metres. Of these drill holes, 232 (21,040 metres) were for definition drilling, 37 (7,959 metres) were for conversion drilling and 61 (41,898 metres) were related to mine exploration. Total expenditures for diamond drilling in 2012 were $16.2 million, including $2.8 million for definition and delineation drilling In 2012, proven and probable gold reserves decreased by 0.4 million ounces to 4.8 million ounces (33.1 million tonnes of ore grading 4.49 grams per tonne). This decrease was primarily due to a combination of the introduction of more stringent criteria for determining the cut-off, a more conservative stope-design and production planning process and higher operating costs. The Rimpi Deep zone was the only zone where reserves increased (+0.9 million ounces) as a result of exploration drilling. Indicated mineral resources decreased by 5.1 million tonnes to 7.9 million tonnes of ore grading 2.65 grams per tonne. Inferred mineral resources increased by 11.0 million tonnes to 19.0 million tonnes of ore grading 3.88 grams per tonne. A successful deep drilling program in 2012 at the Rimpi Deep zone, which is located immediately below the Rimpi-S zone, has converted a large amount of inferred resources into probable reserves in this area. The gold mineralization in Rimpi Deep is still open at depth and to the north. A resource-to-reserve conversion drilling campaign was carried out at Suuri, Roura and Rimpi-S in 2012, which did not increase reserves significantly. Outside of the Kittila mining licence area, systematic diamond drilling and target focused ground geophysics continued along the Suurikuusikko Trend, and a number of new targets were tested by diamond drilling. Encouraging results were obtained from new gold zones in the Kuotko West area located approximately 10 kilometres north of the Kittila mine site. A total of 44 diamond drill holes totalling 15,436 metres were drilled on exploration targets outside of the mining licence area in 2012. The 2013 exploration budget for the Kittila mine is approximately $7.4 million ($6.2 million for minesite exploration and $1.2 million for resource-to-reserve conversion) and includes over 24,600 metres in diamond drilling (16,200 metres for minesite exploration and 8,400 metres for resource-to-reserve conversion), using up to four drills throughout the year to help further identify the gold reserve and resource potential of the Kittila property. In addition, $2.6 million of exploration expenditures, including an estimated 11,000 metres of diamond drilling, is planned for exploration along the 25-kilometre Suurikuusikko Trend in 2013. 2012 ANNUAL REPORT 49 Table of Contents Pinos Altos Mine The Pinos Altos mine achieved commercial production in November 2009. It is located on an 11,000-hectare property in the Sierra Madre gold belt, 285 kilometres west of the City of Chihuahua in the State of Chihuahua in northern Mexico. At December 31, 2012, the Pinos Altos mine, including the Creston Mascota deposit, was estimated to contain proven and probable mineral reserves of 2.7 million ounces of gold and 74.4 million ounces of silver comprised of 38.1 million tonnes of ore grading 2.21 grams of gold per tonne and 60.71 grams of silver per tonne. The Pinos Altos property is made up of two blocks: the Agnico Eagle Mexico Concessions (22 concessions, 26,810.2 hectares), and the Pinos Altos Concessions (18 concessions, 5,053.1 hectares). Location Map of the Pinos Altos Mine (as at December 31, 2012) Approximately 74% of the current Pinos Altos mineral reserves and resources are subject to a net smelter royalty of 3.5% payable to Pinos Altos Explotación y Exploración S.A. de C.V. ("PAEyE") and the remaining 26% of the current mineral reserves and resources at Pinos Altos are subject to a 2.5% net smelter return royalty payable to the Consejo de Recursos Minerales, a Mexican Federal Government agency. After 2029, this portion of the property will also be subject to a 3.5% net smelter return royalty payable to PAEyE. The assets acquired by the Company from PAEyE in 2006 included the right to use up to 400 hectares of land for mining installations for a period of 20 years after formal mining operations have been initiated. The Company also obtained sole ownership of the Agnico Eagle Mexico Concessions previously owned by Compania Minera La Parreña S.A. de C.V. During 2008, the Company and PAEyE entered into an agreement under which the Company acquired further surface rights for open pit mining operations and additional facilities. Infrastructure payments, surface rights payments and advance royalty payments totalling $35.5 million were made to PAEyE in 2009 as a result of this agreement. In 2006, the Company concluded negotiations with communal land owners (ejidos) and others for the purchase of 5,745 hectares of land contained within the Agnico Eagle Mexico and Pinos Altos Concessions. In addition, a temporary occupation agreement with a 30-year term expiring in 2036 was negotiated with ejido Jesus del Monte for 1,470 hectares of land covered by these same concession blocks. The acquisition of these surface rights for the geologically prospective lands within the district surrounding the Pinos Altos property will facilitate future exploration and mining development in these areas. 50 AGNICO-EAGLE MINES LIMITED Table of Contents The Pinos Altos mine is directly accessible by a paved interstate highway that links the cities of Chihuahua and Hermosillo and is connected to a state power grid that is within ten kilometres of the Pinos Altos property. The Company anticipates existing and planned underground mine workings will intercept water resources sufficient to sustain the requirements for future operation. The land position is sufficient for construction of all planned surface, infrastructure and mining facilities at the Pinos Altos mine, including its tailings impoundment area. The Company further believes that a sufficient local and trained workforce is available in northern Mexico to continue to support the operation of the mine. The Pinos Altos property is characterized by moderate to rough terrain with mixed forest (pine and oak) and altitudes that vary from 1,770 metres to 2,490 metres above sea level. The climate is sub-humid, with about one metre of annual precipitation. The average annual temperature is 18.3 degrees Celsius. Exploration and mining work can be carried out year-round. In August 2007, on the basis of an independently reviewed feasibility study, the Company approved construction of a mine at Pinos Altos. The mine achieved commercial production in November 2009. Combined production from the Pinos Altos mine and the nearby Creston Mascota deposit was 234,837 payable ounces of gold and 2,312,013 payable ounces of silver in 2012 at total cash costs per ounce of gold of $286. In 2013, combined gold production from the Pinos Altos mine and the Creston Mascota deposit is expected to be approximately 191,000 ounces and silver production is expected to be approximately 2,263,841 ounces. Total cash costs per ounce of gold are forecast at approximately $300. Under the current mine plan, from 2013 to 2029, combined gold production from the Pinos Altos mine, including the Creston Mascota deposit, is expected to average approximately 154,000 ounces of gold per year. Based on a feasibility study prepared in 2009, the Company decided to build a stand-alone heap leach operation at the satellite open pit Creston Mascota deposit. Creston Mascota is expected to produce approximately 51,489 ounces of gold per year during the next five years (2013-2017). Capital costs in connection with the project were approximately $65 million. The first gold pour from the Creston Mascota deposit occurred on December 28, 2010 and commercial production from the Creston Mascota deposit was achieved in the first quarter of 2011. On September 30, 2012, a movement of ore material was detected on the lower levels of the Creston Mascota leach pad (Phase 1). As a result of this movement, leaching operations were temporarily suspended at Creston Mascota until the upper level of the leach pad (Phase 2) could be prepared as an isolated containment area. These modifications are expected to be completed in early 2013 and resumption of leaching operations is expected during the second quarter of 2013. The Company continues to evaluate opportunities to develop other mineral resources that have been identified in the Pinos Altos area as satellite operations. The Company has engaged the local communities in the project area with hiring, local contracts, education support and medical support programs to ensure that the project provides long-term benefits to the residents living and working in the region. Approximately 70% of the operating workforce at Pinos Altos are locally hired and 100% of the permanent workforce at the Company operations in Mexico are Mexican nationals. 2012 ANNUAL REPORT 51 Table of Contents Mining and Milling Facilities Surface Plan of the Pinos Altos Mine (as at December 31, 2012) 52 AGNICO-EAGLE MINES LIMITED Table of Contents Surface Plan of the Creston Mascota Deposit (as at December 31, 2012) Milling operations during 2012 at Pinos Altos averaged 5,020 tonnes processed per day as compared to the design expectation of 4,000 tonnes per day. The underground mine at Pinos Altos produced an average 3,193 tonnes of ore per day as compared to the design expectation of 3,000 tonnes per day. The open pit mines at Pinos Altos and the Creston Mascota deposit produced 23,465,263 tonnes of ore, overburden and waste in 2012, which met the expectation of the mine plan for the year. Mining Methods The surface operations at the Pinos Altos mine use traditional open pit mining techniques with bench heights of seven metres and double benches on the footwall and single benching on the hanging wall. Mining is accomplished with front end loaders, trucks, track drills and various support equipment. Based upon geotechnical evaluations, the final pit slopes will vary between 45 degrees and 50 degrees. Performance at the open pit mining operation at Pinos Altos during 2012 continues to indicate that the equipment, mining methods and personnel selected for the project are satisfactory for future production phases. 16,007,364 tonnes of ore, overburden and waste were mined during 2012, exceeding the expected production for the year by 2%. The underground mine, which commenced operations in the second quarter of 2010, uses the long hole sublevel stoping method to extract the ore. The Company has considerable expertise with this mining method, having used the same method at the LaRonde mine in Quebec. This method has also been used at various other Mexican mining operations. The stope height is planned at 30 metres and the stope width at 15 metres. Ore is hauled to the surface utilizing underground trucks via a ramp system. The paste backfill system and ventilation system were commissioned in the fourth quarter of 2012 ANNUAL REPORT 53 Table of Contents 2010 and are now fully operational. During 2012, approximately 1,155,200 tonnes of ore were produced from the underground portion of the mine, averaging 3,164 tonnes per day. Currently, the full capacity of the underground mine is 3,000 tonnes of ore per day. However, construction of a shaft hoisting facility to increase the mining capacity to 4,500 tonnes of ore per day was initiated in 2012, with completion of this project expected in 2016. The shaft hoisting capacity will reduce the number of underground trucks required and will continue to maintain mill feed rates at 4,500 tonnes per day in future years as the open pit mines at Pinos Altos become depleted. Approximately 30 kilometres of total lateral development have been completed as of December 31, 2012. Surface Facilities The principal mineral processing facilities at the Pinos Altos mine are designed to process 4,000 tonnes of ore per day in a conventional process plant circuit which includes single stage crushing, grinding in a SAG and ball mill in closed loop, gravity separation followed by agitated leaching, counter current decantation and metals recovery in the Merrill-Crowe process. Tailings are detoxified and filtered and then used for paste backfill in the underground mine or deposited as dry tailings in an engineered tailings impoundment area. The Pinos Altos mill processed an average of 5,033 tonnes of ore per day during 2012. Low grade ore at Pinos Altos is processed in a heap leach system designed to accommodate approximately five million tonnes of mineralized material over the life of the project. The production from heap leach operations is expected to be relatively minor, contributing about 5% of total metal production planned for the life of the mine. As noted above, a separate heap leach operation and ancillary support facilities were built at the Creston Mascota deposit, which is designed to process approximately 4,000 tonnes of ore per day in a three stage crushing, agglomeration and heap leach circuit with carbon adsorption. This project began commissioning in the latter part of 2010, with commercial production achieved in the first quarter of 2011. During 2012, a total of 1,397,599 tonnes of ore were produced at the Creston Mascota deposit, averaging 3,819 tonnes per day. Based on early performance of the mine and process facilities at the Creston Mascota deposit, the equipment, mining methods and personnel are satisfactory for completion of the planned production phases. The Creston Mascota deposit is expected to produce approximately 53,000 ounces of gold per year during the six-year remaining projected mine life (2013-2018). Surface facilities at the Pinos Altos mine include: a heap leach pad, pond, liner and pumping system; administrative support offices and change room facilities; camp facilities; a laboratory; a process plant shop; a maintenance shop; a generated power station; surface power transmission lines and substations; the engineered tailings management system; and a warehouse. Over the life of the mine, recoveries of gold and silver in the milling circuit at Pinos Altos (other than from the Creston Mascota deposit) are expected to average approximately 93% and 48%, respectively. The Company anticipates precious metals recovery from low grade ore processed in the Pinos Altos heap leach facility will average about 68% for gold and 12% for silver. Heap leach recoveries for Creston Mascota ore are expected to average 71% for gold and 16% for silver. Mineral Recoveries During 2012, the Pinos Altos mill processed 1,837,333 tonnes of ore, averaging approximately 5,020 tonnes of ore treated per day and operating at approximately 90.6% of available time. The following table sets out the metal recoveries at the Pinos Altos mill in 2012. Head Grade Overall Metal Recovery Payable Production Gold 2.974 g/t 94.0% 165,056 oz Silver 82.29 g/t 44.0% 2,124,334 oz An additional 1,024,976 tonnes of ore were processed and placed on the heap leach pad at Pinos Altos in 2012, with an average grade of 0.74 grams of gold per tonne and 24.8 grams of silver per tonne. Cumulative metals recovery on the heap leach pad at Pinos Altos are 64.14% gold and 11.99% silver. Heap leach recovery is following the expected cumulative recovery curve and it is anticipated that the ultimate recovery of 68% for gold and 12% for silver will be achieved when leaching is completed. 54 AGNICO-EAGLE MINES LIMITED Table of Contents An additional 1,532,364 tonnes of ore were processed and placed on the heap leach pad at the Creston Mascota deposit in 2012, with an average grade of 1.74 grams of gold per tonne and 14.77 grams of silver per tonne. Cumulative metals recovery on the heap leach pad at the Creston Mascota deposit are 54% gold and 7.61% silver. Heap leach recovery is following the expected cumulative recovery curve and it is anticipated that the ultimate recovery of 71% for gold and 16% for silver will be achieved when leaching is completed. Total metal production (from mill and heap leach) at Pinos Altos, including the Creston Mascota deposit, during 2012 was 234,837 payable ounces of gold and 2,312,013 payable ounces of silver. Environmental Matters The Pinos Altos mine has received the necessary permit authorizations for construction and operation of a mine, including a Change of Land Use permit and an Environmental Impact Study approval from the Mexican environmental agency ("SEMARNAT"). As of December 31, 2012, all permits necessary for the operation of the Pinos Altos mine, including the operations at the Creston Mascota deposit, had been received. Pinos Altos uses the dry stack tailings technology to minimize the geotechnical and environmental risk that can be associated with the rainfall intensities and topographic relief in the Sierra Madre region of Mexico. All of the Mexican environmental regulatory requirements are expected to be met or exceeded by the Pinos Altos mine (including operations at the Creston Mascota deposit). Operations at Pinos Altos and the Creston Mascota deposit were deemed to qualify for the "Industria Limpia" (clean industry) designation by SEMARNAT in 2012. Capital Expenditures Capital expenditures at the Pinos Altos mine during 2012 were approximately $25.2 million. Capital expenditures at the Creston Mascota deposit during 2012 were approximately $2.0 million. The Company expects sustaining and deferred capital expenditures at Pinos Altos to be approximately $62 million in 2013 with average sustaining and deferred capital of approximately $18 million per year for a projected mine life of approximately 17 years. Approximately $13 million in development capital is forecast at the Creston Mascota deposit in 2013, with sustaining capital expenditures of $5.4 million during its remaining six-year mine life. Development As of December 31, 2012, for the mine life to date, more than 92.7 million tonnes of ore, overburden and waste had been removed from the open pit mine at Pinos Altos and more than 30 kilometres of lateral development had been completed in the underground mine. At the Creston Mascota deposit, approximately 18.0 million tonnes of ore, overburden, and waste had been removed from the open pit mine as of December 31, 2012. Geology, Mineralization and Exploration Geology The Pinos Altos mine is in the northern part of the Sierra Madre geologic province, on the northeast margin of the Ocampo Caldera, which hosts many epithermal gold and silver occurrences including the nearby Ocampo mining operation and Moris mine. The property is underlain by Tertiary-age (less than 45 million years old) volcanic and intrusive rocks that have been disturbed by faulting. The volcanic rocks belong to the lower volcanic complex and the discordantly-overlying upper volcanic supergroup. The lower volcanic complex is represented on the property by the Navosaigame conglomerates (including thinly-bedded sandstone and siltstone) and the El Madrono volcanics (felsic tuffs and lavas intercalated with rhyolitic tuffs, sandy volcanoclastics and sediments). The upper volcanic group is made up of the Victoria ignimbrites (explosive felsic volcanics), the Frijolar andesites (massive to flow-banded, porphyritic flows) and the Buenavista ignimbrites (dacitic to rhyolitic pyroclastics). Intermediate and felsic dykes as well as rhyolitic domes intrude all of these units. The Santo Nino andesite is a dyke that intrudes along the Santo Nino fault zone. Structure on the property is dominated by a 10-kilometre by 3-kilometre horst, a fault-uplifted block structure oriented west-northwest, that is bounded on the south by the south-dipping Santo Nino fault and on the north by the north-dipping Reyna de Plata fault. Quartz-gold vein deposits are emplaced along these faults and along transfer faults that splay from the Santo Nino fault. 2012 ANNUAL REPORT 55 Table of Contents Mineralization Gold and silver mineralization at the Pinos Altos mine consists of low sulphidation epithermal type hydrothermal veins and breccias. The Santo Nino structure outcrops over a distance of roughly six kilometres. It strikes at 060 degrees azimuth on its eastern portion and turns to strike roughly 090 degrees azimuth on its western fringe. The structure dips at 70 degrees towards the south. The four mineralized sectors hosted by the Santo Nino structure consist of discontinuous quartz rich lenses named from east to west: El Apache, Oberon de Weber, Santo Nino and Cerro Colorado. The El Apache lens is the most weakly mineralized. The area hosts a weakly developed white quartz dominated breccia. Gold values are low and erratic over its roughly 750 metre strike length. Past drilling suggests that this zone is of limited extent at depth. The Oberon de Weber lens has been followed on surface and by diamond drilling over an extent of roughly 500 metres. Shallow holes drilled by the Company show good continuity both in grade and thickness over roughly 550 metres. From previous drilling done by Penoles, continuity at depth appears to be erratic with a weakly defined western rake. The Santo Nino lens is the most vertically extensive of these lenses. It has been traced to a depth of approximately 750 metres below surface. The vein is followed on surface over a distance of 550 metres and discontinuously up to 650 metres. Beyond its western and eastern extents, the Santo Nino andesite is massive and only weakly altered. Gold grades found are systematically associated with green quartz brecciated andesite. The Cerro Colorado lens is structurally more complex than the three described above. Near the surface, it is marked by a complex superposition of brittle faults with mineralized zones which are difficult to correlate from hole to hole. Its relation to the Santo Nino fault zone is not clearly defined. Two deeper holes drilled by the Company suggest better grade continuity is possible at depth. The San Eligio zone is located approximately 250 metres north of Santo Nino. The host rock is brecciated Victoria Ignimbrite, occasionally with stockworks. There is no andesite in this sector. Unlike the other lenses, the San Eligio lens dips towards the north. The lateral extent seems to be continuous for 950 metres. Its average width is five metres and never exceeds 15 metres. Surface mapping and prospecting has suggested good potential for additional mineralization on strike and at depths below 150 metres. Visible gold has been seen in the drill core. Several other promising zones are associated with the horst feature in the northwest part of the property. The Creston Mascota deposit is 7 kilometres northwest of the Santo Nino deposit, and is similar, but dips shallowly to the west. The Creston Mascota deposit is about 1,000 metres long and 4 to 40 metres wide, and extends from surface to more than 200 metres depth. Ore production from the Creston Mascota deposit began in July 2010, with the first gold poured in December 2010 and commercial productions commencing in February 2011. Exploration In 2012, minesite exploration activities were primarily focused on definition and delineation of the resources at Santo Nino, Oberon de Weber, San Eligio and Creston Mascota. A total of 25.9 kilometres of minesite exploration drilling, 17.9 kilometres of definition drilling and 8 kilometres of delineation drilling were completed during the year. Regional exploration in 2012 focused on the Penasco Blanco, Veta Escalon, Veta Colorada and Veta Flor prospects. Diamond drilling consisted of 5.7 kilometres. More than 23,800 core samples and 5,220 rock samples were sent to a certified laboratory and assayed mainly for gold and silver. The Cubiro mineralization is two kilometres west of the Creston Mascota deposit. Cubiro is a surface deposit that strikes northwest, has a steep dip and has been followed along strike for approximately 850 metres. Drilling has intersected significant gold and silver mineralization up to 30 metres wide. The Cubiro deposit is split by a fault that caused 200 metres of displacement to the west, which has been traced by drilling. The zone is still open to the southeast and possibly at depth. The Sinter zone is 1,500 metres north-northeast of the Santo Nino zone and is part of the Reyna de Plata gold structure. The steeply dipping mineralization is four to 35 metres wide and almost 900 metres long, with over 350 metres of vertical depth. Sinter is being evaluated for its open pit mining and heap leach potential. 56 AGNICO-EAGLE MINES LIMITED Table of Contents Other identified mineral resources in the Pinos Altos region include the Bravo and Carola zones adjacent to the Creston Mascota deposit and the Reyna de la Plata prospect further to the east. Exploration efforts will be allocated to these zones as the development continues at Pinos Altos and the Creston Mascota deposit. In 2013, the Company expects to spend approximately $6.5 million on exploration at the Pinos Altos mine, including $3.5 million on 14,000 metres of conversion drilling and $3.0 million on 12,000 metres of exploration drilling. La India Mine Project Construction began at La India in September 2012 and commercial production is anticipated for the second quarter of 2014, three months ahead of the original plan. On average, the La India mine is expected to produce approximately 90,000 ounces of gold annually at total cash costs per ounce of approximately $500 over a mine life of approximately nine years. At December 31, 2012, the La India mine was estimated to contain proven and probable mineral reserves of 0.8 million ounces of gold comprised of 33.5 million tonnes of ore grading 0.72 grams per tonne. The La India property consists of 43 mining concessions totalling approximately 56,000 hectares in the Mulatos Gold Belt. The La India mine project includes the Tarachi deposit and several other prospective targets in the belt. At Tarachi, indicated resources are 34.5 million tonnes grading 0.41 grams of gold per tonne and inferred resources are 72.0 million tonnes grading 0.38 grams of gold per tonne. A metallurgical testing program on Tarachi composite samples has been initiated. Location Map of the La India Mine Project (as at December 31, 2012) The Mulatos Gold Belt is part of the Sierra Madre gold and silver belt that also hosts the operating Mulatos gold mine immediately southeast of the La India property and the Pinos Altos mine and the Creston Mascota deposit 70 kilometres to the southeast. 2012 ANNUAL REPORT 57 Table of Contents The La India mine project is located in the municipality of Sahuaripa, southeastern Sonora State, between the small rural towns of Tarachi and Matarachi, which offer basic infrastructure in the form of roads, rural telephone service, small grocery stores and unpaved air strips. More services are available in the town of Sahuaripa located 60 kilometres by gravel road (approximately 2.5 hours) northwest of the La India mine project. The population of the district is estimated to be a few thousand, with most of the inhabitants involved in cattle ranching, farming, forestry and mining and exploration. An adequate supply of labour for mining operations can be drawn from the region. Trained exploration personnel for the La India mine project are mainly sourced from northern Mexico including Hermosillo, Sonora. The closest major city with an international airport is Hermosillo, the capital of Sonora, located 210 kilometres west-northwest of the La India mine project. Road travel from Hermosillo to the site takes approximately seven hours. Alternatively, the project can be accessed by small aircraft. The Company anticipates that the power supply at the La India project will be provided by diesel generators. The Company acquired the La India property in November 2011 as part of its acquisition of Grayd. Grayd had explored the property since 2004 and had prepared a preliminary economic assessment of the La India project in December 2010 based on a June 2010 NI 43-101-compliant resource estimate. Infill drilling at La India from November 2011 to May 2012 allowed the Company to confirm and expand the mineral resources reported in the December 2010 preliminary economic assessment. On August 31, 2012, the Company completed a feasibility study for the construction of a multi-pit mine and heap leach operation on the La India deposit. Engineering studies and operating and capital cost estimates were developed to exploit only the oxide mineralization at La India; there is no plan to mine sulphide minerals. Metallurgical test results indicate an overall gold recovery of 80%. Total cash costs are expected to be $497 per ounce of gold produced net of by-product silver credits. The pre-production capital cost is estimated at $157.6 million and the life of mine capital cost is expected to total $183.4 million. As of December 31, 2012, the environmental permits required for construction of the mine had been obtained and the following advances had been achieved: •construction camp was completed and contractors began construction of the sites for the crusher, leach pad/pond facilities, process plant, truck shop, warehouse, office and permanent camp facilities; •surface water rights were obtained to enable project water requirements to be secured through the construction of rain catchment ponds close to the project; •permission was obtained to use the airstrip in the town of Tarachi (20 kilometres from the project site) to improve access to the project; and •the initial ramp-up of operating personnel and equipment. The climate at La India is semi-arid with seasonal temperatures ranging from 35 degrees celsius to – 2 degrees celsius, and torrential rainfall from July to September. Exploration activities may be conducted year-round. At the Tarachi deposit, the surface rights in the project area are owned by the Matarachi Ejido (agrarian community) and private parties. All measured, indicated and inferred project resources lie within privately owned or ejido possessed land. Surface access lease agreements have been executed with the property owners or possessors for all identified target areas. The existing agreements permit exploration activities only; if mining activity is contemplated in this exploration area the Company will require further negotiations to acquire the surface rights needed for project development. Mining and Milling Facilities Mining Methods Operations at the La India mine will use traditional open pit mining techniques with bench heights of six metres with front end loaders, trucks, track drills and various support equipment. Based upon geotechnical evaluations, the final pit slopes will vary between 45 degrees and 50 degrees. Surface Facilities Current facilities at the La India mine project include an exploration camp and a construction camp. The power for the camps is supplied by diesel generators and water is supplied by a local spring and septic discharges are managed in their respective leach fields. Non-organic waste from the camp is disposed in the Matarachi Ejido landfill. Construction of the mine began September 2012 and commercial production is expected the second quarter of 2014. The following surface plan details the ultimate mine layout showing ultimate pits and waste rock dump locations, roads, the leach pad and other infrastructure. 58 AGNICO-EAGLE MINES LIMITED Table of Contents Surface Plan of the La India Mine Project (as at December 31, 2012) 2012 ANNUAL REPORT 59 Table of Contents Surface facilities at the La India mine project include: a three-stage ore crushing facility; a 50 million tonne capacity lined heap leach pad with process ponds and pumping system; a carbon adsorption plant; a laboratory; a process plant shop; a mining equipment maintenance shop; a generated power station; surface power transmission lines and substations; a warehouse; administrative support offices; and camp facilities. Environmental Matters Baseline environmental information has been collected at the La India mine project since late 2008. This information includes surface water sampling, archeological assessment and soil, fauna and flora assessments. The La India mine project is not located in an area with a special federal environmental protection designation. Both the Manifesto de Impacto Ambiental (an environmental impact statement) and Cambio de Uso de Suelo (a land use change permit) required for project development were granted by the authorities in 2012 once all the prerequisites were provided by the Company. Some historic mining has been observed in the area but the remaining waste dumps and tailings are small and are not considered to present significant environmental issues. Capital Expenditures Pre-production capital cost at La India is estimated at $157.6 million and the life of mine capital cost is expected to amount to $183.4 million. Capital expenditures at the La India mine project during 2012 were approximately $39.2 million and the Company expects capital expenditures to be approximately $92 million in 2013. Development Mining at La India is scheduled to begin in late 2013 and early 2014 to achieve commercial production in the second quarter of 2014. Agreements & Licences The mining concessions for the La India mine project and Tarachi are controlled by the Company by means of direct ownership and by 11 separate agreements whereby Agnico-Eagle can earn a 100% interest in certain concessions by making cash and share payments. Payment has been made in full for the claims that host most of the measured, indicated and inferred resources. Some concessions are subject to underlying net smelter royalties varying between 1% and 3%, some of which may be purchased by the Company which would result in net smelter royalties of up to 0.5% remaining. For the Tarachi deposit, payments totalling $3.3 million and shares with value equivalent to $967,500 over an eight year period are required for the Company to earn a 100% interest in the relevant concessions. To date, $1 million has been paid toward these concessions. Some concessions are subject to underlying net smelter royalties varying between 1% and 3%, some of which may be purchased by the Company, which would result in net smelter royalties of up to 0.5% remaining. The defined mineral reserve and resource and all lands required for infrastructure for the La India mine project are wholly-contained within three privately-held properties which Agnico-Eagle has acquired in order to permit exploration, construction and mine development activities. At the Tarachi deposit, the surface rights in the project area are owned by the Matarachi Ejido and private parties. All measured, indicated and inferred project resources lie within privately owned or ejido possessed land. Surface access lease agreements have been executed with the property owners or possessors for all identified target areas. The existing agreements permit exploration activities only, further negotiation would be required for any future mine development at the Tarachi deposit. Geology, Mineralization and Exploration Geology and Mineralization The La India mine project lies within the Sierra Madre Occidental ("SMO") province, an extensive Eocene to Miocene volcanic field from the United States-Mexico border to central Mexico. The La India mine project lies within the western limits of the SMO in an area dominated by outcrops of andesite and dacitic tuffs, overlain by rhyolites and rhyolitic tuffs that were affected by large-scale north-northwest-striking normal faults and intruded by granodiorite and diorite stocks. Incised fluvial canyons cut the uppermost strata and expose the Lower Series volcanic strata. 60 AGNICO-EAGLE MINES LIMITED Table of Contents The project area is predominantly underlain by a volcanic sequence comprised of andesitic and felsic extrusive volcanic strata with interbedded epiclastic volcaniclastic strata of similar composition. The mineral occurrences present in the project area, and the deposit type being sought, are volcanic-hosted epithermal, high-sulphidation gold-silver deposits. Such deposits may be present as veins and/or disseminated deposits. The La India mine project deposit area is one of several high-sulphidation epithermal mineralization centres recognized in the region. Epithermal high-sulphidation mineralization at the La India mine project developed as a cluster of gold zones (Main and North) aligned north-south within a genetically related zone of hydrothermal alteration in excess of 20 square kilometres in area. Gold mineralization is confined to the Late Eocene rocks within zones of intermediate and advanced argillitic alteration originally containing sulphides, and subsequently oxidized by supergene processes. The North and Main zones are within two kilometres of each other. Surface outcrop mapping and drill-hole data so far indicate that the gold system at the Tarachi deposit is likely best classified as a gold porphyry deposit. Exploration Gold was discovered at the Mulatos deposit by the Spanish colonials in 1806, but indigenous peoples likely exploited the native-gold-bearing oxidized zone of the deposit prior to this. Small underground mines and prospects are present throughout the La Cruz and La Viruela areas, where modern exploration was conducted by New Golden Sceptre Minerals Ltd. and New Goliath Minerals Ltd. (late 1980s), Noranda Inc. (early 1990s) and San Fernando Mining Co. Ltd. (from 1993). Grayd began to actively explore the project in 2004, including geologic mapping, geochemical rock chip sampling, airborne and ground geophysical surveys, photogrammetric topographic mapping, diamond drilling, reverse circulation drilling, baseline environmental studies and metallurgical testing. Newmont Mining Corp. funded the work between July 2005 and July 2006 and then declined to continue, retaining no interest in the property. The Tarachi deposit, located approximately 10 kilometres north of the La India mine project on the same property, was discovered in 2010. From 2004 through February 7, 2011, Grayd completed 129 diamond drill holes (13,834 metres) and 560 reverse circulation drill holes (49,552 metres) at the La India mine project. In 2011, 13 diamond drill holes (1,119 metres) and 30 reverse circulation drill holes (2,728 metres) were drilled at the La India mine project and 25 diamond drill holes (5,400 metres) and 67 reverse circulation drill holes (16,144 metres) were drilled at the Tarachi deposit. The Company expects to spend approximately $2.0 million on exploration at the La India mine project in 2013, which will include drilling the underlying sulphide extensions and the Viruela and Cerro de Oro areas. From the acquisition of Grayd in November 2011 until December 31, 2012, the Company completed 246 diamond drill holes (19,268 metres) and 108 reverse circulation drill holes (10,460 metres) at the La India mine project, and 42 diamond drill holes (11,190 metres) and 25 reverse circulation drill holes (7,170 metres) at the Tarachi deposit. The Company expects to spend approximately $6.0 million on exploration at the Tarachi deposit in 2013. Meadowbank Mine The Meadowbank mine, which achieved commercial production in March 2010, is located in the Third Portage Lake area in the Kivalliq District of Nunavut in northern Canada, approximately 70 kilometres north of Baker Lake. At December 31, 2012, the Meadowbank mine was estimated to contain proven and probable mineral reserves of 2.3 million ounces of gold comprised of 25.3 million tonnes of ore grading 2.82 grams of gold per tonne. The Company acquired its 100% interest in the Meadowbank mine in 2007 as the result of the acquisition of Cumberland (see "– History and Development of the Company"). The fresh water required for domestic camp use, mining and milling is obtained from the intake barge at Third Portage Lake. Power is supplied by a 29-megawatt diesel electric power generation plant with heat recovery. 2012 ANNUAL REPORT 61 Table of Contents Location Map of the Meadowbank Mine (as at December 31, 2012) The Meadowbank mine is held under ten Crown mining leases, three exploration concessions and 40 Crown mineral claims. The Crown mining leases, which cover the Portage, Goose and Goose South deposits, are administered under federal legislation. The mining leases, which have renewable ten-year terms, have no annual work commitments but are subject to annual rent fees that vary according to their renewal date. The mining leases cover approximately 7,400 hectares and expire in either 2016 or 2019. The production lease with the KIA is a surface lease covering 1,354 hectares and requires payment of C$127,800 annually. Production from subsurface lease areas is subject to a royalty of up to 14% of the adjusted net profits, as defined in the Territorial Mining Regulations. In order to conduct exploration on the Inuit-owned lands at Meadowbank, the Company must receive approval for an annual work proposal from the KIA, the body that holds the surface rights in the Kivalliq District and administers land use in the region through various boards. The Nunavut Water Board (the "NWB"), one such board, provided the recommendation to Aboriginal Affairs and Northern Development Canada to grant the Meadowbank mine's construction and operating licences in July 2008. The Company has obtained all of the approvals and licences required to build and operate the Meadowbank mine. The three Meadowbank exploration concessions comprise approximately 23,126 hectares and are granted by Nunavut Tunngavik Inc., the corporation responsible for administering subsurface mineral rights on Inuit-owned lands in Nunavut. Exploration concessions cover the Vault deposit at Meadowbank and in 2013 will require annual rental fees of approximately C$92,924 and exploration expenditures of approximately C$696,930. During the exploration phase, the concessions can be held for up to 20 years and the concessions can be converted into production leases with annual fees of C$1 per hectare, but no annual work commitments. Production from the concessions is subject to a 12% net profits interest royalty from which annual deductions are limited to 85% of the gross revenue. 62 AGNICO-EAGLE MINES LIMITED Table of Contents In 2012, the Company signed a production lease with Nunavut Tunngavik Inc. covering the extraction and processing of gold from the Vault deposit. This lease authorizes the Company to mine and process gold from the Vault deposit and sets in place royalty payments that are equivalent to those being paid by the Company at the Portage and Goose pits. The 40 Crown mineral claims cover approximately 36,433 hectares at Meadowbank and are subject to land fees and work commitments. Land fees are payable only when work is filed. The most recent filing was in 2012, when approximately C$8,998 in land fees were paid and C$5,491,178 in assessment work was submitted. The Kivalliq region in which the Meadowbank mine is located has an arid arctic climate. The Meadowbank property is situated in an area characterized by low, rolling hills that are covered predominantly in heath tundra with numerous lakes and ponds. All of the open pit mines operate beneath the water level of adjacent lakes and use dykes to prevent water inflow. Elevation ranges from approximately 130 metres at lakeshores up to 200 metres on ridge crests. Operations at the Meadowbank mine are expected to be year-round with only minor weather-related interruptions to mining operations; however, these interruptions are not expected to affect ore availability for milling operations or other operating activities. The Meadowbank mine is accessible from Baker Lake, located 70 kilometres to the south, over a 110-kilometre all-weather road completed in March 2008. Baker Lake provides 2.5 months of summer shipping access via Hudson Bay and year-round airport facilities. The Meadowbank mine also has a 1,100-metre long gravel airstrip, permitting access by air. The Company uses ocean transportation for fuel, equipment, bulk materials and supplies from Montreal, Quebec, (or Hudson Bay port facilities) via barges and ships into Baker Lake during the summer port access period that starts at the end of July in each year. Fuel and supplies are transported year-round to the site from Baker Lake by conventional tractor trailer units. Transportation for personnel and air cargo are provided on scheduled or chartered flights. The permanent bases for employees from which to service the Meadowbank mine are Val D'Or and Montreal in Quebec and the Kivalliq communities. Since February 2009, all chartered flights have landed directly at Meadowbank. The Meadowbank mine achieved commercial production in March 2010 and produced 366,030 ounces of gold in 2012 at total cash costs per ounce of $913. In 2013, total cash costs at Meadowbank are expected to be approximately $1,000 per ounce. In 2013, payable gold production at Meadowbank is expected to be approximately 362,172 ounces. The expected mine life is up to 2018. 2012 ANNUAL REPORT 63 Table of Contents Mining and Milling Facilities Surface Plan of the Meadowbank Mine (as at December 31, 2012) 64 AGNICO-EAGLE MINES LIMITED Table of Contents Surface Plan of the Vault Deposit (as at December 31, 2012) Meadowbank has three major deposits that have sufficient drilling definition to sustain reserves: Portage, Goose and Vault. By the end of 2009, all of the camp infrastructure (dormitories and kitchen), a mill, a service building shop and generator buildings were built. All required aggregates used in the mining process are produced from waste material taken from the north end of the Portage pit. In 2008, a dewatering dyke was constructed in order to access the north half of the Portage pit in preparation for production in 2010. Construction of the Bay-Goose dyke, a major dewatering dyke required to access the southern portion of the Portage and the Goose pits, commenced in the summer of 2009 and was completed in the spring of 2011. Three tailings impoundment dykes, Saddle Dam 1, Saddle Dam 2 and Stormwater Dykes, were built in 2009 and 2010. Also, the first phase of the main tailings impoundment dyke, Central Dyke, was started in 2012 and will be in construction for the duration of the mine life. The eight-kilometre long access road to the Vault pit was started in 2011 and completed in 2012. Mining Methods Mining at the Meadowbank mine is done by open pit with trucks and excavators. The ore is extracted conventionally using drilling and blasting, then hauled by trucks to a primary gyratory crusher adjacent to the mill. The marginal-grade material (material grading under the cut-off grade at a gold price of $1,490 per ounce but which has the potential to increase the reserves at the end of the mine life if the metal prices justify its processing) is stockpiled separately. Also, low-grade material stockpiles (material that has been extracted but currently is lower than the mill feed grade) were created. This low-grade material is processed when the mining fronts cannot supply enough material to the mill. Waste rock is hauled to 2012 ANNUAL REPORT 65 Table of Contents one of two waste storages on the property, used for dyke construction or construction material or backfilled into the mined out area. Mining first commenced in the Portage pit in 2010 and in the Goose pit in March 2012, and is scheduled to commence in the Vault pit in 2014. Surface Facilities The accommodations complex at the Meadowbank mine consists of a permanent camp and a temporary camp to accommodate extra workers. The camp is supported with a sewage treatment, solid waste disposal and potable water plant. In 2008, the exploration group was relocated eight kilometres south of the minesite location to a separate camp with an 80-person capacity. A major fire in March 2011 destroyed the kitchen facilities at the Meadowbank mine. New kitchen facilities were built in the summer of 2011 and commissioned in December 2011. Plant site facilities include a mill building, a maintenance mechanical shop building, a generator building, an assay lab and a heavy vehicle maintenance shop. A structure comprised of two separate crushers flank the main process complex. Power is supplied by an 29-megawatt diesel electric power generation plant with heat recovery and an onsite fuel storage (5.6 million litres) and distribution system. The mill-service-power complex is connected to the accommodations complex by enclosed corridors. In addition, the Company is building peripheral infrastructure including tailings and waste impoundment areas. In January 2012, the Company identified naturally occurring asbestos fibres in dust samples taken from the secondary crusher building at the Meadowbank mine and subsequently found small concentrations of fibres in the ore coming from certain areas of the open pit mines. The Company has instituted additional monitoring and an asbestos management program at the site to ensure that asbestos levels are within applicable territorial, regulatory and industry standards. Facilities constructed at Baker Lake include a barge landing site located three kilometres east of the community and a storage compound. A fuel storage and distribution complex with a 60-million litre capacity has been built next to the barge landing facility. In 2013, new facilities will be built near the Vault deposit as a result of the remoteness of this pit (the Vault deposit is located approximately 8 kilometres from the mine complex). The new facilities will include a refuge, a storage area, a fuel farm, an electrical power generation plant and a water treatment plant. The process design is based on a conventional gold plant flowsheet consisting of two-stage crushing, grinding, gravity concentration, cyanide leaching and gold recovery in a CIP circuit. The mill is designed for year-round operations with a design capacity of 9,800 tonnes per day. The overall gold recovery is projected to be approximately 92.8%, based on projections from metallurgical test work, with approximately 15% typically recovered in the gravity circuit. The run-of-mine ore is transported to the crusher using an off-road truck. The ore is dumped into the gyratory crusher or into designated ore-type stockpiles. The product from the primary crusher is conveyed to the cone crusher in closed circuit with a vibrating screen. The crushed ore is delivered to the coarse ore stockpile and ore from the stockpile is conveyed to the mill. The grinding circuit is comprised of a primary SAG mill operated in open circuit and a secondary ball mill operated in closed circuit with cyclones. A portion of the cyclone underflow stream is sent to the concentrator, which separates the heavy minerals from the ore. The grinding circuit incorporates a gravity process to recover free gold and the free gold concentrate is leached in an intensive cyanide leach-direct electrowinning recovery process. The cyclone overflow is sent to the grinding thickener. The clarified overflow is recycled to the grinding circuit and thickened underflow is pumped to a pre-aeration and leach circuit. The cyanide circuit consists of seven tanks providing approximately 42 hours retention time. The leached slurry flows to a train of six CIP tanks. Gold in the solution flowing from the leaching circuit is adsorbed into the activated carbon. Gold is recovered from the carbon in a Zadra elution circuit and is recovered from the solution using an electrowinning recovery process. The gold sludge is then poured into dore bars using an electric induction furnace. The CIP tailings are treated for the destruction of cyanide using the standard sulphur-dioxide-air process. The detoxified tailings are then pumped to the permanent tailings facility. The tailings storage is designed for zero discharge, with all process water being reclaimed for re-use in the mill to minimize water requirements. Mineral Recoveries Gold recoveries are expected to average 92.8% for all deposits. The different ore zones have slightly different grind sensitivities to gold recovery and, as such, different particle size distributions are recommended as target grinds in the 66 AGNICO-EAGLE MINES LIMITED Table of Contents process. The use of a slightly coarser grind for the Vault ores will allow all three of the ore zones to be processed at a consistent process throughput. During 2012, gold recovery averaged 93.91%. Approximately 3,820,000 tonnes of ore were processed, averaging 10,440 tonnes of ore per day with the mill operating 94.1% of available time. The following table sets out the metal recoveries for the 3,200,000 tonnes of ore extracted at the Meadowbank mine in 2012. Mill processing exceeded extraction from the mine in 2012; 346,000 tonnes came from the marginal stockpile and 274,000 tonnes from the low-grade stockpile. Head Grade Overall Metal Recovery Payable Production Gold 3.18 g/t 93.91% 366,030 oz Environmental Matters (including Inuit Impact and Benefit Agreement) The development of the Meadowbank mine was subject to an extensive environmental review process under the Land Claims Agreement administered by the Nunavut Impact Review Board (the "NIRB"). On December 30, 2006, a predecessor to the Company received the Project Certificate from the NIRB, which included the terms and conditions to ensure the environmental integrity of the development process. Subsequently, in July 2008, the Company received a water licence from the NWB for construction and operation of the mine subject to additional terms and conditions. Both authorizations were approved by the then Minister of Aboriginal Affairs and Northern Development Canada. In February 2007, a predecessor to the Company and the Nunavut government signed a Development Partnership Agreement (the "DPA") with respect to the Meadowbank mine. The DPA provides a framework for stakeholders, including the federal and municipal governments and the KIA, to maximize the long-term socio-economic benefits of the Meadowbank mine to Nunavut. An IIBA for the Meadowbank mine (the "Meadowbank IIBA") was signed with the KIA in March 2006. This agreement was renegotiated and a revised Meadowbank IIBA was signed on October 18, 2011. The Meadowbank IIBA ensures that local employment, training and business opportunities arising from all phases of the project are accessible to the Kivalliq Inuit. The Meadowbank IIBA also outlines the special considerations and compensation that must be provided to the Inuit regarding traditional, social and cultural matters. The Company currently holds a renewable exploration lease from the KIA that expires December 31, 2015. In July 2008, the Company signed a production lease for the construction and the operation of the mine, the mill and all related activities. In April 2008, the Company and the KIA signed a water compensation agreement for the Meadowbank mine addressing Inuit rights under the Land Claims Agreement respecting compensation for water use and water impacts associated with the project. The Meadowbank mine consists of three gold-bearing deposits: Portage, Goose and Vault. A series of four dykes have been built to isolate the mining activities at the Portage and Goose deposits from neighbouring lakes. An additional dyke will be built in 2013 to isolate the mining activities at the Vault deposit. Waste rock from the Portage, Goose Island and Vault pits is primarily stored in the Portage and Vault rock storage facilities, and a portion of the waste is placed in the Portage Pit. The control strategy to minimize the onset of oxidation and the subsequent generation of acid mine drainage includes freeze control of the waste rock through permafrost encapsulation and capping with an insulating convective layer of neutralizing rock (ultramafic and non-acid generating volcanic rocks). The Vault rock storage facility does not require an insulating convective layer due to the non-acid generating nature of the rock in that area. Waste rock deposited in the Portage pit will be covered with water during the closure phase flooding of the pit which will prevent any acid generation. Because the site is underlain by about 450 metres of permafrost, the waste rock below the capping layer is expected to freeze, resulting in low (if any) rates of acid rock drainage generation in the long term. Tailings are stored in the dewatered portion of the Second Portage Lake. The tailings are deposited on tailings beaches within a two cell tailings storage facility. A reclamation pond is located within the tailings storage facility. The control strategy to minimize water infiltration into the tailings storage facility and the migration of constituents out of the facility includes freeze control of the tailings through permafrost encapsulation and through comprehensive, engineered dyke 2012 ANNUAL REPORT 67 Table of Contents liners. A four-metre-thick dry cover of acid neutralizing ultramafic rock backfill will be placed over the tailings as an insulating convective layer to confine the permafrost active layer within relatively inert tailings materials. The water management objective for the project is to minimize the potential impact on the quality of surface water and groundwater resources at the site. Diversion ditches were constructed in 2012 to avoid the contact of clean runoff water with areas affected by the mine or mining activities. Contact water originating from affected areas is intercepted, collected, conveyed to the tailings storage facility or a site attenuation pond for re-use in process or decanted to treatment for removal of solids (if needed) prior to release to the Third Portage Lake. Capital Expenditures/Development A total of $86 million has been budgeted to be spent at the Meadowbank mine (excluding exploration) in 2013, including $55 million on dyke construction, $25.6 million on sustaining capital and equipment and $1.4 million on construction projects carried over from 2012. As well, $2.2 million has been budgeted to complete 11,500 metres of delineation drilling in the starter pit and an additional $0.8 million to complete 3,500 metres of diamond drilling in the Vault East deposit area in order to define additional resources. It is also expected that there will be 5,000 metres of diamond drilling representing $1 million to continue testing the goose underground structure below the ultimate pit. Regional exploration in the Meadowbank area has been budgeted at $1.8 million and will include 4,000 metres of exploration diamond drilling. The Meadowbank mine started production in 2010. Total capital costs of construction incurred since the date of acquisition by the Company amounted to $1.1 billion as at December 31, 2012. The remaining mine life is expected to be five years. Geology, Mineralization and Exploration Geology The Meadowbank mine comprises a number of Archean-age gold deposits hosted within polydeformed volcanic and sedimentary rocks of the Woodburn Lake Group, part of the Western Churchill supergroup in northern Canada. Three minable gold deposits – Goose, Portage and Vault – have been discovered along the 25-kilometre long Meadowbank gold trend, and the PDF deposit (a fourth deposit) has been outlined on the northeast gold trend. These known gold resources are within 225 metres of the surface, making the project amenable to open pit mining. Mineralization The predominant gold mineralization found in the Portage and Goose deposits is associated with iron sulfides, mainly pyrite and pyrrhotite, which occur as a replacement of magnetite in the oxide facies iron formation host rock. To a lesser extent, pyrite and chalcopyrite may be found and, on rare occasions, arsenopyrite may be associated with the other sulphides. Gold is mainly observed in native form (electrum), occurring in isolated specs or as plating around sulfide grains. The ore zones are typically 6-7 metres wide, following the contacts between the iron formation units and the surrounding host rock. Zones extend up to several hundred metres along strike and at depth. The sulphides primarily occur as replacement of the primary magnetite layers, as well as narrow stringers or bands of disseminated sulphides that almost always crosscut the main foliation and/or bedding which would imply an epigenetic mode of emplacement. The percentage of sulphides is quite variable and may range from trace to semi-massive amounts over several centimetres to several metres in length. The higher gold grades and the occasional occurrence of visible gold are almost always associated with greater than 20% sulphide content. The main mineralized banded iron formation unit is bounded by an ultramafic unit to the west which locally occurs interlayered with the banded iron formation and to the east by an intermediate to felsic metavolcaniclastic unit. In the Vault deposit, pyrite is the principal ore-bearing sulphide. The disseminated sulphides occur along sheared horizons that have been sericitized and silicified. These zones are several metres wide and may continue for hundreds of metres along strike and down dip. Three of the four known gold deposits are currently planned to be mined. The Goose Island and Portage deposits are hosted within highly deformed, magnetite-rich iron formation rocks, while intermediate volcanic rock assemblages host the majority of the mineralization at the more northerly Vault deposit. The fourth deposit, PDF, shows the same characteristics as Vault, though it is not currently anticipated to be a mineable deposit. 68 AGNICO-EAGLE MINES LIMITED Table of Contents Defined over a 1.85-kilometre strike length and across lateral extents ranging from 100 to 230 metres, the geometry of the Portage deposit consists of general north-northwest-striking ore zones that are highly folded. The mineralization in the lower limb of the fold is typically six to eight metres in true thickness, reaching up to 20 metres in the hinge area. The Goose deposit is located just south of the Portage deposit and is also associated with iron formation but exhibits different geometry, with a north-south trend and a steep westerly dip. Mineralized zones typically occur as a single unit near surface, splaying into several limbs at depth. The deposit is currently defined over a 750-metre strike length and down to 500 metres at depth (mainly in the southern end), with true thicknesses of three to 12 metres (reaching up to 20 metres locally). The Goose underground resource (100 to 500 metres at depth) extends 700 metres to the south of the Goose pit. The ore zones show the same characteristics as the Goose pit, which is two to five main zones sub-parallel and undulating. The average thickness rarely exceeds three to five metres. The Vault deposit is located seven kilometres northeast of the Portage and Goose deposits. It is planar and shallow-dipping with a defined strike of 1,100 metres. The deposit has been disturbed by two sets of normal faults striking east-west and north-south and dipping moderately to the southeast and steeply to the east, respectively. The main lens has an average true thickness of eight to 12 metres, reaching as high as 18 metres locally. The hanging wall lenses are typically three to five metres, and up to seven metres, in true thickness. Exploration Grassroots exploration in the project area began as early as 1980. Several companies conducted various types of work between 1980 and 2007. Throughout these years, six deposits were the main focus of exploration: Portage, Cannu, Bay Zone, Goose, Vault and PDF. Over time, the Cannu, Bay Zone and Portage deposits were combined into one mineable deposit referred to as Portage. Exploration has extended the Goose Island deposit southward, adding the Goose South and Gosling zones. In 2009, the mine exploration group took over the pit and adjacent areas. Three goals were targeted: exploration drilling, resource conversion and waste pad condemnation. In 2010, 102 holes totalling 37,928 metres were drilled. The focus of the exploration campaign was testing the underground potential of the Goose deposit, resource conversions at the Vault deposit and on the south continuity of the Portage and Goose deposits. On the Goose underground deposit, a total of 23 holes for 11,145 metres were drilled from 200 to 750 metres in depth. These holes contributed to increase the continuity and understanding of the mineralization. The drilling was predominantly to expand the Goose deposit at depth and towards the south, as well as to conduct infill drilling in areas where large gaps occurred between auriferous intersections. The program was successful in expanding the Goose deposit at depth and towards the south. On the Vault deposit, a total of 39 holes for 5,943 metres were drilled from 25 to 200 metres in depth during 2010. These holes were aimed at converting resources close to the pit shell and also to extending resources to the south-west continuity towards the Tern Lake porphyry. On the southern portion of the Portage deposit, a total of 18 holes for 8,070 metres were drilled from 50 to 250 metres in depth during 2010, with the aim of converting resources directly south of the Portage pit and other inferred occurrences within a close proximity to the pit. On the Goose south trend, a total of 13 holes for 7,320 metres were drilled from 150 to 250 metres in depth during 2010. These holes were aimed at following the south trend of the Portage Goose iron formation. In 2011, 284 diamond drill holes totalling 24,229 metres were drilled. The exploration program had four goals: exploring the southern trend of the Goose deposit at depth; following-up on the regional results of testing on the Farwest Iron Formation and the geophysics of the Tern Lake porphyry completed in 2010; continuing resource conversion work initiated on the Vault deposit in 2010 and extending resources on the south west part of deposit; and a resources conversion with a definition program in Portage pit. The definition program on the Portage pit was conducted in phases from May to December 2011 and represented 165 holes totalling 11,431 metres of diamond drilling. In addition, reverse circulation drilling was used to drill over 42 holes totalling 1,074 metres. This method is expected to reduce the cost of drilling. On the Goose South trend, 6 holes totalling 2,382 metres were drilled during 2011. On the Farwest Iron Formation, 7 holes for a total of 2,721 metres were drilled along the trend and verified the potential of the west contact with the granitic mass. On the Tern Lake porphyry, 19 holes totalling 931 metres were drilled. 2012 ANNUAL REPORT 69 Table of Contents At the Vault pit during 2011, 19 holes were drilled for a total of 1,250 metres, 43 holes totalling 3,545 metres were drilled in Vault South and 25 holes totalling 1,969 metres were drilled in Vault East. In 2012, 517 diamond and reverse circulation drill holes totalling 28,052 metres were drilled. Exploration focused on delineation and infill drilling on the Portage and Goose pits and resource conversion, definition and condemnation drilling at Vault. In addition, two deep exploration holes were drilled to follow up on earlier testing of the north and south extension of the Portage main structure. The delineation drilling program on the Portage pit was conducted throughout the year with a break between June and September while waiting for the reverse circulation drill to arrive by sealift. A total of 134 reverse circulation holes in 3,254 metres and 205 diamond drill holes in 11,304 metres were drilled in the north pit and south pit, including the Pushback area. The drilling program resulted in the completion of a 25x25 metre grid over the entire pit and the commencement of a 12.5x12.5 metre infill grid. At the Goose Island pit, 1,902 metres in 7 reverse circulation holes and 3,347 metres in 74 diamond drill holes were drilled in 2012. The diamond drill holes were drilled in January and February, primarily to complete the 25x25 metre delineation grid in the pit. The reverse circulation holes were drilled in selected areas on a 12.5x12.5 metre grid in October and November 2012. At the Vault project, 3,441 metres in 70 diamond drill holes were drilled between mid-February and early April 2012 to partially complete the delineation program (25x25 metre grid) within the starter pit. Additional drilling to complete this program is planned for 2013. A condemnation drilling program for the waste storage facility was also completed by early April 2012, with 3,777 metres drilled in 25 holes. Drilling carried out during the period of 2009 to 2012 returned significant results on the Goose underground and Vault deposits. At the Goose deposit, the increase in indicated mineral resources comes from a confirmation of continuity towards the south and at depth. At the Vault deposit, the increase in mineral reserves is the result of converting resources to reserves at depth along the east pit wall. Positive drill results show continuity of mineralization toward the southwest where reserves have been defined in what is currently called the Phaser pit. Meliadine Project The Meliadine project is an advanced exploration property located near the western shore of Hudson Bay in the Kivalliq region of Nunavut, about 25 kilometres north of the hamlet of Rankin Inlet and 290 kilometres southeast of the Meadowbank mine. The closest major city is Winnipeg, Manitoba, about 1,500 kilometres to the south. The Company acquired its 100% interest in the Meliadine project through its acquisition of Comaplex in July 2010 (see "– History and Development of the Company"). The mineral reserves and resources of the Meliadine project are estimated at December 31, 2012 to contain proven and probable mineral reserves of 3.0 million ounces of gold in 13.3 million tonnes of ore grading 7.0 grams per tonne. In addition, the project had 17.2 million tonnes of indicated mineral resources grading 3.9 grams of gold per tonne and 14.8 million tonnes of inferred mineral resources grading 6.2 grams of gold per tonne at December 31, 2012. The Meliadine property is a large, almost entirely contiguous land package that is nearly 80 kilometres long. It consists of 65,499 hectares of mineral rights, of which 62,069 hectares are held under the Canada Mining Regulations and administered by the Aboriginal Affairs and Northern Development Canada and referred to as Crown Land. The Crown Land is made up of mining claims covering 10,783 hectares and mineral leases covering 51,286 hectares. There are also 3,430 hectares of subsurface Nunavut Tunngavik Inc. concessions administered by a division of the Nunavut Territorial government. In 2012, C$126,734 was paid to Aboriginal Affairs and Northern Development Canada for the mining lease; Nunavut Tunngavik Inc. requires annual rental fees of C$13,721 and exploration expenditures of C$102,909. The Kivalliq region has an arid arctic climate. The Meliadine property is mainly covered by glacial overburden with the presence of deep-seated permafrost. The property is about 60 metres above sea level in low-lying topography with numerous lakes. Surface waters are usually frozen by early October and remain frozen until early June. Surface geological work can be carried out from mid-May to mid-October, while exploration drilling can take place throughout the year, though is reduced in December and January due to cold and darkness. Equipment, fuel and dry goods are transported on the annual warm-weather sealift by barge to Rankin Inlet via Hudson Bay. Ocean-going barges from Churchill, Manitoba or eastern Canadian ports can access the community from late June to early October. Churchill, which is approximately 470 kilometres south of Rankin Inlet, has a deep-water port facility and a year-round rail link to locations to the south. 70 AGNICO-EAGLE MINES LIMITED Table of Contents Personnel, perishables and lighter goods arrive at the Rankin Inlet regional airport by commercial or charter airline, from which they can be flown to the property by chartered helicopter or delivered by tracked vehicles by a winter-road from Rankin Inlet directly to the Meliadine project exploration camp from January to mid-May. In 2011, the Company submitted an application to the NIRB and other regulatory agencies proposing the building of a 23.8-kilometre-long all-weather gravel road (including three bridges) linking Rankin Inlet with the project site to support ongoing exploration activities at the Meliadine project property. Approval from the NIRB on the application was received in February 2012 and a water license from the NWB was received in March 2012. Construction of the road began in March 2012. As at December 31, 2012, 11.5 kilometres of the road and all three of the bridges had been completed. The construction of the road is expected to be completed by mid-2013. Exploration personnel for the Meliadine project are mainly sourced from other parts of Canada on a fly-in/fly-out rotation from Val d'Or, Quebec, and Winnipeg, Manitoba, although there is preferential employment of qualified people from the Kivalliq region. The hamlet of Rankin Inlet has developed a strong taskforce of entrepreneurs who provide a wide variety of services, such as freight expediting, equipment supply and outfitting. Location Map of the Meliadine Project (as at December 31, 2012) 2012 ANNUAL REPORT 71 Table of Contents Mining and Milling Facilities Surface Plan of the Meliadine Project (as at December 31, 2012) Facilities Current facilities include the Meliadine project exploration camp located on the shore of Meliadine Lake, approximately 2.3 kilometres east of the Tiriganiaq deposit. The self-contained camp consists of four wings of new trailers that can accommodate up to 200 personnel and includes new kitchen facilities, complete with diesel generators. These new facilities replaced the previous tent exploration camp. As described above, construction of an all-weather access road linking Rankin Inlet to the Meliadine site began in March 2012 and is expected to be completed by mid-2013. Power is currently generated using diesel generators for the Meliadine exploration camp on an as-required basis. Potable water for the Meliadine project camp is pumped from Meliadine Lake and water for the previous underground operations and surface drill programs is pumped from Pump Lake. The current water licence allows for a maximum daily water use of 290 cubic metres on the Meliadine West licence and 299 cubic metres on the Meliadine East licence. 72 AGNICO-EAGLE MINES LIMITED Table of Contents The Meliadine project exploration camp has an incinerator on site to burn all flammable materials, such as camp and food wastes. Plastics and metal objects, along with incinerator ash, are set aside for transport to be disposed of in the Rankin Inlet landfill. All hazardous and liquid wastes are held at the Meliadine project site for transport to a waste management company in southern Canada. Sewage has been treated through a Biodisk treatment system since the summer of 2010. Run-off water is contained in the primary water containment area and released only when sampling results meet acceptable water quality standards. Routine water sampling has been conducted since the mid-1990s and reported on a monthly basis to the authorities. The Meliadine East camp on Atulik Lake was decommissioned during the summer of 2010, with completion in the winter of 2010 and 2011. The core shack and storage building remain at the former camp site. An underground portal allowing access to an exploration decline was built at the Tiriganiaq deposit in 2007 and 2008 in order to extract a bulk sample for study purposes. A waste rock and ore storage pad was generated during excavation of the decline and a sampling tower was installed for processing the bulk sample. There is a two-kilometre-long road between the Meliadine project exploration camp and the portal site. Another underground bulk sample of 4,600 tonnes of ore was taken from the Tiriganiaq deposit via this portal in 2011. The results confirmed the resource estimation model that has been developed for the two principal zones (Zones 1000 and 1100) at Tiriganiaq, and in fact indicated approximately 6% more gold than had been predicted by the block model for these areas. The 2011 bulk sample program also confirmed the previous assessment of the Company's block model in terms of grade continuity, consistency and distribution, and the evaluation of related mining properties through geological mapping, underground chip-, channel- and muck-sampling, and geotechnical observations. Environmental Matters (including IIBA) Land and environmental management in the region of the Meliadine project is generally governed by the provisions of the Land Claims Agreement. Pursuant to the Land Claims Agreement, land use leases must be obtained from the KIA. The Meliadine project has been granted a commercial lease for exploration and underground development activity, a prospecting and land use lease for exploration and development activities, an exploration land use lease for exploration and drilling on the Inuit-owned lands of Meliadine East and a parcel drilling permit for drilling activity on Inuit-owned lands. A number of right-of-way leases covering road access to the Meliadine project property and esker quarrying on the Inuit-owned lands were also granted by the KIA. Pursuant to the Land Claims Agreement, an exploration water licence and a bulk sample water licence were granted by the NWB in March 2012. A project certificate from the NIRB is the next approval required for the Meliadine project. In connection therewith, the NIRB issued guidelines to the Company in February 2012 for the preparation of an environmental impact statement ("EIS") for the Meliadine project. The Company submitted a draft EIS to the NIRB for review in January 2013. The Company received comments from the NIRB regarding the draft EIS and expects to resubmit the draft EIS to the NIRB in April 2013. Upon completion of a public and technical review, a final EIS will be submitted to the NIRB and the Company expects to be granted a project certificate in mid-2014. Other operating permits and licences can only be issued after a project certificate is received from the NIRB. An IIBA, an Inuit Water Compensation Agreement and a Production Lease will also need to be negotiated between the Company and the KIA. Negotiations regarding an IIBA between the Company and KIA commenced in January 2012. Geology, Mineralization and Exploration Geology and Mineralization Archean volcanic and sedimentary rocks of the Meliadine greenstone belt underlie the property, which is mainly covered by glacial overburden with deep-seated permafrost and is part of the Western Churchill supergroup in northern Canada. The rock layers have been folded, sheared and metamorphosed, and have been truncated by the Pyke Fault, a regional structure that extends the entire 80-kilometre length of the large property. The Pyke Fault appears to control gold mineralization on the Meliadine project property. At the southern edge of the fault is a series of oxide iron formations that host the seven Meliadine project deposits currently known. The deposits consist of multiple lodes of mesothermal quartz-vein stockworks, laminated veins and sulphidized iron formation mineralization with strike lengths of up to three kilometres. The Upper Oxide iron formation hosts the Tiriganiaq and Wolf North zones. The two Lower Lean iron formations contain the F Zone, Pump, Wolf Main and Wesmeg deposits. The Normeg zone was discovered in 2011 on the eastern end of the Wesmeg zone, near Tiriganiaq. The Wolf (North and Main), F Zone, Pump and Wesmeg/Normeg deposits are all within five kilometres of Tiriganiaq. The Discovery deposit is 17 kilometres east 2012 ANNUAL REPORT 73 Table of Contents southeast of Tiriganiaq and is hosted by the Upper Oxide iron formation. Each of these deposits has mineralization within 120 metres of surface, making them potentially mineable by open pit methods. They also have deeper ore that could potentially be mined with underground methods, which is being examined in the feasibility study. Exploration The Meliadine property was explored for gold from 1987 through 2010 at a cost of C$166.8 million by former owners Asamera Inc., Rio Algom Limited, Comaplex, Cumberland and Western Mining International, as well as the Company and numerous consultants. For many years the property was divided into two halves – Meliadine East and Meliadine West – which were consolidated into the Meliadine property in December 2009. Lack of outcropping bedrock in the area resulted in the use of high-density magnetic surveying followed by diamond drilling as the most common and successful exploration strategy on the property. This included 193,318 metres of drilling in 682 holes from 1993 through 2010, as well as geophysical surveying, prospecting and sampling. In 2007 and 2008, there was an underground exploration and bulk sample program on the Tiriganiaq deposit. This was followed by a preliminary assessment for the property in 2009, which indicated the potential of the project to support a mining operation. In 2010, there were 128 exploration drill holes (32,000 metres) at the Meliadine project, of which 53% were drilled by the Company after acquiring the property in July 2010. The Company spent $10 million on exploration from July through December 2010. The Company initiated an exploration and development program in the summer of 2010. Approximately 300,000 metres of drilling was completed by the end of 2012 to convert and extend the known mineral resources to reserves. This drilling was primarily carried out at Tiriganiaq, but also took place at other known mineralized zones. At the end of 2012, the Company had spent $150.2 million, broken down as follows: $45.7 million on exploration diamond drilling, $30.7 million on construction and equipment purchases (camp and road), $30.4 million on site services, transportation and accommodation, $11.6 million on environmental expenses and permitting, $11.3 million on underground work and equipment purchases, $11.0 million on administration and technical services, $6.5 million on a bulk sample and $3.0 million on studies. In 2013, a total of $91 million is budgeted on the project, including $15 million for a feasibility study, $6 million for permitting activities, $13 million for site infrastructure, $13 million for exploration ramp development, $15.9 million for camp operations and logisitics and $13.8 million for 55,000 metres of conversion and exploration drilling within the known deposits. An additional $10.4 million is budgeted for 35,000 metres of regional exploration drilling outside of the known deposits. A feasibility study completed in 2011 confirmed the viability of the Meliadine project at an operating rate of 3,000 tonnes per day. Internal studies that incorporate the recent exploration results are currently underway looking to increase project throughput and improve the rate of return. Regional Exploration Activities During 2012, the Company continued to actively explore in Quebec, Ontario, Nunavut, Nevada, Finland, Sweden, Mexico and Argentina. The Canadian exploration activities were focused on the Goldex, Wyoming, Maritime and Lapa properties in Quebec, as well as on the Meadowbank property in Nunavut where activities were conducted both within and outside the mining lease and the Meliadine project, also in Nunavut. In the United States, exploration activities during 2012 were concentrated on the West Pequop and Summit projects located in northeast Nevada and the Rattlesnake project located in Wyoming. At the LaRonde, Lapa, Pinos Altos and Kittila mines, the Company continued exploration programs around the mines. Most of the exploration budget was spent on drilling programs near the mine infrastructure along previously recognized gold trends. At the end of 2012, the Company's land holdings in Canada consisted of 69 projects comprised of 2,748 mineral titles covering an aggregate of 220,060 hectares. Land holdings in the United States consisted of four properties comprised of 2,620 mineral titles covering an aggregate of 21,585 hectares. Land holdings in Finland consisted of three groups of properties comprised of 289 mineral titles covering an aggregate of 25,654 hectares. Land holdings in Sweden consisted of one project comprised of seven mineral titles covering an aggregate of 8,957 hectares. Land holdings in Mexico consisted of eight projects comprised of 116 mining concession titles covering an aggregate of 129,258 hectares. Land holdings in Argentina consisted of one project with two mineral titles covering an aggregate of 2,691 hectares. 74 AGNICO-EAGLE MINES LIMITED Table of Contents The total amount spent on regional exploration in 2012 was $76.8 million, which included drilling 860 holes for an aggregate of approximately 237 kilometres. The budget for regional exploration expenditures in 2013 is approximately $52.1 million, including approximately 142.8 kilometres of drilling. Mineral Reserves and Mineral Resources Cautionary Note to Investors Concerning Estimates of Measured and Indicated Mineral Resources This section uses the terms "measured mineral resources" and "indicated mineral resources". Investors are advised that while these terms are recognized and required by Canadian regulations, the SEC does not recognize them. Investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into mineral reserves. Cautionary Note to Investors Concerning Estimates of Inferred Mineral Resources This section uses the term "inferred mineral resources". Investors are advised that while this term is recognized and required by Canadian regulations, the SEC does not recognize it. "Inferred mineral resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that any part or all of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that any part or all of an inferred mineral resource exists, or is economically or legally mineable. Information on Mineral Reserves and Mineral Resources of the Company The preparation of the information set out below with respect to the mineral reserves at the LaRonde, Lapa, Kittila, Pinos Altos and Meadowbank mines, the Goldex and La India mine projects and the Meliadine and Bousquet projects has been supervised by Daniel Doucet, P.Eng., the Corporate Director, Reserve Development of the Company, a "qualified person" as that term is defined in NI 43-101. The Company's mineral reserves estimate was derived from internally generated data or geology reports. All of the Company's reserve and resource estimates have been audited by independent consultants. The criteria set out in NI 43-101 for reserve definitions and guidelines for classification of mineral reserves are similar to those used by Guide 7. However, the definitions in NI 43-101 differ in certain respects from those under Guide 7. Under Guide 7, among other things, a mineral reserve estimate must have a "final" or "bankable" feasibility study. Guide 7 also requires the use of commodity prices that reflect current economic conditions at the time of reserve determination, which Staff of the SEC has interpreted to mean historic three-year average prices. In addition to the differences noted above, Guide 7 does not recognize mineral resources. The assumptions used for the 2012 mineral reserves and resources estimates for the Lapa, Goldex, Meadowbank, Meliadine and Creston Mascota properties reported by the Company in this Form 20-F were based on three-year average prices for the period ending December 31, 2012 of $1,490 per ounce of gold, $29.00 per ounce of silver, $0.95 per pound of zinc, $3.67 per pound of copper, $1.00 per pound of lead and exchange rates of C$1.00 per $1.00, 12.75 Mexican pesos per $1.00 and $1.34 per €1.00. The assumptions used for the 2012 mineral reserves and resources estimates for the LaRonde, Kittila, Pinos Altos, La India and Tarachi properties reported by the Company in this Form 20-F used more conservative metal price assumptions of $1,345 per ounce of gold, $25.00 per ounce of silver, $0.95 per pound of zinc, $3.49 per pound of copper, $0.99 per pound of lead and exchange rates of C$1.00 per $1.00, 13.00 Mexican pesos per $1.00 and $1.30 per €1.00. The assumptions used for the 2011 mineral reserves and resources estimate reported by the Company in this Form 20-F were based on three-year average prices for the period ending December 31, 2011 of $1,255 per ounce of gold, $23.00 per ounce of silver, $0.91 per pound of zinc, $3.25 per pound of copper, $0.95 per pound of lead and exchange rates of C$1.05 per $1.00, 12.86 Mexican pesos per $1.00 and $1.37 per €1.00. The assumptions used for the 2010 mineral reserves and resources estimate reported by the Company in this Form 20-F were based on three-year average prices for the period ending December 31, 2010 of $1,024 per ounce gold, $16.62 per ounce silver, $0.86 per pound zinc, $2.97 per pound copper, $0.90 per pound lead and exchange rates of C$1.08 per $1.00, 12.43 Mexican pesos per $1.00 and $1.40 per €1.00. Other assumptions used for estimating 2011 and 2010 mineral reserve and resource information may be found in the Company's annual filings in respect of the years ended December 31, 2011 and December 31, 2010, respectively. 2012 ANNUAL REPORT 75 Table of Contents Set out below are the reserve estimates as of December 31, 2012, as calculated in accordance with NI 43-101 and Guide 7, respectively (tonnages and contained gold quantities are rounded to the nearest thousand): National Instrument 43-101 Industry Guide No. 7 Property Tonnes Gold Grade (g/t) Contained Gold (oz) Tonnes Gold Grade (g/t) Contained Gold (oz) Proven Reserves LaRonde mine (underground) 6,323,000 2.96 602,000 6,323,000 2.96 602,000 Lapa mine (underground) 1,129,000 6.25 227,000 1,129,000 6.25 227,000 Goldex mine project (underground) 59,000 1.70 3,000 59,000 1.70 3,000 Kittila mine (open pit) 272,000 4.30 38,000 272,000 4.30 38,000 Kittila mine (underground) 1,189,000 4.66 178,000 1,189,000 4.66 178,000 Kittila mine total proven 1,461,000 4.59 216,000 1,461,000 4.59 216,000 Pinos Altos mine (open pit) 457,000 0.93 14,000 457,000 0.93 14,000 Pinos Altos mine (underground) 2,610,000 2.82 237,000 2,610,000 2.82 237,000 Pinos Altos mine total proven 3,067,000 2.54 250,000 3,067,000 2.54 250,000 Meadowbank mine (open pit) 1,764,000 1.56 88,000 1,764,000 1.56 88,000 Meliadine project (open pit) 34,000 7.31 8,000 34,000 7.31 8,000 Total Proven Reserves 13,836,000 3.13 1,394,000 13,836,000 3.13 1,394,000 Probable Reserves LaRonde mine (underground) 22,462,000 4.99 3,604,000 22,462,000 4.99 3,604,000 Bousquet (open pit) 2,943,000 1.88 178,000 2,943,000 1.88 178,000 Lapa mine (underground) 939,000 5.58 168,000 939,000 5.58 168,000 Goldex mine project (underground) 6,936,000 1.55 346,000 6,936,000 1.55 346,000 Kittila mine (open pit) 182,000 3.51 21,000 182,000 3.51 21,000 Kittila mine (underground) 31,480,000 4.49 4,547,000 31,480,000 4.49 4,547,000 Kittila mine total probable 31,662,000 4.49 4,567,000 31,662,000 4.49 4,567,000 Pinos Altos mine (open pit) 15,692,000 1.75 884,000 15,692,000 1.75 884,000 Pinos Altos mine (underground) 19,382,000 2.54 1,580,000 19,382,000 2.54 1,580,000 Pinos Altos mine total probable 35,074,000 2.18 2,464,000 35,074,000 2.18 2,464,000 La India mine project (open pit) 33,457,000 0.72 776,000 33,457,000 0.72 776,000 Meadowbank mine (open pit) 23,560,000 2.91 2,206,000 23,560,000 2.91 2,206,000 Meliadine project (open pit) 5,172,000 5.85 973,000 5,172,000 5.85 973,000 Meliadine project (underground) 8,094,000 7.71 2,006,000 8,094,000 7.71 2,006,000 Meliadine project total probable 13,266,000 6.98 2,979,000 13,266,000 6.98 2,979,000 Total Probable Reserves 170,300,000 3.16 17,286,000 170,300,000 3.16 17,286,000 Total Proven and Probable Reserves 184,136,000 3.16 18,681,000 184,136,000 3.16 18,681,000 76 AGNICO-EAGLE MINES LIMITED Table of Contents In the following tables setting out mineral reserve information about the Company's mineral projects, tonnage information is rounded to the nearest thousand tonnes and the total contained gold ounces stated do not include equivalent gold ounces for byproduct metals contained in the mineral reserve. For all reserves and resources other than inferred mineral resources, the reported metal grades in the estimates reflect losses in the recovery process, that is, the metallurgical losses associated with processing the extracted ore. The mineral reserve and mineral resource figures presented in this Form 20-F are estimates, and no assurance can be given that the anticipated tonnages and grades will be achieved or that the indicated level of recovery will be realized. LaRonde Mine Mineral Reserves and Mineral Resources As at December 31, 2012 2011 2010 Gold-Rich Orebody Proven mineral reserves – tonnes 5,300,000 4,100,000 3,200,000 Average grade – gold grams per tonne 3.30 3.10 3.07 Probable mineral reserves – tonnes 21,800,000 26,700,000 27,900,000 Average grade – gold grams per tonne 5.11 4.91 4.90 Gold-Poor Orebody Proven mineral reserves – tonnes 1,000,000 1,200,000 1,600,000 Average grade – gold grams per tonne 1.23 0.97 0.95 Probable mineral reserves – tonnes 700,000 1,200,000 2,000,000 Average grade – gold grams per tonne 1.11 1.22 1.01 Total proven and probable mineral reserves – tonnes 28,800,000 33,200,000 34,700,000 Average grade – gold grams per tonne 4.54 4.40 4.32 Total contained gold ounces 4,206,000 4,700,000 4,818,000 Notes: (1)The 2012 proven and probable mineral reserves set out in the table above are based on a net smelter return cut-off value of the ore that varies between C$88 per tonne and C$118 per tonne depending on the deposit. The Company's historical metallurgical recovery rates at the LaRonde mine from January 1, 2004 to December 31, 2012 averaged 90.7% for gold, 87.0% for silver, 81.6% for zinc and 86.4% for copper. The historical metallurgical recovery rate for lead from January 1, 2008 to December 31, 2012 was 15.4%. The Company estimates that a 10% change in the gold price would result in an approximate 0.9% change in mineral reserves. (2)In addition to the mineral reserves set out above, at December 31, 2012, the LaRonde mine contained indicated mineral resources of 5,432,000 tonnes grading 1.88 grams of gold per tonne and inferred mineral resources of 11,887,000 tonnes grading 3.73 grams of gold per tonne. (3)The following table shows the reconciliation of mineral reserves (in nearest thousand tonnes) at the LaRonde mine by category at December 31, 2012 with those at December 31, 2011. Revision means additional mineral reserves converted from mineral resources or other categories of mineral reserves and mineral reserves added from exploration activities during 2012. Proven Probable Total December 31, 2011 5,331 27,901 33,232 Processed in 2012 2,359 – 2,359 Revision 3,351 (5,439 ) (2,087 ) December 31, 2012 6,323 22,462 28,786 (4)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the LaRonde mine may be found in the Technical Report on the 2005 LaRonde Mineral Resource & Mineral Reserve Estimate filed with Canadian securities regulatory authorities on the System for Electronic Document Analysis and Retrieval ("SEDAR") on March 23, 2005. (5)At December 31, 2012, the Bousquet project contained probable mineral reserves of 2,943,000 tonnes grading 1.88 grams of gold per tonne. In addition, the Bousquet project contained indicated mineral resources of 9,805,000 tonnes grading 2.44 grams of gold per tonne and inferred mineral resources of 4,567,000 tonnes grading 4.04 grams of gold per tonne. 2012 ANNUAL REPORT 77 Table of Contents Lapa Mine Mineral Reserves and Mineral Resources As at December 31, 2012 2011 2010 Gold Proven mineral reserves – tonnes 1,129,000 1,044,000 1,122,000 Average grade – gold grams per tonne 6.25 6.45 7.24 Probable mineral reserves – tonnes 939,000 1,340,000 1,709,000 Average grade – gold grams per tonne 5.58 6.61 7.56 Total proven and probable mineral reserves – tonnes 2,068,000 2,384,000 2,831,000 Average grade – gold grams per tonne 5.95 6.54 7.43 Total contained gold ounces 395,000 501,000 677,000 Notes: (1)The 2012 mineral reserve estimates were calculated using an assumed metallurgical gold recovery of 71% and a cut-off grade of 3.9 grams of gold per tonne, and the resource estimates were calculated using an assumed metallurgical gold recovery of 75% and a cut-off grade of 2.8 grams of gold per tonne. The operating cost per tonne estimate for the Lapa mine in 2012 was C$131.71. The Company estimates that a 10% change in the gold price would result in an approximate 12% change in mineral reserves. (2)In addition to the mineral reserves set out above, at December 31, 2012, the Lapa mine contained indicated mineral resources of 1,118,000 tonnes grading 4.08 grams of gold per tonne and inferred mineral resources of 934,000 tonnes grading 6.69 grams of gold per tonne. (3)The following table shows the reconciliation of mineral reserves (in nearest thousand tonnes) at the Lapa mine by category at December 31, 2012 with those at December 31, 2011. Revision means additional mineral reserves converted from mineral resources or other categories of mineral reserves and mineral reserves added from exploration activities during 2012. Proven Probable Total December 31, 2011 1,044 1,340 2,384 Processed in 2012 640 – 640 Revision 725 (401 ) 324 December 31, 2012 1,129 939 2,068 (4)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Lapa mine may be found in the Technical Report on the Lapa Gold Project, Cadillac Township, Quebec, Canada filed with Canadian securities regulatory authorities on SEDAR on June 8, 2006. 78 AGNICO-EAGLE MINES LIMITED Table of Contents Goldex Mine Project Mineral Reserves and Mineral Resources As at December 31, 2012 2011 2010 Gold Proven mineral reserves – tonnes 59,000 – 14,804,000 Average grade – gold grams per tonne 1.70 – 1.87 Probable mineral reserves – tonnes 6,936,000 – 13,722,000 Average grade – gold grams per tonne 1.55 – 1.63 Total proven and probable mineral reserves – tonnes 6,995,000 – 28,526,000 Average grade – gold grams per tonne 1.55 – 1.75 Total contained gold ounces 349,000 – 1,609,000 Notes: (1)The suspension of mining operations at the Goldex mine on October 19, 2011 resulted in a restatement, as of that date, of all Goldex proven or probable reserves (as stated on December 31, 2010) that had not already been mined, as measured or indicated resources, except stockpiled ore on surface; the stockpiled ore was processed by the end of October 2011. (2)On July 25, 2012, the Board of Directors approved the development of underground mining operations in the M and E Zones, where initial reserves were estimated in a feasibility study completed on October 14, 2012. (3)The 2012 proven and probable mineral reserves set forth in the table above were estimated using an assumed metallurgical gold recovery of 93%. Mining costs were estimated to be C$41.77 per tonne for the E Zone and C$40.28 per tonne for the M Zone. The cut-off grade used for mineral reserves was 1.05 grams of gold per tonne for the E Zone and 1.01 grams of gold per tonne for the M Zone. The Company estimates that a 10% change in the gold price would result in an approximate 4.4% change in mineral reserves. (4)In addition to the mineral reserves set out above, at December 31, 2012, the Goldex mine project contained measured mineral resources of 12,360,000 tonnes grading 1.86 grams of gold per tonne, indicated mineral resources of 14,808,000 tonnes grading 1.83 grams of gold per tonne and inferred mineral resources of 34,645,000 tonnes grading 1.52 grams of gold per tonne. (5)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Goldex mine project may be found in the Technical Report on Restatement of the Mineral Resources at Goldex Mine, Quebec, Canada as at October 19, 2011 filed with the Canadian securities regulatory authorities on SEDAR on December 5, 2011 and the Technical Report on Production of the M and E Zones at Goldex Mine dated October 14, 2012 filed with the Canadian securities regulatory authorities on SEDAR on November 1, 2012. Kittila Mine Mineral Reserves and Mineral Resources As at December 31, 2012 2011 2010 Gold Proven mineral reserves – tonnes 1,461,000 702,000 403,000 Average grade – gold grams per tonne 4.59 5.09 4.23 Probable mineral reserves – tonnes 31,662,000 33,862,000 32,329,000 Average grade – gold grams per tonne 4.49 4.65 4.64 Total proven and probable mineral reserves – tonnes 33,122,000 34,564,000 32,732,000 Average grade – gold grams per tonne 4.49 4.66 4.64 Total contained gold ounces 4,783,000 5,177,000 4,880,000 Notes: (1)The 2012 proven and probable mineral reserve and mineral resource estimates were calculated using a metallurgical gold recovery of 89%. Gold cut-off grades used were 1.98 grams per tonne, undiluted (1.76 grams per tonne, diluted) for open pit reserves and between 3.33 grams per tonne and 3.49 grams per tonne, undiluted (between 2.82 grams per tonne and 3.00 grams per tonne, diluted), depending on the deposit, for underground reserves. The open pit operating cost was estimated to be €50.57 per tonne in 2012, while the underground cost averaged €79.38 per tonne in 2012. The Company estimates that a 10% change in the gold price would result in an approximate 9.2% change in mineral reserves. (2)In addition to the mineral reserves set out above, at December 31, 2012, the Kittila mine contained indicated mineral resources of 7,854,000 tonnes grading 2.65 grams of gold per tonne and inferred mineral resources of 18,966,000 tonnes grading 3.88 grams of gold per tonne. 2012 ANNUAL REPORT 79 Table of Contents (3)The breakdown of proven and probable mineral reserves between planned open pit operations and underground operations at the Kittila mine (with tonnage and contained ounces rounded to the nearest thousand) at December 31, 2012 is: Category Mining Method Tonnes Gold Grade (g/t) Contained Gold (oz) Proven mineral reserves Open pit 272,000 4.30 38,000 Proven mineral reserves Underground 1,189,000 4.66 178,000 Total proven mineral reserves 1,461,000 4.59 216,000 Probable mineral reserves Open pit 182,000 3.51 21,000 Probable mineral reserves Underground 31,480,000 4.49 4,547,000 Total probable mineral reserves 31,662,000 4.49 4,567,000 (4)The following table shows the reconciliation of mineral reserves (in nearest thousand tonnes) at the Kittila mine by category at December 31, 2012 with those at December 31, 2011. Revision means additional mineral reserves converted from mineral resources or other categories of mineral reserves and mineral reserves added from exploration activities during 2012. Proven Probable Total December 31, 2011 702 33,862 34,564 Processed in 2012 1,090 – 1,090 Revision 1,849 (2,200 ) (352 ) December 31, 2012 1,461 31,662 33,122 (5)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Kittila mine may be found in the Technical Report on the December 31, 2009, Mineral Resource and Mineral Reserve Estimate and the Suuri Extension Project, Kittila Mine, Finland, filed with the Canadian securities regulatory authorities on SEDAR on March 4, 2010. 80 AGNICO-EAGLE MINES LIMITED Table of Contents Pinos Altos Mine Mineral Reserves and Mineral Resources As at December 31, 2012 2011 2010 Gold and Silver Proven mineral reserves – tonnes 3,067,000 1,987,000 2,864,000 Average gold grade – grams per tonne 2.54 1.83 1.90 Average silver grade – grams per tonne 81.31 51.59 54.06 Probable mineral reserves – tonnes 35,074,000 44,792,000 41,298,000 Average gold grade – grams per tonne 2.18 2.07 2.33 Average silver grade – grams per tonne 58.90 59.17 65.53 Total proven and probable mineral reserves – tonnes 38,141,000 46,779,000 44,162,000 Average gold grade – grams per tonne 2.21 2.06 2.30 Average silver grade – grams per tonne 60.71 58.85 64.78 Total contained gold ounces 2,714,000 3,103,000 3,271,000 Total contained silver ounces 74,441,000 88,508,000 91,982,000 Notes: (1)The 2012 proven and probable mineral reserve estimates are based on a net smelter return cut-off value of the open pit ore between $9.01 per tonne and $28.43 per tonne, depending on the deposit, and a net smelter return cut-off value of the underground ore of $59.11 per tonne. The operating cost per tonne estimate for the Pinos Altos mine in 2012 was $35.41 without deferred stripping ($32.24 with deferred stripping). The metallurgical gold recovery used in the reserve estimates varied between 59% and 96%, depending on the deposit. The metallurgical silver recovery used in the reserve estimates varied between 10% and 44.21%, depending on the deposit. The Company estimates that a 10% change in the gold price would result in an approximate 2.2% change in mineral reserves. (2)In addition to the mineral reserves set out above, at December 31, 2012, the Pinos Altos mine contained indicated mineral resources of 17,947,000 tonnes grading 1.52 grams of gold per tonne and 33.13 grams of silver per tonne and inferred mineral resources of 24,592,000 tonnes grading 1.19 grams of gold per tonne and 25.00 grams of silver per tonne. (3)The proven and probable mineral reserves of the Pinos Altos mine set out in the table above include proven mineral reserves from the Creston Mascota deposit of 136,000 tonnes grading 0.96 grams of gold per tonne and 7.42 grams of silver per tonne and probable mineral reserves from the Creston Mascota deposit of 9,950,000 tonnes grading 1.12 grams of gold per tonne and 12.00 grams of silver per tonne. The indicated mineral resource at the Pinos Altos mine also includes indicated mineral resources from the Creston Mascota deposit of 1,765,000 tonnes grading 0.58 grams of gold per tonne and 3.78 grams of silver per tonne. The inferred mineral resource at the Pinos Altos mine also includes inferred mineral resources from the Creston Mascota deposit of 1,079,000 tonnes grading 0.79 grams of gold per tonne and 5.95 grams of silver per tonne. (4)The breakdown of mineral reserves between planned open pit operations and underground operations at the Pinos Altos mine (with tonnage and contained ounces rounded to the nearest thousand) at December 31, 2012 is: Category Mining Method Tonnes Gold Grade (g/t) Silver Grade (g/t) Contained Gold (oz) Contained Silver (oz) Proven mineral reserves Open pit stock pile 457,000 0.93 19.45 14,000 286,000 Proven mineral reserves Underground 2,610,000 2.82 92.14 237,000 7,732,000 Total proven mineral reserves 3,067,000 2.54 81.31 250,000 8,018,000 Probable mineral reserves Open pit 15,692,000 1.75 37.43 884,000 18,886,000 Probable mineral reserves Underground 19,382,000 2.54 76.29 1,580,000 47,537,000 Total probable mineral reserves 35,074,000 2.18 58.90 2,464,000 66,424,000 2012 ANNUAL REPORT 81 Table of Contents (5)The following table shows the reconciliation of mineral reserves (in nearest thousand tonnes) at the Pinos Altos mine by category at December 31, 2012 with those at December 31, 2011. Revision means additional mineral reserves converted from mineral resources or other categories of mineral reserves and mineral reserves added from exploration activities during 2012. Proven Probable Total December 31, 2011 1,987 44,792 46,779 Processed in 2012 4,395 – 4,395 Revision 5,475 (9,718 ) (4,243 ) December 31, 2012 3,067 35,074 38,141 (6)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Pinos Altos mine may be found in the Pinos Altos Gold-Silver Mining Project, Chihuahua State, Mexico, Technical Report on the Mineral Resources and Reserves as of December 31, 2008 filed with the Canadian securities regulatory authorities on SEDAR on March 25, 2009. La India Mine Project Mineral Reserves and Mineral Resources As at December 31, 2012 2011 2010 Gold Probable mineral reserves – tonnes 33,457,000 – n/a Average grade – gold grams per tonne 0.72 – n/a Total proven and probable mineral reserves – tonnes 33,457,000 – n/a Average grade – gold grams per tonne 0.72 – n/a Total contained gold ounces 776,000 – n/a Notes: (1)The 2012 mineral reserve and mineral resource estimates for the La India mine project (including the Tarachi deposit) were calculated using a metallurgical gold recovery of 62% or 89%, depending on the deposit. The economic cut-off grade used to determine the open pit reserves varied from 0.2 grams of gold per tonne to 0.4 grams of gold per tonne, depending on the deposit, and is 0.15/0.30 grams of gold per tonne as a marginal cut-off grade. The estimated operating cost used for the 2012 mineral reserve estimate was $7.10 per tonne. The Company estimates that a 10% change in the gold price would result in an approximate 1.9% change in mineral reserves. (2)In addition to the mineral reserves set out above, at December 31, 2012, the La India mine project (including the Tarachi deposit) contained measured mineral resources of 1,662,000 tonnes grading 0.29 grams of gold per tonne, indicated mineral resources of 41,530,000 tonnes grading 0.42 grams of gold per tonne and inferred mineral resources of 81,002,000 tonnes of ore grading 0.39 grams of gold per tonne. (3)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the La India mine project may be found in the Technical Report on the June 30, 2012 Update of the Mineral Resources and Mineral Reserves, La India Gold Project, Municipality of Sahuaripa, Sonora, Mexico, dated August 31, 2012, filed with the Canadian securities regulatory authorities on SEDAR on October 12, 2012. 82 AGNICO-EAGLE MINES LIMITED Table of Contents Meadowbank Mine Mineral Reserves and Mineral Resources As at December 31, 2012 2011 2010 Gold Proven mineral reserves – tonnes 1,764,000 1,931,000 839,000 Average grade – gold grams per tonne 1.56 1.49 3.13 Probable mineral reserves – tonnes 23,560,000 22,563,000 33,259,000 Average grade – gold grams per tonne 2.91 2.91 3.18 Total proven and probable mineral reserves – tonnes 25,324,000 24,494,000 34,098,000 Average grade – gold grams per tonne 2.82 2.79 3.18 Total contained gold ounces 2,294,000 2,201,000 3,486,000 Notes: (1)The 2012 mineral reserve and mineral resource estimates were calculated using a metallurgical gold recovery of 91% or 94%, depending on the deposit. The economic cut-off grade used to determine the open pit reserves varied from 1.14 grams of gold per tonne to 1.16 grams of gold per tonne, depending on the deposit, and is 1.03 to 1.06 grams of gold per tonne as a marginal cut-off grade, depending on the deposit. The estimated ore-based operating costs used for the 2012 mineral reserve estimate varied between C$53.60 per tonne and C$54.72 per tonne, depending on the deposit, with an additional haulage cost of C$1.12 for Vault deposit reserves. The Company estimates that a 10% change in the gold price would result in an approximate 0.2% change in mineral reserves. (2)In addition to the mineral reserves set out above, at December 31, 2012, the Meadowbank mine contained measured mineral resources of 1,441,000 tonnes grading 0.93 grams of gold per tonne, indicated mineral resources of 8,885,000 tonnes grading 2.75 grams of gold per tonne and inferred mineral resources of 3,589,000 tonnes of ore grading 3.81 grams of gold per tonne. (3)The following table shows the reconciliation of mineral reserves (in nearest thousand tonnes) at the Meadowbank mine by category at December 31, 2012 with those at December 31, 2011. Revision means additional mineral reserves converted from mineral resources or other categories of mineral reserves, an update to mineral reserves based on changed mine plans, and mineral reserves added from exploration activities during 2012. Proven Probable Total December 31, 2011 1,931 22,563 24,494 Processed in 2012 3,821 – 3,821 Revision 3,654 997 4,651 December 31, 2012 1,764 23,560 25,324 (4)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Meadowbank mine may be found in the Technical Report on the Mineral Resources and Mineral Reserves at Meadowbank Gold Mine, Nunavut, Canada as at December 31, 2011 filed with Canadian securities regulatory authorities on SEDAR on March 23, 2012. 2012 ANNUAL REPORT 83 Table of Contents Meliadine Project Mineral Reserves and Mineral Resources As at December 31, 2012 2011 2010 Gold Proven mineral reserves – tonnes 34,000 34,000 – Average grade – gold grams per tonne 7.31 7.31 – Probable mineral reserves – tonnes 13,266,000 12,434,000 9,467,000 Average grade – gold grams per tonne 6.98 7.18 6.49 Total proven and probable mineral reserves – tonnes 13,300,000 12,468,000 9,467,000 Average grade – gold grams per tonne 6.98 7.18 6.49 Total contained gold ounces 2,987,000 2,877,000 2,600,000 Notes: (1)The 2012 mineral reserve and mineral resource estimates were calculated using metallurgical gold recovery curves for Tiriganiaq and F Zone. The curves give a maximum recovery of 96% for Tiriganiaq and 93% for F Zone. The 2012 mineral resource estimates for all other zones were calculated using a metallurgical gold recovery of 94%, except for Wolf and Pump, which were calculated using a metallurgical gold recovery of 95% and 90%, respectively. The cut-off grade used to determine the open pit reserves was 1.94 grams of gold per tonne, undiluted (1.69 grams of gold per tonne, diluted), and the cut-off grade used to determine the underground reserves was 4.89 grams of gold per tonne, undiluted (3.62 grams of gold per tonne, diluted). The estimated operating cost used for the 2012 mineral reserve estimate was C$74.71 per tonne for open pit and C$165.65 per tonne for underground. The Company estimates that a 10% change in the gold price would result in an approximate 3.5% change in mineral reserves. (2)In addition to the mineral reserves set out above, at December 31, 2012, the Meliadine project contained indicated mineral resources of 17,234,000 tonnes grading 3.94 grams of gold per tonne and inferred mineral resources of 14,816,000 tonnes of ore grading 6.15 grams of gold per tonne. (3)The breakdown of mineral reserves between planned open pit operations and underground operations at the Meliadine project (with tonnage and contained ounces rounded to the nearest thousand) at December 31, 2012 is: Category Mining Method Tonnes Gold Grade (g/t) Contained Gold (oz) Proven mineral reserves Open pit stockpile 34,000 7.31 8,000 Probable mineral reserves Open pit 5,172,000 5.85 973,000 Probable mineral reserves Underground 8,094,000 7.71 2,006,000 Total probable mineral reserves 13,266,000 6.98 2,979,000 Total proven and probable mineral reserves 13,300,000 6.98 2,987,000 (4)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Meliadine project may be found in the Technical Report on the December 31, 2010 Mineral Resource and Mineral Reserve Estimate, Meliadine Gold Project, Nunavut, Canada filed with the Canadian securities regulatory authorities on SEDAR on March 8, 2011. Risk Mitigation The Company mitigates the likelihood and potential severity of the various risks it encounters in its day-to-day operations through the application of high standards in the planning, construction and operation of mining facilities. In addition, emphasis is placed on hiring and retaining competent personnel and developing their skills through training in safety and loss control. The Company's operating and technical personnel have a solid track record of developing and operating precious metal mines and several of the Company's mines have been recognized for excellence in this regard with various safety and development awards. Nevertheless, the Company and its employees continue with a focused effort to improve workplace safety and the Company has placed additional emphasis on safety procedure training for both mining and supervisory employees. The Company also mitigates some of the Company's normal business risk through the purchase of insurance coverage. An Insurable Risk Management Policy, approved by the Board, governs the purchase of insurance coverage and only permits the purchase of coverage from insurance companies of the highest credit quality. For a more complete list of the risk factors affecting the Company, please see "Item 3 Key Information – Risk Factors". 84 AGNICO-EAGLE MINES LIMITED Table of Contents Glossary of Selected Mining Terms "acid mine drainage" Acidic run-off water from mines and mine waste containing sulphide minerals. "alteration" Any physical or chemical change in the mineral composition of a rock subsequent to its formation, generally produced by weathering or hydrothermal solutions. Milder and more localized than metamorphism. "anastomosing" A network of branching and rejoining fault or vein surfaces or surface traces. "andesite" A dark-coloured, fine-grained calc-alkaline volcanic rock of intermediate composition. "assay" To analyze the proportions of metals in an ore; to test an ore or mineral for composition, purity, weight or other properties of commercial interest. "banded iron formation" An iron formation that shows marked banding, generally of iron-rich minerals and chert or fine-grained quartz. "bedrock" Solid rock exposed at the surface of the Earth or overlain by unconsolidated material, weathered rock or soil. "bench" A ledge in an open-pit mine that forms a single level of operation above which minerals or waste rock are excavated. The ore or waste is removed in successive layers (benches), several of which may be in operation simultaneously. "breccia" A rock in which angular rock fragments are surrounded by a mass of fine-grained minerals. "brittle" Of minerals, proneness to fracture under low stress. A quality affecting behaviour during comminution of ore, whereby one species fractures more readily than others in the material being crushed. "bulk mining" A method of mining in which large quantities of low-grade ore are mined without attempt to segregate the high-grade portions. "byproduct" A secondary metal or mineral product recovered from the processing of rock. "carbon-in-leach (CIL)" A precious metals recovery step in the mill. Gold and silver are leached from the ground ore and at the same time adsorbed onto granules of activated carbon, which is then separated by screening and processed to remove the precious metals. "carbon-in-pulp (CIP)" A precious metals recovery step in the mill. After gold and silver have been leached from ground ore, they are adsorbed onto granules of activated carbon, which is then separated by screening and processed to remove the precious metals. A CIP circuit comprises a series of tanks through which leached slurry flows. Gold is captured onto captive activated carbon that will periodically be moved counter-currently from tank to tank. Head tank carbon is extracted periodically to further recover adsorbed gold before being returned to the circuit tails tank. "chalcopyrite" A sulphide mineral of copper and iron; the most important ore mineral of copper. "concentrate" The clean product recovered by froth flotation in the plant. "conglomerate" A coarse-grained sedimentary rock composed of rounded fragments set in a fine-grained cemented matrix. "contact" A plane or irregular surface between two types or ages of rock. "counter-current decantation" The clarification of washery water and the concentration of tailings by the use of several thickeners in series. The water flows in the opposite direction from the solids. The final products are slurry that is removed and clear water that is reused in the circuit. "crosscut" An underground passage driven from a shaft toward the ore, at (or near) right angles to the strike of a vein or other orebody. "cut-off grade" The minimum metal grade in an ore that can be mined profitably. 2012 ANNUAL REPORT 85 Table of Contents "cyanidation" A method of extracting exposed gold or silver grains from crushed or ground ore by dissolving (leaching) it in a weak cyanide solution. May be carried out in tanks inside a mill or in heaps of ore out of doors (heap leach). "deposit" A natural occurrence of mineral or mineral aggregate, in such quantity and quality to invite exploitation. "development" The preparation of a mining property or area so that an orebody can be analyzed and its tonnage and quality estimated. Development is an intermediate stage between exploration and mining. "diamond drill" A drilling machine with a rotating, hollow, diamond-studded bit that cuts a circular channel around a core, which can be recovered to provide a more-or-less continuous and complete columnar sample of the rock penetrated. "dilution" The contamination of ore with barren wall rock in stoping, increasing tonnage mined and lowering the overall ore grade. "dip" The angle at which a vein, structure or rock bed is inclined from the horizontal as measured at right angles to the strike. "disseminated" Said of a mineral deposit (especially of metals) in which the desired minerals occur as scattered particles in the rock, but in sufficient quantity to make the deposit an ore. Some disseminated deposits are very large. "dore" Unrefined gold and silver bullion bars, which will be further refined to almost pure metal. "drift" A horizontal opening in or near an orebody and parallel to the long dimension of the orebody, as opposed to a crosscut that crosses the orebody. "ductile" Of rock, able to sustain, under a given set of conditions, 5% to 10% deformation before fracturing or faulting. "dyke" An earthen embankment, as around a drill sump or tank, or to impound a body of water or mill tailings. Also, a tabular body of igneous rock that cuts across the structure of adjacent rocks. "electrowinning" An electrochemical process in which a metal dissolved within an electrolyte is plated onto an electrode. Used to recover metals such as copper and gold from solution in the leaching of concentrates, etc. "envelope" 1. The outer or covering part of a fold, especially of a folded structure that includes some sort of structural break. 2. A metamorphic rock surrounding an igneous intrusion. 3. In a mineral, an outer part different in origin from an inner part. "epigenetic" Orebodies formed by hydrothermal fluids and gases that were introduced into the host rocks from elsewhere, filling cavities in the host rock. "epithermal" Referring to a mineral deposit that formed later than the enclosing rocks consisting of veins and replacement bodies, containing precious metals or, more rarely, base metals. "extensional-shear vein" A vein put in place in an extension fracture caused by the deformation of a rock. "fault" A fracture or a fracture zone in crustal rocks along which there has been displacement of the two sides relative to one another parallel to the fracture. The displacement may be a few inches or many kilometres long. 86 AGNICO-EAGLE MINES LIMITED Table of Contents "feasibility study" A comprehensive technical and economic study of the selected development option for a mineral project that includes appropriately detailed assessments of realistically assumed mining, processing, metallurgical, economic, marketing, legal, environmental, social and governmental considerations, together with any other relevant operational factors and a detailed financial analysis, that are necessary to demonstrate at the time of reporting that extraction is reasonably justified (economically mineable). The results of the study may reasonably serve as the basis for a final decision by a proponent or financial institution to proceed with, or finance, the development of the project. The confidence level of the study will be higher than that of a pre-feasibility study. "felsic" A term used to describe light-coloured rocks containing feldspar, feldspathoids and silica. "flotation" The method of mineral separation in which a froth created by a variety of reagents floats some finely crushed minerals, whereas other minerals sink. The metal-rich flotation concentrate is then skimmed off the surface. "flowsheet" A diagram showing the progress of material through a treatment plant. "foliation" A general term for a planar arrangement of features in any type of rock, especially the planar structure that results in a metamorphic rock. "footwall" The rock beneath an inclined vein or ore deposit. (Opposite of a hanging wall). "fracture" Any break in a rock, whether or not it causes displacement, due to mechanical failure by stress; includes cracks, joints and faults. "free gold" Gold not combined with other substances. "glacial till" Dominantly unsorted and unstratified, unconsolidated rock debris, deposited directly by and underneath a glacier. "grade" The relative quantity or the percentage of metal content of an orebody, e.g., grams of gold per tonne of rock, or percent copper. "greenstone belt" An area underlain by metamorphosed volcanic and sedimentary rocks, usually in a continental shield. "grouting" The process of sealing off a water flow in rocks by forcing a thin slurry of cement or other chemicals into the crevices; usually done through a diamond drill hole. "hanging wall" The rock on the upper side of a vein or ore deposit. "head grade" The average grade of ore fed into a mill. "hectare" A metric measurement of area. 1 hectare = 10,000 square metres = 2.47 acres. "horst" An up-faulted block of rock. "hydrothermal alteration" Alteration of rocks or minerals by reaction with hydrothermal (magmatic) fluids. "igneous rock" Rock formed by the solidification of molten material that originated within the Earth. "indicated mineral resource" That part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be reasonably assumed. While this term is recognized and required by Canadian regulations, the SEC does not recognize it. Investors are cautioned not to assume that any part or all of the mineral deposits in this category will ever be converted into mineral reserves. 2012 ANNUAL REPORT 87 Table of Contents "inferred mineral resource" That part of a mineral resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. While this term is recognized and required by Canadian regulations, the SEC does not recognize it. Investors are cautioned not to assume that any part or all of the mineral deposits in this category will ever be converted into mineral reserves. Investors are cautioned not to assume that part of or all of an inferred mineral resource exists, or is economically or legally mineable. "infill drilling" Drilling within a defined mineralized area to improve the definition of known mineralization. "intrusive" A body of igneous rock formed by the consolidation of magma intruded below surface into other rocks, in contrast to lavas, which are extruded upon the Earth's surface. "iron formation" A chemical sedimentary rock, typically thin-bedded or finely laminated, containing at least 15% iron of sedimentary origin and commonly containing layers of chert. "kilometre" A metric measurement of distance. 1.0 kilometre = 1,000 metres = 0.62 miles. "leaching" A chemical process for the extraction of valuable minerals from ore; also, a natural process by which ground waters dissolve minerals. "lens" A geological deposit that is thick in the middle and tapers towards the ends, resembling a convex lens. "lithologic groups" Groups of rock formations. "lode" A mineral deposit consisting of a zone of veins, veinlets or disseminations. "longitudinal retreat" An underground mining method where the ore is excavated in horizontal slices along the orebody and the stoping starts below and advances upwards. The ore is recovered underneath in the stope. "mafic" Igneous rocks composed mostly of dark, iron- and magnesium-rich silicate minerals. "massive" Said of a mineral deposit, especially of sulphides, characterized by a great concentration of ore in one place, as opposed to a disseminated or vein-like deposit. Said of any rock that has a homogeneous texture or fabric over a large area, with an absence of layering or any similar directional structure. "matrix" The fine-grained rock material in which a larger mineral is embedded. "measured mineral resource" That part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics are so well established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic parameters to support production planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm both geological and grade continuity. While this term is recognized and required by Canadian regulations, the SEC does not recognize it. Investors are cautioned not to assume that any part or all of the mineral deposits in this category will ever be converted into mineral reserves. 88 AGNICO-EAGLE MINES LIMITED Table of Contents "Merrill-Crowe process" A separation technique for removing gold from a cyanide solution. The solution is separated from the ore by methods such as filtration and counter-current decantation, and then the gold is precipitated onto zinc dust. Silver and copper may also precipitate. The precipitate is filtered to capture the gold slimes, which are further refined, e.g., by smelting, to remove the zinc and by treating with nitric acid to dissolve the silver. "metallurgical properties" Properties characterizing metals and minerals behaviour under various processing techniques. "metamorphism" The process by which the form or structure of sedimentary or igneous rocks is changed by heat and pressure. "mill" A mineral treatment plant in which crushing, wet grinding and further treatment of ore is conducted; also a revolving drum used for the grinding of ores in preparation for treatment. "mineral resource" A concentration or occurrence of diamonds, natural solid inorganic material or natural solid fossilized organic material including base and precious metals, coal and industrial minerals in or on the Earth's crust in such form and quantity and of such a grade or quality that it has reasonable prospects for economic extraction. The location, quantity, grade, geological characteristics and continuity of a mineral resource are known, estimated or interpreted from specific geological evidence and knowledge. Investors are cautioned not to assume that any part or all of the mineral deposits in any category of resources will ever be converted into mineral reserves. "mineral reserve" The economically mineable part of a measured or indicated mineral resource demonstrated by at least a preliminary feasibility study. This study must include adequate information on mining, processing, metallurgical, economic and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified. A mineral reserve includes diluting materials and allowances for losses that may occur when the material is mined. "muck" Finely blasted rock (ore or waste) underground. "net smelter return royalty" A royalty payment made by a producer of metals based on the proceeds from the sale of mineral products after deducting off-site processing and distribution costs including smelting, refining, transportation and insurance costs. "ounce" A measurement of weight, especially used for gold, silver and platinum group metals. 1 troy ounce = 31.1035 grams. "outcrop" The part of a rock formation that appears at the surface of the Earth. "oxidation" A chemical reaction caused by exposure to oxygen, which results in a change in the chemical composition of a mineral. "phenocryst" Large crystals or mineral grains floating in the matrix or groundmass of a porphyry. "pillar" A block of ore or other rock entirely surrounded by stoping, left intentionally for purposes of ground control or on account of low value. "plunge" The inclination of a fold axis or other linear structure from a horizontal plane, measured in the vertical plane. "polydeformed" A rock that has been subjected to more than one instance of folding, faulting, shearing, compression or extension as a result of various tectonic forces. "porphyritic" Rock texture in which one or more minerals has a larger grain size than the accompanying minerals. "porphyry" Any igneous rock in which relatively large crystals, called phenocrysts, are set in a fine-grained groundmass. 2012 ANNUAL REPORT 89 Table of Contents "preliminary feasibility study" or "pre-feasibility study" A comprehensive study of a range of options for the technical and economic viability of a mineral project that has advanced to a stage where a preferred mining method (in the case of underground mining) or the pit configuration (in the case of an open pit) is established, and an effective method of mineral processing is determined. It includes a financial analysis based on reasonable assumptions on mining, processing, metallurgical, economic, marketing, legal, environmental, social and governmental considerations and the evaluation of any other relevant factors which are sufficient for a qualified person, acting reasonably, to determine if all or part of the mineral resource may be classified as a mineral reserve. "pressure oxidation" A process by which sulphide minerals are oxidized in order to expose gold that is encapsulated in the mineral lattice. The main component of a pressure oxidation circuit consists of a pressurized vessel (autoclave) where the oxygen level, process temperature and acidity are the primary control parameters. "probable mineral reserve" The economically mineable part of an indicated and, in some circumstances, a measured mineral resource demonstrated by at least a preliminary feasibility study. "proven mineral reserve" The economically mineable part of a measured mineral resource demonstrated by at least a preliminary feasibility study. "pyrite" A yellow iron sulphide mineral, FeS2, normally of little value. It is sometimes referred to as "fool's gold". "pyroclastic" Rocks produced by explosive or aerial ejection of ash, fragments and glassy material from a volcanic vent. "recovery" The percentage of valuable metal in the ore that is recovered by metallurgical treatment. "reverse circulation drilling" A type of drilling into rock using a solid bit to produce a hole and deliver rock chips (rather than core) to surface for analysis. "rock burst" A sudden and often violent breaking of a mass of rock from the walls of a mine, caused by failure of highly stressed rock and the rapid release of accumulated strain energy. "run-of-mine ore" The raw, mined material as it is delivered, prior to sorting, stockpiling or treatment. "sandstone" A sedimentary rock consisting of grains of sand cemented together. "schist" A strongly foliated crystalline rock that can be readily split into thin flakes or slabs due to the well-developed parallelism of more than 50% of the minerals present in it, such as mica or hornblende. "sedimentary rocks" Rocks resulting from the consolidation of loose sediment that has accumulated in layers. Examples are limestone, shale and sandstone. "semi-autogenous grinding (SAG)" A method of grinding rock whereby larger chunks of the rock itself and steel balls form the grinding media. "shear" or "shearing" The deformation of rocks by lateral movement along innumerable parallel planes, generally resulting from pressure and producing metamorphic structures such as cleavage and schistosity. "shear zone" A tabular zone of rock that has been crushed and brecciated by many parallel fractures due to shear stress. Such an area is often mineralized by ore-forming solutions. "sill" An intrusive sheet of igneous rock of roughly uniform thickness that has been forced between the bedding planes of existing rock. "slurry" Fine rock particles in circulating water in a treatment plant. 90 AGNICO-EAGLE MINES LIMITED Table of Contents "stope" 1. Any excavation in a mine, other than development workings, made for the purpose of extracting ore. 2. To excavate ore in an underground mine. "strike" The direction, or bearing from true north, of a horizontal line on a vein or rock formation at right angles to the dip. "stringers" Mineral veinlets or filaments occurring in a discontinuous subparallel pattern in a host rock. "sublevel retreat" An underground mining method in which the ore is excavated in horizontal slices along the orebody, starting below and advancing upwards. The ore is recovered underneath in the stope. "sulphide" A mineral characterized by the linkage of sulphur with a metal, such as pyrite, FeS2. "tabular" Said of a feature having two dimensions that are much larger or longer than the third, such as a dyke. "tailings" Material rejected from a mill after the economically and technically recoverable valuable minerals have been extracted. "tailings dam" or "tailings impoundment" or "tailings pond" Area closed at the lower end by a constraining wall or dam to which mill effluents are sent, the prime function of which is to allow enough time for metals to settle out or for cyanide to be naturally destroyed before the water is returned to the mill or discharged into the local watershed. "tenement" The right to enter, develop and work a mineral deposit. Includes a mining claim or a mining lease. A synonym of mineral title. "thickener" A vessel for reducing the proportion of water in a pulp by means of sedimentation. "thickness" The distance at right angles between the hanging wall and the footwall of a lode or lens. "tonne" A metric measurement of mass. 1 tonne = 1,000 kilograms = 2,204.6 pounds = 1.1 tons. "transfer fault" A structure that can accommodate lateral variations of deformation and strain. "transverse open stoping" An underground mining method in which the ore is excavated in horizontal slices perpendicular to the orebody length and the stoping starts below and advances upwards. The ore is recovered underneath the stope through a drawpoint system. "trench" A narrow excavation dug through overburden, or blasted out of rock, to expose a vein or ore structure for sampling or observation. "vein" A mineral filling of a fault or other fracture in a host rock. "wacke" A "dirty" sandstone that consists of a mixture of poorly sorted mineral and rock fragments in an abundant matrix of clay and fine silt. "winze" An internal mine shaft. "Zadra elution circuit" The process in this part of a gold mill strips gold and silver from carbon granules and puts them into solution. "zone" An area of distinct mineralization, i.e., a deposit. | 20-F |
| 2011 | Item 4. Information on the Company | History and Development of the Company The Company is an established Canadian-based international gold producer with mining operations in northwestern Quebec, northern Mexico, northern Finland and Nunavut and exploration activities in Canada, Europe, Latin America and the United States. The Company's operating history includes over three decades of continuous gold production primarily from underground operations. Since its formation on June 1, 1972, the Company has produced almost 7.5 million ounces of gold. For definitions of certain technical terms used in the following discussion, see "– Property, Plant and Equipment – Glossary of Selected Mining Terms". The Company's strategy is to focus on the continued exploration, development and expansion of its properties, all of which are located in politically stable jurisdictions. The Company has spent approximately $2.7 billion on mine development over the last five years. Through this development program, the Company transformed itself from a regionally focused, single mine producer to a multi-mine international gold producer with five operating, 100% owned mines. Since 1988, the LaRonde mine, in the Abitibi region of Quebec, has been the Company's flagship operation, producing approximately 4.3 million ounces of gold as well as valuable byproducts. The Lapa mine, the Company's highest grade metals mine, is 11 kilometres east of the LaRonde mine. The synergies between these sites contribute to the Company's efforts to reduce costs. The Kittila mine, in Finland, achieved commercial production in May 2009, has a long reserve life and has significant production expansion potential. The Pinos Altos mine, in Mexico, achieved commercial production in November 2009 and also has significant production expansion potential. The Company's fifth mine, Meadowbank, in Nunavut, achieved commercial production in March 2010 and is expected to produce the most gold (295,000 ounces) in 2012. In addition, the Company plans to pursue opportunities for growth in gold production and gold reserves through the prudent acquisition or development of exploration properties, development properties, producing properties and other mining businesses in the Americas and Europe. In 2011, the Company produced 985,460 ounces of gold at total cash costs per ounce of $580 net of revenues from byproduct metals. For 2012, the Company expects to produce between 875,000 and 950,000 ounces of gold at a total cash costs per ounce of gold produced between $690 and $750 net of byproduct revenue. These expected higher total cash costs compared to 2011 reflect the closure of the Goldex mine, the Company's second lowest cost mine, in October 2011 due to suspected rock subsidence issues; the higher proportion of production coming from the Meadowbank mine, which is expected to have higher total cash costs per ounce compared to the Company's average; higher costs associated with the transition to underground mining operations at the Pinos Altos mine and the Kittila mine; and increased production from the Company's mines and mine projects that do not contain byproduct metals, revenue from which reduces total cash costs per ounce. In addition, the higher total cash costs per ounce also reflect the Canadian dollar strengthening against the U.S. dollar and continued escalations in labour, shipping and transportation costs. See "Note to Investors Concerning Certain Measures of Performance" for a discussion of the use of the non-US GAAP measure total cash costs per ounce. The Company has traditionally sold all of its production at the spot price of gold due to its general policy not to sell forward its future gold production. The Company operates through four segments: Canada, Europe, Latin America and Exploration. The Canadian Segment is comprised of the Province of Quebec and the Territory of Nunavut. The Company's Quebec properties include the LaRonde mine, the Goldex mine (mining operations suspended in October 2011) and the Lapa mine, each of which is held directly by the Company. In 2011, the Quebec properties accounted for 37.2% of the Company's gold production, comprised of 12.6% from the LaRonde mine, 13.7% from the Goldex mine and 10.9% from the Lapa mine. In 2012, the Company anticipates that its Quebec properties will account for 26.4% of the Company's gold production, of which 17.3% and 9.1% of the Company's gold production will come from the LaRonde mine and the Lapa mine, respectively. 16 AGNICO-EAGLE MINES LIMITED Table of Contents The Company's Nunavut properties are comprised of the Meadowbank mine and the Meliadine project, which are both held directly by the Company. In 2011, the Meadowbank mine accounted for 27.5% of the Company's gold production and the Company anticipates that in 2012 the Meadowbank mine will account for approximately 32.3% of the Company's gold production. The Company's operations in the European Segment are conducted through its indirect subsidiary, Agnico Eagle Finland Oy, which indirectly owns the Kittila mine in Finland. In 2011, the Kittila mine accounted for 14.6% of the Company's gold production and the Company anticipates that in 2012 the Kittila mine will account for approximately 16.9% of the Company's gold production. The Company's mining operations in the Latin American Region are conducted through its subsidiary, Agnico Eagle Mexico S.A. de C.V., which owns the Pinos Altos mine, including the Creston Mascota deposit at Pinos Altos. The La India project is owned by the Company's indirect subsidiary, Resource Grayd De Mexico, S.A. de C.V.. In 2011, the Pinos Altos mine accounted for 20.7% of the Company's gold production and the Company anticipates that in 2012 the Pinos Altos mine will account for approximately 22.5% of the Company's gold production. The Exploration Segment includes the Company's grassroots exploration operations in the United States, the European exploration office, the Canadian exploration offices and the Latin American exploration office. In addition, the Company has an international exploration office in Reno, Nevada. Agnico-Eagle's expertise in acquiring mine projects and developing mines is shown through the launch of five operating mines. The following table sets out the date of acquisition, the date of commencement of construction and the date of achieving commercial production for the Company's mines and mine projects. Date of Acquisition Date of Commencement of Construction Date of achieving Commercial Production LaRonde mine 1992 (1) 1985 1988 Goldex mine (suspended in October, 2011) December 1993 (1) July 2005 August 2008 Kittila mine November 2005 June 2006 May 2009 Lapa mine June 2003 (1) June 2006 May 2009 Pinos Altos mine March 2006 August 2007 November 2009 Meadowbank mine April 2007 Pre-April 2007 March 2010 Meliadine project July 2010 2014 (2) 2017 (2) La India project January 2012 – – Notes: (1)Date when 100% ownership was acquired. (2)Anticipated. The Company's exploration program focuses primarily on the identification of new mineral reserves and resources and new development opportunities in proven gold producing regions. Current exploration activities are concentrated in Canada, Europe, Latin America and the United States. Several projects were evaluated during the year in other countries where the Company believes the potential for gold occurrences is excellent and which the Company believes to be politically stable and supportive of the mining industry. The Company currently manages 77 properties in Canada, 6 properties in the United States, three groups of properties in Finland, one property in Sweden, six projects in Mexico and one project in Argentina. Exploration activities are managed from offices in Val d'Or, Quebec; Reno, Nevada; Chihuahua, Mexico; Kittila, Finland; and Vancouver, British Columbia. In addition, the Company continuously evaluates opportunities to make strategic acquisitions, such as the acquisition of Grayd Resource Corporation ("Grayd") completed in January 2012 that resulted in 100% ownership of the La India project. Five of the Company's new mines or projects came from relatively recent acquisitions. In the second quarter of 2004, the Company acquired an approximate 14% ownership interest in Riddarhyttan Resources AB ("Riddarhyttan"), a Swedish precious and base metals exploration and development company that was at the time 2011 ANNUAL REPORT 17 Table of Contents listed on the Stockholm Stock Exchange. In November 2005, the Company completed a tender offer (the "Riddarhyttan Offer") for all of the issued and outstanding shares of Riddarhyttan that it did not own. The Company issued 10,023,882 of its common shares and paid and committed an aggregate of $5.1 million cash as consideration to Riddarhyttan shareholders in connection with the Riddarhyttan Offer. On March 28, 2011, Riddarhyttan was merged with Agnico-Eagle AB and Agnico-Eagle Sweden AB, with Agnico-Eagle Sweden AB as the continuing entity. The Kittila mine, located approximately 900 kilometres north of Helsinki near the town of Kittila in Finnish Lapland, is currently 100% owned by Agnico-Eagle Finland Oy, which is owned by Agnico-Eagle Sweden AB. In the first quarter of 2005, the Company entered into an exploration and option agreement with Industrias Penoles S.A. de C.V. ("Penoles") to acquire the Pinos Altos property in northern Mexico. The Pinos Altos property is comprised of approximately 11,000 hectares in the Sierra Madre gold belt, approximately 225 kilometres west of the city of Chihuahua in the state of Chihuahua in northern Mexico. In February 2006, the Company exercised its option and acquired the Pinos Altos property on March 15, 2006. Under the terms of the exploration and option agreement, the purchase price of $66.8 million was comprised of $32.5 million in cash and 2,063,635 common shares of the Company. In February 2007, the Company made an exchange offer for all of the outstanding shares of Cumberland Resources Ltd. ("Cumberland") not already owned by the Company. At the time, Cumberland was a pre-production development stage company listed on the Toronto Stock Exchange (the "TSX") and American Stock Exchange whose primary asset was the Meadowbank property. In May 2007, the Company acquired approximately 92% of the issued and outstanding shares of Cumberland that it did not previously own and, in July 2007, the Company completed the acquisition of all Cumberland shares by way of a compulsory acquisition. The Company issued 13,768,510 of its common shares and paid $9.6 million in cash as consideration to Cumberland shareholders in connection with its acquisition of Cumberland. In April 2010, the Company entered into an agreement in principle with Comaplex Minerals Corp. ("Comaplex") whereby the Company would acquire all of the outstanding shares of Comaplex that it did not already own. At the time, Comaplex owned a 100% interest in the advanced stage Meliadine gold property, which is located approximately 300 kilometres southeast of the Company's Meadowbank mine. In May 2010, the Company executed the definitive agreements with Comaplex and, in July 2010 by plan of arrangement, the Company acquired 100% of the Meliadine gold property through the acquisition of Comaplex, which was renamed Meliadine Holdings Inc. ("Meliadine"). Pursuant to the arrangement, Comaplex transferred to Geomark Exploration Ltd. all assets and related liabilities other than those relating to the Meliadine project. In connection with the arrangement, the Company issued 10,210,848 of its common shares as consideration to Comaplex shareholders. On January 1, 2011, the Company amalgamated with Meliadine. In September 2011, the Company entered into an acquisition agreement with Grayd, a Canadian-based natural resource company listed on the TSX Venture Exchange, pursuant to which the Company agreed to make an offer to acquire all of the issued and outstanding common shares of Grayd. At the time, Grayd held a 100% interest in the La India project located in the Mulatos Gold Belt of Sonora, Mexico and had recently discovered the Tarachi gold porphyry prospect located approximately ten kilometres north of the La India project. In October 2011, the Company made the offer by way of a take-over bid circular, as amended and supplemented, and, in November 2011, acquired approximately 95% of the outstanding common shares of Grayd. In January 2012, the Company completed a compulsory acquisition of the remaining outstanding common shares of Grayd and Grayd became a wholly-owned subsidiary of the Company. In aggregate, the Company issued 1,319,418 of its common shares and paid C$179.7 million in cash as consideration to Grayd shareholders in connection with the transaction. In 2011, the Company's capital expenditures were $482.8 million. The 2011 capital expenditures included $90.7 million at the LaRonde mine (which included approximately $49.5 million of expenditures relating to the LaRonde mine extension), $42.2 million at the Goldex mine, $86.5 million at the Kittila mine, $18.4 million at the Lapa mine, $40.0 million at the Pinos Altos mine (which included approximately $7.6 million related to the Creston Mascota deposit), $116.9 million at the Meadowbank mine and $73.9 million at the Meliadine project and $14.2 million at other minor projects. In addition, the Company spent $11.0 million on mine site exploration and $64.7 million on exploration activities at the Company's grassroots exploration properties, including corporate development expenses. Budgeted 2012 capital expenditures of $382.3 million include $74.8 million at the LaRonde mine, $10.2 million at the Lapa mine, $31.5 million at the Pinos Altos mine, $51.9 million at the Kittila mine, $88.5 million at the Meadowbank mine and $44.5 million in capitalized exploration expenditures. In addition, the Company plans exploration expenditures on grassroots exploration projects of approximately $80.4 million, including $52.0 million at the Meliadine project and $3.5 million at the La India project. Depending on the success of the exploration programs at these and other properties, the Company may be required to make additional capital expenditures for exploration, development and pre-production. 18 AGNICO-EAGLE MINES LIMITED Table of Contents The financing for the expenditures set out above is expected to be from internally generated cash flow from operations, from the Company's existing cash balances and from drawdowns of the Company's bank credit facility. Please see "Item 10 Additional Information – Material Contracts – Credit Agreement". Based on current funding available to the Company and expected cash flows from operations, the Company believes it has sufficient funds available to fund its projected capital expenditures for all its properties. Capital expenditures by the Company in 2010 and 2009 were $512 million and $657 million, respectively. The 2010 capital expenditures included $97 million at the LaRonde mine (which included approximately $62 million of expenditures relating to the LaRonde mine extension), $24 million at the Goldex mine, $72 million at the Kittila mine, $33 million at the Lapa mine, $104 million at the Pinos Altos mine (which included approximately $43 million related to the Creston Mascota deposit at Pinos Altos) and $174 million at the Meadowbank mine and $8 million at the Meliadine project and other minor properties. In addition, the Company spent $35 million on exploration activities at the Company's grassroots exploration properties. The 2009 capital expenditures included $76 million at the LaRonde mine (which included approximately $39 million of expenditures relating to the LaRonde mine extension), $22 million at the Goldex mine, $90 million at the Kittila mine (which included $36 million of expenditures on construction of the underground mine), $47 million at the Lapa mine (which included $22 million on construction of the mine), $133 million at the Pinos Altos mine and $288 million at the Meadowbank mine. In addition, the Company spent $55 million on exploration activities at the Company's grassroots exploration properties. The Company was formed by articles of amalgamation under the laws of the Province of Ontario on June 1, 1972, as a result of the amalgamation of Agnico Mines Limited ("Agnico Mines") and Eagle Gold Mines Limited ("Eagle"). Agnico Mines was incorporated under the laws of the Province of Ontario on January 21, 1953 under the name "Cobalt Consolidated Mining Corporation Limited". Eagle was incorporated under the laws of the Province of Ontario on August 14, 1945. On December 19, 1989, Agnico-Eagle acquired the remaining 57% interest in Dumagami Mines Limited not already owned by it, as a consequence of the amalgamation of Dumagami Mines Limited with a wholly-owned subsidiary of Agnico- Eagle, to continue as one company under the name Dumagami Mines Inc. ("Dumagami"). On December 29, 1992, Dumagami transferred all of its property and assets, including the LaRonde mine, to Agnico-Eagle and was subsequently dissolved. On December 8, 1993, the Company acquired the remaining 46.3% interest in Goldex Mines Limited not already owned by it, as a consequence of the amalgamation of Goldex Mines Limited with a wholly-owned subsidiary of the Company, to continue as one company under the name Goldex Mines Limited. On January 1, 1996, the Company amalgamated with two wholly-owned subsidiaries, including Goldex Mines Limited. In October 2001, under a plan of arrangement, the Company amalgamated with an associated corporation, Mentor Exploration and Development Co., Limited ("Mentor"). In connection with the arrangement, the Company issued 369,348 of its common shares in consideration for the acquisition of all of the issued and outstanding shares of Mentor that it did not already own. On August 1, 2007, the Company, Agnico-Eagle Acquisition Corporation, Cumberland and a wholly-owned subsidiary of Cumberland, Meadowbank Mining Corporation, amalgamated under the laws of the Province of Ontario and continued under the name of Agnico-Eagle Mines Limited. On January 1, 2011, the Company and 1816276 Ontario Inc. (the successor corporation to Meliadine, which in turn was the successor corporation to Comaplex) amalgamated under the laws of the Province of Ontario and continued under the name of Agnico-Eagle Mines Limited. The Company's executive and registered office is located at Suite 400, 145 King Street East, Toronto, Ontario, Canada M5C 2Y7; telephone number (416) 947-1212; website: http://www.agnico-eagle.com. The information contained on the website is not part of this Form 20-F. The Company's principal place of business in the United States is located at 8725 Technology Way, Suite B, Reno, Nevada 89521. Business Overview The Company believes that it has a number of key operating strengths that provide distinct competitive advantages. Growth Profile. The Company has a proven track record of increasing production capacity at existing operations through a combination of acquisitions, operational improvements, expansions and development. The closure of the Goldex mine in October 2011 was an unanticipated event and has negatively impacted the growth profile. However, the Company 2011 ANNUAL REPORT 19 Table of Contents anticipates production of between 875,000 and 950,000 ounces of gold in 2012 with continued growth to 2014. In 2012, the Company expects production increases at the LaRonde, Meadowbank and Kittila mines. The Company's production growth in 2012 is expected to come principally from the Meadowbank Mine, as well as from the continued operational improvements at the Kittila and LaRonde mines. Over the last five years, the Company has spent over $2.7 billion on the development of five new mines, and its significant extension of the LaRonde mine at depth. With the large majority of mine development projects complete and with five mines having achieved steady state operational status, capital expenditures are expected to decline from 2011 onward, significantly increasing free cash flow. Future capital expenditures are expected to be primarily for incremental expansion projects and exploration and development of the Meliadine project. Operations in Politically Stable, Mining-Friendly Regions. The Company and its predecessors have over three decades of continuous gold production experience and expertise in metals mining. The Company's operations and exploration and development projects are located in regions that the Company believes are supportive of the mining industry. Two of the Company's producing mines are located in northwestern Quebec, one of North America's principal gold-producing regions. The Company's Kittila mine in northern Finland, Pinos Altos mine in northern Mexico and Meadowbank mine in Nunavut are also located in regions which the Company believes are also supportive of the mining industry. Strong Operating Base. Through its acquisition, exploration and development program, the Company has been transformed from a regionally focused, single mine producer to a multi-mine international gold producer with five operating, 100% owned mines. The Company's existing operations at the LaRonde mine provide a strong base for additional mineral reserve and production development at the property and in the Abitibi region of northwestern Quebec and for the development of its mines and projects in Nunavut, Finland and Mexico. The experience gained through building and operating the LaRonde mine has assisted with the Company's development of its other mine projects. In addition, the extensive infrastructure associated with the LaRonde mine supports the nearby Lapa mine. Highly Experienced Management Team. The members of the Company's senior management team have an average of over 22 years of experience in the mining industry. Management's significant experience has underpinned the Company's historical growth and provides a solid base upon which to expand the Company's operations. Based on these strengths, the Company's corporate strategy is to grow production and reserves in mining-friendly regions. Optimize and Further Expand Operations. The Company continues to focus its resources and efforts on the exploration and development of its properties in Quebec, Nunavut, Finland and Mexico with a view to increasing annual gold production and gold mineral reserves. Leverage Mining Experience. The Company believes it can benefit not only from the existing infrastructure at its mines but also from the geological knowledge that it has gained in mining and developing its properties. The Company's strategy is to capitalize on its mining expertise to exploit fully the potential of its properties. Expand Gold Reserves. The Company is conducting drilling programs at all of its properties with a goal of further increasing its gold reserves. In 2011, on a contained gold ounces basis, the gold reserves of the Company decreased to 18.75 million ounces (157 million tonnes grading 3.71 grams of gold per tonne), a decrease from the 21.3 million ounces reported as at December 31, 2010, primarily as a result of the reclassification of reserves to resources at the Goldex mine due to the suspension of operations and a reduction of reserves at the Meadowbank mine due to a new mine plan. Growth Through Primary Exploration and Acquisitions. The Company's growth strategy has been to pursue the expansion of its development base through the acquisition of additional properties in the Americas and Europe. Historically, the Company's producing properties have resulted from a combination of investments in advanced exploration companies and primary exploration activities. By investing in pre-development stage companies, the Company believes that it has been able to acquire control of projects at favourable prices and reasonable valuations. Mining Legislation and Regulation Canada The mining industry in Canada operates under both federal and provincial or territorial legislation governing prospecting and the exploration, development, operation and decommissioning of mines and mineral processing facilities. Such legislation relates to the method of acquisition and ownership of mining rights, labour, occupational or worker health and safety standards, royalties, mining, exports, reclamation, closure and rehabilitation of mines and other matters. The mining industry in Canada is also subject to extensive laws and regulations at both the federal and provincial or territorial levels concerning the protection of the environment. The primary federal regulatory authorities with jurisdiction 20 AGNICO-EAGLE MINES LIMITED Table of Contents over the Company's mining operations in respect of environmental matters are the Department of Fisheries and Oceans (Canada) and Environment Canada. The construction, development and operation of a mine, mill or refinery requires compliance with applicable environmental laws and regulations and/or review processes, including obtaining land use permits, water permits, air emissions certifications, industrial depollution attestations, hazardous substances management and similar authorizations from various governmental agencies. Environmental laws and regulations impose high standards on the mining industry to reduce or eliminate the effects of waste generated by mining and processing operations and subsequently deposited on the ground or affecting the air or water. Laws and regulations regarding the decommissioning, reclamation and rehabilitation of mines may require approval of reclamation plans, provision of financial guarantees and long-term management of closed mines. Quebec In Quebec, mining rights are governed by the Mining Act (Quebec) and, subject to limited exceptions, are owned by the province. A mining claim entitles its holder to explore for minerals on the subject land. It remains in force for a term of two years from the date it is registered and may be renewed indefinitely subject to continued exploration works in relation thereto. In order to retain title to mining claims, in addition to paying a small bi-annual rental fee currently ranging from C$27 to C$123 per claim depending on its location and area (as set by Quebec government regulations), exploration work (or an equivalent value cash payment) has to be completed in advance (either on the claim or on adjacent mining claims, concessions or leases) and filed with the Ministry of Natural Resources and Wildlife (Quebec) prior to the date of expiry of the claim. The amount of exploration work required bi-annually currently ranges from C$48 to C$3,600 per claim depending on its location, area and period of validity (as set by Quebec government regulations). In 1966, the mining concession system set out for lands containing mineralized zones in the Mining Act (Quebec) was replaced by a system of mining leases, but the mining concessions sold prior to such replacement remain in force. A mining lease entitles its holder to mine and remove valuable mineral substances from the subject land, provided it pays the annual rent set by Quebec government regulations, which currently ranges from C$21 per hectare (on privately held land) to C$44 per hectare (on land owned by the province). Leases are granted initially for a term of 20 years and are renewable up to three times, each for a duration of ten years. After the third renewal, the Minister of Natural Resources and Wildlife (Quebec) may grant an extension thereof on the conditions, for the rental and for the term he or she determines. Bill 14, An Act respecting the development of mineral resources in keeping with the principles of sustainable development, was introduced in the Quebec National Assembly in May 2011 and is currently being studied by a parliamentary commission. If adopted, Bill 14 will amend a number of rules relating to the mining regime in Quebec, including measures to stimulate exploration work on claims, to enhance the protection of the environment and to promote social acceptability of mining activities, all of which will likely impact the Company's activities in Quebec. Among other provisions of Bill 14, obligations respecting exploration work expenditures on claims will become more stringent; mine operators will be required to provide a financial guarantee respecting a broader scope of rehabilitation and restoration work and such financial guarantee will need to be provided within a shorter timeframe; public consultations will be required before commencing mining operations; in certain urban, residential, vacationing or recreational areas, exploration and mining activities may be restricted; and the Minister of Natural Resources and Wildlife will have an increased ability to withdraw land from mining activity or otherwise limit mining activities to avoid conflicts with other land uses. Bill 14 will also increase penalties for contraventions of the Mining Act (Quebec). In Quebec, the primary provincial regulatory authorities with jurisdiction over the Company's mining operations in respect of environmental matters are the Ministry of Sustainable Development, Environment and Parks (Quebec) and the Ministry of Natural Resources and Wildlife (Quebec). Nunavut As a result of the Nunavut Land Claims Agreement (the "Land Claims Agreement") of July 1993, ownership of large tracts of land was granted to the Inuit. These Inuit-owned lands include areas with high mineral potential. Further, as a result of other rights granted to the Inuit in the Land Claims Agreement, Inuit organizations play an important role in the management of natural resources and the environment in Nunavut. These duties are shared among the federal and territorial governments and Inuit organizations. Under the Land Claims Agreement, the Inuit own surface rights to certain lands representing approximately 16% of Nunavut. For a portion of the Inuit-owned lands representing approximately 2% of Nunavut, the Inuit own mineral (subsurface) rights in addition to the surface rights. In Nunavut, the Crown's mineral rights are administered by the Aboriginal Affairs and Northern Development Canada in accordance with the Northwest Territories and Nunavut Mining Regulations (the "Territorial Mining Regulations") under 2011 ANNUAL REPORT 21 Table of Contents the Territorial Lands Act (Canada). The Inuit mineral rights in subsurface Inuit-owned lands are owned and administered by Nunavut Tunngavik Incorporated ("Nunavut Tunngavik"), a corporation representing the Inuit people of Nunavut. Future production from Nunavut Tunngavik-administered mineral claims is subject to production leases which include a 12% net profits interest royalty from which annual deductions are limited to 85% of gross revenue. Production from Crown mining leases is subject to a royalty of up to 14% of adjusted net profits, as defined in the Territorial Mining Regulations. Before the operation of a Major Development Project, as defined in the Land Claims Agreement, can begin, developers must also negotiate an Inuit impact benefits agreement with the regional Inuit Association. The Kivalliq Inuit Association (the "KIA") is the Inuit organization that holds surface title to the Inuit-owned lands in the Kivalliq region and is responsible for administering surface rights on these lands on behalf of the Inuit of the region. In order to conduct exploration work on Inuit-owned lands, the Company is required to submit a project proposal or work plan. This proposal is subject to approval by the KIA for surface land tenure and to review by other boards established by the Land Claims Agreement to determine environmental effects and, if needed, to grant water rights. Federal and territorial government departments participate in the reviews conducted by these boards. For mine development, the Company requires a surface lease and water compensation agreement with the KIA and a licence under federal legislation for the use of water, including the deposit of waste. During mine construction and operations, the Company is subject to additional Nunavut and federal government regulations related to environmental, safety, fire and other operational matters. Finland Mining legislation in Finland consists of the Mining Act, the Mining Safety Decree and the Mining Hoisting Equipment Decree. The new Mining Act was implemented on July 1, 2011 and replaced the previous Mining Act (503/1965) as a result of overall reform of mining legislation in Finland. In Finland, subject to certain area restrictions, anyone has a right irrespective of land ownership to conduct survey work and take geological measurements and observations, with the right to take small samples from the soil provided that these measures do not cause other than only minor damage or inconvenience. However, before sampling, notice must be given to the owner of the respective land. A prospecting permit is required for more comprehensive survey work and it entitles its holder to conduct necessary research and explorations in certain areas defined in the prospecting permit in order to discover the quality and extent of the deposit and to build or move temporary facilities and machinery onto the prospecting area. The prospecting permit does not grant a right to exploit a deposit, for which purpose a mining permit is required, but it grants its holder a priority to receive the mining permit on the prospecting area. A mining permit entitles its holder to exploit all minerals found on the mining area defined in the permit as well as all organic and non-organic surface material and the soil and bedrock as considered necessary for the purposes of the mining work. In addition to the mining permit a mining safety permit regarding safety measures of the contemplated mining operations is required in order to build and operate a mine. The mining area must either be owned or leased by voluntary agreements by the permit holder for mining work to commence in accordance with the terms of the permit. In certain cases, if the mining operator and the owner of the land cannot come to a voluntary agreement on the use of the land for mining purposes, the Council of State of Finland may grant a mining area redemption permit which entitles its holder the right to establish a mining area on the area owned by another landowner without consent, provided that the mining project is required by public interest. The Finnish Safety and Chemicals Agency is responsible for granting prospecting permits, mining permits and mining safety permits upon an application provided that statutory requirements are fulfilled. Prospecting permits are issued for fixed periods of time (a maximum period of four years at a time which can be extended for three-year periods, up to a maximum of 15 years). Mining permits are generally granted without an expiry date. However, the Safety and Chemicals Agency investigates grounds for the continued existence of the permit at least once every ten years. In some cases, depending on the prevailing circumstances and the deposit, mining permits may only be granted for a fixed period of time (to a maximum period of ten years at a time). Prospecting permits and mining permits may be cancelled if the holder of the permit does not perform mining operations in accordance with the permit and its terms or violates rules of the Mining Act. 22 AGNICO-EAGLE MINES LIMITED Table of Contents Without specific permission of the National Board of Patents and Registrations of Finland a right to apply for and acquire a prospecting permit and mining permit is limited to Finnish corporations and individuals and foreign individuals and corporations domiciled in a state belonging to the European Economic Area. All mining operations must be carried out in accordance with the permit terms and with laws and regulations concerning conservation and environmental protection issues. Under the Environmental Protection Act, mining activities require an environmental permit which may be issued either for a definite or indefinite period of time. The Environmental Protection Act is based on the principles of prevention and minimization of damages and hazards, application of the best available technology, application of the best environmental practice and the "polluter pays" principle. The Act on Compensation for Environmental Damage includes provisions on the compensation for damage to a person or a property resulting from pollution of water, air, soil, noise, vibration, radiation, light, heat, smell or other similar nuisances, caused by an activity carried out at a fixed location. This act is based on the principle of strict liability. In addition to the permits listed above, mining operators may require several other permits and may be subject to other obligations under Finnish legislation. According to the Act on Environmental Impact Assessment Procedure, certain projects require compliance with an environmental impact assessment procedure. These include major projects with a considerable impact on the environment, such as the excavation, enrichment and handling of metals and other minerals in cases where the excavated material is estimated to exceed 550,000 tonnes annually. A permit authority may not give its approval to an activity covered by the scope of the Act on the Environmental Impact Assessment Procedure without having taken an environmental impact assessment report into consideration. Mexico Mining in Mexico is subject to the Mining Law, a federal law. Under the Mexican Constitution, all minerals belong to the Mexican Nation. Private parties may explore and extract minerals pursuant to mining concessions granted by the executive branch of the Mexican government, as a general rule to whoever first claims them. While the Mining Law touches briefly upon labour, occupational and worker health and safety standards, these are primarily dealt with by the Federal Labour Law. The Mining Law also briefly addresses environmental matters, which are primarily regulated by the General Law of Ecological Balance and Protection of the Environment, also of federal jurisdiction. The primary agencies with jurisdiction over mining activities are the Ministry of the Economy, the Ministry of Labor and Social Welfare and the Ministry of the Environment and Natural Resources. The National Water Commission has jurisdiction regarding the granting of water rights and the Ministry of Defense with respect to the use of explosives. Concessions are granted for 50 years, renewable once. The main obligations to keep concessions current are the semi-annual payment of mining duties (taxes), based on the surface area of the concession, and the performance of work in the areas covered by the concessions, which is evidenced by minimum expenditures or by the extraction of ore. Organizational Structure The Company's significant subsidiaries (all of which are directly or indirectly wholly-owned by the Company, unless otherwise indicated) are 1715495 Ontario Inc., Agnico-Eagle Mines Sweden Cooperatie U.A., which owns all of the shares of Agnico-Eagle Sweden AB, a Swedish company through which the Company holds its interest in Oijarvi Resources Oy, and Agnico-Eagle Finland Oy, a Finnish company through which the Kittila mine is held. In addition, the Company's interest in the Pinos Altos mine in northern Mexico is held through its indirect wholly-owned Mexican subsidiary, Agnico Eagle Mexico S.A. de C.V., which is owned, in part, by 1641315 Ontario Inc. and Tenedora Agnico Eagle Mexico S.A. de C.V., which is owned in part by Agnico-Eagle Mines Mexico Cooperatie U.A. and the Company's interest in the La India project in Mexico is held through its indirect wholly-owned Mexican subsidiary, Resource Grayd De Mexico, S.A. de C.V., which is owned by Grayd, which is directly wholly owned by the Company, and Tenedora Agnico Eagle Mexico S.A. de C.V. The LaRonde mine, the Lapa mine, the Goldex mine, the Meadowbank mine and the Meliadine project are owned directly by the Company. The Company's wholly-owned subsidiaries, Servicios Agnico Eagle Mexico, S.A. de C.V., Servicios Pinos Altos, S.A. de C.V. and Minera Agave, S.A. de C.V. provide services in connection with the Company's operations in Mexico. The Company's operations in the United States are conducted through Agnico-Eagle (USA) Limited. 2011 ANNUAL REPORT 23 Table of Contents The following chart sets out the corporate structure of the Company, each of its significant subsidiaries and certain other subsidiaries, together with the jurisdiction of organization of the Company and each such subsidiary as at March 12, 2012: Agnico-Eagle Organizational Chart 24 AGNICO-EAGLE MINES LIMITED Table of Contents Property, Plant and Equipment Location Map of the Abitibi Region LaRonde Mine The LaRonde mine is situated approximately halfway between the City of Rouyn-Noranda and the City of Val d'Or in northwestern Quebec (approximately 470 kilometres northwest of Montreal, Quebec) in the municipalities of Preissac and Cadillac. At December 31, 2011, the LaRonde mine was estimated to contain proven and probable mineral reserves of approximately 4.7 million ounces of gold comprised of 33.2 million tonnes of ore grading 4.40 grams per tonne. The Company's LaRonde mine consists of the LaRonde property and the adjacent El Coco and Terrex properties, each of which is 100% owned and operated by the Company. The LaRonde mine can be accessed either from Val d'Or in the east or from Rouyn-Noranda in the west, which are located approximately 60 kilometres from the LaRonde mine via Quebec provincial highway No. 117. The LaRonde mine is situated approximately two kilometres north of highway No. 117 on Quebec regional highway No. 395. The Company has access to the Canadian National Railway at Cadillac, Quebec, approximately six kilometres from the LaRonde mine. The LaRonde mine operates under mining leases obtained from the Ministry of Natural Resources and Wildlife (Quebec) and under certificates of approval granted by the Ministry of Sustainable Development, Environment and Parks (Quebec). The LaRonde property consists of 35 contiguous mining claims and one provincial mining lease and covers in total 1,044.9 hectares. The El Coco property consists of 22 contiguous mining claims and one provincial mining lease and covers in total 356.7 hectares. The Terrex property consists of 21 mining claims that cover in total 424.4 hectares. The mining leases on the LaRonde and El Coco properties expire in 2018 and 2021, respectively, and are automatically renewable for three further ten-year terms upon payment of a small fee. The Company also has three surface rights leases that cover in total approximately 301.5 hectares that relate to the water pipeline right of way from Lake Preissac and the eastern extension of the LaRonde tailings pond #7 on the El Coco property. The surface rights leases are renewable annually. 2011 ANNUAL REPORT 25 Table of Contents Location Map of the LaRonde Mine The LaRonde mine includes underground operations at the LaRonde and El Coco properties that can both be accessed from the Penna Shaft, a mill, a treatment plant, a secondary crusher building and related facilities. The El Coco property is subject to a 50% net profits interest in favour of Barrick Gold Corporation ("Barrick") on future production from approximately 500 metres east of the LaRonde property boundary. The remaining 1,500 metres is subject to a 4% net smelter return royalty. This area of the property is now substantially mined out and the Company has not paid royalties since 2004 and does not expect to pay royalties in 2012. In 2003, exploration work started to extend outside of the LaRonde property onto the Terrex property where a down-plunge extension of Zone 20 North was discovered. The Terrex property is subject to a 5% net profits royalty to Delfer Gold Mines Inc. and a 2% net smelter return royalty to Barrick. The Company does not expect to pay royalties on this part of the property in 2012. In addition, the Company owns 100% of the Sphinx property immediately to the east of the El Coco property. In 2012, payable gold production at the LaRonde mine is expected to increase to approximately 157,500 ounces, and total cash costs per ounce are expected to be approximately $570. The Abitibi region has a continental climate with average annual rainfall of 64 centimetres and average annual snowfall of 318 centimetres. The average monthly temperatures range from a minimum of -23 degrees Celsius in January to a maximum of 23 degrees Celsius in July. Under normal circumstances, mining operations are conducted year-round without interruption due to weather conditions. The Company believes that the Abitibi region of northwestern Quebec has sufficient experienced mining personnel to staff its operations in the Abitibi region. The elevation is 337 metres above sea level. The LaRonde property is relatively flat with a maximum relief of approximately 40 metres. The topography gently slopes down from north to south and is characterized by boreal-type forest at LaRonde and the nearby properties. All of the LaRonde mine's power requirements are supplied by Hydro-Quebec through connections to its main power transmission grid. Water used in the LaRonde mine's operations is sourced from Lake Preissac and is transported approximately four kilometres to the minesite through a surface pipeline. 26 AGNICO-EAGLE MINES LIMITED Table of Contents Mining and Milling Facilities Surface Plan of the LaRonde Mine The LaRonde mine was originally developed utilizing a 1,207-metre shaft (Shaft #1) and an underground ramp access system. The ramp access system is available down to Level 25 of Shaft #1 and continues down to Level 248 at the Penna Shaft. The mineral reserve accessible from Shaft #1 was depleted in September 2000 and Shaft #1 is no longer in use. A second production shaft (Shaft #2), located approximately 1.2 kilometres to the east of Shaft #1, was completed in 1994 to a depth of 525 metres and was used to mine Zones 6 and 7. Both ore zones were depleted in March 2000 and the workings were allowed to flood up to Level 6 (approximately 280 metres). A third shaft (the Penna Shaft), located approximately 800 metres to the east of Shaft #1, was completed down to a depth of 2,250 metres in March 2000. The Penna Shaft is used to mine Zones 20 North, 20 South, 6 and 7. In 2009, as part of the LaRonde mine extension, the Company completed construction of an 823-metre internal shaft from Level 203 to access the ore below Level 245, approximately 2,858 metres below surface. Mining Methods Four mining methods have historically been used at the LaRonde mine: open pit for the three surface deposits; sublevel retreat; longitudinal retreat with cemented rock backfill or paste backfill; and transverse open stoping with paste, cemented rock backfill or unconsolidated backfill. The primary source of ore at the LaRonde mine continues to be from underground mining methods. During 2011, two mining methods were used: longitudinal retreat with cemented rock backfill or paste backfill and transverse open stoping with cemented rock backfill, paste or unconsolidated backfill. In the underground mine, sublevels are driven at between 30-metre and 40-metre vertical intervals, depending on the depth. Stopes are undercut in 15-metre wide panels. In the longitudinal method, panels are mined in 15-metre sections and backfilled with 100% cemented rock backfill or paste backfill. The paste backfill plant was completed in 2000 and is 2011 ANNUAL REPORT 27 Table of Contents located on the surface at the processing facility. In the transverse open stoping method, approximately 50% of the ore is mined in the first pass and filled with cemented rock backfill or paste backfill. On the second pass, the remainder of the ore is mined and filled with unconsolidated waste rock backfill or cemented paste backfill. Surface Facilities Surface facilities at the LaRonde mine include a processing plant with a daily capacity of 7,200 tonnes of ore, which has been expanded four times since 1987 from the original rate of 1,630 tonnes per day. Beginning in 1999, transition to the LaRonde mine poly-metallic massive sulphide orebody required several modifications to the processing plant which consisted of a new coarse ore handling system, new SAG and ball mill, the addition of a zinc flotation circuit and capacity increases to the existing copper flotation and precious metals circuits. In 2008, the installation of a limited copper/lead separation flotation circuit, following the copper flotation circuit, was completed. Also in 2008, operation of a small cyanidation plant, for the treatment of sulphide concentrate from the Goldex mine, began. A new carbon-in-leach circuit is under construction and will replace the existing LaRonde precious metal Merrill Crowe circuit by year end. The LaRonde mine is also the site for the Lapa mine ore processing plant (1,500 tonnes per day), which the Company commissioned in the second quarter of 2009. The ore requires a series of grinding, copper/lead flotation and separation, zinc flotation and zinc tails precious metals leaching circuits, followed by a counter-current decantation circuit and Merrill Crowe precipitation. Paste backfill and cyanide destruction plants operate intermittently. The tailings area has a dedicated cyanide destruction and metals precipitation plant that water passes through prior to recirculating to the mill. A biological water treatment plant was commissioned in 2005 to address the build-up of thiocyanate in the tailings ponds at the LaRonde mine. This build-up was the result of the high sulphide content of the LaRonde mine ore and 90% recirculation of the process water. The plant uses bacteria to oxidize and destroy thiocyanate and removes phosphate from the water before it is released to the environment. The Goldex concentrate circuit consists of pulp received from the Goldex mill via truck and subsequent leaching of the pulp with cyanide. The leached material is sent to the Lapa cyanide leach with carbon circuit ("CIL") for gold recovery with Lapa residual pulp. The Goldex circuit ceased to operate in November 2011 following the suspension of mining operations at Goldex on October 19, 2011. This circuit is currently on standby pending a decision regarding future production from the Goldex operations. The Lapa process consists of a two-stage grinding circuit to reduce the granularity of the ore. A gravity recovery circuit that is incorporated into the grinding circuit recovers up to 45% of the available gold, depending on feed grades. The residual pulp is leached in a conventional CIL circuit to dissolve the balance of the precious metal. Prior to November 2011, when the Goldex circuit ceased operations, the leached slurry from the Goldex concentrate circuit was mixed with the Lapa pulp for carbon contact. A carbon strip circuit recovers the gold from the carbon which is recycled to the leach circuit. 2012 annual production at the LaRonde mill is expected to consist of approximately 2,100,000 ounces of silver, 4,800 tonnes of copper, up to 570 tonnes of lead and 33,000 tonnes of zinc. Gold recovery at the LaRonde mine is distributed approximately 73% in the copper concentrate, 1.5% in the lead concentrate, 4.25% in the zinc concentrate and 12.4% via leaching. Mineral Recoveries During 2011, gold and silver recovery averaged 89.6% and 88.3%, respectively. Zinc recovery averaged 86.9% with a concentrate quality of 56% zinc. Copper recovery averaged 77.1% with a concentrate quality of 8.66% copper. Approximately 2.4 million tonnes of ore were processed averaging 7,027 tonnes of ore per day at 93.8% of available time. 28 AGNICO-EAGLE MINES LIMITED Table of Contents The following table sets out the metal recoveries, concentrate grades and contained metals for the 2.4 million tonnes of ore extracted by the Company at the LaRonde mine in 2011. Copper Concentrate (41,970 tonnes produced) Zinc Concentrate (115,717 tonnes produced) Lead Concentrate (4,006 tonnes produced) Head Grades Grade Recovery Grade Recovery Grade Recovery Overall Metal Recoveries Payable Production Gold 1.79 g/t 54.8 g/t 53.35% 1.7 g/t 4.68% 108.2 g/t 10.29% 89.64% 124,173 oz Silver 54.42 g/t 1,226 g/t 39.30% 175 g/t 15.40% 3,319 g/t 10.39% 88.28% 3,196,496 oz Copper 0.20% 8.66% 77.12% – – – – 77.10% 3,216 t Lead 0.36% – – – – 60.33% 28.33% 28.33% 2,342 t Zinc 3.09% – – 55.9% 86.87% – – 86.87% 54,894 t Environmental Matters Currently, water is treated at various facilities at the LaRonde mine operations. Water contained in the tailings to be used as underground backfill is treated to degrade cyanide using a sulphur dioxide and air process. The tailings entering the tailings pond are first decanted and the clear water subjected to natural cyanide degradation. This water is then transferred to sedimentation pond #1 to undergo a secondary treatment at a plant located between sedimentation ponds #1 and #2 that uses a peroxy-silicate process to destroy cyanide, lime and coagulant to precipitate metals. The tailings pond occupies an area of about 175 hectares. Waste rock that is not used underground for backfill is brought up to the surface and stored in close proximity to the tailings pond to be used to build coffer dams inside the pond. A waste rock pile containing approximately 500,000 tonnes of waste and occupying about nine hectares is located west of the mill. Due to the high sulphur content of the LaRonde mine ore, the Company has had to address toxicity issues in the tailings ponds since the 1990s. Since introducing and optimizing a biological treatment plant in 2004, the treatment process is now stable and the effluent has remained non-toxic since 2006. In 2006, the Company commenced an ammonia stripping operation involving an effluent partially treated by the biological treatment plant which allowed an increase in treatment flow rate, while keeping the final effluent toxicity-free. In 2009, to further increase the treatment flow rate of the biological plant, the Company commenced construction of ammonia stripping towers, which became operational in June 2010. In addition, water from mine dewatering and drainage water are treated to remove metals prior to discharge at a lime treatment plant located at the LaRonde mill. Capital Expenditures In 2006, the Company initiated construction to extend the infrastructure at the LaRonde mine to access the ore below Level 245, referred to as the LaRonde mine extension. Hoisting from the LaRonde mine extension began in the fourth quarter of 2011 and commercial production was achieved in November 2011. The LaRonde mine extension infrastructure includes a 823-metre internal shaft (completed in November 2009) starting from Level 203, which provides a total depth of 2,858 metres. A ramp is used to access the lower part of the orebody up to 3,110 metres in depth. The internal winze system is used to hoist ore from depth to facilities on Level 215, approximately 2,150 metres below surface, where it is transferred to the Penna Shaft hoist. Capital expenditures at the LaRonde mine during 2011 were approximately $93 million, which included $41 million on sustaining capital expenditures and $52 million comprised primarily of expenditures on the LaRonde mine extension. Budgeted 2012 capital expenditures at the LaRonde mine are $74 million, including $21 million on sustaining capital expenditures and capitalized exploration and $43 million on the LaRonde mine extension. Another $10 million will be added to the carbon-in-pulp ("CIP") / high density sludge ("HDS") project. Total capital expenditures for the LaRonde mine and the LaRonde mine extension are estimated at $366 million from 2012 to 2024 (including the CIP/HDS project). 2011 ANNUAL REPORT 29 Table of Contents Development In 2011, a total of 14,116 metres of lateral development was completed. Development was focused on stope preparation of mining blocks for production in 2011 and 2012, especially the preparation of the lower mine production horizon. A total of 4,925 metres of development work was completed for the LaRonde mine extension infrastructure and the ramp to access the LaRonde mine extension. A total of 14,500 metres of lateral development is planned for 2012. The main focus of development work continues to be stope preparation. The Company plans to develop and prepare the access to Zone 20 South down to Level 245. For the LaRonde mine extension, a total of 6,370 metres of development is planned, mainly to develop the ramp access to the orebody and for future ventilation infrastructure. At the same time, development work will continue to prepare for mining below Level 245. As the LaRonde mine extension has substantially been completed and will be the primary location of mining going forward, the "extension" designation will be dropped and the entire complex will be referred to as the LaRonde mine. Geology, Mineralization and Exploration Geology The LaRonde property is located near the southern boundary of the Archean-age (2.7 billion years old) Abitibi Subprovince and the Pontiac Subprovince within the Superior Geological Province of the Canadian Shield. The most important regional structure is the Cadillac-Larder Lake ("CLL") fault zone marking the contact between the Abitibi and Pontiac Subprovinces, located approximately two kilometres to the south of the LaRonde property. The geology that underlies the LaRonde mine consists of three east-west-trending, steeply south-dipping and generally south-facing regional groups of rock formations. From north to south, they are: (i) 400 metres (approximate true thickness) of the Kewagama Group, which is made up of a thick band of interbedded wacke; (ii) 1,500 metres of the Blake River Group, a volcanic assemblage that hosts all the known economic mineralization on the property; and (iii) 500 metres of the Cadillac Group, made up of a thick band of wacke interbedded with pelitic schist and minor iron formation. Zones of strong sericite and chlorite alteration that enclose massive to disseminated sulphide mineralization (including the ore that is mined for gold, silver, zinc, copper and lead at the LaRonde mine) follow steeply dipping, east-west-trending, anastomosing shear zone structures within the Blake River Group volcanic units across the property. These shear zones are part of the larger Doyon-Dumagami Structural Zone that hosts several important gold occurrences (including the Doyon gold mine, the Westwood project and the former Bousquet mines) and has been traced for over ten kilometres within the Blake River Group, from the LaRonde mine westward to the Mouska gold mine. Mineralization The gold-bearing zones at the LaRonde mine are lenses of disseminated stringers through to massive, aggregates of coarse pyrite with zinc, copper and silver content. Ten zones that vary in size from 50,000 to 40,000,000 tonnes have been identified, of which four are (or are believed to be) economic. Gold content is not proportional to the total sulphide content but does increase with copper content. Gold values are also higher in areas where the pyrite lenses are crosscut by tightly spaced north-south fractures. These historical relationships, which were noted at LaRonde Shaft #1's Main Zone, are maintained at the Penna Shaft zones. The zinc-silver (i.e., Zone 20 North) mineralization with lower gold values, common in the upper mine, grades into gold-copper mineralization within the lower mine. Gold value enhancement associated with crosscutting north-south fractures also occurs within the LaRonde mine. The predominant base metal sulphides within the LaRonde mine are chalcopyrite (copper) and sphalerite (zinc). The Company believes that Zone 20 North is one of the largest gold-bearing massive sulphide mineralized zones known in the world and one of the largest mineralized zones known in the Abitibi region of Ontario and Quebec. Zone 20 North contains the majority of the mineral reserves and resources at the LaRonde mine, including 33,113,000 tonnes of proven and probable mineral reserves grading 4.51 grams of gold per tonne, representing 94% of the total proven and probable mineral reserves at the LaRonde mine, 5,419,000 tonnes of indicated mineral resources grading 1.61 grams of gold per tonne, representing 75% of the total measured and indicated mineral resources at the LaRonde mine, and 9,297,000 tonnes of inferred mineral resources grading 4.00 grams of gold per tonne, representing 82% of the total inferred mineral resources at LaRonde. 30 AGNICO-EAGLE MINES LIMITED Table of Contents The depth of Zone 20 North extends between 700 metres below surface and 3,500 metres below surface, and possibly lower. With increased access on the lower levels of the mine (i.e. from Level 215 to Level 255), the transformation from a "zinc/silver" orebody to a "gold/copper" deposit is expected to continue during 2012. Zone 20 North can be divided into an upper zinc/silver-enriched gold-poor zone and a lower gold/copper-enriched gold-rich zone. The zinc zone has been traced over a vertical distance of 1,700 metres and a horizontal distance of 570 metres, with thicknesses approaching 40 metres. The gold zone has been traced over a vertical distance of over 2,200 metres and a horizontal distance of 900 metres, with thicknesses varying from three to 40 metres. The zinc zone consists of massive zinc/silver mineralization containing 50% to 90% massive pyrite and 10% to 50% massive light brown sphalerite. The gold zone mineralization consists of 30% to 70% finely disseminated to massive pyrite containing 1% to 10% chalcopyrite veinlets, minor disseminated sphalerite and rare specks of visible gold. Gold grades are generally related to the chalcopyrite or copper content. At depth, the massive sulphide lens becomes richer in gold and copper. During 2011, 2.2 million tonnes of ore grading 1.72 grams of gold per tonne, 57.18 grams of silver per tonne, 3.27% zinc, 0.20% copper and 0.39% lead were mined from Zone 20 North. Exploration The combined tonnage of proven and probable mineral reserves at the LaRonde mine for year-end 2011 is 33.2 million tonnes which represents a 4% decrease in the amount compared to year-end 2010 (34.7 million tonnes). This mineral reserve includes the replacement of 2.4 million tonnes of ore that were mined in 2011. The reduction in reserves is principally associated with the tonnes mined during 2011. Diamond drilling is used for exploration on the LaRonde property. In 2011, a total of 181 holes were drilled on the LaRonde property for a total length of 16,190 metres, compared to 212 holes for a total length of 19,188 metres in 2010. Of the drilling in 2011, 165 holes (8,181 metres) were for production stope delineation, 12 holes (2,614 metres) were for definition drilling and 4 holes (5,396 metres) were for exploration. In 2010, 187 holes (5,397 metres) were for production stope delineation, 21 holes (6,016 metres) were for definition drilling and 4 holes (5,403 metres) were for exploration. Expenditures on diamond drilling at the LaRonde mine during 2011 were approximately $2.41 million, including $0.97 million in definition and delineation drilling expenses charged to operating costs at the LaRonde mine. Expenditures on exploration in 2011 were $1.44 million, and are expected to be $1.15 million in 2012. The main focus of the 2011 exploration program was continuing the investigation of Zone 20 North at depth. This program was conducted from the Level 215 exploration drift, approximately 2,150 metres below the surface. The first hole of the program was completed at the end of 2009 to a final length of 1,852 metres. This hole intersected Zone 20 North at a depth of 3,520 metres below surface, which is approximately 410 metres below the current reserve envelope. The intersection returned 14.3 metres (true width) grading 3.03 grams of gold per tonne. In 2010, a second branch was drilled from this mother hole and returned 4.1 metres grading 1.77 grams of gold per tonne at a depth of 3,595 metres below surface. Another hole was initiated in 2011 and drilling was still in progress at the end of the year. The drilling will continue in 2012. Another important focus of 2011 drilling was to start the deep exploration campaign to the east of the current reserves from the 086 level exploration drift. The purpose of this campaign is to explore stratigraphy to the east at a depth of 2,000 to 2,500 metres below surface which is similar to structures at the LaRonde mine that often contain mineralisation. In 2011, two holes were completed with no significant values and another hole was in progress at year end. In addition, definition and delineation drilling was undertaken in the 20 North and 20 South Zones to assist in finalizing mining stope designs. Zone 20 North was the main focus of the definition drilling in 2011. Infill drilling from Level 260 to Level 236 confirmed the previous Zone 20 North reserves with a significant gain of 16,000 ounces mainly located in the western edge of the orebody. Bousquet and Ellison Properties The Bousquet property is located immediately west of the LaRonde mine and consists of two mining leases covering 80.0 hectares and 31 claims covering 384.9 hectares. The property, along with various equipment and other mining properties, was acquired from Barrick in September 2003 for $2.9 million in cash, $1.1 million in common shares of the Company and the assumption of specific reclamation and other obligations related to the Bousquet property. The property is subject to a 2% net smelter return royalty interest in favour of Barrick. From 2004 to 2007, the Company recovered 108,407 tonnes of ore grading 2.33 grams of gold per tonne from Zone 4 in a small open pit. In 2006 and 2007, the Company recovered 99,342 tonnes of ore grading 7.02 grams of gold per tonne from two small ore blocks underground at Bousquet. There has been no mining of this property since 2007. 2011 ANNUAL REPORT 31 Table of Contents In 2011, the Company completed a diamond drilling program consisting primarily of twinning and resampling historic holes to evaluate the production potential of an open pit at Bousquet Zone 5. This work led to a new resource estimate for Zone 5 and an internal feasibility study has been conducted for a resumption of production in the Zone 5 open pit. This study led to a positive scenario and a final estimate of new probable reserves of approximately 0.2 million ounces of gold comprised of 3.2 million tonnes of ore grading 1.88 grams per tonne. For the whole Bousquet property, including Zone 5, the December 31, 2011 indicated mineral resource is approximately 9.8 million tonnes grading 2.44 grams of gold per tonne. The inferred mineral resource is 4.6 million tonnes grading 4.04 grams of gold per tonne. Expenditures on exploration in 2011 were $2.40 million, which includes the cost of drilling 18,616 metres in 70 holes. In 2012, the Company expects to spend $1.5 million in exploration including $0.3 million in drilling of 3,000 metres at Bousquet and continue optimisation of the feasibility study. The Ellison property is located immediately west of the Bousquet property and consists of eight claims covering 101.0 hectares. The property was acquired in August 2002 for $0.32 million in cash and a commitment to spend $0.49 million in exploration over four years. The commitment was fulfilled in 2004 and the property is 100% owned by the Company. The property is subject to a net smelter return royalty interest in favour of Yorbeau Resources Inc. that varies between 1.5% and 2.5% depending on the price of gold. Should commercial production from the Ellison property commence, the Company will be required to pay Yorbeau Resources Inc. an additional C$0.5 million in cash. From 2009 to 2011, the Company conducted drilling for a total of 12,465 metres on the deep exploration program on the Ellison property, at a cost of $7.4 million in order to better define the mineralization at depth, interpreted to be in the Westwood horizon. The potential exists for a large gold resource with similar geology to the LaRonde mine extension. The December 31, 2011 indicated mineral resource at Ellison is approximately 0.4 million tonnes grading 5.68 grams of gold per tonne, and the inferred resource is 0.8 million tonnes grading 5.81 grams of gold per tonne. A follow-up exploration program was approved for Ellison in 2012, including 3,600 metres of drilling at a budget of $1.0 million. Goldex Mine The Goldex mine, which achieved commercial production in August 2008, is located in the City of Val d'Or, Quebec, approximately 60 kilometres east of the LaRonde mine. On October 19, 2011, the Company suspended mining operations and gold production at Goldex, following the receipt of recommendations from independent consultants to halt underground mining operations during the investigation into ground stability issues. As a result, the Company wrote off substantially all of its investment in the Goldex mine (approximately $254 million), took a closure provision of approximately $44 million and reclassified all of the remaining 1.6 million ounces of proven and probable gold reserves (approximately 0.9 million ounces of gold in proven reserves (14.8 million tonnes grading 1.87 grams of gold per tonne) and approximately 0.7 million ounces of gold in probable reserves (13.0 million tonnes grading 1.6 grams of gold per tonne) estimated as of December 31, 2010), other than the ore stockpiled on surface, as mineral resources in the third quarter of 2011. The surface stockpile was processed in the Goldex mill by October 30, 2011. The Goldex property is now considered an advanced exploration project with significant measured, indicated and inferred mineral resources in several zones, but no mineral reserves. 32 AGNICO-EAGLE MINES LIMITED Table of Contents At the present time, development work continues underground on the M-Zone (as defined below) and the exploration ramp into the D-Zone (as defined below), and exploration continues, with diamond drilling from surface and underground. Location Map of the Goldex Mine The Goldex property is accessible by provincial highway. The elevation is approximately 302 metres above sea level. All of the Goldex mine's power requirements were supplied by Hydro-Quebec through connections to its main power transmission grid. All of the water that was required at the Goldex mine was sourced directly by aqueduct from the Thompson River immediately adjacent to the minesite or through recirculation of water from the surface pond and the auxiliary tailings pond. For additional information regarding the Abitibi region in which the Goldex mine is located, including information with respect to climate, topography, vegetation and mining personnel, see "– Property, Plant and Equipment – LaRonde Mine". The Goldex mine operated under a mining lease obtained from the Ministry of Natural Resources and Wildlife (Quebec) and under certificates of approval granted by the Ministry of Sustainable Development, Environment and Parks (Quebec). The Goldex property, in which the Company has a 100% working interest, consists of 22 contiguous mining claims and, since April 2006, one provincial mining lease (98.6 hectares), covering an aggregate of 331.2 hectares. The property is made up of three blocks: the Probe block (130.7 hectares); the Dalton block (10.4 hectares); and the Goldex Extension block (190.1 hectares). The claims are renewable every second year upon payment of a small fee. The mining lease expires in 2028 and is automatically renewable for three further ten-year terms upon payment of a small fee. The Company also has one lease covering 418.5 hectares of surface rights that are used for the auxiliary tailings pond. This lease is renewable annually upon payment of a small fee. The Goldex mine includes underground operations that can be accessed from two shafts, a processing plant, an ore storage facility and other related facilities. The Goldex Extension Zone ("GEZ"), which was the gold deposit on which the Company was focusing its production efforts before production was suspended indefinitely on October 19, 2011, was discovered in 1989 on the Goldex Extension block (although the Company believes a small portion of the GEZ occurs on the Probe block). Probe Mines Ltd. holds a 5% net smelter return royalty interest on the Probe block. In 2011, exploration and development work continued on the zone located on the Probe block 150 metres above the western end of the GEZ (the "M-Zone"). 2011 ANNUAL REPORT 33 Table of Contents In late 1997, the Company completed a mining study that indicated the deposit was not economically viable to mine at the then-prevailing gold price (approximately $323 per ounce of gold) using the mining approach chosen and drill-hole-indicated grade. The property was placed on care and maintenance and the workings were allowed to flood. In February 2005, a new mineral reserve and resource estimate was completed for the GEZ which, coupled with a feasibility study, led to a probable mineral reserve estimate of 1.6 million ounces of gold contained in 20.1 million tonnes of ore grading 2.54 grams of gold per tonne. The GEZ resource model was revised and, in March 2005, the Company approved a feasibility study and the construction of the Goldex mine. The mine achieved commercial production on August 1, 2008 and consistently operated at or above the designed rate of 6,900 tonnes per day until its operations were suspended in October 2011. Based on the results of a scoping study completed in July 2009, the Company determined to expand the mine and mill operations at the Goldex mine to 8,000 tonnes per day. This project was completed in 2010. Capital costs in connection with the expansion totalled $10 million. The crusher for the expansion was commissioned at the end of the first quarter of 2010 at a rate of 7,811 tonnes per day. The Goldex mine produced 135,478 ounces of gold in 2011 at total cash costs of $472 per ounce. The Goldex mine is not expected to produce more gold until the suspected rock stability issues are resolved. Mining and Milling Facilities Surface Plan of the Goldex Mine At the time the Company commenced construction of the Goldex mine, the surface facilities included a headframe, a hoistroom, a surface building containing a mechanical shop, a warehouse and an office. In addition, the Goldex property had a 790-metre deep shaft (Shaft #1), which provided access to underground workings. Shaft #1 is predominantly used to hoist waste rock from development activities. 34 AGNICO-EAGLE MINES LIMITED Table of Contents The sinking of a new production shaft was completed in 2007. This shaft (Shaft #2) is a 5.5-metre diameter shaft with a 50-centimetre thick concrete lining and is used for ventilation as well as hoisting services. Shaft #2 is 865 metres deep and includes five stations. A refurbished friction hoist was installed for production and service duties, and an auxiliary hoist was installed for emergency and personnel service. The production hoist is equipped with one cageskip. Each skip has a 21.5-tonne capacity and the shaft can hoist an average of 7,000 to 8,000 tonnes of ore per day. Mining Method Prior to the suspension of mining operations on October 19, 2011, the Goldex mine used a high volume bulk mining method, which was made possible through the use of large mining stopes. Drilling and blasting of 165-millimetre production holes was used to obtain a muck size large enough to be economically efficient. Using this method required a percentage of the broken ore to be kept in the stope to reduce the backfilling cost and to reduce sloughing on the walls. Little ore and waste development was necessary to mine out the deposit. Following the suspension of mining on October 19, 2011, future mining methods, if any, are under evaluation. Surface Facilities Plant construction at the Goldex mine commenced in the second quarter of 2006 and was completed in the first quarter of 2008. The plant reached design capacity in the second quarter of 2009. Grinding at the Goldex mill was done through a two-stage circuit comprised of a SAG mill and a ball mill. As part of the expansion project commenced in 2009, a surface crusher was added to reduce the size of ore transferred to the surface from 150 millimetres to 50 millimetres. A lamellar decanter was also added to recover small particles present in the water overflow of the concentrate thickener. The underflow pump of this thickener was upgraded following flotation circuit modification to increase the pull rate of the small particles. Approximately two-thirds of the gold was recovered through a gravity circuit, passed over shaking tables and smelted on site. The remainder of the gold and pyrite was recovered by a flotation process. The concentrate was then thickened and trucked to the mill at the LaRonde mine where it was further treated by cyanidation. Gold recovered was consolidated with precious metals from the LaRonde and Lapa mines. The Company reached an average gold recovery of 93.38% in 2011, prior to the suspension of mining. In addition, surface facilities at the Goldex property include an electrical sub-station, a compressor building, a service building for administration and changing rooms, a warehouse building, a concrete headframe above Shaft #2, a hazardous waste storage facility and a dome covering the ore stockpile. Mineral Recoveries Prior to the suspension of mining operations on October 19, 2011, the Goldex mill processed approximately 2.48 million tonnes of ore, averaging approximately 8,173 tonnes of ore treated per day and operating at approximately 95% of available time. The following table sets out the metal recoveries at the Goldex mine in 2011. Head Grades Gravity Recovery Flotation-Cyanidation Recovery Global Recovery Payable Production Gold 1.82 g/t 67.76% 25.63% 93.38% 135,478 oz Environmental Matters Environmental permits for the construction and operation of an ore extracting infrastructure at the Goldex mine were received from the Ministry of Sustainable Development, Environment and Parks (Quebec) in October 2005. The permits also covered the construction and operation of a sedimentation pond for mine water treatment and sewage facilities, and these facilities have been built at the Goldex mine site. In June 2009, the permits were revised to allow the expansion of the mine and mill operations to 8,500 tonnes per day. In November 2006, the Company and the Quebec government signed an agreement permitting the Company to dispose of the Goldex tailings at the Manitou minesite, a tailings site formerly used by an unrelated third party and abandoned to the Quebec government. The Manitou tailings site has issues relating to acid drainage and the construction of tailings facilities by the Company and the deposit of tailings from the Goldex plant on the Manitou tailings site was accepted by the Ministry of Sustainable Development, Environment and Parks (Quebec) as a valid rehabilitation plan to address the acid generation problem at Manitou. Under the agreement, the Company managed the construction and operation of the tailings facilities and the Quebec government paid all additional costs above the Company's budget for tailings facilities set 2011 ANNUAL REPORT 35 Table of Contents out in the Goldex feasibility study. The Quebec government retains responsibility for all environmental contamination at the Manitou tailings site and for final closure of the facilities. In addition, the Company has built a separate tailings deposit area (auxiliary tailings pond) near the Goldex mine. Environmental permits for the construction and operation of the auxiliary tailings pond at the Goldex mine were received in March 2007. In 2011, 237,615 tonnes of Goldex tailings were discharged to the auxiliary pond for a total to date of 764,077 tonnes. At the Manitou site, 2.20 million tonnes of Goldex tailings were discharged for a total to date of 8.095 million tonnes. A new dyke was built in the summer of 2011 in the auxiliary tailings pond to create a second polishing basin to reduce total suspended solids in the discharged water during spring time. Construction of this dyke was necessary following a notice of infraction received in 2011 from the Quebec Ministry of Environment for exceeding of the permitted total suspended solids. Following suspension of mining operations at the Goldex property, the mine closure costs were revised to account for the change in conditions at the site. The estimated total for the closure costs of the Goldex mine is approximately $51.4 million, comprised of the following: $1.2 million for demolition, $1 million for engineering, $0.45 million for site preliminary works, $5.4 million for mining site rehabilitation (primarily for backfilling of the zone with high subsidence), $23.2 million for rock grouting and soil improvement, $0.26 million for revegetation of the site, $0.06 million to rehabilitate the sedimentation pond, $0.2 million to rehabilitate the waste rock pile, $1.03 million to rehabilitate the South Tailings basin area, $0.7 million for geotechnical and environmental monitoring; $17.6 million for property purchases and $0.3 million for Baie-Dorée road rehabilitation. In addition, a separate provision of approximately $4.6 million exists for the remaining participation of the Company in the rehabilitation of the Manitou site. Capital Expenditures Prior to the suspension of mining operations on October 19, 2011, capital expenditures at the Goldex mine in 2011 were approximately $48.4 million, which included $7.8 million on sustaining capital expenditures, $7.1 million on the construction of facilities in the M-Zone and water management, $10.7 million in deferred development expenses, $16.3 million for remediation work at the surface and $5.3 million in exploration expense. For 2012, an interim budget of $69.8 million has been approved to further develop the M-Zone, complete remediation work, perform crown pillar investigations and explore the D-Zone. Development During 2011, approximately 4,256 metres of lateral and vertical development were completed at a cost of $15.3 million, including development following the suspension of mining operations on October 19, 2011. At the present time, development work continues underground on the M-Zone and the exploration ramp into the D-Zone, and exploration continues with diamond drilling. For 2012, 900 metres of development at a cost of $6.1 million is planned to develop the M-Zone and for exploration of the D-Zone. Geology, Mineralization and Exploration Geology Geologically, the Goldex property is similar to the LaRonde property and is located near the southern boundary of the Archean-age (2.7 billion years old) Abitibi Subprovince, a typical granite-greenstone terrane located within the Superior Province of the Canadian Shield. The southern contact of the Abitibi Subprovince with the Pontiac Subprovince is marked by the east-southeast trending CLL Fault Zone, the most important regional structural feature. The Goldex deposit is hosted within a quartz diorite sill, the "Goldex Granodiorite", located in a succession of mafic to ultramafic volcanic rocks that are all generally oriented west-northwest. The GEZ extends from 500 to 800 metres below the surface and is entirely hosted by the Goldex Granodiorite. The limits of the zone are defined by the intensity of the quartz vein stockwork envelope and by gold assays. The zone is almost egg-shaped; it is over 300 metres tall by 450 metres long (in a west-northwest direction) and its thickness increases rapidly from 25 metres along the east-west edges to almost 150 metres in the centre. In 2011, exploration efforts at Goldex were focused on the satellite M-Zone and D-Zone. These satellite zones are defined by quartz tourmaline veins and gold assays that are similar to the GEZ. The M-Zone has been defined as having a length of 160 metres, a height of 120 metres and a thickness of 115 metres. The D-Zone is approximately 150 metres below the GEZ and close to 1,350 metres below the surface. It appears to have an approximate length of 500 metres. 36 AGNICO-EAGLE MINES LIMITED Table of Contents Mineralization Gold mineralization at Goldex corresponds to the quartz-tourmaline vein deposit type. The Goldex gold-bearing quartz-tourmaline-pyrite veins and veinlets have strong structural control. The most significant structure directly related to mineralization is a discrete shear zone, the Goldex Mylonite, that is up to five metres wide and occurs within the Goldex Granodiorite, just south of the GEZ and most other gold occurrences. The quartz-tourmaline-pyrite vein mineralization is controlled by minor fracture zones that are oriented west-northwest and dip steeply north or south. The fractures are parallel to, but north of, the Goldex Mylonite. Within the GEZ are three vein sets, the most important of which are extensional-shear veins dipping 30 degrees south and usually less than 10 centimetres thick. The vein sets and associated alteration combine to form stacked envelopes up to 30 metres thick. Strong albite-sericite alteration of the host-rock quartz diorite surrounds the quartz-tourmaline-pyrite veins and covers almost 80% of the mineralized zone; outside of the envelopes, prior chlorite alteration affects the quartz diorite and gives it a darker grey-green colour. Occasionally, enclaves of relatively unaltered medium grey-green-coloured quartz diorite (with no veining or gold) are found within the GEZ; they are included exceptionally as internal waste to allow for a smooth shape, required for mining purposes. Most of the gold occurs as microscopic particles that are almost always associated with pyrite, generally adjacent to grains and crystals but also 20% included within the pyrite. The gold-bearing pyrite occurs in the quartz-tourmaline veins and in narrow fractures in the sericite-albite-altered quartz diorite (generally immediately adjacent to the veins). Less than 1.5% of the gold occurs as the mineral calaverite, a gold telluride. Exploration In 2011, $7.8 million was spent on exploration at Goldex. A total of 107 holes were drilled using diamond drilling methods at the Goldex mine for a total length of approximately 47 kilometres, compared to 122 holes for a total length of 44 kilometres in 2010. The expenses include an exploration ramp drifted on a length of 475 metres from Level 86 to explore the D-Zone at depth. Three different zones in the Goldex Granodiorite intrusive were drilled in 2011. The main exploration focus (83%) with 38.8 kilometres of drilling was for the D-Zone, the remaining 7.4 kilometres (16%) were drilled for the top of the M-Zone and 750m (1%) for the sector to the East of the GEZ. The 2012 exploration program is budgeted to include 8,000 metres of diamond drilling at a cost of $1.2 million. The primary target is the D-Zone. Kittila Mine The Kittila mine, which commenced commercial production in May 2009, is located approximately 900 kilometres north of Helsinki and 50 kilometres northeast of the town of Kittila in northern Finland. At December 31, 2011, the Kittila mine was estimated to contain proven and probable mineral reserves of 5.2 million ounces of gold comprised of 34.6 million tonnes of ore grading 4.66 grams per tonne. The Kittila mine is accessible by paved road from the village of Kiistala, which is located on the southern portion of the main claim block. The gold deposit is located near the small village of Rouravaara, approximately ten kilometres north of the village of Kiistala, accessible via a paved road. The property is close to infrastructure, including hydro power, an airport and the town of Kittila. The project also has access to a qualified labour force, including mining and construction contractors. The total landholdings surrounding and including the Kittila mine comprise one mining licence covering an area of approximately 847 hectares, 120 individual tenements (prospecting permits) covering approximately 10,652 hectares and 168 prospecting permit applications covering approximately 14,910 hectares. The mineral titles form a continuous block around the Kittila mining licence. The block has been divided into the Suurikuusikko area, the Suurikuusikko West area and the Kittila mining licence centred at 25.4110 degrees longitude east and 67.9683 degrees latitude north. The boundary of the mining licence is determined by ground-surveyed points whereas the boundaries of the other tenements are not required to be surveyed. All of the tenements in the Kittila mine are registered in the name of Agnico-Eagle Finland Oy, an indirect, wholly-owned subsidiary of the Company. According to the Finnish government's land tenure records, all tenements are in good standing. The expiry dates of the tenements vary from May 2012 up to June 2015. Tenements are initially valid for four years, provided exploration work in the area is reported annually and a small annual fee is paid to maintain title; extensions for titles can be granted for 11 additional years on payment of a slightly higher fee and active exploration in the area. Agnico-Eagle Finland Oy also holds the mining licence in respect of the Kittila mine. The mine is subject to a 2.0% net smelter return royalty payable to the Republic of Finland. 2011 ANNUAL REPORT 37 Table of Contents The Kittila mine area is sparsely populated and is situated between 200 and 245 metres above sea level. The topography is characterized by low rolling forested hills separated by marshes, lakes and interconnected rivers. The gold deposit is situated on an area of land that has no special use at present and there is sufficient land available for tailings facilities. Water requirements for the Kittila mine are sourced from the nearby Seurujoki River, recirculation of water from pit dewatering and tailings pond water. The Kittila region is located within the South-West Lapland zone of the northern boreal vegetation zone characterized by spruce forests, marshes and bogs. The mine is located within the Arctic Circle but the climate is moderated by the Gulf Stream off the coast of Norway such that northern Finland's climate is comparable to that of eastern Canada. Winter temperatures range from -10 to -30 degrees Celsius, whereas summer temperatures range from 10 degrees Celsius to the mid-20s. Exploration and mining work can be carried out year-round. Because of its northern latitude, winter days are extremely short with a brief period of 24-hour darkness around the winter solstice. Conversely, summer days are very long with a brief period of 24-hour daylight in early summer around the summer solstice. Annual precipitation varies between five and 50 centimetres, one-third of which falls as snow. Snow accumulation usually begins in November and remains until March or April. Location Map of the Kittila Mine The Company acquired its 100%, indirect interest in the Kittila mine through the acquisition of Riddarhyttan completed in November 2005. See "– History and Development of the Company". In June 2006, on the basis of an independently reviewed feasibility study, the Company approved construction of the Kittila mine. The Kittila mine is currently an open pit mining operation with underground mining via ramp access. The current open pits will be mined out by the end of 2012 and from 2013 onward all mining will be from the underground portion of the mine. The initial underground stope was 38 AGNICO-EAGLE MINES LIMITED Table of Contents mined in early 2010. Ore is processed in a 3,000-tonne per day surface processing plant that was commissioned in late 2008. Limited gold concentrate production started in September 2008 and gold dore bar production commenced in January 2009. During 2010 throughput at the Kittila mine approached design levels and gold recoveries continued to improve. The Kittila mine is anticipated to produce approximately 155,000 ounces of gold in 2012 at estimated total cash costs per ounce of approximately $650. Over the period of 2012 to 2038, total annual average gold production of approximately 150,000 ounces is anticipated. A scoping study is underway to assess the feasibility of significantly increasing the annual gold production. Mining and Milling Facilities Surface Plan of the Kittila Mine The orebodies at Kittila are being mined initially from two open pits, followed by underground operations to mine the deposits at depth. Additional, smaller open pits will be used to mine any remaining mineral reserves close to the surface in the future. Open pit mining started in May 2008 and the extracted ore was stockpiled. As of December 2011, a total of 2.8 million tonnes of ore have been processed, 0.4 million tonnes of ore have been stockpiled and 31.5 million tonnes of waste rock have been excavated. Work on the ramp to access the underground reserves continued throughout 2011 and total underground development to date is approximately 14,521 metres. Underground mining commenced in the fourth 2011 ANNUAL REPORT 39 Table of Contents quarter of 2010 and, as of December 2011, a total of 0.45 million tonnes of ore have been mined from the underground portions of the mine. Mining Methods The Kittila mine currently mines the Suurikuusikko orebody with a 160-metre deep open pit. Ore is mined in 7.5-metre benches together with waste rock using buffer blasting techniques and is loaded selectively to minimize dilution and maximize ore recovery. Hydraulic excavators load ore into 100-tonne trucks that haul the ore to the crusher and the waste rock to the waste disposal area. Approximately 3,000 tonnes of ore per day are fed to the concentrator. Surface mining is expected to continue through 2012. Underground development continued throughout the year and ore production from the underground started at a steady rate in the fourth quarter of 2011. The underground mining method is open stoping with delayed backfill. Stopes are between 25 and 40 metres high and yield approximately 10,000 tonnes of ore per stope. To ensure sufficient ore production is available to supply the mill, approximately 6,000 metres of tunnels will be developed each year. After extraction, stopes will be filled with cemented backfill or paste backfill to enable the safe extraction of ore in adjacent stopes. Ore will be trucked to the surface crusher via the ramp access system. Surface Facilities Construction of the processing plant and associated equipment was completed in 2008 and facilities on site include an office building, a maintenance facility for the open pit equipment, a warehouse, a maintenance shop, an oxygen plant, a processing plant, a tank farm, a crusher, conveyor housings and an ore bin. In addition, some temporary structures house contractor offices and work areas. The ore at Kittila is treated by grinding, flotation, pressure oxidation and carbon-in-leach circuits. Gold is recovered from the carbon in a Zadra elution circuit and is recovered from the solution using electrowinning and then poured into dore bars using an electric induction furnace. Mineral Recoveries In 2011, the Kittila mill processed 1.1 million tonnes of ore with an availability of 84% for an average throughput of 2,824 tonnes per day. Low mill availability was caused by maintenance issues associated with the autoclave and scrubber, mainly related to leaking mechanical seals, brick lining failures in the autoclave and blocked pipelines on the autoclave and the scrubber. The following table sets out the gold production at the Kittila mine in 2011: Head Grade Overall Metal Recovery Payable Production Gold 5.11 g/t 84.6% 143,560 oz Ore processing at Kittila consists of two stages. In the first stage, ore is enriched by flotation and in the second stage the gold is extracted by pressure oxidation and cyanide-in-leach processes. Flotation recoveries were stable during 2011 and flotation recovery averaged 93% during the year. Trials are still in progress with the aim to try to further increase the flotation recovery. An in-house metallurgical laboratory was built in 2011 and will allow further flotation test work to be undertaken to attempt to optimize flotation recoveries. Recoveries in the second stage of the process were also relatively stable in 2011. Lower recoveries in the second quarter of 2011 were related to mechanical failures and operating difficulties in the autocalve. Modifications inside the autoclave allowed for better oxygen distribution management, which resulted in better sludge flow and oxidation within the autoclave, leading to better recovery availability. Also, further optimizing and improved control of the process enabled continuous improvement in recoveries. A large amount of test work was done in 2011 and the testing and optimization of the process will continue in 2012. Large-scale test-work is ongoing to find optimized pressure oxidation and results are expected in 2012. 40 AGNICO-EAGLE MINES LIMITED Table of Contents Environmental Matters The Company currently holds a mining licence, an environmental permit and operational permits in respect of the Kittila mine. All permits necessary to begin production were received during 2008. The construction of the first phase of the tailings dam and waterproof bottom layer was completed in the fall of 2008. This first phase is sufficient to hold tailings from three years of production. Work began on the second phase in 2009 and continues according to plans and permit requirements. Water from dewatering the mine and water used in the mine and mill is collected and treated by sedimentation. Emissions and environmental impact are monitored in accordance with the comprehensive monitoring program that has been approved by the Finnish environmental authorities. To further improve environmental performance, scrubbing of mill-off gas will be enhanced and this work was initiated in the fourth quarter of 2011. There are no material environmental liabilities related to the Kittila mine. Capital Expenditures Capital expenditures at the Kittila mine during 2011 were approximately $92 million, which included paste backfill plant construction, mill modification costs, underground mine development costs, exploration and conversion drilling costs within the mining licence area and sustaining capital costs. The Company expects capital expenditures at the Kittila mine to be approximately $67 million in 2012, most of which will be used for mill scrubber improvements, mining equipment for underground mining, development and construction of underground mining infrastructure, construction of the paste backfill plant and exploration and conversion drilling. Development Mining at the Suurikuusikko and Roura open pits progressed throughout 2011 with a total of 650,000 tonnes of ore and 5.7 million tonnes of waste mined from the open pit. The Company expects that 600,000 tonnes of ore and 1.6 million tonnes of waste will be mined from the Suurikuusikko and Roura pits during 2012. Total costs for open pit development in 2011 were $2.8 million. In 2011, underground development progressed in both the Rouravaara and Suurikuusikko zones with 6,440 metres of ramp and sublevel access development completed during the year. A total of 103,000 tonnes of ore from development and 280,000 tonnes of stope ore were mined in 2011. The Company expects to complete 6,000 metres of lateral development and 400 metres of vertical development during 2012. Geology, Mineralization and Exploration Geology The Kittila mine is situated within the Kittila Greenstone belt, part of the Lapland Greenstone belt in the Proterozoic-age Svecofennian geologic province. The appearance and geology of the area is similar to that of the Abitibi region of the Canadian Shield. In northern Finland, the bedrock is typically covered by a thin but uniform blanket of unconsolidated glacial till. Bedrock exposures are scarce and irregularly distributed. The mine area is underlain by mafic volcanic and sedimentary rocks metamorphosed to greenschist assemblages and assigned to the Kittila group. The major rock units trend north to north-northeast and are near-vertical. The volcanics are further sub-divided into iron-rich tholeiitic basalts (Kautoselka Formation) located to the west and magnesium-rich tholeiitic basalt, coarse volcaniclastic units, graphitic schist and minor chemical sedimentary rocks (Vesmajarvi Formation) located to the east. The contact between these two rock units consists of a transitional zone (the Porkonen Formation) varying between 50 and 200 metres in thickness. This zone is strongly sheared, brecciated and characterized by intense hydrothermal alteration and gold mineralization, features consistent with major brittle-ductile deformation zones. It includes the north-northeast-oriented Suurikuusikko Trend. Mineralization The Porkonen Formation hosts the Kittila gold deposit, which contains multiple mineralized zones stretching over a strike length of more than 25 kilometres. Most of the work has been focused on the 4.5-kilometre stretch that hosts the known gold reserves and resources. From north to south, the zones are Rimminvuoma ("Rimpi-S"), North Rouravaara ("Roura-N"), Central Rouravaara ("Roura-C"), depth extension of Rouravaara and Suurikuusikko ("Suuri/Roura Deep"), Suurikuusikko ("Suuri"), Etela and Ketola. The Suuri and Suuri/Roura Deep zones include several parallel sub-zones that have previously been referred to as Main East, Main Central and Main West. The Suuri zone hosts approximately 34% of the current probable gold reserve estimate on a contained-gold basis, while Suuri Deep has approximately 20%, Roura-C 2011 ANNUAL REPORT 41 Table of Contents approximately 11%, Roura Deep approximately 25%, Roura-N approximately 2%, Rimpi-S approximately 6%, Ketola approximately 1% and Etela approximately 0.1%. Gold mineralization in these zones is associated with intense hydrothermal alteration (carbonate-albite-sulphide), and is almost exclusively refractory, locked inside fine-grained sulphide minerals: arsenopyrite (approximately 73%) or pyrite (approximately 23%). The rest is "free gold", which is manifested as extremely small grains of gold in pyrite. Exploration In 1986, the discovery of coarse visible gold in quartz-carbonate veining along a road cut near the village of Kiistala alerted the Geological Survey of Finland ("GTK") to the gold exploration potential of the area. Following this discovery, GTK initiated regional exploration over the area and deployed a wide range of indirect exploration tools to explore this relatively unexplored area. Over the period from 1987 to 2005, GTK and later Riddarhyttan undertook drilling programs and other testing on the property. After it acquired the property in 1998, Riddarhyttan continued to investigate the metallurgical properties of the refractory gold mineralization with the objective of demonstrating its recoverability and assessing suitable processing scenarios and initiated engineering and environmental studies to assess the feasibility of a mining project. Diamond drilling is used for exploration on the Kittila property. Most of the work on the mining licence area has focused on the Suuri and Roura zones. Up to the end of December 2011, a total of 2,315 drill holes, totalling 639,774 metres, have been completed on the property. In 2011, between six and eight drill machines worked on the Kittila property: two drills on underground infill drilling; three to six drills on mine exploration; and one to two drills on resource-to-reserve conversion drilling. A total of 445 holes were completed for a length of 82,377 metres. Of these drill holes, 353 drill holes (30,197 metres) were for definition drilling, 44 drill holes (20,535 metres) were for conversion drilling and 48 drill holes (31,645 metres) were related to mine exploration. Total expenditures for diamond drilling in 2011 were $17.5 million, including $3.7 million for definition and delineation drilling. Exploration during 2011 increased proven and probable gold reserves to 5.2 million ounces (34.6 million tonnes of ore grading 4.66 grams per tonne). Most of the increase came from the Roura Deep zone (239,002 ounces) and the Rimpi zone (119,753 ounces). Indicated mineral resources decreased by 2.4 million tonnes to 13.0 million tonnes of ore grading 2.46 grams per tonne. Inferred mineral resources tonnage decreased by 0.4 million tonnes to 8.0 million tonnes of ore grading 4.55 grams per tonne, but because of higher gold grades the contained gold ounces in this category increased by 74%. The decrease in indicated mineral resources reflects the successful conversion of resources to reserves, especially in the Roura Deep and Rimpi zones. The successful deep drilling program in 2011 at the Roura Deep zone, which is located immediately below the Roura zone and north of the Suuri Deep zone, has confirmed that most of the Roura ore lenses are present in the Roura Deep zone and most of the ore lenses in the Suuri Deep zone continue north to the Roura Deep zone. The gold mineralization is open at depth and to the north. A resource-to-reserve conversion drilling campaign was carried out at Suuri, Roura and Roura-N in 2011. As a result of this work, probable reserves increased by 119,753 ounces from Rimpi, but drilling at Suuri did not increase reserves significantly. Suuri will be the main target for resource-to-reserve conversion drilling in 2012. Outside of the Kittila mining licence area, systematic geochemical sampling and diamond drilling continued on targets along the Suurikuusikko Trend, and a number of new targets were tested by diamond drilling. Encouraging results were received from a new gold zone in the Kuotko area located approximately ten kilometres north of the mine construction site. A total of 68 diamond drill holes totalling 19,948 metres were drilled on exploration targets outside of the mining licence area in 2011. The 2012 exploration budget for the Kittila mine is approximately $13.5 million ($10.3 million for minesite exploration, $1.2 million for resource-to-reserve conversion and $2.0 million for 400 metres of development in an exploration ramp at the 600-metre mine level), and includes over 39,700 metres in diamond drilling (32,200 metres for minesite exploration and 7,500 metres for resource-to-reserve conversion), using up to five drills throughout the year to help further identify the gold reserve and resource potential of the Kittila property. In addition, $2.9 million of exploration expenditures, including an estimated 10,900 metres of diamond drilling, is planned for exploration along the 25-kilometre Suurikuusikko Trend. 42 AGNICO-EAGLE MINES LIMITED Table of Contents Lapa Mine The Lapa mine, which achieved commercial production in May 2009, is located approximately 11 kilometres east of the LaRonde mine near Cadillac, Quebec. At December 31, 2011, the Lapa mine was estimated to contain proven and probable mineral reserves of 0.5 million ounces of gold comprised of 2.38 million tonnes of ore grading 6.54 grams per tonne. The Lapa property is made up of the Tonawanda property, which consists of 43 contiguous mining claims and one provincial mining lease covering an aggregate of 702.4 hectares, and the Zulapa property, which consists of one mining concession of 93.5 hectares. Location Map of the Lapa Mine The Company's initial interest in the Lapa property was acquired in 2002 through an option agreement with Breakwater Resources Ltd. ("Breakwater"). The Company undertook an aggressive exploration program and discovered a new gold deposit almost 300 metres below the surface. In 2003, the Company purchased the Lapa property from Breakwater for a payment of $8.9 million, a 1% net smelter return royalty on the Tonawanda property and a 0.5% net smelter return royalty on the Zulapa property. In 2008, the Company purchased all royalties from Breakwater for C$6.35 million. In addition, both the Zulapa and Tonawanda properties are subject to a 5% net profit royalty payable to Alfer Inc. and René Amyot. In 2004, an additional claim of 9.4 hectares was added to the Company's holdings at the Lapa mine. In January 2009, a mining lease covering 66.8 hectares was entered into with the Ministry of Natural Resources and Wildlife (Quebec). The Lapa mine is accessible by provincial highway. The elevation varies between approximately 320 and 390 metres above sea level. All of the Lapa mine's power requirements are supplied by Hydro-Quebec through connections to its main power transmission grid. All of the water required at the Lapa mine is sourced from the Heva river located 3.5 kilometres to the south of the mine. The water is pumped into an existing open pit nearby the property that has been allowed to flood and from which the mine is supplied. The topography slopes relatively gently from north to south. The property is generally covered by a boreal-type forest consisting mainly of black spruce and white pine with minor amounts of birch and poplar. For additional information regarding the Abitibi region in which the Lapa mine is located, see "– Property, Plant and Equipment – LaRonde Mine". Gold production during 2012 at the Lapa mine is expected to be approximately 100,000 ounces at estimated total cash costs per ounce of approximately $750. 2011 ANNUAL REPORT 43 Table of Contents Mining and Milling Facilities Surface Plan of the Lapa Mine The Lapa site hosts an underground mining operation and the ore is trucked to the processing facility at the LaRonde mine, which has been modified to treat the ore, recover the gold and store the residues. Tailings from the Lapa mine are deposited in the tailings pond at the LaRonde mine. In July 2004, the Company initiated the sinking of an 825-metre deep shaft at the Lapa property. In April 2006, 2,800 tonnes of ore development was extracted at Lapa and was estimated to contain on average 10.65 grams of gold per tonne. These results and results from other sampling methods were incorporated into a feasibility study and in June 2006, the Company accelerated construction of the Lapa mine. This construction included extending the shaft to a depth of 1,369 metres, which was completed in October 2007. Significant additional construction was required in order for the Lapa mine to achieve commercial production in May 2009, including the construction of the mill. Mining Methods Two underground mining methods are used at the Lapa mine: longitudinal retreat with cemented backfill and locally transverse open stoping with cemented backfill. Sublevels are driven at 30-metre vertical intervals. Stopes are mined in 12-metre sections and backfilled with 100% cemented rock backfill. Excavated ore from the Lapa site is trucked via provincial highway to the processing facility at the LaRonde mine. 44 AGNICO-EAGLE MINES LIMITED Table of Contents Surface Facilities The infrastructure on the Lapa property includes the refurbished former LaRonde Shaft #1 headframe and shafthouse, service buildings, offices, a settling pond for waste water, dry facilities, an ore bin, a diesel reservoir and a water treatment plant. In November 2007, lateral development began on three horizons. A backfill plant was commissioned in December 2008 and the sedimentation pond was extended in 2007 to control suspended solids from underground dewatering discharge. Ore at the Lapa mine is processed through grinding, gravity and leaching circuits. Dedicated milling facilities have been integrated into the mill at the LaRonde mine. Based on an average ore head grade of 6.63 grams per tonne, gold recovery averaged 81% in 2011. With an average production in excess of 1,700 tonnes per day in 2011, the mine operated consistently above its design rate of 1,500 tonnes per day. The Company is attempting to reduce the mining dilution caused by weaker than expected rock conditions in the south wall, which is mainly composed of talc chlorite schist. Mineral Recoveries In 2011, the Lapa mine produced 598,464 tonnes of ore grading 6.63 grams of gold per tonne. The Lapa processing facility treated 620,712 tonnes of ore in 2011 (approximately 1,700 tonnes per day) and operated at about 96% of available time. Head Grades Overall Metal Recoveries Payable Production Gold 6.63 g/t 81.04% 107,068 oz Environmental Matters Water used underground at the Lapa mine was initially re-circulated from mine dewatering after settling in the sedimentation pond. The re-circulation led to ammonia concentration in the water, and the Company experienced occasional toxicity problems in the water pond in 2008 and 2009. To address the ammonia content in the water, the Company built a 3.5-kilometre pipeline to obtain fresh water from the Heva River. The pipeline was commissioned in November 2009. The Company also commissioned a water treatment plant on site in 2010, which was completed in the fourth quarter of 2010, to reduce the ammonia from mine dewatering. Output is currently within the target range at approximately eight parts per million of ammonia and average efficiency is at approximately 70%. Optimization of the plant is ongoing. A sedimentation pond is used to remove suspended solids from the dewatering water before either release to the environment or re-use in the underground mining operation. The waste rock pile naturally drains towards the sedimentation pond. A waste rock sampling program implemented during the shaft sinking phase verified the non-acid generating nature of the waste rock. Water effluent from the sedimentation pond is being sampled as required under the Quebec mining effluent guidelines, and is expected to comply with the water quality criteria. The mill residues will be sent to the LaRonde mine tailings area. There are no known environmental liabilities associated with the Lapa site. The Certificates of Authorization to proceed with mine production and with mill construction were issued by the Ministry of Sustainable Development, Environment and Parks (Quebec) in October and December 2007, respectively. The Certificate of Authorization for mill and tailings production was received in 2008. Capital Expenditures The Company incurred approximately $18.0 million in capital expenditures at the Lapa mine in 2011 and expects to incur approximately $13.8 million in 2012, of which $8.9 million relates to deferred development, $2.8 million to sustaining capital expenditures (including underground construction and mining equipment) and $3.0 million for exploration. Development In 2011, a total of 5,685 metres of lateral development was completed. Development focused on permanent drifts (ramps and haulage way), stope preparation of mining blocks set for production in 2011 and 2012, and access to the newly 2011 ANNUAL REPORT 45 Table of Contents discovered East Zone, which is expected to begin production in early 2012. Since mid-2010, all three main mining horizons are linked via a ramp. Geology, Mineralization and Exploration Geology The Lapa property is geologically similar to the LaRonde property and is also located near the southern boundary of the Archean-age (2.7 billion years old) Abitibi Subprovince and the Pontiac Subprovince within the Superior Province of the Canadian Shield. The most important regional structure is the CLL fault zone marking the contact between the Abitibi and Pontiac Subprovinces. The fault zone passes through the property from west to east, and is marked by schists and mafic to ultramafic volcanic flows that comprise the Piché group (up to approximately 300 metres thick in the mine area). On the Lapa property, the fault zone displays a "Z" shaped fold to which all of the lithologic groups in the region conform. Feldspathic dykes cut the Piché group, especially near the fold. North of the Piché group lies the Cadillac sedimentary group, which consists of 500 metres or more of well-banded wacke, conglomerate and siltstone with intercalations of iron formation. The Pontiac group sedimentary rocks (up to approximately 300 metres thick) that occur to the south of the Piché group are similar to the Cadillac group but do not contain conglomerate nor iron formation. Mineralization All of the known gold mineralization along the CLL fault zone is epigenetic (late) vein type, controlled by the structure. The mineralization is associated with the fault zone and occurs within or immediately adjacent to the Piché group rocks. The Lapa deposit is comprised of the Contact zone and five satellite zones. The Contact zone accounts for approximately 82% of the mineral reserves. The ore zones are made up of multiple quartz veins and veinlets, often smoky and anastomosing, within a sheared and altered envelope containing minor sulphides and visible gold. The Contact zone is generally located at the contact between the Piché group and the Cadillac group. The satellite zones are located within the Piché group at a distance varying from ten to 50 metres from the contact with the Cadillac group, except for the Contact North zone, which is located approximately ten metres north of the Contact zone within the Cadillac group. The sheared envelope consists of millimetre-thick foliation bands of biotite or sericite with silica and, in places, cuts across rock units. Quartz veins and millimetre-sized veinlets parallel to the foliation account for 5% to 25% of the mineralization. Visible gold is common in the veins and veinlets but can also be found in the altered host rock. Sulphides account for 1% to 3% of the mineralization; the most common sulphides, in order of decreasing importance, are arsenopyrite, pyrite, pyrrhotite and stibnite. Graphite is also rarely observed as inclusions in smoky quartz veins. The Contact and satellite zones are tabular mineralized envelopes oriented east-west and dipping very steeply to the north, turning south at depth. The economic portion of the zone has been traced from depths of approximately 450 metres to more than 1,300 metres below surface. The Contact zone has an average strike length of 300 metres, varies in thickness from 2.8 to 5.0 metres and is open at depth. Locally some thicker intervals have been intersected but their continuity has not been demonstrated. The satellite zones have thicknesses similar to the Contact zone. Exploration Two exploration diamond drilling programs occurred at the Lapa mine during 2011. The first program concentrated on confirming and expanding the known orebodies (Contact zone and the other satellite zones) in the immediate vicinity of the ore zones. The drilling tested the eastern area of the Contact zone reserve at roughly 1,000 metres depth below the surface and 300 metres east of the Contact zone reserve limit. Good results, including visible gold, were returned and additional resources were identified. This area was added in the mine plan in March 2011. The 2012 program will focus on expanding mineral resources in this area. Additional drilling was done below Level 128 (the deepest producing level). Technical services will evaluate the economics of this area during 2012. The second program was executed from the newly excavated exploration track drift on Level 101 (one kilometre deep) toward the east. This program will continue through 2013. Overall, there was a reduction of approximately 175,000 ounces of gold in reserves at Lapa from 2010 to 2011 after mining 129,000 ounces of gold. The net reduction of 46,000 ounces in reserves was a result of a lower-than-expected grade from 2011 delineation diamond drilling. Mineral underground resources at the Lapa mine remained mostly unchanged. Approximately 0.5 million tonnes of inferred resources were added on surface following surface drilling in 2010 and 2011. Drilling and evaluation will continue in 2012. In 2011, a total of 231 holes were drilled on the Lapa property for a total 46 AGNICO-EAGLE MINES LIMITED Table of Contents length of 28,386 metres, compared to 264 holes for a total length of 25,660 metres in 2010. Of the drilling in 2011, 165 holes (9,257 metres) were for production stope delineation and 66 holes (19,129 metres) were for exploration. In 2010, 207 holes (13,263 metres) were for production stope delineation, 8 holes (1,477 metres) were for definition drilling and 49 holes (10,920 metres) were for exploration. Expenditure on diamond drilling at the Lapa mine during 2011 was approximately $2.39 million, including $0.76 million in definition and delineation drilling expenses charged to operating costs. In 2012, the Company expects to spend $3.0 million on exploration, including $0.76 million on the excavation of a track drift toward the east. In 2012, 18% of the exploration drilling budget will be used for exploration in close vicinity of the mine infrastructure and 82% will be used for drilling from the exploration drift. Pinos Altos Mine The Pinos Altos mine achieved commercial production in November 2009. It is located on an 11,000-hectare property in the Sierra Madre gold belt, 285 kilometres west of the City of Chihuahua in the State of Chihuahua in northern Mexico. At December 31, 2011, the Pinos Altos mine was estimated to contain proven and probable mineral reserves of 3.1 million ounces of gold and 88.5 million ounces of silver comprised of 46.8 million tonnes of ore grading 2.06 grams of gold per tonne and 58.85 grams of silver per tonne. The Pinos Altos property is made up of two blocks: the Agnico Eagle Mexico Concessions (22 concessions, 26,810.2 hectares), and the Minerales El-Madroño Concessions (18 concessions, 5,053.1 hectares). Location Map of the Pinos Altos Mine The Madrono Concessions (which cover approximately 74% of the current mineral resources) are subject to a net smelter royalty of 3.5% payable to Minerales El Madrono S.A. de C.V. ("Madrono"). The Pinos Altos Concession (which covers approximately 26% of the current mineral resources) is subject to a 2.5% net smelter return royalty payable to the Consejo de Recursos Minerales, a Mexican Federal Government agency. After 2029, this portion of the property will also be subject to a 3.5% net smelter return royalty payable to Madrono. The assets at Pinos Altos acquired by the Company in 2006 included an assignment of rights under contracts to explore and exploit the Madrono Concessions and the Pinos Altos Concession, the right to use up to 400 hectares of land owned by Madrono for mining installations for a period of 20 years after formal mining operations have been initiated and sole ownership of the Parrena Concessions. During 2008, the Company and Madrono entered an agreement under which the Company acquired further surface rights for open pit 2011 ANNUAL REPORT 47 Table of Contents mining operations and additional facilities. Infrastructure payments, surface rights payments and advance royalty payments totalling $35.5 million were made to Madrono in 2009 in respect of this agreement. In 2006, the Company concluded negotiations with communal land owners (ejidos) and others for the purchase of 5,745 hectares of land contained within the Parrena and Pinos Altos Concessions. In addition, a temporary occupation agreement with a 30-year term expiring in 2036 was negotiated with ejido Jesus del Monte for 1,470 hectares of land covered by these same concession blocks. The acquisition of these surface rights for the geologically prospective lands within the district surrounding Pinos Altos will facilitate future exploration and mining development in these areas. The Pinos Altos mine is directly accessible by a paved interstate highway that links the cities of Chihuahua and Hermosillo and is within ten kilometres of an extension of the state power grid. Existing and planned underground mine workings will intercept water resources sufficient to sustain the requirements for future operation. The land position is sufficient for construction of all planned surface, infrastructure and mining facilities at the Pinos Altos mine, including its tailings impoundment area. The Company further believes that a sufficient local and trained workforce is available in northern Mexico to support the operation of the mine. The Pinos Altos property is characterized by moderate to rough terrain with mixed forest (pine and oak) and altitudes that vary from 1,770 metres to 2,490 metres above sea level. The climate is sub-humid, with about one metre of annual precipitation. The average annual temperature is 18.3 degrees Celsius. Exploration and mining work can be carried out year-round. In August 2007, on the basis of an independently reviewed feasibility study, the Company approved construction of a mine at Pinos Altos. The mine achieved commercial production in November 2009. Combined production from the Pinos Altos mine and the Creston Mascota deposit at Pinos Altos was 204,380 ounces of gold and 1.85 million ounces of silver in 2011 at total cash costs per ounce of gold of $299. In 2012, combined gold production from the Pinos Altos mine and the Creston Mascota deposit at Pinos Altos is expected to be approximately 205,000 ounces and silver production is expected to be approximately 2.0 million ounces. Total cash costs per ounce of gold are forecast at approximately $415. From 2012 to 2026, combined gold production from the Pinos Altos mine, including the Creston Mascota deposit at Pinos Altos, is expected to average approximately 170,000 ounces of gold per year. Based on a feasibility study prepared in 2009, the Company determined to build a stand-alone heap leach operation at the satellite open pit Creston Mascota deposit at Pinos Altos. Creston Mascota is expected to produce approximately 50,000 ounces of gold per year during its five-year mine life. Capital costs in connection with the project were approximately $65 million, of which approximately $12 million was incurred in 2011. The first gold pour from the Creston Mascota deposit at Pinos Altos occurred on December 28, 2010 and commercial production from the Creston Mascota deposit at Pinos Altos was achieved in the first quarter of 2011. The Company has engaged the local communities in the project area with hiring, local contracts, education support and medical support programs to ensure that the project provides long-term benefits to the residents living and working in the region. Approximately two-thirds of the operating workforce at Pinos Altos are locally hired and more than 99% of the permanent workforce are Mexican nationals. 48 AGNICO-EAGLE MINES LIMITED Table of Contents Mining and Milling Facilities Surface Plan of the Pinos Altos Mine In 2011, the Creston Mascota deposit at Pinos Altos achieved commercial production and the optimization of the Pinos Altos mine continued. Milling operations at Pinos Altos averaged 4,770 tonnes processed per day as compared to the design expectation of 4,000 tonnes per day. In its first full year of operation, the underground mine at Pinos Altos produced an average 2,983 tonnes of ore per day as compared to the design expectation of 3,000 tonnes per day. The open pit mines at Pinos Altos and the Creston Mascota deposit at Pinos Altos produced 28.5 million tonnes of ore, overburden and waste in 2011, which met the expectation of the mine plan for the year. Mining Methods The surface operations at the Pinos Altos mine use traditional open pit mining techniques with bench heights of seven metres and double benches on the footwall and single benching on the hanging wall. Mining is accomplished with front end loaders, trucks, track drills and various support equipment. Based upon geotechnical evaluations, the final pit slopes will vary between 45 degrees and 50 degrees. Performance at the open pit mining operation at Pinos Altos during 2011 continues to indicate that the equipment, mining methods and personnel selected for the project are satisfactory for future production phases. Approximately 28.5 million tonnes of ore, overburden and waste were mined during 2011, meeting the expected production for the year. During the first ten years of the project's life, it is expected that approximately half of the ore volume processed will be derived from open pit operations, principally at Santo Niño, Oberon de Weber and the Creston Mascota at Pinos Altos. Underground mine production will produce the balance of the ore for the processing plant. The underground mine, which commenced operations in the second quarter of 2010, uses the long hole sublevel stoping method to extract the ore. The Company has considerable expertise with this mining method, having used the same method at the LaRonde mine in Quebec. This method has also been used at various other Mexican mining operations. The stope height is planned at 30 metres and the stope width at 15 metres. Ore is hauled to the surface utilizing underground trucks via a ramp system. The paste backfill system and ventilation system were commissioned in the fourth quarter of 2010 and are now fully operational. During 2011, approximately 1,090,000 tonnes of ore were produced from the underground portion of the mine, averaging 2,984 tonnes per day. At full capacity, the underground mine is expected to produce an average of 3,000 tonnes of ore per day. Performance of the underground mine continues to indicate that the equipment, mining methods, ground control and personnel selected are satisfactory for future production phases. A 2011 ANNUAL REPORT 49 Table of Contents scoping study is expected to be completed in the second quarter of 2012 to evaluate the potential benefit of building a shaft installation to improve the capacity and increase the efficiency of the underground mine. Total lateral development completed as of December 31, 2011 was approximately 22.6 kilometres. Surface Facilities The principal mineral processing facilities at the Pinos Altos mine are designed to process 4,000 tonnes of ore per day in a conventional process plant circuit which includes single stage crushing, grinding in a SAG and ball mill in closed loop, gravity separation followed by agitated leaching, counter current decantation and metals recovery in the Merrill Crowe process. Tailings are detoxified and filtered and then used for paste backfill in the underground mine or deposited as dry tailings in an engineered tailings impoundment area. The Pinos Altos mill processed an average of 4,770 tonnes of ore per day during 2011. Low grade ore at Pinos Altos is processed in a heap leach system designed to accommodate approximately five million tonnes of mineralized material over the life of the project. The production from heap leach operations is expected to be relatively minor, contributing about 5% of total metal production planned for the life of the mine. A separate heap leach operation and ancillary support facilities were built at the Creston Mascota deposit at Pinos Altos, which is designed to process approximately 4,000 tonnes of ore per day in a three stage crushing, agglomeration and heap leach circuit with carbon adsorption. This project began commissioning in the latter part of 2010, with commercial production achieved in the first quarter of 2011. During 2011, a total of 1,452,708 tonnes of ore were produced at the Creston Mascota deposit at Pinos Altos, averaging 3,980 tonnes per day. Based on early performance of the mine and process facilities at the Creston Mascota deposit at Pinos Altos, the equipment, mining methods and personnel are satisfactory for completion of the planned production phases. The Creston Mascota deposit at Pinos Altos is expected to produce approximately 50,000 ounces of gold per year during a five-year remaining mine life. Surface facilities at the Pinos Altos mine include a heap leach pad, pond, liner and pumping system; administrative support offices and change room facilities; camp facilities; a laboratory; a process plant shop; a maintenance shop; a generated power station; surface power transmission lines and substations; the engineered tailings management system; and a warehouse. Over the life of the mine, recoveries of gold and silver in the milling circuit at Pinos Altos (other than from the Creston Mascota deposit at Pinos Altos operation) are expected to average approximately 93% and 49%, respectively. Precious metals recovery from low grade ore processed in the Pinos Altos heap leach facility will average about 68% for gold and 12% for silver. Heap leach recoveries for Creston Mascota ore are expected to average 71% for gold and 16% for silver. Mineral Recoveries During 2011, the Pinos Altos mill processed 1.74 million tonnes of ore, averaging approximately 4,770 tonnes of ore treated per day and operating at approximately 93.3% of available time. The following table sets out the metal recoveries at the Pinos Altos mill in 2011. Head Grade Overall Metal Recovery Payable Production Gold 2.86 g/t 93.7% 149,867 oz Silver 65.73 g/t 43.1% 1,545,773 oz An additional 992,992 tonnes of ore were processed and placed on the heap leach pad at Pinos Altos, with an average grade of 0.65 grams of gold per tonne and 17.45 grams of silver per tonne. Cumulative metals recovery on the heap leach pad at Pinos Altos are 57.5% gold and 11.7% silver. Heap leach recovery is following the expected cumulative recovery curve and it is anticipated that the ultimate recovery of 68% for gold and 12% for silver will be achieved when leaching is completed. An additional 1,452,708 tonnes of ore were processed and placed on the heap leach pad at the Creston Mascota deposit at Pinos Altos, with an average grade of 1.52 grams of gold per tonne and 7.5 grams of silver per tonne. Cumulative metals recovery on the heap leach pad at the Creston Mascota deposit at Pinos Altos are 48.0% gold and 4.8% silver. Heap leach 50 AGNICO-EAGLE MINES LIMITED Table of Contents recovery is following the expected cumulative recovery curve and it is anticipated that the ultimate recovery of 71% for gold and 16% for silver will be achieved when leaching is completed. Total metal production (from mill and heap leach) at Pinos Altos, including the Creston Mascota deposit, during 2011 was 204,380 ounces of gold and approximately 1.85 million ounces of silver. Environmental Matters The Pinos Altos mine has received the necessary permit authorizations for construction and operation of a mine, including a Change of Land Use permit and an Environmental Impact Study approval from the Mexican environmental agency ("SEMARNAT"). As of December 31, 2011, all permits necessary for the operation of the Pinos Altos mine, including the operations at the Creston Mascota deposit at Pinos Altos, had been received and requests for modifications to allow for future expansion of facilities, including at the Creston Mascota deposit at Pinos Altos, had been approved or were under review by SEMARNAT. Pinos Altos uses the dry stack tailings technology to minimize the geotechnical and environmental risk that can be associated with the rainfall intensities and topographic relief in the Sierra Madre region of Mexico. All of the Mexican environmental regulatory requirements are expected to be met or exceeded by the Pinos Altos mine (including operations at the Creston Mascota deposit at Pinos Altos). Operations at Pinos Altos and the Creston Mascota deposit at Pinos Altos were deemed to qualify for the "Industria Limpia" (clean industry) designation by SEMARNAT in 2011. Capital Expenditures Capital expenditures at the Pinos Altos mine during 2011 were approximately $24 million. Capital expenditures relating to operations at the Creston Mascota deposit at Pinos Altos during 2011 were approximately $12 million. The Company expects sustaining and deferred capital expenditures at Pinos Altos to be approximately $31 million in 2012 with average sustaining and deferred capital of approximately $15.7 million per year for a projected mine life of approximately 17 years. Approximately $0.5 million in development capital is forecast at the Creston Mascota deposit at Pinos Altos in 2012 with sustaining capital expenditures of $10 million during its anticipated five-year mine life. Development At December 31, 2011 more than 71.7 million tonnes of overburden and waste had been removed from the open pit mine at Pinos Altos and more than 22.6 kilometres of lateral development had been completed in the underground mine. At the Creston Mascota deposit at Pinos Altos, approximately 10.6 million tonnes of ore and overburden had been removed from the open pit mine as of December 31, 2011. Geology, Mineralization and Exploration Geology The Pinos Altos mine is in the northern part of the Sierra Madre geologic province, on the northeast margin of the Ocampo Caldera, which hosts many epithermal gold and silver occurrences including the nearby Ocampo mining operation and Moris mine. The property is underlain by Tertiary-age (less than 45 million years old) volcanic and intrusive rocks that have been disturbed by faulting. The volcanic rocks belong to the lower volcanic complex and the discordantly-overlying upper volcanic supergroup. The lower volcanic complex is represented on the property by the Navosaigame conglomerates (including thinly-bedded sandstone and siltstone) and the El Madrono volcanics (felsic tuffs and lavas intercalated with rhyolitic tuffs, sandy volcanoclastics and sediments). The upper volcanic group is made up of the Victoria ignimbrites (explosive felsic volcanics), the Frijolar andesites (massive to flow-banded, porphyritic flows) and the Buenavista ignimbrites (dacitic to rhyolitic pyroclastics). Intermediate and felsic dykes as well as rhyolitic domes intrude all of these units. The Santo Nino andesite is a dyke that intrudes along the Santo Nino fault zone. Structure on the property is dominated by a 10-kilometre by 3-kilometre horst, a fault-uplifted block structure oriented west-northwest, that is bounded on the south by the south-dipping Santo Nino fault and on the north by the north-dipping Reyna de Plata fault. Quartz-gold vein deposits are emplaced along these faults and along transfer faults that splay from the Santo Nino fault. 2011 ANNUAL REPORT 51 Table of Contents Mineralization Gold and silver mineralization at the Pinos Altos mine consists of low sulphidation epithermal type hydrothermal veins and breccias. The Santo Nino structure outcrops over a distance of roughly six kilometres. It strikes at 060 degrees azimuth on its eastern portion and turns to strike roughly 090 degrees azimuth on its western fringe. The structure dips at 70 degrees towards the south. The four mineralized sectors hosted by the Santo Nino structure consist of discontinuous quartz rich lenses named from east to west: El Apache, Oberon de Weber, Santo Nino and Cerro Colorado. The El Apache lens is the most weakly mineralized. The area hosts a weakly developed white quartz dominated breccia. Gold values are low and erratic over its roughly 750 metre strike length. Past drilling suggests that this zone is of limited extent at depth. The Oberon de Weber lens has been followed on surface and by diamond drilling over an extent of roughly 500 metres. Shallow holes drilled by the Company show good continuity both in grade and thickness over roughly 550 metres. From previous drilling done by Penoles, continuity at depth appears to be erratic with a weakly defined western rake. The Santo Nino lens is the most vertically extensive of these lenses. It has been traced to a depth of approximately 750 metres below surface. The vein is followed on surface over a distance of 550 metres and discontinuously up to 650 metres. Beyond its western and eastern extents, the Santo Nino andesite is massive and only weakly altered. Gold grades found are systematically associated with green quartz brecciated andesite. The Cerro Colorado lens is structurally more complex than the three described above. Near the surface, it is marked by a complex superposition of brittle faults with mineralized zones which are difficult to correlate from hole to hole. Its relation to the Santo Nino fault zone is not clearly defined. Two deeper holes drilled by the Company suggest better grade continuity is possible at depth. The San Eligio zone is located approximately 250 metres north of Santo Nino. The host rock is brecciated Victoria Ignimbrite, occasionally with stockworks. There is no andesite in this sector. Unlike the other lenses, the San Eligio lens dips towards the north. The lateral extent seems to be continuous for 950 metres. Its average width is five metres and never exceeds 15 metres. Surface mapping and prospecting has suggested good potential for additional mineralization on strike and at depths below 150 metres. Visible gold has been seen in the drill core. Several other promising zones are associated with the horst feature in the northwest part of the property. The Creston Mascota deposit at Pinos Altos is 7 kilometres northwest of the Santo Nino deposit, and is similar, but dips shallowly to the west. The Creston Mascota deposit at Pinos Altos is about 1,000 metres long and 4 to 40 metres wide, and extends from surface to more than 200 metres depth. Ore production from the Creston Mascota deposit at Pinos Altos began in July 2010, with the first gold poured in December 2010 and commercial productions commencing in February 2011. Exploration In 2011, minesite exploration activities were primarily focused on definition and delineation of the resources at Santo Nino, Oberon de Weber, San Eligio and Creston Mascota. A total of 15 kilometres of minesite exploration drilling, 10.1 kilometres of definition drilling and 4.4 kilometres of delineation drilling were completed during the year. Regional exploration in 2011 focused on the El Cubiro prospect. Diamond drilling consisted of 30.6 kilometres in 84 drill holes. More than 6,000 core samples and 1,250 rock samples were sent to a certified laboratory and assayed mainly for gold and silver. The recently discovered Cubiro mineralization is two kilometres west of the Creston Mascota deposit at Pinos Altos. Cubiro is a surface deposit that strikes northwest, has a steep dip and has been followed along strike for approximately 850 metres. Drilling has intersected significant gold and silver mineralization up to 30 metres wide. The Cubiro deposit is split by a fault that caused 200 metres of displacement to the west, which has been traced by drilling. The zone is still open to the southeast and possibly at depth. The Sinter zone is 1,500 metres north northeast of the Santo Nino zone and is part of the Reyna de Plata gold structure. The steeply dipping mineralization is four to 35 metres wide and almost 900 metres long, with over 350 metres of vertical depth. Sinter is being evaluated for its open pit mining and heap leach potential. Other identified mineral resources in the Pinos Altos region include the Bravo and Carola zones adjacent to the Creston Mascota deposit at Pinos Altos and the Reyna de la Plata prospect further to the east. Exploration efforts will be allocated to these zones as the development continues at Pinos Altos and the Creston Mascota deposit at Pinos Altos. In 2012 the Company expects to spend $4.7 million on exploration at the Pinos Altos mine, including $3.2 million on 11,800 metres of conversion drilling and $1.5 million on 5,000 metres of exploration drilling. In addition, $1.1 million is expected to be spent on regional exploration on the Pinos Altos property, including 3,000 metres of drilling at the Cubiro, Escalon and Penasco deposits. 52 AGNICO-EAGLE MINES LIMITED Table of Contents Meadowbank Mine The Meadowbank mine, which achieved commercial production in March 2010, is located in the Third Portage Lake area in the Kivalliq District of Nunavut in northern Canada, approximately 70 kilometres north of Baker Lake. At December 31, 2011, the Meadowbank mine was estimated to contain proven and probable mineral reserves of 2.2 million ounces of gold comprised of 24.5 million tonnes of ore grading 2.79 grams of gold per tonne. The Company acquired its 100% interest in the Meadowbank mine in 2007 as the result of the acquisition of Cumberland (see "– History and Development of the Company"). The fresh water required for domestic camp use, mining and milling is obtained from the intake barge at Third Portage Lake. Power is supplied by a 29-megawatt diesel electric power generation plant with heat recovery. Location Map of the Meadowbank Mine The Meadowbank mine is held under ten Crown mining leases, three exploration concessions and 40 Crown mineral claims. The Crown mining leases, which cover the Portage, Goose Island and Goose South deposits, are administered under federal legislation. The mining leases, which have renewable ten-year terms, have no annual work commitments but are subject to annual rent fees that vary according to their renewal date. The mining leases cover approximately 7,400 hectares and expire in either 2016 or 2019. The production lease with the KIA is a surface lease covering 1,354 hectares and requires payment of C$124,530 annually. Production from subsurface lease areas is subject to a royalty of up to 14% of the adjusted net profits, as defined in the Territorial Mining Regulations. In order to conduct exploration on the Inuit-owned lands at Meadowbank, the Company must receive approval for an annual work proposal from the KIA, the body that holds the surface rights in the Kivalliq District and administers land use in the region through various boards. The Nunavut Water Board, one such board, provided the recommendation to the Ministry of Indian Affairs and Northern Development (Canada) to grant the Meadowbank mine's construction and operating licences in July 2008. The Company has obtained all of the approvals and licences required to build and operate the Meadowbank mine. 2011 ANNUAL REPORT 53 Table of Contents The three Meadowbank exploration concessions comprise approximately 23,100 hectares and are granted by Nunavut Tunngavik, the corporation responsible for administering subsurface mineral rights on Inuit-owned lands in Nunavut. Exploration concessions cover the Vault deposit at Meadowbank and in 2012 will require annual rental fees of approximately C$92,504 and exploration expenditures of approximately C$693,780. During the exploration phase, the concessions can be held for up to 20 years and the concessions can be converted into production leases with annual fees of C$1 per hectare, but no annual work commitments. Production from the concessions is subject to a 12% net profits interest royalty from which annual deductions are limited to 85% of the gross revenue. The 40 Crown mineral claims cover approximately 36,433 hectares at Meadowbank and are subject to land fees and work commitments. Land fees are payable only when work is filed. The most recent filing was in 2011, when approximately C$8,998 in land fees were paid and approximately C$2,266,670 in assessment work was submitted. The Kivalliq region in which the Meadowbank mine is located has an arid arctic climate. The Meadowbank property is situated in an area characterized by low, rolling hills that are covered predominantly in heath tundra with numerous lakes and ponds. Elevation ranges from approximately 130 metres at lakeshores up to 200 metres on ridge crests. Operations at the Meadowbank mine are expected to be year-round with only minor weather-related interruptions to mining operations; however, these interruptions are not expected to affect ore availability for milling operations or other operating activities. The Meadowbank mine is accessible from Baker Lake, located 70 kilometres to the south, over a 110-kilometre all-weather road completed in March 2008. Baker Lake provides 2.5 months of summer shipping access via Hudson Bay and year-round airport facilities. The Meadowbank mine also has a 1,100-metre long gravel airstrip, permitting access by air. The Company uses ocean transportation for fuel, equipment, bulk materials and supplies from Montreal, Quebec, (or Hudson Bay port facilities) via barges and ships into Baker Lake during the summer port access period that starts at the end of July in each year. Fuel and supplies are transported year-round to the site from Baker Lake by conventional tractor trailer units using an all-weather private access road. Transportation for personnel and air cargo are provided on scheduled or chartered flights. The permanent bases for employees from which to service the Meadowbank mine are Val D'Or and Montreal in Quebec and the Kivalliq communities. Since February 2009, all chartered flights have landed directly at Meadowbank. The Meadowbank mine achieved commercial production in March 2010 and produced 270,801 ounces of gold in 2011 at total cash costs per ounce of $1,000. In 2012, total cash costs at Meadowbank are expected to be approximately $1,040 per ounce. In 2012, payable gold production at Meadowbank is expected to be approximately 295,000 ounces, reflecting a slower than expected ramp-up to design rates as a result of a number of issues during startup over the past two years. While the mill throughput is now exceeding the original design rate, the grades to the mill continue to be lower than expected. This, combined with the unexpected rise in minesite costs has resulted in a new mine plan which forecasts lower gold production over a shorter mine life. The mine life now extends to 2017 rather than 2020. 54 AGNICO-EAGLE MINES LIMITED Table of Contents Mining and Milling Facilities Surface Plan of the Meadowbank Mine Meadowbank has three major deposits that have sufficient drilling definition to sustain reserves; Portage, Goose and Vault. By the end of 2009, all of the camp infrastructure (dormitories and kitchen), a mill, a service building shop and generator buildings were built. All required aggregates used in the mining process are produced from waste material taken from the north end of the Portage pit. In 2008, a dewatering dyke was constructed in order to access the north half of the Portage pit in preparation for production in 2010. Construction of the Bay-Goose dyke, a major dewatering dike required to access the southern portion of the Portage and the Goose Island pits, commenced in the summer of 2009 and was completed in the spring of 2011. Three tailings impoundment dykes, Saddle Dam 1, Saddle Dam 2 and Stormwater Dykes, were built in 2009 and 2010. Also, the first phase of the main tailings impoundment dyke, Central Dyke, was started in 2011 and will be in construction for the duration of the mine life. The eight-kilometer long access road to the Vault pit was started in 2011 and will be completed in 2012. Mining Methods Mining at the Meadowbank mine is done by open pit with trucks and excavators. The ore is extracted conventionally using drilling and blasting, then hauled by trucks to a primary gyratory crusher adjacent to the mill. The marginal-grade material (material grading under the cut-off grade at a gold price of $1,255 per ounce but which has the potential to increase the reserves at the end of the mine life if the metal prices justify its processing) is stockpiled separately. Also, a sub-grade material stockpile (material for which extraction has already been paid but currently is lower than the mill feed grade) has 2011 ANNUAL REPORT 55 Table of Contents been created for potential processing at the end of the mine life. Waste rock is hauled to one of two waste storages on the property, used for dyke construction or construction material or backfilled into the mined out area. Mining first commenced in the Portage pit in 2010 and was the only mine in production in 2011. Mining is scheduled to commence in March 2012 in the Goose pit and in 2014 in the Vault pit. Surface Facilities The accommodations complex at the Meadowbank mine consists of a permanent camp and a temporary camp to accommodate extra workers. The camp is supported with a sewage treatment, solid waste disposal and potable water plant. In 2008, the exploration group was relocated eight kilometres south of the minesite location to a separate camp with an 80-person capacity. Plant site facilities include a mill building, a maintenance mechanical shop building, a generator building, an assay lab and a heavy vehicle maintenance shop. A structure comprised of two separate crushers flank the main process complex. Power is supplied by an 29-megawatt diesel electric power generation plant with heat recovery and an onsite fuel storage (5.6 million litres) and distribution system. The mill-service-power complex is connected to the accommodations complex by enclosed corridors. In addition, the Company will build peripheral infrastructure including tailings and waste impoundment areas. Facilities constructed at Baker Lake include a barge landing site located three kilometres east of the community and a storage compound. A fuel storage and distribution complex with a 60-million litre capacity has been built next to the barge landing facility. The process design is based on a conventional gold plant flowsheet consisting of two-stage crushing, grinding, gravity concentration, cyanide leaching and gold recovery in a CIP circuit. The mill is designed for year-round operations with a design capacity of 9,800 tonnes per day. The overall gold recovery is projected to be approximately 92.9%, based on projections from metallurgical test work, with approximately 15% typically recovered in the gravity circuit. The run-of-mine ore is transported to the crusher using an off-road truck. The ore is dumped into the gyratory crusher or into designated ore-type stockpiles. The product from the primary crusher is conveyed to the cone crusher in closed circuit with a vibrating screen. The crushed ore is delivered to the coarse ore stockpile and ore from the stockpile is conveyed to the mill. The grinding circuit is comprised of a primary SAG mill operated in open circuit and a secondary ball mill operated in closed circuit with cyclones. A portion of the cyclone underflow stream is sent to the concentrator, which separates the heavy minerals from the ore. The grinding circuit incorporates a gravity process to recover free gold and the free gold concentrate is leached in an intensive cyanide leach-direct electrowinning recovery process. The cyclone overflow is sent to the grinding thickener. The clarified overflow is recycled to the grinding circuit and thickened underflow is pumped to a pre-aeration and leach circuit. The cyanide circuit consists of seven tanks providing approximately 42 hours retention time. The leached slurry flows to a train of six CIP tanks. Gold in the solution flowing from the leaching circuit is adsorbed into the activated carbon. Gold is recovered from the carbon in a Zadra elution circuit and is recovered from the solution using an electrowinning recovery process. The gold sludge is then poured into dore bars using an electric induction furnace. The CIP tailings are treated for the destruction of cyanide using the standard sulphur-dioxide-air process. The detoxified tailings are then pumped to the permanent tailings facility. The tailings storage is designed for zero discharge, with all process water being reclaimed for re-use in the mill to minimize water requirements. Mineral Recoveries Gold recoveries are expected to average 92.9% for all deposits. The different ore zones have slightly different grind sensitivities to gold recovery and, as such, different particle size distributions are recommended as target grinds in the process. The use of a slightly coarser grind for the Vault ores will allow all three of the ore zones to be processed at a consistent process throughput. 56 AGNICO-EAGLE MINES LIMITED Table of Contents During 2011, gold recovery averaged 93.8%. Approximately 2,977,723 tonnes of ore were processed, averaging 8,158 tonnes of ore per day with the mill operating 87.19% of available time. The following table sets out the metal recoveries contained for the 2,977,723 tonnes of ore extracted at the Meadowbank mine in 2011. Head Grade Overall Metal Recovery Payable Production Gold 3.01 g/t 93.82% 270,801 oz Environmental Matters (including Inuit Impact and Benefit Agreement) The development of the Meadowbank mine was subject to an extensive environmental review process under the Nunavut Land Claims Agreement administered by the Nunavut Impact Review Board (the "NIRB"). On December 30, 2006, a predecessor to the Company received the Project Certificate from the NIRB, which includes the terms and conditions to ensure the integrity of the development process. The Nunavut Water Board provided the recommendation to the Ministry of Aboriginal Affairs and Northern Development Canada to grant the Meadowbank mine's construction and operation under a water licence in July 2008. In February 2007, a predecessor to the Company and the Nunavut government signed a Development Partnership Agreement (the "DPA") with respect to the Meadowbank mine. The DPA provides a framework for stakeholders including the federal and municipal governments and the KIA, to maximize the long-term socio-economic benefits of the Meadowbank mine to Nunavut. An Inuit Impact Benefit Agreement for the Meadowbank mine (the "IIBA") was signed with the KIA in March 2006. This agreement was renegotiated and a revised IIBA was signed October 18, 2011. The IIBA ensures that local employment, training and business opportunities arising from all phases of the project are accessible to the Kivalliq Inuit. The IIBA also outlines the special considerations and compensation that Cumberland agreed to provide to the Inuit regarding traditional, social and cultural matters. The Company currently holds a renewable exploration lease from the KIA that expires December 31, 2015. In July 2008, the Company signed a production lease for the construction and the operation of the mine, the mill and all related activities. In April 2008, the Company and KIA signed a water compensation agreement for the Meadowbank mine addressing Inuit rights under the Land Claims Agreement respecting compensation for water use and water impacts associated with the project. The Meadowbank mine consists of several gold-bearing deposits: Portage, Goose and Vault. A series of six dykes have been built to isolate the mining activities at the Portage and Goose deposits from neighbouring lakes. An additional dyke will be built in 2013 to isolate the mining activities at the Vault deposit. Waste rock from the Portage, Goose Island and Vault pits will primarily be stored in the Portage and Vault rock storage facility, and a portion of the waste will be stored in the Portage Pit. The control strategy to minimize the onset of oxidation and the subsequent generation of acid mine drainage includes freeze control of the waste rock through permafrost encapsulation and capping with an insulating convective layer of neutralizing rock (ultramafic and non-acid generating volcanic rocks). Because the site is underlain by about 450 metres of permafrost, the waste rock below the capping layer is expected to freeze, resulting in low rates of acid rock drainage generation in the long term. Tailings are stored in the Second Portage arm. Initially the tailings will be deposited in a subaqueous environment, but the majority of tailings will be deposited on tailings beaches. A reclamation pond will be operated within the tailings storage facility. The control strategy to minimize water infiltration into the tailings storage facility and the migration of constituents out of the facility includes freeze control of the tailings through permafrost encapsulation. A four-metre-thick dry cover of acid neutralizing ultramafic rock backfill will be placed over the tailings as an insulating convective layer to confine the permafrost active layer within relatively inert materials. The water management objective for the project is to minimize the potential impact on the quality of surface water and groundwater resources at the site. Diversion ditches will be constructed in 2012 to avoid the contact of clean runoff water with areas affected by the mine or mining activities. Contact water originating from affected areas is intercepted, collected, conveyed to the tailings storage facility for re-use in process or decanted to treatment (if needed) prior to release to receiving lakes. 2011 ANNUAL REPORT 57 Table of Contents Capital Expenditures/Development A total of $86.1 million has been budgeted to be spent at the Meadowbank mine (excluding exploration) in 2012, including $55 million on dyke construction, $29.1 million on sustaining capital and equipment and $4 million on construction projects carried over from 2011. As well, $1.6 million has been budgeted for 5,000 metres of diamond drilling to convert resources to reserves in the Vault deposit area. Regional exploration in the Meadowbank area has been budgeted at $5.1 million and will include 13,000 metres of exploration diamond drilling. The Meadowbank mine started production in 2010. Total capital costs of construction incurred since the date of acquisition by the Company amounted to $838 million. The mine life is expected to be six years. Geology, Mineralization and Exploration Geology The Meadowbank mine comprises a number of Archean-age gold deposits hosted within polydeformed volcanic and sedimentary rocks of the Woodburn Lake Group, part of the Western Churchill supergroup in northern Canada. Three minable gold deposits – Goose, Portage and Vault – have been discovered along the 25-kilometre long Meadowbank gold trend, and the PDF deposit (a fourth deposit) has been outlined on the northeast gold trend. These known gold resources are within 225 metres of the surface, making the project amenable to open pit mining. Mineralization The predominant gold mineralization found in the Portage and Goose deposits is associated with iron sulfides, mainly pyrite and pyrrhotite, which occur as a replacement of magnetite in the oxide facies iron formation host rock. To a lesser extent, pyrite and chalcopyrite may be found and, on rare occasions, arsenopyrite may be associated with the other sulphides. Gold is mainly observed in native form (electrum), occurring in isolated specs or as plating around sulfide grains. The ore zones are typically 6-7 metres wide, following the contacts between the iron formation units and the surrounding host rock. Zones extend up to several hundred metres along strike and at depth. The sulphides primarily occur as replacement of the primary magnetite layers, as well as narrow stringers or bands of disseminated sulphides that almost always crosscut the main foliation and/or bedding which would imply an epigenetic mode of emplacement. The percentage of sulphides is quite variable and may range from trace to semi-massive amounts over several centimetres to several metres in length. The higher gold grades and the occasional occurrence of visible gold are almost always associated with greater than 20% sulphide content. The main mineralized banded iron formation unit is bounded by an ultramafic unit to the west which locally occurs interlayered with the banded iron formation and to the east by an intermediate to felsic metavolcaniclastic unit. In the Vault deposit, pyrite is the principal ore bearing sulphide. The disseminated sulphides occur along sheared horizons that have been sericitized and silicified. These zones are several metres wide and may continue for hundreds of metres along strike and down dip. Three of the four known gold deposits are currently planned to be mined. The Goose Island and Portage deposits are hosted within highly deformed, magnetite-rich iron formation rocks, while intermediate volcanic rock assemblages host the majority of the mineralization at the more northerly Vault deposit. The fourth deposit, PDF, shows the same characteristics as Vault, though it is not currently anticipated to be a mineable deposit. Defined over a 1.85-kilometre strike length and across lateral extents ranging from 100 to 230 metres, the geometry of the Portage deposit consists of general north-northwest-striking ore zones that are highly folded. The mineralization in the lower limb of the fold is typically six to eight metres in true thickness, reaching up to 20 metres in the hinge area. The Goose Island deposit is located just south of the Portage deposit and is also associated with iron formation but exhibits different geometry, with a north-south trend and a steep westerly dip. Mineralized zones typically occur as a single unit near surface, splaying into several limbs at depth. The deposit is currently defined over a 750-metre strike length and down to 500 metres at depth (mainly in the southern end), with true thicknesses of three to 12 metres (reaching up to 20 metres locally). The Goose underground resource (100 to 500 metres at depth) extends 700 metres to the south of the Goose pit. The ore zones show the same characteristics as the Goose pit, which is two to five main zones sub-parallel and undulating. The average thickness rarely exceeds three to five metres. The Vault deposit is located seven kilometres northeast of the Portage and Goose deposits. It is planar and shallow-dipping with a defined strike of 1,100 metres. The deposit has been disturbed by two sets of normal faults striking east-west and 58 AGNICO-EAGLE MINES LIMITED Table of Contents north-south and dipping moderately to the southeast and steeply to the east, respectively. The main lens has an average true thickness of eight to 12 metres, reaching as high as 18 metres locally. The hanging wall lenses are typically three to five metres, and up to seven metres, in true thickness. Exploration Grass roots exploration in the project area began as early as 1980. As some interesting targets arose, several companies conducted various types of work between 1980 and 2007. Throughout these years, six deposits were the main focus of exploration: Portage, Cannu, Bay Zone, Goose, Vault and PDF. Over time, the Cannu, Bay Zone and Portage deposits were combined into one mineable deposit referred to as Portage. Exploration has extended the Goose Island deposit southward, adding the Goose South and Gosling zones. In 2009, the mine exploration group took over the pit and adjacent areas. Three goals were targeted: exploration drilling, resource conversion and waste pad condemnation. In 2010, 102 holes totalling 37,928 metres were drilled. The focus of the exploration campaign was testing the underground potential of the Goose deposit, resource conversions at the Vault deposit and on the south continuity of the Portage and Goose deposits. On the Goose underground deposit, a total of 23 holes for 11,145 metres were drilled from 200 to 750 metres in depth. These holes contributed to increase the continuity and understanding of the mineralization. The drilling was predominantly to expand the Goose deposit at depth and towards the south, as well as to conduct infill drilling in areas where large gaps occurred between auriferous intersections. The program was successful in expanding the Goose deposit at depth and towards the south. On the Vault deposit, a total of 39 holes for 5,943 metres were drilled from 25 to 200 metres in depth. These holes were aimed at converting resources close to the pit shell and also to extending resources to the south-west continuity towards the Tern Lake porphyry. On the southern portion of the Portage deposit, a total of 18 holes for 8,070 metres were drilled from 50 to 250 metres in depth with the aim of converting resources directly south of the Portage pit and other inferred occurrences within a close proximity to the pit. On the Goose south trend, a total of 13 holes for 7,320 metres were drilled from 150 to 250 metres in depth. These holes were aimed at following the south trend of the Portage-Goose iron formation. In 2011, 284 diamond drill holes totalling 24,229 metres were drilled. The exploration program had four goals: exploring the southern trend of the Goose deposit at depth; following-up on the regional results of testing on the Farwest Iron Formation and the geophysics of the Tern Lake porphyry completed in 2010; continuing resource conversion work initiated on the Vault deposit in 2010 and extending resources on the south west part of deposit; and a resources conversion with a definition program in Portage pit. The definition program on the Portage pit was conducted in phases from May to December 2011 and represented 165 holes totalling 11,431 metres of diamond drilling. In addition, a new method was tried in the Portage pit for definition drilling, a reverse circulation drill was used to drill over 42 holes totalling 1,074 metres. This method will reduce the cost of drilling. On the Goose South trend, 6 holes totalling 2,382 metres were drilled. On the Farwest Iron Formation, 7 holes for a total of 2,721 metres were drilled along the trend and verified the potential of the west contact with the granitic mass. On the Tern Lake porphyry, 19 holes totalling 931 metres were drilled. At the Vault pit, 19 holes were drilled for a total of 1,250 metres, 43 holes totalling 3,545 metres were drilled in Vault South and 25 holes totalling 1,969 metres were drilled in Vault East. Drilling carried out during the period of 2009 to 2011 returned significant results on the Goose underground and Vault deposits. At the Goose underground deposit, the increase in indicated mineral resources comes from a confirmation of continuity towards the south and at depth. At the Vault deposit, the increase in mineral reserves is the result of converting resources to reserves along the east pit wall. Positive drill results show continuity of mineralization toward the southwest, indicating that the pit can be expanded in that direction. 2011 ANNUAL REPORT 59 Table of Contents Meliadine Project The Meliadine project is an advanced exploration property located near the western shore of Hudson Bay in the Kivalliq region of Nunavut, about 25 kilometres north of the hamlet of Rankin Inlet and 290 kilometres southeast of the Meadowbank mine. The closest major city is Winnipeg, Manitoba, about 1,500 kilometres to the south. Agnico-Eagle acquired its 100% interest in the Meliadine project through its acquisition of Comaplex in July 2010 (see "– History and Development of the Company"). The mineral reserves and resources of the Meliadine project are estimated at December 31, 2011, to contain proven and probable mineral reserves of 2.9 million ounces of gold in 12.5 million tonnes of ore grading 7.18 grams per tonne. In addition, the project has 12.6 million tonnes of indicated mineral resources grading 4.09 grams of gold per tonne, and 12.7 million tonnes of inferred mineral resources grading 5.98 grams of gold per tonne. The Meliadine property is a large, almost entirely contiguous land package that is nearly 80 kilometres long. It consists of 55,603 hectares of mineral rights, of which 52,173 hectares are held under the Canada Mining Regulations and administered by the Department of Indian Affairs and Northern Development and referred to as Crown Land. The Crown Land is made up of mining claims covering 887 hectares and mineral leases covering 51,285 hectares. There are also 3,430 hectares of subsurface Nunavut Tunngavik Inc. concessions administered by a division of the Nunavut Territorial government. The Kivalliq region has an arid arctic climate. The Meliadine property is mainly covered by glacial overburden with the presence of deep-seated permafrost. The property is about 60 metres above sea level in low-lying topography with numerous lakes. Surface waters are usually frozen by early October and remain frozen until early June. Surface geological work can be carried out from mid-May to mid-October, while exploration drilling can take place throughout the year, though is reduced in January and February due to cold and darkness. Equipment, fuel and dry goods are transported on the annual warm-weather sealift by barge to Rankin Inlet via Hudson Bay. Ocean-going barges from Churchill, Manitoba or eastern Canadian ports can access the community from late June to early October. Churchill, which is approximately 470 kilometres south of Rankin Inlet, has a deep-water port facility and a year-round rail link to locations to the south. Personnel, perishables and lighter goods arrive at the Rankin Inlet regional airport by commercial or charter airline, from which they can be flown to the property by chartered helicopter. An all-weather gravel road extends from Rankin Inlet to within two kilometres of the Meliadine River, which is approximately 15 kilometres away from the property, but there is winter-road access for tracked vehicles from Rankin Inlet directly to the Meliadine project exploration camp from January to mid-May. The Company has proposed the building of a 23.8-kilometre long all-weather gravel road linking Rankin Inlet with the project site to support ongoing exploration activities at the Meliadine project property. An application to construct this road was submitted to the NIRB and other regulatory agencies in 2011. A positive decision from the NIRB on the application was received in February, 2012 and approvals from other regulatory agencies are pending. A positive decision will allow construction to begin in 2012, in which case the road is expected to be completed by the summer of 2013. Exploration personnel for the Meliadine project are mainly sourced from other parts of Canada on a fly-in/fly-out rotation from Val d'Or, Quebec, and Winnipeg, Manitoba, approximately 1,500 kilometres south of the Meliadine project property, respectively, although there is preferential employment of qualified people from the Kivalliq region. The hamlet of Rankin Inlet has developed a strong taskforce of entrepreneurs that provide a wide variety of services, such as freight expediting, equipment supply and outfitting. 60 AGNICO-EAGLE MINES LIMITED Table of Contents Location Map of the Meliadine Project 2011 ANNUAL REPORT 61 Table of Contents Facilities Surface Plan of the Meliadine Project Current facilities at the Meliadine project include the Meliadine project exploration camp located on the shore of Meliadine Lake, approximately 2.3 kilometres north of the Tiriganiaq deposit. The camp is constructed of Weatherhaven tents and can accommodate up to 150 personnel. Covered wooden walkways connect all tents to the washrooms and kitchen facilities. A 100-person, self-contained trailer camp, complete with two diesel generators, was installed adjacent to the existing exploration camp in early 2011. A second 100-person, self-contained trailer camp is expected to be installed in the first half of 2012. Power is currently generated using diesel generators for the Meliadine exploration camp on an as-required basis. Potable water for the Meliadine project camp is pumped from Meliadine Lake and water for the previous underground operations and surface drill programmes is pumped from Pump Lake. The current water licence allows for a maximum daily water use of 290 cubic metres (Meliadine West), while a request for an amendment to the water licence was filed in October 2010 with the Nunavut Water Board (Meliadine East) to increase water use to 299 cubic metres per day. The Meliadine project exploration camp has an incinerator on site to burn all flammable materials, such as camp and food wastes. Plastics and metal objects, along with incinerator ash, are set aside for transport to be disposed of in the Rankin Inlet landfill. All hazardous and liquid wastes are held at the Meliadine project site for transport to a waste management company in southern Canada. 62 AGNICO-EAGLE MINES LIMITED Table of Contents Sewage has been treated through a Biodisk treatment system since the summer of 2010. Run-off water is contained in the primary water containment area and released only when sampling results meet acceptable water quality standards. Routine water sampling has been conducted since the mid-1990s and reported on a monthly basis to the authorities. The Meliadine East camp on Atulik Lake was decommissioned during the summer of 2010, with completion in the winter of 2010 and 2011. The core shack and storage building remain at the former camp site. An underground portal allowing access to an exploration decline was built at the Tiriganiaq deposit in 2007 and 2008 in order to extract a bulk sample for study purposes. A waste rock and ore storage pad was generated during excavation of the decline and a sampling tower was installed for processing the bulk sample. There is a two-kilometre road between the Meliadine project exploration camp and the portal site. Another bulk sample was taken from underground via this portal in 2011 and results are expected to be available in early 2012. Environmental Matters (including Inuit Impact Benefit Agreement) Land and environmental management in the region of the Meliadine project is generally governed by the provisions of the Nunavut Land Claims Agreement ("NLCA"). Pursuant to the NLCA, land use leases must be obtained from the KIA. The Meliadine project has been granted a commercial lease for exploration and underground development activity, a prospecting and land use lease for exploration and development activities, an exploration land use lease for exploration and drilling on the Inuit-owned lands of Meliadine East and a parcel drilling permit for drilling activity on Inuit-owned lands. A number of right-of-way leases covering road access to the Meliadine project property and esker quarrying on the Inuit-owned lands were also granted by the KIA. Pursuant to the NLCA, an exploration water licence and a bulk sample water licence were granted by the Nunavut Water Board (the "NWB"). An application was made to the NIRB and the NWB for the construction of an access road to the Meliadine project camp to be able to carry out the exploration program year-round. A Project Certificate from the NIRB is the next approval required by the Meliadine project. Other operating permits and licences can only be issued after such Project Certificate is received. An Inuit Impact Benefit Agreement and an Inuit Water Compensation Agreement will also need to be negotiated with the KIA. Geology, Mineralization and Exploration Geology and Mineralization Archean volcanic and sedimentary rocks of the Meliadine greenstone belt underlie the property, which is mainly covered by glacial overburden with deep-seated permafrost and is part of the Western Churchill supergroup in northern Canada. The rock layers have been folded, sheared and metamorphosed, and have been truncated by the Pyke Fault, a regional structure that extends the entire 80-kilometre length of the large property. The Pyke Fault appears to control gold mineralization on the Meliadine project property. At the southern edge of the fault is a series of oxide iron formations that host all six Meliadine project deposits currently known. The deposits consist of multiple lodes of mesothermal quartz-vein stockworks, laminated veins and sulphidized iron formation mineralization with strike lengths of up to three kilometres. The Upper Oxide iron formation hosts the Tiriganiaq and Wolf North zones. The two Lower Lean iron formations contain the F Zone, Pump, Wolf Main and Wesmeg deposits, which are all within five kilometres of Tiriganiaq. The Discovery deposit is 17 kilometres east southeast of Tiriganiaq and is hosted by the Upper Oxide iron formation. Each of these deposits has mineralization within 120 metres of surface, making them potentially mineable by open pit methods. They also have deeper ore that could potentially be mined with underground methods. Exploration The Meliadine property has been explored for gold from 1987 through 2010 at a cost of C$166.8 million by former owners Asamera Inc., Rio Algom Limited, Comaplex, Cumberland and Western Mining International, as well as the Company and numerous reputable consultants. For many years the property was divided into two halves – Meliadine East and Meliadine West – which were consolidated into the Meliadine property in December 2009. A detailed history of exploration on the property is given in a technical report by the Company posted on SEDAR on March 8, 2011. Lack of outcropping bedrock in the area resulted in the use of high-density magnetic surveying followed by diamond drilling as the most common and successful exploration strategy on the property. This has included 193,318 metres of drilling in 682 holes from 1993 through 2010, as well as geophysical surveying, prospecting and sampling. In 2007 and 2008, there was an underground exploration and bulk sample program on the Tiriganiaq deposit. This was followed by a 2011 ANNUAL REPORT 63 Table of Contents Preliminary Assessment for the property in 2009, which indicated the potential of the project to support a mining operation. In 2010, there were 128 exploration drill holes (32,000 metres) at the Meliadine project, of which 53% were drilled by the Company after acquiring the property in July 2010. Agnico-Eagle spent $10 million on exploration from July through December 2010. The Company initiated a $129.6 million exploration program in the summer of 2010. Approximately 200,000 metres of drilling is planned through early 2013, mainly to convert mineral resources to reserves at Tiriganiaq. At the end of 2011, the Company spent $74.7 million, principally in diamond drilling (105,000 metres), bulk sample, updated feasibility study, permitting, all-weather road and camp expansion. Another $54.9 million has been budgeted through early 2013 to complete the exploration program (diamond drilling, feasibility study, permitting and the construction of an all-weather road linking the project to Rankin Inlet). The Company spent an additional $12 million in 2011 for the ramp project and has budgeted $16.1 million for this purpose in 2012. La India Project Location Map of the La India Project The La India project is located in the Mulatos Gold Belt in the municipality of Sahuaripa, southeast Sonora State in northern Mexico. The Mulatos Gold Belt is part of the Sierra Madre gold and silver belt that also hosts the operating Mulatos gold mine immediately southeast of the La India project property and the Pinos Altos mine and Creston Mascota at Pinos Altos deposit 70 kilometres to the southeast. The La India project includes the La India feasibility-stage heap leach gold project as well as the recently discovered Tarachi gold zone and several other prospective targets in the belt. The property consists of 43 mining concessions totalling approximately 56,000 hectares, making the Company the largest mineral title holder by area in the Mulatos Gold 64 AGNICO-EAGLE MINES LIMITED Table of Contents Belt. The climate is semi-arid with seasonal temperatures ranging from 35 degrees Celsius to –2 degrees Celsius, and torrential rainfall from July to September. Exploration activities may be conducted year-round. The project is located between the small rural towns of Tarachi and Matarachi, which offer basic infrastructure in the form of roads, rural telephone service, small grocery stores and unpaved air strips. More services are available in the town of Sahuaripa located 60 kilometres by gravel road (about 2.5 hours) northwest of the La India project. The population of the district is estimated to be a few thousand, with most of the inhabitants involved in cattle ranching, farming, forestry and mining and exploration. An adequate supply of labour for mining operations can be drawn from the region. Trained exploration personnel for the La India project are mainly sourced from northern Mexico including Hermosillo, Sonora. The closest major city with an international airport is Hermosillo, the capital of Sonora, located 210 kilometres west-northwest of the La India project. Road travel from Hermosillo to the site takes approximately seven hours. Alternatively, the project can be accessed by small aircraft. The federally owned and operated electric transmission grid extends to within approximately 60 kilometres of the project. Grayd began to actively explore the project in 2004, and began preliminary metallurgical test work in 2006. Grayd produced NI-43-101 compliant technical reports as of 2004, 2006, 2008, 2009 and May 2010. A Preliminary Economic Assessment ("PEA") was completed on behalf of Grayd on December 6, 2010 by independent consultants, based on only the oxide portion of the La India project resources (as reported in May 2010). The PEA envisioned an open pit mine with gold recovery of 80% by heap leach with an overall average annual production of 92,000 ounces over its nine-year life. According to the PEA, annual production could range from a low of 66,000 ounces in year six to a high of 108,000 ounces in year seven. As of December 31, 2011, the La India project consisting of the La India feasibility-stage heap leach gold project and Tarachi gold zone had a measured resource of 3.7 million tonnes of ore grading 1.06 grams of gold per tonne, and an indicated resource of 44.5 million tonnes of ore grading 0.72 grams of gold per tonne and inferred resources of 32.1 million tonnes grading 0.69 grams of gold per tonne, using a cut-off of 0.40 grams of gold per tonne. These resources are in the North and Main zones of the La India project and the Tarachi gold zone. The defined mineral resources and all lands required for infrastructure as proposed by the PEA for the La India project are wholly contained within three privately held properties. At the Tarachi gold zone, the surface rights in the project area are owned by the Matarachi Ejido (agrarian community) and private parties. All measured, indicated and inferred project resources lie within privately owned or ejido possessed land. Surface access lease agreements have been executed with the property owners or possessors for all identified target areas. The existing agreements permit exploration activities only; if mining activity is contemplated in this exploration area the Company will require further negotiations to acquire the surface rights needed for project development. Mining and Milling Facilities Surface Facilities Current facilities at the La India project include an exploration camp, which consists of former ranch house buildings that have been modified for housing requirements. The power for the exploration camp is supplied by diesel generators, water is supplied by a local spring and septic discharges are managed in a leach field. Non-organic waste from the camp is disposed in the Matarachi Ejido landfill. The camp will be modified and expanded as the Company develops the La India project in 2012. Environmental Matters Baseline environmental information has been collected at the La India project since late 2008. This information includes surface water sampling, archeological assessment and soil, fauna and flora assessments. The La India project is not located in an area with a special Federal environmental protection designation. Therefore, basic exploration activities are regulated under Norma Oficial Mexicana NOM-120-ECOL-1997, which allows for most exploration activities including mapping, geochemical sampling, geophysical surveys, mechanized trenching, road building and drilling. Mine construction and operation activities generally require the preparation of a Manifesto de Impacto Ambiental (MIA, an environmental impact statement), and a Cambio de Uso de Suelo (CUS, a land use change) permit. No factors have been identified that would be expected to hinder authorization of Federal and State environmental permits required for construction and operation of a mine at the La India project. Some historic mining has been observed in the 2011 ANNUAL REPORT 65 Table of Contents area but the remaining waste dumps and tailings are small and are not considered to present significant environmental issues. No obstacles to obtaining the permits are anticipated providing Agnico-Eagle obtains the necessary surface rights and meets the design and mitigation criteria required by the Mexican permitting authorities. The Company has considerable permitting experience in Mexico and is familiar with the regulatory requirements as a result of its ongoing operations at the Pinos Altos mine and the Creston Mascota deposit at Pinos Altos. Agreements & Licences The mining concessions for the La India project and Tarachi are controlled by the Company by means of direct ownership and by 11 separate agreements whereby Agnico-Eagle can earn a 100% interest in certain concessions by making cash and share payments. For the La India project, should the Company elect to acquire all currently optioned concessions, an additional $2.3 million in payments would be required. Payment has been made in full for the claims that host most of the measured, indicated and inferred resources. Some concessions are subject to underlying net smelter royalties varying between 1% and 3%, some of which may be purchased by the Company which would result in net smelter royalties between 0% and 0.5%. For the Tarachi gold zone, payments totalling $3.3 million and shares with value equivalent to $967,500 over an eight year period are required for the Company to earn a 100% interest in the relevant concessions. To date $1 million has been paid toward these concessions. Should the Company elect to acquire all currently optioned concessions, an additional $2.3 million in payments would be required. Some concessions are subject to underlying net smelter royalties varying between 1% and 3%, some of which may be purchased by the Company, which would result in net smelter royalties between 0% and 0.5%. The defined mineral reserve and resource and all lands required for infrastructure as proposed by the PEA are wholly contained within three privately-held properties. Agnico-Eagle has acquired the surface rights for the Bronces y Bajios and la Armagosa ranches and negotiations are underway with the owner of the el Duraznito ranch. The current land agreements are sufficient to permit exploration activities that are conducted under environmental regulation NOM-120. Construction and mine development could begin on the Bronces y Bajios and la Armagosa ranches subject to receipt of necessary permits, and the development of mining activity on the el Duraznito ranch is pending a final surface agreement. At the Tarachi gold zone, the surface rights in the project area are owned by the Matarachi Ejido and private parties. All measured, indicated and inferred project resources lie within privately owned or ejido possessed land. Surface access lease agreements have been executed with the property owners or possessors for all identified target areas. The existing agreements permit exploration activities only, further negotiation would be required for any future mine development at the Tarachi gold zone. Geology, Mineralization and Exploration Geology and Mineralization The La India project lies within the Sierra Madre Occidental ("SMO") province, an extensive Eocene to Miocene volcanic field from the United States-Mexico border to central Mexico. The La India project lies within the western limits of the SMO in an area dominated by outcrops of andesite and dacitic tuffs, overlain by rhyolites and rhyolitic tuffs that were affected by large-scale north-northwest-striking normal faults and intruded by granodiorite and diorite stocks. Incised fluvial canyons cut the uppermost strata and expose the Lower Series volcanic strata. The project area is predominantly underlain by a volcanic sequence comprised of andesitic and felsic extrusive volcanic strata with interbedded epiclastic volcaniclastic strata of similar composition. The mineral occurrences present in the project area, and the deposit type being sought, are volcanic-hosted epithermal, high-sulphidation gold-silver deposits. Such deposits may be present as veins and/or disseminated deposits. The La India project deposit area is one of several high-sulphidation epithermal mineralization centres recognized in the region. Epithermal high-sulphidation mineralization at the La India project developed as a cluster of gold zones (Main and North) aligned north-south within a genetically related zone of hydrothermal alteration in excess of 20 square kilometres in area. Gold mineralization is confined to the Late Eocene rocks within zones of intermediate and advanced argillitic alteration originally containing sulphides, and subsequently oxidized by supergene processes. The North and Main zones are within two kilometres of each other. 66 AGNICO-EAGLE MINES LIMITED Table of Contents Surface outcrop mapping and drill-hole data so far indicate that the gold system at the Tarachi gold zone is likely best classified as a gold porphyry deposit. Exploration Gold was discovered at the Mulatos deposit by the Spanish colonials in 1806, but indigenous peoples likely exploited the native-gold-bearing oxidized zone of the deposit prior to this. Small underground mines and prospects are present throughout the La Cruz and La Viruela areas, where modern exploration was conducted by New Golden Sceptre Minerals Ltd. and New Goliath Minerals Ltd. (late 1980s), Noranda Inc. (early 1990s) and San Fernando Mining Co. Ltd. (from 1993). Grayd began to actively explore the project in 2004, including geologic mapping, geochemical rock chip sampling, airborne and ground geophysical surveys, photogrammetric topographic mapping, diamond drilling, reverse circulation drilling, baseline environmental studies and metallurgical testing. Newmont Mining Corp. funded the work between July 2005 and July 2006 and then declined to continue, retaining no interest in the property. The Tarachi gold zone, located approximately 10 kilometres north of the La India project on the same property, was discovered in 2010. From 2004 through February 7, 2011, Grayd completed 129 diamond drill holes (13,834 metres) and 560 reverse circulation drill holes (49,552 metres) at the La India project. In 2011, 13 diamond drill holes (1,119 metres) and 30 reverse circulation drill holes (2,728 metres) were drilled at the La India project and 25 diamond drill holes (5,400 metres) and 67 reverse circulation drill holes (16,144 metres) were drilled at the Tarachi gold zone. The La India feasibility-stage heap leach gold project deposit and the Tarachi gold zone will continue to be actively explored by Agnico-Eagle. The Company has initiated an $18.6 million exploration and development program at the La India feasibility-stage heap leach gold project deposit for 2012 that will include infill drilling, technical studies, land acquisition, water acquisition, infrastructure and permitting efforts. At the Tarachi gold zone, the Company has planned a $5 million exploration program with approximately 9,850 metres of diamond drilling and 10,000 metres of reverse circulation drilling planned in 2012. Regional Exploration Activities During 2011, the Company continued to actively explore in Quebec, Ontario, Nunavut, Nevada, Finland, Sweden, Mexico and Argentina. The Canadian exploration activities were focused on the Ellison/Bousquet and Maritime/Lapa properties in Quebec, as well as on the Meadowbank property in Nunavut where activities were conducted both within and outside the mining lease and the Meliadine project, also in Nunavut. In the United States, exploration activities during 2011 were concentrated on the West Pequop project located in northeast Nevada and the Rattlesnake project located in Wyoming. At the LaRonde, Goldex, Lapa, Pinos Altos and Kittila mines, the Company continued exploration programs around the mines. Most of the exploration budget was spent on drilling programs near the mine infrastructure, along previously recognized gold trends. At the end of 2011, the Company's land holdings in Canada consisted of 77 projects comprised of 2,879 mineral titles covering an aggregate of 270,513 hectares. Land holdings in the United States consisted of 6 properties comprised of 3,486 mineral titles covering an aggregate of 30,552 hectares. Land holdings in Finland consisted of three groups of properties comprised of 133 mineral titles covering an aggregate of 11,757 hectares. Land holdings in Sweden consisted of one project comprised of four mineral titles covering an aggregate of 2,830 hectares. Land holdings in Mexico consisted of six projects comprised of 111 mining concession titles covering an aggregate of 125,820 hectares. Land holdings in Argentina consisted of one project with two mineral titles covering an aggregate of 2,691 hectares. The total amount spent on regional exploration in 2011 was $76.1 million, which included drilling 775 holes for an aggregate of approximately 216 kilometres. The budget for regional exploration expenditures in 2012 is approximately $67.4 million, including approximately 212 kilometres of drilling. Mineral Reserves and Mineral Resources Cautionary Note to Investors Concerning Estimates of Measured and Indicated Mineral Resources This section uses the terms "measured mineral resources" and "indicated mineral resources". Investors are advised that while these terms are recognized and required by Canadian regulations, the SEC does not recognize them. Investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into mineral reserves. 2011 ANNUAL REPORT 67 Table of Contents Cautionary Note to Investors Concerning Estimates of Inferred Mineral Resources This section uses the term "inferred mineral resources". Investors are advised that while this term is recognized and required by Canadian regulations, the SEC does not recognize it. "Inferred mineral resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that any part or all of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that any part or all of an inferred mineral resource exists, or is economically or legally mineable. The preparation of the information set forth below with respect to the mineral reserves at the LaRonde mine (which includes mineral reserves at the LaRonde mine extension), the Lapa, Kittila, Pinos Altos and Meadowbank mines and the Meliadine and Bousquet projects has been supervised by the Company's Vice-President, Project Development, Marc Legault, P.Eng, a "qualified person" as that term is defined in NI 43-101. The Company's mineral reserves estimate was derived from internally generated data or geology reports. The criteria set forth in NI 43-101 for reserve definitions and guidelines for classification of mineral reserve are similar to those used by Guide 7. However, the definitions in NI 43-101 differ in certain respects from those under Guide 7. Under Guide 7, among other things, a mineral reserve estimate must have a "final" or "bankable" feasibility study. Guide 7 also requires the use of commodity prices that reflect current economic conditions at the time of reserve determination which Staff of the SEC has interpreted to mean historic three-year average prices. In addition to the differences noted above, Guide 7 does not recognize mineral resources. The assumptions used for the 2011 mineral reserves and resources estimate reported by the Company in this Form 20-F were based on three-year average prices for the period ending December 31, 2011 of $1,255 per ounce gold, $23.00 per ounce silver, $0.91 per pound zinc, $3.25 per pound copper, $0.95 per pound lead and exchange rates of C$1.05 per $1.00, 12.86 Mexican pesos per $1.00 and $1.37 per €1.00. The assumptions used for the 2010 mineral reserves and resources estimate reported by the Company in this Form 20-F were based on three-year average prices for the period ending December 31, 2010 of $1,024 per ounce gold, $16.62 per ounce silver, $0.86 per pound zinc, $2.97 per pound copper, $0.90 per pound lead and exchange rates of C$1.08 per $1.00, 12.43 Mexican pesos per $1.00 and $1.40 per €1.00. The assumptions used for the 2009 mineral reserves and resources estimate used by the Company in this Form 20-F were based on three-year average prices for the period ending December 31, 2009 of $848 per ounce gold, $14.35 per ounce silver, $1.03 per pound zinc, $3.15 per pound copper, $0.97 per pound lead and exchange rates of C$1.09 per $1.00, 11.00 Mexican pesos per $1.00 and $1.37 per €1.00. Other assumptions used for estimating 2010 and 2009 mineral reserve and resource information may be found in the Company's annual filings in respect of the years ended December 31, 2010 and December 31, 2009, respectively. 68 AGNICO-EAGLE MINES LIMITED Table of Contents Set out below are the reserve estimates as of December 31, 2011, as calculated in accordance with NI 43-101 and Guide 7, respectively (tonnages and contained gold quantities are rounded to the nearest thousand): National Instrument 43-101 Industry Guide No. 7 Property Tonnes Gold Grade (g/t) Contained Gold (oz) Tonnes Gold Grade (g/t) Contained Gold (oz) Proven Reserves LaRonde mine (underground) 5,331,000 2.60 445,000 5,331,000 2.60 445,000 Kittila mine (open pit) 319,000 3.86 40,000 319,000 3.86 40,000 Kittila mine (underground) 383,000 6.11 75,000 383,000 6.11 75,000 Kittila mine total proven 702,000 5.09 115,000 702,000 5.09 115,000 Lapa mine (underground) 1,044,000 6.45 217,000 1,044,000 6.45 217,000 Meliadine project (open pit) 34,000 7.31 8,000 34,000 7.31 8,000 Pinos Altos mine (open pit) 848,000 0.80 22,000 848,000 0.80 22,000 Pinos Altos mine (underground) 1,139,000 2.59 95,000 1,139,000 2.59 95,000 Pinos Altos mine total proven 1,987,000 1.83 117,000 1,987,000 1.83 117,000 Meadowbank mine (open pit) 1,931,000 1.49 92,000 1,931,000 1.49 92,000 Total Proven Reserves 11,029,000 2.80 994,000 11,029,000 2.80 994,000 Probable Reserves LaRonde mine (underground) 27,901,000 4.74 4,255,000 27,901,000 4.74 4,255,000 Bousquet (open pit) 3,165,000 1.88 191,000 3,165,000 1.88 191,000 Kittila mine (open pit) 802,000 5.66 146,000 802,000 5.66 146,000 Kittila mine (underground) 33,060,000 4.63 4,916,000 33,060,000 4.63 4,916,000 Kittila mine total probable 33,862,000 4.65 5,062,000 33,862,000 4.65 5,062,000 Lapa mine (underground) 1,340,000 6.61 285,000 1,340,000 6.61 285,000 Meliadine project (open pit) 5,292,000 5.80 987,000 5,292,000 5.80 987,000 Meliadine project (underground) 7,142,000 8.20 1,882,000 7,142,000 8.20 1,882,000 Meliadine project total probable 12,434,000 7.18 2,869,000 12,434,000 7.18 2,869,000 Pinos Altos mine (open pit) 19,599,000 1.68 1,059,000 19,599,000 1.68 1,059,000 Pinos Altos mine (underground) 25,193,000 2.38 1,927,000 25,193,000 2.38 1,927,000 Pinos Altos mine total probable 44,792,000 2.07 2,986,000 44,792,000 2.07 2,986,000 Meadowbank mine (open pit) 22,563,000 2.91 2,109,000 22,563,000 2.91 2,109,000 Total Probable Reserves 146,057,000 3.78 17,757,000 146,057,000 3.78 17,757,000 Total Proven and Probable Reserves 157,086,000 3.71 18,750,000 157,086,000 3.71 18,750,000 In the following tables setting out mineral reserve information about the Company's mineral projects, tonnage information is rounded to the nearest thousand tonnes, the total contained gold ounces stated do not include equivalent gold ounces for byproduct metals contained in the mineral reserve, and the reported metal grades in the estimates represent in-place grades and do not reflect losses in the recovery process, that is, the metallurgical losses associated with processing the extracted ore. The mineral reserve and mineral resource figures presented in this Form 20-F are estimates, and no assurance can be given that the anticipated tonnages and grades will be achieved or that the indicated level of recovery will be realized. 2011 ANNUAL REPORT 69 Table of Contents LaRonde Mine Mineral Reserves and Mineral Resources As at December 31, 2011 2010 2009 Gold-Rich Orebody Proven mineral reserves – tonnes 4,100,000 3,200,000 2,700,000 Average grade – gold grams per tonne 3.10 3.07 3.37 Probable mineral reserves – tonnes 26,700,000 27,900,000 26,500,000 Average grade – gold grams per tonne 4.91 4.90 5.16 Gold-Poor Orebody Proven mineral reserves – tonnes 1,200,000 1,600,000 2,100,000 Average grade – gold grams per tonne 0.97 0.95 1.03 Probable mineral reserves – tonnes 1,200,000 2,000,000 3,100,000 Average grade – gold grams per tonne 1.22 1.01 0.99 Total proven and probable mineral reserves – tonnes 33,200,000 34,700,000 34,400,000 Average grade – gold grams per tonne 4.40 4.32 4.39 Total contained gold ounces 4,700,000 4,818,000 4,849,000 Notes: (1)The 2011 proven and probable mineral reserves set forth in the table above are based on a net smelter return cut-off value of the ore that varies between C$82.00 per tonne and C$103.00 per tonne depending on the deposit. The Company's historical metallurgical recovery rates at the LaRonde mine from January 1, 2004 to December 31, 2011 averaged 90.8% for gold, 87.0% for silver, 86.3% for zinc and 81.8% for copper. The historical metallurgical recovery rate for lead from January 1, 2008 to December 31, 2011 was 14.8%. The Company estimates that a 10% change in the gold price would result in an approximate 0.9% change in mineral reserves. (2)In addition to the mineral reserves set out above, at December 31, 2011, the LaRonde mine contained indicated mineral resources of 7,225,000 tonnes grading 1.79 grams of gold per tonne and inferred mineral resources of 11,400,000 tonnes grading 3.68 grams of gold per tonne. (3)The following table shows the reconciliation of mineral reserves (in nearest thousand tonnes) at the LaRonde mine by category at December 31, 2011 with those at December 31, 2010. Revision means additional mineral reserves converted from mineral resources or other categories of mineral reserves and mineral reserves added from exploration activities during 2011. Proven Probable Total December 31, 2010 4,838 29,892 34,729 Mined in 2011 2,406 0 2,406 Revision 2,899 (1,991 ) 909 December 31, 2011 5,331 27,901 33,232 (4)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the LaRonde mine may be found in the Technical Report on the 2005 LaRonde Mineral Resource & Mineral Reserve Estimate filed with Canadian securities regulatory authorities on SEDAR on March 23, 2005. (5)At December 31, 2011, the Bousquet project contained probable mineral reserves of 3,165,000 tonnes grading 1.88 grams of gold per tonne. In addition, the Bousquet project contained indicated mineral resources of 9,805,000 tonnes grading 2.44 grams of gold per tonne and inferred mineral resources of 4,567,000 tonnes grading 4.04 grams of gold per tonne. 70 AGNICO-EAGLE MINES LIMITED Table of Contents Goldex Mine Mineral Reserves and Mineral Resources As at December 31, 2011 2010 2009 Gold Proven mineral reserves – tonnes – 14,804,000 5,217,000 Average grade – gold grams per tonne – 1.87 2.02 Probable mineral reserves – tonnes – 12,990,000 19,524,000 Average grade – gold grams per tonne – 1.62 2.06 Total proven and probable mineral reserves – tonnes – 27,794,000 24,741,000 Average grade – gold grams per tonne – 1.75 2.05 Total contained gold ounces – 1,566,000 1,630,000 Notes: (1)The suspension of mining operations at the Goldex mine on October 19, 2011 resulted in a restatement, as of that date, of all Goldex proven or probable reserves (as stated on December 31, 2010), that had not already been mined, as indicated resources, except stockpiled ore on surface that was reclassified as measured resources. (2)As at December 31, 2011, the Goldex mine contained measured mineral resources of 12,360,000 tonnes grading 1.86 grams of gold per tonne, indicated mineral resources of 24,448,000 tonnes grading 1.72 grams of gold per tonne and inferred mineral resources of 31,081,000 tonnes grading 1.59 grams of gold per tonne. (3)The following table shows the reconciliation of mineral reserves (in nearest thousand tonnes) at the Goldex mine by category at December 31, 2011 with those at December 31, 2010. Revision means additional mineral reserves converted from mineral resources or other categories of mineral reserves and the restatement of mineral reserves to another category. Proven Probable Total December 31, 2010 14,804 12,990 27,794 Mined in 2011 2,477 0 2,477 Revision (12,327 ) (12,990 ) (25,317 ) December 31, 2011 – – – (4)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Goldex mine may be found in the Technical Report on Restatement of the Mineral Resources at Goldex Mine, Quebec, Canada as at October 19, 2011 filed with the Canadian securities regulatory authorities on SEDAR on December 5, 2011. 2011 ANNUAL REPORT 71 Table of Contents Kittila Mine Mineral Reserves and Mineral Resources As at December 31, 2011 2010 2009 Gold Proven mineral reserves – tonnes 702,000 403,000 257,000 Average grade – gold grams per tonne 5.09 4.23 3.71 Probable mineral reserves – tonnes 33,862,000 32,329,000 25,704,000 Average grade – gold grams per tonne 4.65 4.64 4.83 Total proven and probable mineral reserves – tonnes 34,564,000 32,732,000 25,961,000 Average grade – gold grams per tonne 4.66 4.64 4.82 Total contained gold ounces 5,177,000 4,880,000 4,025,000 Notes: (1)The 2011 proven and probable mineral reserve and mineral resource estimates were calculated using a metallurgical gold recovery of 89%. Gold cut-off grades used were 1.90 grams per tonne, undiluted (1.69 grams per tonne, diluted) for open pit reserves and between 2.97 grams per tonne and 3.24 grams per tonne, undiluted (between 2.52 grams per tonne and 2.80 grams per tonne, diluted), depending on the deposit, for underground reserves. The open pit operating cost was estimated to be €43.28 per tonne in 2011, while the underground cost averaged €68.30 per tonne. The Company estimates that a 10% change in the gold price would result in an approximate 6% change in mineral reserves. (2)In addition to the mineral reserves set out above, at December 31, 2011, the Kittila mine contained indicated mineral resources of 12,978,000 tonnes grading 2.46 grams of gold per tonne and inferred mineral resources of 7,953,000 tonnes grading 4.55 grams of gold per tonne. (3)The breakdown of proven and probable mineral reserves between planned open pit operations and underground operations at the Kittila mine (with tonnage and contained ounces rounded to the nearest thousand) at December 31, 2011 is: Category Mining Method Tonnes Gold Grade (g/t) Contained Gold (oz) Proven mineral reserves Open pit 319,000 3.86 40,000 Proven mineral reserves Underground 383,000 6.11 75,000 Total proven mineral reserves 702,000 5.09 115,000 Probable mineral reserves Open pit 802,000 5.66 146,000 Probable mineral reserves Underground 33,060,000 4.63 4,916,000 Total probable mineral reserves 33,862,000 4.65 5,062,000 (4)The following table shows the reconciliation of mineral reserves (in nearest thousand tonnes) at the Kittila mine by category at December 31, 2011 with those at December 31, 2010. Revision means additional mineral reserves converted from mineral resources or other categories of mineral reserves and mineral reserves added from exploration activities during 2011. Proven Probable Total December 31, 2010 403 32,329 32,732 Mined in 2011 1,031 0 1,031 Revision 1,330 1,533 2,863 December 31, 2011 702 33,862 34,564 (5)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Kittila mine may be found in the Technical Report on the December 31, 2009, Mineral Resource and Mineral Reserve Estimate and the Suuri Extension Project, Kittila Mine, Finland, filed with the Canadian securities regulatory authorities on SEDAR on March 4, 2010. 72 AGNICO-EAGLE MINES LIMITED Table of Contents Lapa Mine Mineral Reserves and Mineral Resources As at December 31, 2011 2010 2009 Gold Proven mineral reserves – tonnes 1,044,000 1,122,000 897,000 Average grade – gold grams per tonne 6.45 7.24 8.33 Probable mineral reserves – tonnes 1,340,000 1,709,000 2,319,000 Average grade – gold grams per tonne 6.61 7.56 8.09 Total proven and probable mineral reserves – tonnes 2,384,000 2,831,000 3,216,000 Average grade – gold grams per tonne 6.54 7.43 8.16 Total contained gold ounces 501,000 677,000 843,000 Notes: (1)The 2011 mineral reserve and mineral resource estimates were calculated using an assumed metallurgical gold recovery of 74.7% and a cut-off grade of 3.80 grams of gold per tonne. The operating cost per tonne estimate for the Lapa mine in 2011 was C$119.41. The Company estimates that a 10% change in the gold price would result in an approximate 4% change in mineral reserves. (2)In addition to the mineral reserves set out above, at December 31, 2011, the Lapa mine contained indicated mineral resources of 1,964,000 tonnes grading 4.08 grams of gold per tonne and inferred mineral resources of 719,000 tonnes grading 4.74 grams of gold per tonne. (3)The following table shows the reconciliation of mineral reserves (in nearest thousand tonnes) at the Lapa mine by category at December 31, 2011 with those at December 31, 2010. Revision means additional mineral reserves converted from mineral resources or other categories of mineral reserves and mineral reserves added from exploration activities during 2011. Proven Probable Total December 31, 2010 1,122 1,709 2,831 Mined in 2011 621 0 621 Revision 543 (369 ) 174 December 31, 2011 1,044 1,340 2,384 (4)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Lapa mine may be found in the Technical Report on the Lapa Gold Project, Cadillac Township, Quebec, Canada filed with Canadian securities regulatory authorities on SEDAR on June 8, 2006. 2011 ANNUAL REPORT 73 Table of Contents Pinos Altos Mine Mineral Reserves and Mineral Resources As at December 31, 2011 2010 2009 Gold and Silver Proven mineral reserves – tonnes 1,987,000 2,864,000 880,000 Average gold grade – grams per tonne 1.83 1.90 1.51 Average silver grade – grams per tonne 51.59 54.06 26.53 Probable mineral reserves – tonnes 44,792,000 41,298,000 41,080,000 Average gold grade – grams per tonne 2.07 2.33 2.54 Average silver grade – grams per tonne 59.17 65.53 70.31 Total proven and probable mineral reserves – tonnes 46,779,000 44,162,000 41,960,000 Average gold grade – grams per tonne 2.06 2.30 2.52 Average silver grade – grams per tonne 58.85 64.78 69.39 Total contained gold ounces 3,103,000 3,271,000 3,396,000 Total contained silver ounces 88,508,000 91,982,000 93,613,000 Notes: (1)The 2011 proven and probable mineral reserve estimates are based on a net smelter return cut-off value of the open pit ore between $7.96 per tonne and $26.39 per tonne, depending on the deposit, and a net smelter return cut-off value of the underground ore of $52.93 per tonne. The operating cost per tonne estimate for the Pinos Altos mine in 2011 was $32.03 without deferred stripping ($27.00 with deferred stripping). The metallurgical gold recovery used in the reserve estimates varied between 59% and 96.5%, depending on the deposit. The metallurgical silver recovery used in the reserve estimates varied between 10% and 47.4%, depending on the deposit. The Company estimates that a 10% change in the gold price would result in an approximate 2% change in mineral reserves. (2)In addition to the mineral reserves set out above, at December 31, 2011, the Pinos Altos mine contained indicated mineral resources of 20,576,000 tonnes grading 1.27 grams of gold per tonne and 28.13 grams of silver per tonne and inferred mineral resources of 23,113,000 tonnes grading 1.05 grams of gold per tonne and 22.65 grams of silver per tonne. (3)The proven and probable mineral reserves of the Pinos Altos mine set forth in the table above include proven mineral reserves from the Creston Mascota deposit of 278,000 tonnes grading 0.84 grams of gold per tonne and 1.95 grams of silver per tonne and probable mineral reserves from the Creston Mascota deposit of 12,039,000 tonnes grading 1.12 grams of gold per tonne and 12.00 grams of silver per tonne. The indicated mineral resource at the Pinos Altos mine also includes indicated mineral resources from the Creston Mascota deposit of 1,947,000 tonnes grading 0.57 grams of gold per tonne and 3.58 grams of silver per tonne. The inferred mineral resource at the Pinos Altos mine also includes inferred mineral resources from the Creston Mascota deposit of 1,687,000 tonnes grading 0.88 grams of gold per tonne and 7.18 grams of silver per tonne. (4)The breakdown of mineral reserves between planned open pit operations and underground operations at the Pinos Altos mine (with tonnage and contained ounces rounded to the nearest thousand) at December 31, 2011 is: Category Mining Method Tonnes Gold Grade (g/t) Silver Grade (g/t) Contained Gold (oz) Contained Silver (oz) Proven mineral reserves Open pit stock pile 848,000 0.80 13.82 22,000 377,000 Proven mineral reserves Underground 1,139,000 2.59 79.73 95,000 2,919,000 Total proven mineral reserves 1,987,000 1.83 51.59 117,000 3,296,000 Probable mineral reserves Open pit 19,599,000 1.68 37.51 1,059,000 23,634,000 Probable mineral reserves Underground 25,193,000 2.38 76.02 1,927,000 61,578,000 Total probable mineral reserves 44,792,000 2.07 59.17 2,986,000 85,212,000 74 AGNICO-EAGLE MINES LIMITED Table of Contents (5)The following table shows the reconciliation of mineral reserves (in nearest thousand tonnes) at the Pinos Altos mine by category at December 31, 2011 with those at December 31, 2010. Revision means additional mineral reserves converted from mineral resources or other categories of mineral reserves and mineral reserves added from exploration activities during 2011. Proven Probable Total December 31, 2010 2,864 41,298 44,162 Mined in 2011 4,509 0 4,509 Revision 3,632 3,494 7,126 December 31, 2011 1,987 44,792 46,779 (6)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Pinos Altos mine may be found in the Pinos Altos Gold-Silver Mining Project, Chihuahua State, Mexico, Technical Report on the Mineral Resources and Reserves as of December 31, 2008 filed with the Canadian securities regulatory authorities on SEDAR on March 25, 2009. Meadowbank Mine Mineral Reserves and Mineral Resources As at December 31, 2011 2010 2009 Gold Proven mineral reserves – tonnes 1,931,000 839,000 600,000 Average grade – gold grams per tonne 1.49 3.13 4.57 Probable mineral reserves – tonnes 22,563,000 33,259,000 31,600,000 Average grade – gold grams per tonne 2.91 3.18 3.51 Total proven and probable mineral reserves – tonnes 24,494,000 34,098,000 32,200,000 Average grade – gold grams per tonne 2.79 3.18 3.53 Total contained gold ounces 2,201,000 3,486,000 3,655,000 Notes: (1)The 2011 mineral reserve and mineral resource estimates were calculated using a metallurgical gold recovery of 91.0% or 94.0% depending on the deposit. The economic cut-off grade used to determine the open pit reserves varied from 1.40 grams of gold per tonne to 1.47 grams of gold per tonne, depending on the deposit, and is 1.02 grams of gold per tonne as a marginal cut-off grade. The estimated ore-based operating costs used for the 2011 mineral reserve estimate varied between C$52.84 per tonne and C$53.63 per tonne, depending on the deposit, with an additional haulage cost of C$4.95 for Vault deposit reserves. The Company estimates that a 10% change in the gold price would result in an approximate 2% change in mineral reserves. (2)In addition to the mineral reserves set out above, at December 31, 2011, the Meadowbank mine contained indicated mineral resources of 17,213,000 tonnes grading 2.38 grams of gold per tonne and inferred mineral resources of 3,745,000 tonnes of ore grading 3.81 grams of gold per tonne. (3)The following table shows the reconciliation of mineral reserves (in nearest thousand tonnes) at the Meadowbank mine by category at December 31, 2011 with those at December 31, 2010. Revision means additional mineral reserves converted from mineral resources or other categories of mineral reserves, an update to mineral reserves based on changed mine plans, and mineral reserves added from exploration activities during 2011. Proven Probable Total December 31, 2010 839 33,259 34,098 Mined in 2011 2,978 0 2,978 Revision 4,070 (10,696 ) (6,626 ) December 31, 2011 1,931 22,563 24,494 (4)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Meadowbank mine may be found in the Technical Report on the Mineral Resources and Mineral Reserves dated February 15, 2012, Meadowbank Gold Project, Nunavut, Canada filed with Canadian securities regulatory authorities on SEDAR on March 23, 2012. 2011 ANNUAL REPORT 75 Table of Contents Meliadine Project Mineral Reserves and Mineral Resources As at December 31, 2011 2010 2009 Gold Proven mineral reserves – tonnes 34,000 0 – Average grade – gold grams per tonne 7.31 – – Probable mineral reserves – tonnes 12,434,000 9,467,000 – Average grade – gold grams per tonne 7.18 8.54 – Total proven and probable mineral reserves – tonnes 12,468,000 9,467,000 – Average grade – gold grams per tonne 7.18 8.54 – Total contained gold ounces 2,877,000 2,600,000 – Notes: (1)The 2011 mineral reserve and mineral resource estimates were calculated using metallurgical gold recovery curves for Tiriganiaq and F-Zone. The curves give a maximum recovery of 96% for Tiriganiaq and 93% for F-Zone. The 2011 mineral resource estimates for all others were calculated using a metallurgical gold recovery of 92%. The cut-off grade used to determine the open pit reserves was 2.19 grams of gold per tonne, undiluted (1.91 grams of gold per tonne, diluted), and the cut-off grade used to determine the underground reserves was 5.29 grams of gold per tonne, undiluted (4.10 grams of gold per tonne, diluted). The estimated operating cost used for the 2011 mineral reserve estimate was C$74.71 per tonne for open pit and C$165.65 per tonne for underground. The Company estimates that a 10% change in the gold price would result in an approximate 3.4% change in mineral reserves. (2)In addition to the mineral reserves set out above, at December 31, 2011, the Meliadine project contained indicated mineral resources of 12,621,000 tonnes grading 4.09 grams of gold per tonne and inferred mineral resources of 12,687,000 tonnes of ore grading 5.98 grams of gold per tonne. (3)The breakdown of mineral reserves between planned open pit operations and underground operations at the Meliadine project (with tonnage and contained ounces rounded to the nearest thousand) at December 31, 2011 is: Category Mining Method Tonnes Gold Grade (g/t) Contained Gold (oz) Proven mineral reserves Open pit stockpile 34,000 7.31 8,000 Probable mineral reserves Open pit 5,292,000 5.80 987,000 Probable mineral reserves Underground 7,142,000 8.20 1,882,000 Total proven and probable mineral reserves 12,468,000 7.18 2,877,000 (4)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Meliadine project may be found in the Technical Report on the December 31, 2010 Mineral Resource and Mineral Reserve Estimate, Meliadine Gold Project, Nunavut, Canada, dated February 16, 2011, filed with the Canadian securities regulatory authorities on SEDAR on March 8, 2011. La India Project Mineral Reserves and Mineral Resources At December 31, 2011, the La India project, consisting of the La India feasibility-stage heap leach gold project and the Tarachi gold zone, contained no proven or probable mineral reserves, but contained measured mineral resources of 3,730,000 tonnes grading 1.06 grams of gold per tonne, indicated mineral resources of 44,496,000 tonnes grading 0.72 grams of gold per tonne and inferred mineral resources of 32,125,000 tonnes grading 0.69 grams of gold per tonne. Risk Mitigation The Company mitigates the likelihood and potential severity of the various risks it encounters in its day-to-day operations through the application of high standards in the planning, construction and operation of mining facilities. In addition, emphasis is placed on hiring and retaining competent personnel and developing their skills through training in safety and loss control. The Company's operating and technical personnel have a solid track record of developing and operating precious metal mines and several of the Company's mines have been recognized for excellence in this regard with various safety and development awards. Nevertheless, the Company and its employees continue with a focused effort to improve workplace safety and the Company has placed additional emphasis on safety procedure training for both mining and supervisory employees. The Company also mitigates some of the Company's normal business risk through the purchase of insurance coverage. An Insurable Risk Management Policy, approved by the Board, governs the purchase of insurance coverage and only permits the purchase of coverage from insurance companies of the highest credit quality. For a more complete list of the risk factors affecting the Company, please see "Item 3 Key Information – Risk Factors". 76 AGNICO-EAGLE MINES LIMITED Table of Contents Glossary of Selected Mining Terms "alteration" Any physical or chemical change in a rock or mineral subsequent to formation. Milder and more localized than metamorphism. "anastomosing" A network of branching and rejoining fault or vein surfaces or surface traces. "andesite" A dark-coloured igneous, calc-alkaline volcanic rock, of intermediate composition (containing between 52-63% silica). "assay" An analysis to determine the presence, absence or concentration of one or more chemical components. "bedrock" The solid rock underlying surface deposits. "breccia" Said of rock formations consisting mostly of angular fragments hosted by a fine-grained matrix. "brittle" Of minerals, proneness to fracture under low stress. A quality affecting behaviour during comminution of ore, whereby one species fractures more readily than others in the material being crushed. "bulk mining" A mining method in which large quantities of low-grade ore are mined without an attempt to segregate the high-grade portions. "byproduct metal" A secondary or additional metal recovered from the processing of rock. "carbon-in-leach process" A process step in which granular activated carbon particles much larger than the ground ore particles are introduced into the ore pulp. Cyanide leaching and precious metal adsorption onto the activated carbon occur simultaneously. The loaded activated carbon is mechanically screened to separate it from the barren ore pulp and processed to remove the precious metals and prepare it for reuse. "carbon-in-pulp (CIP) circuit" A process by which soluble gold within a finely ground slurry is recovered by adsorption onto coarser activated carbon. A CIP circuit comprises a series of tanks through which leached slurry flows. Gold is captured onto captive activated carbon that will periodically be moved counter-currently from tank to tank. Head tank carbon is extracted periodically to further recover adsorbed gold before being returned to the circuit tails tank. "clast" A fragment of mineral, rock or organic structure that has been moved individually from its place of origin. "concentrate" The clean product recovered in froth flotation. "conglomerate" A sedimentary rock consisting of rounded, water-worn pebbles or boulders cemented into a solid mass. "counter-current decantation" Clarifying wash water and concentrating tailings by use of several thickeners in series. The water flows in the opposite direction from the solids. The final products are slurry that is removed as fluid mud and clear water that is reused in the circuit. "crosscut" A horizontal opening driven from a shaft at or near right angles to the strike of a vein or other orebody. "cut-off grade" (A) In respect of mineral resources, the lowest grade below which the mineralized rock currently cannot reasonably be expected to be economically extracted. (B) In respect of mineral reserves, the lowest grade below which the mineralized rock currently cannot be economically extracted as demonstrated by either a preliminary feasibility study or a feasibility study. Cut-off grades vary between deposits depending upon the amenability of ore to gold extraction and upon costs of production and metal prices. 2011 ANNUAL REPORT 77 Table of Contents "deposit" A mineralized body that has been physically delineated by sufficient drilling, trenching and/or underground work and found to be of sufficient average grade of metal or metals to warrant further exploration and/or development expenditures; such a deposit does not qualify as a commercially mineable orebody or as containing mineral reserves, until final legal, technical and economic factors have been resolved. "development" The preparation of a mining property or area so that an orebody can be analyzed and its tonnage and quality estimated. Development is an intermediate stage between exploration and mining. "diamond drill hole" A borehole drilled using a bit inset with diamonds as the rock-cutting tool. The bit cuts a circular channel around a core of rock that can be recovered to provide a more-or-less continuous and complete columnar sample of the rock penetrated. "dilution" The effect of waste rock or low-grade ore being included in mined ore, increasing tonnage mined and lowering the overall ore grade. "dip" The angle at which a surface is inclined from the horizontal. "discordant" Said of a contact between an igneous intrusion and the country rock that is not parallel to the foliation or the bedding planes of the latter. "disseminated" Said of a mineral deposit (especially of metals) in which the desired minerals occur as scattered particles in the rock, but in sufficient quantity to make the deposit an ore. Some disseminated deposits are very large. "drift" A horizontal underground opening that follows along the length of a vein or rock formation, as opposed to a crosscut that crosses the rock formation. "ductile" Of rock, able to sustain, under a given set of conditions, 5% to 10% deformation before fracturing or faulting. "dyke" An earthen embankment, as around a drill sump or tank, or to impound a body of water or mill tailings. Also, a tabular body of igneous rock that cuts across the structure of adjacent rocks. "electrowinning" An electrochemical process in which a metal dissolved within an electrolyte is plated onto an electrode. Used to recover metals such as copper and gold from solution in the leaching of concentrates, etc. "envelope" 1. The outer or covering part of a fold, especially of a folded structure that includes some sort of structural break. 2. A metamorphic rock surrounding an igneous intrusion. 3. In a mineral, an outer part different in origin from an inner part. "epigenetic" An orebody formed by hydrothermal fluids and gases that were introduced into the host rocks from elsewhere, filling cavities in the host rock. "epithermal" A hydrothermal mineral deposit formed within one kilometre of the Earth's surface and in the temperature range of 50 to 200 degrees Celsius, occurring mainly as veins. Also, said of that depositional environment. "extensional-shear vein" A vein put in place in an extension fracture caused by the deformation of a rock. "fault" A fracture or a fracture zone in crustal rocks along which there has been displacement of the two sides relative to one another parallel to the fracture. The displacement may be a few inches or many kilometres long. 78 AGNICO-EAGLE MINES LIMITED Table of Contents "feasibility study" A comprehensive study of a mineral deposit in which all geological, engineering, legal, operating, economic, social, environmental and other relevant factors are considered in sufficient detail that it could reasonably serve as the basis for a final decision by a financial institution about whether to finance the development of the deposit for mineral production. A "preliminary feasibility study" or "pre-feasibility study" is a comprehensive study of the viability of a mineral project that has advanced to a stage where the mining method (in the case of underground mining) or the pit configuration (in the case of an open pit) has been established, and an effective method of mineral processing has been determined. It includes a financial analysis based on reasonable assumptions of technical, engineering, legal, operating, economic, social and environmental factors and the evaluation of other relevant factors that are sufficient for a qualified person, acting reasonably, to determine if all or part of the mineral resource may be classified as a mineral reserve. "flotation" A process for concentrating minerals based on the selective adhesion of certain minerals to air bubbles in a mixture of water and ground ore. When the right chemicals are added to a frothy water bath of ore that has been ground to the consistency of talcum powder, the minerals will float to the surface. The metal-rich flotation concentrate is then skimmed off the surface. "foliation" A general term for a planar arrangement of textural or structural features in any type of rock, especially the planar structure that results from flattening of the constituent grains of a metamorphic rock. "fracture" A general term for any break in a rock, whether or not it causes displacement, due to mechanical failure by stress. Fractures include cracks, joints and faults. "free gold" Gold not combined with other substances. "glacial till" Dominantly unsorted and unstratified drift, generally unconsolidated, deposited directly by and underneath a glacier without subsequent reworking by meltwater, and consisting of a heterogeneous mixture of clay, silt, sand, gravel and boulders ranging widely in size and shape. Also referred to as "till" and ice-laid drift. "grade" The relative quality of the percentage of metal content in a mineralized body, i.e., grams of gold per tonne of rock. "head grade" The average grade of ore fed into a mill. "hectare" A metric measurement of area. 1 hectare = 10,000 square metres = 2.47 acres. "horst" An up-faulted block of rock. "hydrothermal alteration" Alteration of rocks or minerals by reaction with hydrothermal fluids. "indicated mineral resource" The part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters and to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be reasonably assumed. Mineral resources that are not mineral reserves do not have demonstrated economic viability. While this term is recognized and required by Canadian regulations, the SEC does not recognize it. Investors are cautioned not to assume that any part or all of the mineral deposits in this category will ever be converted into mineral reserves. 2011 ANNUAL REPORT 79 Table of Contents "inferred mineral resource" The part of a mineral resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. While this term is recognized and required by Canadian regulations, the SEC does not recognize it. Investors are cautioned not to assume that any part or all of the mineral deposits in this category will ever be converted into mineral reserves. Investors are cautioned not to assume that part of or all of an inferred mineral resource exists, or is economically or legally mineable. "infill drilling" Drilling within a defined mineralized area to improve the definition of known mineralization. "intrusive" A body of igneous rock formed by the consolidation of magma intruded below surface into other rocks, in contrast to lavas, which are extruded upon the Earth's surface. "iron formation" A chemical sedimentary rock, typically thin-bedded or finely laminated, containing at least 15% iron of sedimentary origin and commonly containing layers of chert. "kilometre" A metric measurement of distance. 1.0 kilometre = 0.62 miles. "lens" Generally used to describe a body of ore that is thick in the middle and tapers towards the ends, resembling a convex lens. "lithologic groups" Geological groups. "lode" A mineral deposit consisting of a zone of veins, veinlets or disseminations. "longitudinal retreat" An underground mining method where the ore is excavated in horizontal slices along the orebody and the stoping starts below and advances upwards. The ore is recovered underneath in the stope. "massive" Said of a mineral deposit, especially of sulphides, characterized by a great concentration of ore in one place, as opposed to a disseminated or vein-like deposit. Said of any rock that has a homogeneous texture or fabric over a large area, with an absence of layering or any similar directional structure. "matrix" The non-valuable minerals in an ore, i.e., gangue. "measured mineral resource" The part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics are so well established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic parameters and to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm both geological and grade continuity. While this term is recognized and required by Canadian regulations, the SEC does not recognize it. Investors are cautioned not to assume that any part or all of the mineral deposits in this category will ever be converted into mineral reserves. "Merrill-Crowe process" A separation technique for removing gold from a cyanide solution. The solution is separated from the ore by methods such as filtration and counter-current decantation, and then the gold is precipitated onto zinc dust. Silver and copper may also precipitate. The precipitate is filtered to capture the gold slimes, which are further refined, e.g., by smelting, to remove the zinc and by treating with nitric acid to dissolve the silver. 80 AGNICO-EAGLE MINES LIMITED Table of Contents "mesothermal deposit" A mineral deposit formed at moderate temperature and pressure by deposition from hydrothermal fluids along a fissure or other opening in rock at an intermediate depth. "metallurgical properties" Properties characterizing metals and minerals behaviour under various processing techniques. "metamorphism" The process by which the form or structure of sedimentary or igneous rocks is changed by heat and pressure. "mill" A mineral treatment plant in which crushing, wet grinding and further treatment of ore is conducted. "mineral reserve" The economically mineable part of a mineral resource. The economics of the mineral reserve should be demonstrated by a feasibility study. This study must include adequate information on mining, processing, metallurgical, economic and other relevant factors that demonstrate, at the time of reporting, that economic extraction is justified. A mineral reserve includes diluting materials and allowances for losses that may occur when the material is mined. "mineral resource" A concentration or occurrence of natural solid inorganic material or natural solid fossilized organic material in or on the Earth's crust in such form and quantity and of such a grade or quality that it has reasonable prospects for economic extraction. The location, quantity, grade, geological characteristics and continuity of a mineral resource are known, estimated or interpreted from specific geological evidence and knowledge. Investors are cautioned not to assume that any or all of a mineral resource will ever be converted into a mineral reserve. "muck" Finely blasted rock (ore or waste) underground. "net smelter return royalty" A phrase used to describe a royalty payment made by a producer of metals based on gross metal production from the property, less deduction of certain limited costs including smelting, refining, transportation and insurance costs. "ounce" A measurement of mass. 1 troy ounce = 31.1035 grams. "outcrop" An exposure of bedrock at the surface. "oxidation" A chemical reaction caused by exposure to oxygen, which results in a change in the chemical composition of a mineral. "oxidative" Descriptive of an oxidation reaction. "phenocryst" A term for large crystals or mineral grains occurring in the matrix or groundmass of a porphyry. "plunge" The inclination of a fold axis or other linear structure from a horizontal plane, measured in the vertical plane. "polydeformed" A rock that has been subjected to more than one instance of folding, faulting, shearing, compression or extension as a result of various tectonic forces. "porphyritic" Rock texture in which one or more minerals has a larger grain size than the accompanying minerals. "porphyry" Any igneous rock in which relatively large crystals, called phenocrysts, are set in a fine-grained groundmass. "pressure oxidation process" A process by which sulphide minerals are oxidized in order to expose gold that is encapsulated in the mineral lattice. The main component of a pressure oxidation circuit consists of one or more pressurized vessels (autoclaves). Oxygen level, process temperature and acidity are the primary control parameters of such units. "probable mineral reserve" The economically mineable part of an indicated mineral resource demonstrated by a feasibility study. 2011 ANNUAL REPORT 81 Table of Contents "proven mineral reserve" The economically mineable part of a measured mineral resource demonstrated by a feasibility study. "pyroclastic" Produced by explosive or aerial ejection of ash, fragments and glassy material from a volcanic vent. Term applicable to the rocks and rock layers as well as to the textures so formed. "recovery" A term used in process metallurgy to indicate the proportion of valuable material obtained in the processing of an ore. It is generally stated as a percentage of valuable metal in the ore that is recovered compared to the total valuable metal present in the ore before processing. "reverse circulation drilling" A type of drilling into rock using a solid bit to produce a hole and deliver rock chips (rather than core) to surface for analysis. Less expensive and faster than diamond drilling but not as accurate. "run-of-mine ore" The mined ore as it is delivered, prior to sorting, stockpiling or treatment. "schist" A strongly foliated crystalline rock that can be readily split into think flakes or slabs due to the well developed parallelism of more than 50% of the minerals present in it. "scrubber" A device for separating particulate material from a waste gas stream. "semi-autogenous grinding" or "SAG" A method of grinding rock whereby larger chunks of the rock itself and steel balls form the grinding media. "shear" or "shearing" The deformation of rocks by lateral movement along innumerable parallel planes, generally resulting from pressure and producing such metamorphic structures as cleavage and schistosity. "sill" An intrusive sheet of igneous rock of roughly uniform thickness that has been forced between the bedding planes of existing rock. "slurry" Fine rock particles in circulating water. "stope development" Driving subsidiary openings to prepare blocks of ore for extraction by stoping. "strike" The bearing of the outcrop of an inclined bed, vein or fault plane on a horizontal surface; the direction of a horizontal line perpendicular to the direction of the dip. "stringers" Mineral veinlets or filaments occurring in a discontinuous subparallel pattern in a host rock. "sublevel retreat" An underground mining method in which the ore is excavated in horizontal slices along the orebody, starting below and advancing upwards. The ore is recovered underneath in the stope. "tabular" Said of a feature having two dimensions that are much larger or longer than the third, such as a dyke. "tailings" Material rejected from the mill after most of the recoverable valuable minerals have been extracted. "tailings dam" A natural or man-made confined area suitable for depositing tailings. "tailings pond" A low-lying depression used to confine tailings, the prime function of which is to allow enough time for metals to settle out or for cyanide to be naturally destroyed before the water is discharged into the local watershed. "tenement" A synonym of mineral title. "thickness" The distance at right angles between the hanging wall and the footwall of a lode or lens. "tonne" A metric measurement of mass. 1 tonne = 1,000 kilograms = 2,204.6 pounds. 82 AGNICO-EAGLE MINES LIMITED Table of Contents "transfer fault" A structure that can accommodate lateral variations of deformation and strain. "transverse open stoping" An underground mining method in which the ore is excavated in horizontal slices perpendicular to the orebody length and the stoping starts below and advances upwards. The ore is recovered underneath the stope through a drawpoint system. "twinned drill hole" A borehole drilled very close to an original hole in the same direction and dip in order to verify the results from the original drill hole. "vein" Minerals filling a fissure, fault or crack in rock. "wacke" A "dirty" sandstone that consists of a mixture of poorly sorted mineral and rock fragments in an abundant matrix of clay and fine silt. "winze" An internal mine shaft. "Zadra elution circuit" The process in this part of a gold mill strips gold and silver from carbon granules and puts them into solution. "zone" An area of distinct mineralization, i.e., a deposit. 2011 ANNUAL REPORT 83 Table of Contents | 20-F |
| 2010 | Item 4. Information on the Company | History and Development of the Company The Company is an established Canadian-based international gold producer with mining operations in northwestern Quebec, northern Mexico, northern Finland and Nunavut and exploration activities in Canada, Europe, Latin America and the United States. The Company's operating history includes over three decades of continuous gold production primarily from underground operations. Since its formation on June 1, 1972, the Company has produced almost 6.5 million ounces of gold. For definitions of certain technical terms used in the following discussion, see "– Property, Plant and Equipment – Glossary of Selected Mining Terms". 2010 ANNUAL REPORT 15 Table of Contents The Company's strategy is to focus on the continued exploration, development and expansion of its properties, all of which are located in politically stable jurisdictions. The Company has spent approximately $2.2 billion on the development of five new mines over the last four years. Through this development program, the Company transformed itself from a regionally focused, single mine producer to a multi-mine international gold producer with six operating, 100% owned mines. Since 1988, the LaRonde Mine, in the Abitibi region of Quebec, has been the Company's flagship operation, producing approximately 4.2 million ounces of gold as well as valuable byproducts. The Goldex Mine is 60 kilometres east of the LaRonde Mine, and the Lapa Mine, the Company's highest grade metals mine, is 11 kilometres east of the LaRonde Mine. The synergies between these sites contribute to the Company's status as a low-cost producer. The Kittila Mine, in Finland, achieved commercial production in May 2009, has a long reserve life and has significant production expansion potential. The Pinos Altos Mine, in Mexico, achieved commercial production in November 2009 and also has significant production expansion potential. The Company's sixth mine, Meadowbank, in Nunavut, achieved commercial production in March 2010 and is expected to produce the most gold (361,600 ounces) in 2011. In addition, the Company plans to pursue opportunities for growth in gold production and gold reserves through the prudent acquisition or development of exploration properties, development properties, producing properties and other mining businesses in the Americas and Europe. The Company believes that its total cash costs per ounce remain below the industry average. In 2010, the Company produced 987,609 ounces of gold at total cash costs per ounce of $451 net of revenues from byproduct metals. For 2011, the Company expects to produce between 1.13 million and 1.23 million ounces of gold at a total cash costs per ounce of gold produced between $420 and $470 net of byproduct revenue. These expected higher total cash costs compared to 2010 reflect the higher proportion of production coming from the Meadowbank Mine, which is expected to have higher total cash costs per ounce compared to the Company's average; higher costs associated with the transition to underground mining operations at the Pinos Altos Mine and the Kittila Mine; and increased production from the Company's mines and mine projects that do not contain byproduct metals, revenue from which reduces total cash costs per ounce. In addition, the higher total cash costs per ounce also reflect the Canadian dollar strengthening against the U.S. dollar and continued escalations in labour, shipping and transportation costs. See "Note to Investors Concerning Certain Measures of Performance" for a discussion of the use of the non-US GAAP measure total cash costs per ounce. The Company has traditionally sold all of its production at the spot price of gold due to its general policy not to sell forward its future gold production. The Company operates through four segments: Canada, Europe, Latin America and Exploration. The Canadian Segment is comprised of the Quebec Region and the Nunavut Region. The Quebec Region includes the LaRonde Mine, the LaRonde Mine extension project, the Goldex Mine and the Lapa Mine, each of which is held directly by the Company. In 2010, the Quebec Region accounted for 47% of the Company's gold production, comprised of 16% from the LaRonde Mine, 19% from the Goldex Mine and 12% from the Lapa Mine. In 2011, the Company anticipates that the Quebec Region will account for 40% of the Company's gold production, of which 13%, 16% and 11% of the Company's gold production will come from the LaRonde Mine, the Goldex Mine and the Lapa Mine, respectively. The Nunavut Region is comprised of the Meadowbank Mine and the Meliadine project, which are both held directly by the Company. In 2010, the Meadowbank Mine accounted for 27% of the Company's gold production (after achieving commercial production in March 2010) and the Company anticipates that it will account for approximately 31% of the Company's 2011 gold production. The Company's operations in the European Segment are conducted through its indirect subsidiary, Agnico-Eagle Finland Oy, which indirectly owns the Kittila Mine in Finland. In 2010, the Kittila Mine accounted for 13% of the Company's gold production and the Company anticipates that in 2011 the Kittila Mine will account for 13% of the Company's gold production. The Company's operations in the Latin American Region are conducted through its subsidiary, Agnico Eagle Mexico S.A. de C.V., which owns the Pinos Altos Mine, including the Creston Mascota deposit. In 2010, the Pinos Altos Mine accounted for 13% of the Company's gold production and the Company anticipates that in 2011 the Pinos Altos Mine will account for 16% of the Company's gold production. The Exploration Segment includes the Company's grassroots exploration operations in the United States, the European exploration office, the Canadian exploration offices, the Meliadine project and the Latin American exploration office. In addition, the Company has an international exploration office in Reno, Nevada. 16 AGNICO-EAGLE MINES LIMITED Table of Contents Agnico-Eagle's expertise in acquiring and developing mines is shown through the successful launch of six operating mines. The following table sets out the date of acquisition, the date of commencement of construction and the date of achieving commercial production for the Company's mines and mine projects. Date of Acquisition Date of Commencement of Construction Date of achieving Commercial Production LaRonde 1992 (1) 1985 1988 Goldex December 1993 (1) July 2005 August 2008 Kittila November 2005 June 2006 May 2009 Lapa June 2003 (1) June 2006 May 2009 Pinos Altos March 2006 August 2007 November 2009 Meadowbank April 2007 Pre-April 2007 March 2010 Meliadine project July 2010 2015 (2) 2015 (2) Notes: (1)Date when 100% ownership was acquired. (2)Anticipated. The Company's exploration program focuses primarily on the identification of new mineral reserves and resources and new development opportunities in proven gold producing regions. Current exploration activities are concentrated in Canada, Europe, Latin America and the United States. Several projects were evaluated during the year in other countries where the Company believes the potential for gold occurrences is excellent and which the Company believes to be politically stable and supportive of the mining industry. The Company currently manages 78 properties in Canada, 11 properties in Nevada and Idaho in the United States, three groups of properties in Finland, three projects in Mexico and one project in Argentina. Exploration activities are managed from offices in Val d'Or, Quebec; Reno, Nevada; Chihuahua, Mexico; Kittila, Finland; and Vancouver, British Columbia. In addition, the Company continuously evaluates opportunities to make strategic acquisitions. Four of the Company's new mines or projects came from relatively recent acquisitions. In the second quarter of 2004, the Company acquired an approximate 14% ownership interest in Riddarhyttan Resources AB ("Riddarhyttan"), a Swedish precious and base metals exploration and development company that was at the time listed on the Stockholm Stock Exchange. In November 2005, the Company completed a tender offer (the "Riddarhyttan Offer") for all of the issued and outstanding shares of Riddarhyttan that it did not own. The Company issued 10,023,882 of its common shares and paid and committed an aggregate of $5.1 million cash as consideration to Riddarhyttan shareholders in connection with the Riddarhyttan Offer. The Company, through wholly-owned subsidiaries, currently holds 100% of Riddarhyttan. The Kittila Mine, located approximately 900 kilometres north of Helsinki near the town of Kittila in Finnish Lapland, is currently 100% owned by Agnico-Eagle Finland Oy, which is owned by Riddarhyttan through its wholly-owned subsidiary, Agnico-Eagle AB. In the first quarter of 2005, the Company entered into an exploration and option agreement with Industrias Penoles S.A. de C.V. ("Penoles") to acquire the Pinos Altos property in northern Mexico. The Pinos Altos property is comprised of approximately 11,000 hectares in the Sierra Madre gold belt, approximately 225 kilometres west of the city of Chihuahua in the state of Chihuahua in northern Mexico. In February 2006, the Company exercised its option and acquired the Pinos Altos property on March 15, 2006. Under the terms of the exploration and option agreement, the purchase price of $66.8 million was comprised of $32.5 million in cash and 2,063,635 common shares of the Company. In February 2007, the Company made an exchange offer for all of the outstanding shares of Cumberland Resources Ltd. ("Cumberland") not already owned by the Company. At the time, Cumberland was a pre-production development stage company listed on the Toronto Stock Exchange (the "TSX") and American Stock Exchange whose primary asset was the Meadowbank property. In May 2007, the Company acquired approximately 92% of the issued and outstanding shares of Cumberland that it did not previously own and, in July 2007, the Company completed the acquisition of all Cumberland shares by way of a compulsory acquisition. The Company issued 13,768,510 of its common shares and paid $9.6 million in cash as consideration to Cumberland shareholders in connection with its acquisition of Cumberland. 2010 ANNUAL REPORT 17 Table of Contents In April 2010, the Company entered into an agreement in principle with Comaplex Minerals Corp. ("Comaplex") whereby the Company would acquire all of the outstanding shares of Comaplex that it did not already own. At the time, Comaplex owned a 100% interest in the advanced stage Meliadine gold property, which is located approximately 300 kilometres southeast of the Company's Meadowbank Mine. In May 2010, the Company executed the definitive agreements with Comaplex and, in July 2010 by plan of arrangement, the Company acquired 100% of the Meliadine gold property through the acquisition of Comaplex, which was renamed Meliadine Holdings Inc. ("Meliadine"). Pursuant to the arrangement, Comaplex transferred to Geomark Exploration Ltd. all assets and related liabilities other than those relating to the Meliadine project. In connection with the arrangement, the Company issued 10,210,848 of its common shares as consideration to Comaplex shareholders. On January 1, 2011, the Company amalgamated with Meliadine. In 2010, the Company's capital expenditures were $512 million. The 2010 capital expenditures included $97 million at the LaRonde Mine (which included approximately $62 million of expenditures relating to the LaRonde Mine extension), $24 million at the Goldex Mine, $72 million at the Kittila Mine, $33 million at the Lapa Mine, $104 million at the Pinos Altos Mine (which included approximately $43 million related to the Creston Mascota deposit), $174 million at the Meadowbank Mine and $8 million at the Meliadine project and other minor projects. In addition, the Company spent $50 million on mine-site exploration and $55 million on exploration activities at the Company's grassroots exploration properties, including corporate development expenses. Budgeted 2011 capital expenditures of $313 million include $96 million at the LaRonde Mine (including $55 million on the LaRonde Mine extension), $26 million at the Goldex Mine, $14 million at the Lapa Mine, $31 million at the Pinos Altos Mine (including $5 million on the construction and development at the Creston Mascota deposit), $52 million at the Kittila Mine, $53 million at the Meadowbank Mine and $41 million in capitalized exploration expenditures. In addition, the Company plans exploration expenditures on grassroots exploration projects of approximately $105 million, including $65 million at the Meliadine project. Depending on the success of the exploration programs at these and other properties, the Company may be required to make additional capital expenditures for exploration, development and pre-production. The financing for the expenditures set out above is expected to be from internally generated cash flow from operations, from the Company's existing cash balances and from drawdowns of the Company's bank credit facility. Please see "Item 10 Additional Information – Material Contracts – Credit Agreement". Based on current funding available to the Company and expected cash flows from operations, the Company believes it has sufficient funds available to fund its projected capital expenditures for all its properties. Capital expenditures by the Company in 2009 and 2008 were $657 million and $909 million, respectively. The 2009 capital expenditures included $76 million at the LaRonde Mine (which included approximately $39 million of expenditures relating to the LaRonde Mine extension), $22 million at the Goldex Mine, $90 million at the Kittila Mine (which included $36 million of expenditures on construction of the underground mine), $47 million at the Lapa Mine (which included $22 million on construction of the mine), $133 million at the Pinos Altos Mine and $288 million at the Meadowbank Mine. In addition, the Company spent $55 million on exploration activities at the Company's grassroots exploration properties. The 2008 capital expenditures included $75 million at the LaRonde Mine (which was comprised of $38 million of sustaining capital expenditures and $37 million comprised primarily of expenditures on the LaRonde Mine extension), $53 million at the Goldex Mine, $196 million at the Kittila Mine, $89 million at the Lapa Mine, $176 million at the Pinos Altos Mine and $314 million at the Meadowbank Mine. In addition, the Company spent $35 million on exploration activities at the Company's grassroots exploration properties. The Company was formed by articles of amalgamation under the laws of the Province of Ontario on June 1, 1972, as a result of the amalgamation of Agnico Mines Limited ("Agnico Mines") and Eagle Gold Mines Limited ("Eagle"). Agnico Mines was incorporated under the laws of the Province of Ontario on January 21, 1953 under the name "Cobalt Consolidated Mining Corporation Limited". Eagle was incorporated under the laws of the Province of Ontario on August 14, 1945. On December 19, 1989, Agnico-Eagle acquired the remaining 57% interest in Dumagami Mines Limited not already owned by it, as a consequence of the amalgamation of Dumagami Mines Limited with a wholly-owned subsidiary of Agnico-Eagle, to continue as one company under the name Dumagami Mines Inc. ("Dumagami"). On December 29, 1992, Dumagami transferred all of its property and assets, including the LaRonde Mine, to Agnico-Eagle and was subsequently dissolved. On December 8, 1993, the Company acquired the remaining 46.3% interest in Goldex Mines Limited not already owned by it, as a consequence of the amalgamation of Goldex Mines Limited with a wholly-owned subsidiary of the Company, to continue as one company under the name Goldex Mines Limited. On January 1, 1996, the Company amalgamated with two wholly-owned subsidiaries, including Goldex Mines Limited. 18 AGNICO-EAGLE MINES LIMITED Table of Contents In October 2001, under a plan of arrangement, the Company amalgamated with an associated corporation, Mentor Exploration and Development Co., Limited ("Mentor"). In connection with the arrangement, the Company issued 369,348 of its common shares in consideration for the acquisition of all of the issued and outstanding shares of Mentor that it did not already own. On August 1, 2007, the Company, Agnico-Eagle Acquisition Corporation, Cumberland and a wholly-owned subsidiary of Cumberland, Meadowbank Mining Corporation, amalgamated under the laws of the Province of Ontario and continued under the name of Agnico-Eagle Mines Limited. On January 1, 2011, the Company and 1816276 Ontario Inc. (the successor corporation to Meliadine, which in turn was the successor corporation to Comaplex) amalgamated under the laws of the Province of Ontario and continued under the name of Agnico-Eagle Mines Limited. The Company's executive and registered office is located at Suite 400, 145 King Street East, Toronto, Ontario, Canada M5C 2Y7; telephone number (416) 947-1212; website: http://www.agnico-eagle.com. The information contained on the website is not part of this Form 20-F. The Company's principal place of business in the United States is located at 8725 Technology Way, Suite B, Reno, Nevada 89521. Business Overview The Company believes that it has a number of key operating strengths that provide distinct competitive advantages. Growth Profile. The Company has a proven track record of increasing production capacity at existing operations through a combination of acquisitions, operational improvements, expansions and development. The Company anticipates increasing its production to between 1.13 million and 1.23 million ounces of gold in 2011 with continued growth to 2014. The Company's production growth in 2011 is expected to come principally from the Meadowbank Mine, as well as from the continued operational improvements at the Kittila, Lapa and Pinos Altos Mines. Over the last four years, the Company has spent over $2.6 billion on the development of five new mines, and its significant extension of the LaRonde Mine at depth. With the large majority of mine development projects complete and with six mines having achieved steady state operational status, capital expenditures are expected to decline materially from 2011 onward, significantly increasing free cash flow. Future capital expenditures are expected to be primarily for incremental expansion projects and exploration of the Meliadine project. Operations in Politically Stable, Mining-Friendly Regions. The Company and its predecessors have over three decades of continuous gold production experience and expertise in metals mining. The Company's operations and exploration and development projects are located in regions that the Company believes are supportive of the mining industry. Three of the Company's producing mines and one of its construction projects are located in northwestern Quebec, one of North America's principal gold-producing regions. The policy potential index measures the effects on exploration of a variety of government policies related to the mining industry. The Company's Kittila Mine in northern Finland, Pinos Altos Mine in northern Mexico and Meadowbank Mine in Nunavut are located in regions which the Company believes are also supportive of the mining industry. Low-Cost, Efficient Operations. The Company believes that its total cash costs per ounce place it below the industry average for producers in the gold mining industry, with total cash costs per ounce of gold produced at $451 for 2010, $346 for 2009 and $162 per ounce for 2008. These relatively low cash costs are attributable to the economies of scale afforded by the Company's mining operations, as well as byproduct metal revenues from the LaRonde and Pinos Altos Mines and sharing of resources among its three operating mines in northwestern Quebec. In addition, the Company believes its highly motivated work force contributes significantly to continued operational improvements and to the Company's low-cost producer status. Strong Operating Base. Through its acquisition, exploration and development program, the Company has been transformed from a regionally focused, single mine producer to a multi-mine international gold producer with six operating, 100% owned mines. The Company's existing operations at the LaRonde Mine provide a strong base for additional mineral reserve and production development at the property and in the Abitibi region of northwestern Quebec and for the development of its mines and projects in Nunavut, Finland and Mexico. The experience gained through building and operating the LaRonde Mine has assisted with the Company's development of its other mine projects. In addition, the extensive infrastructure associated with the LaRonde Mine supports the nearby Goldex and Lapa Mines, and the construction of infrastructure to access the deposits at the LaRonde Mine extension. 2010 ANNUAL REPORT 19 Table of Contents Highly Experienced Management Team. The members of the Company's senior management team have an average of over 23 years of experience in the mining industry. Management's significant experience has underpinned the Company's historical growth and provides a solid base upon which to expand the Company's operations. Based on these strengths, the Company's corporate strategy is to grow low-cost production and reserves in mining-friendly regions. Optimize and Further Expand Operations. The Company continues to focus its resources and efforts on the exploration and development of its properties in Quebec, Nunavut, Finland and Mexico with a view to increasing annual gold production and gold mineral reserves. Leverage Mining Experience. The Company believes it can benefit not only from the existing infrastructure at its mines but also from the geological knowledge that it has gained in mining and developing its properties. The Company's strategy is to capitalize on its mining expertise to exploit fully the potential of its properties. Expand Gold Reserves. The Company is conducting drilling programs at all of its properties with a goal of further increasing its gold reserves. In 2010, on a contained gold ounces basis, the Company increased its gold reserves to 21.3 million ounces (185.8 million tonnes grading 3.57 grams of gold per tonne), an increase of 16% over December 31, 2009 levels, including the replacement of 987,609 ounces of gold mined. Growth Through Primary Exploration and Acquisitions. The Company's growth strategy has been to pursue the expansion of its development base through the acquisition of additional properties in the Americas and Europe. Historically, the Company's producing properties have resulted from a combination of investments in advanced exploration companies and primary exploration activities. By investing in pre-development stage companies, the Company believes that it has been able to acquire control of projects at favourable prices and reasonable valuations. Mining Legislation and Regulation Canada The mining industry in Canada operates under both federal and provincial or territorial legislation governing prospecting and the exploration, development, operation and decommissioning of mines and mineral processing facilities. Such legislation relates to the method of acquisition and ownership of mining rights, labour, occupational or worker health and safety standards, royalties, mining, exports, reclamation, closure and rehabilitation of mines and other matters. The mining industry in Canada is also subject to extensive laws and regulations at both the federal and provincial or territorial levels concerning the protection of the environment. The primary federal regulatory authorities with jurisdiction over the Company's mining operations in respect of environmental matters are the Department of Fisheries and Oceans (Canada) and Environment Canada. The construction, development and operation of a mine, mill or refinery requires compliance with applicable environmental laws and regulations and/or review processes, including obtaining land use permits, water permits, air emissions certifications, industrial depollution attestations, hazardous substances management and similar authorizations from various governmental agencies. Environmental laws and regulations impose high standards on the mining industry to reduce or eliminate the effects of waste generated by mining and processing operations and subsequently deposited on the ground or affecting the air or water. Laws and regulations regarding the decommissioning, reclamation and rehabilitation of mines may require approval of reclamation plans, provision of financial guarantees and long-term management of closed mines. Quebec In Quebec, mining rights are governed by the Mining Act (Quebec) and, subject to limited exceptions, are owned by the province. A mining claim entitles its holder to explore for minerals on the subject land. It remains in force for a term of two years from the date it is registered and may be renewed indefinitely subject to continued exploration works in relation thereto. In order to retain title to mining claims, in addition to paying a small bi-annual rental fee currently ranging from C$26 to C$120 per claim depending on its location and area (as set by Quebec government regulations), exploration work (or an equivalent value cash payment) has to be completed in advance (either on the claim or on adjacent mining claims, concessions or leases) and filed with the Ministry of Natural Resources and Wildlife (Quebec) prior to the date of expiry of the claim. The amount of exploration work required bi-annually currently ranges from C$48 to C$3,600 per claim depending on its location, area and period of validity (as set by Quebec government regulations). In 1966, the mining concession system set out for lands containing mineralized zones in the Mining Act (Quebec) was replaced by a system of mining leases but the mining concessions sold prior to such replacement remain in force. A mining lease entitles its holder 20 AGNICO-EAGLE MINES LIMITED Table of Contents to mine and remove valuable mineral substances from the subject land, provided it pays the annual rent set by Quebec government regulations, which currently ranges from C$21 per hectare (on privately held land) to C$43 per hectare (on land owned by the province). Leases are granted initially for a term of 20 years and are renewable up to three times, each for a duration of ten years. After the third renewal, the Minister of Natural Resources and Wildlife (Quebec) may grant an extension thereof on the conditions, for the rental and for the term he or she determines. Bill 79, An Act to amend the Mining Act, which was introduced in the Quebec National Assembly in December 2009, is still pending and, if adopted, will amend a number of rules relating to the mining regime in Quebec, mainly to stimulate mining exploration. However, it is too early to determine the final form that the amendments will take and what effect, if any, these amendments may have on the Company's operations. In Quebec, the primary provincial regulatory authorities with jurisdiction over the Company's mining operations in respect of environmental matters are the Ministry of Sustainable Development, Environment and Parks (Quebec) and the Ministry of Natural Resources and Wildlife (Quebec). Nunavut As a result of the Nunavut Land Claims Agreement (the "Land Claims Agreement") of July 1993, ownership of large tracts of land was granted to the Inuit. These Inuit-owned lands include areas with high mineral potential. Further, as a result of other rights granted to the Inuit in the Land Claims Agreement, Inuit organizations play an important role in the management of natural resources and the environment in Nunavut. These duties are shared among the federal and territorial governments and Inuit organizations. Under the Land Claims Agreement, the Inuit own surface rights to certain lands representing approximately 16% of Nunavut. For a portion of the Inuit-owned lands representing approximately 2% of Nunavut, the Inuit own mineral (subsurface) rights in addition to the surface rights. In Nunavut, the Crown's mineral rights are administered by the Department of Indian and Northern Affairs (Canada) in accordance with the Northwest Territories and Nunavut Mining Regulations (the "Territorial Mining Regulations") under the Territorial Lands Act (Canada). The Inuit mineral rights in subsurface Inuit-owned lands are owned and administered by Nunavut Tunngavik Incorporated ("Nunavut Tunngavik"), a corporation representing the Inuit people of Nunavut. Future production from Nunavut Tunngavik-administered mineral claims is subject to production leases which include a 12% net profits interest royalty from which annual deductions are limited to 85% of gross revenue. Production from Crown mining leases is subject to a royalty of up to 14% of adjusted net profits, as defined in the Territorial Mining Regulations. Before the operation of a major development project as defined in the Land Claims Agreement can begin, developers must also negotiate an impact benefits agreement with the regional Inuit Association. The Kivalliq Inuit Association (the "KIA") is the Inuit organization that holds surface rights to the Inuit-owned lands in the Kivalliq region and is responsible for administering surface rights on these lands on behalf of the Inuit of the region. In order to conduct exploration work on Inuit-owned lands, the Company is required to submit a project proposal or work plan. This proposal is subject to approval by the KIA for surface land tenure and to review by other boards established by the Land Claims Agreement to determine environmental effects and, if needed, to grant water rights. Federal and territorial government departments participate in the reviews conducted by these boards. For mine development, the Company requires a surface lease and water compensation agreement with the KIA and a licence for the use of water, including the deposit of waste. During mine construction and operations, the Company is subject to additional Nunavut and federal government regulations related to environmental, safety, fire and other operational matters. Finland Mining legislation in Finland consists of the Mining Act and the Mining Decree, which are currently being amended. The Council of State introduced the proposal for a revised Mining Act in the form of a government bill (the "Proposal") to the Finnish Parliament on December 22, 2009. The review of the Proposal by the Commerce Committee is ongoing and, according to information released by the committee on January 24, 2011, the review will continue into 2011 with no definitive timetable for the next step of the process. The review of the Proposal may not continue until after a new Parliament is elected in Finland on April 17, 2011. Unless otherwise stated, the summary set out below reflects the Mining Act as currently in force. In Finland, any corporation having its principal place of business or central administration within the European Economic Area is entitled to the same rights to carry out prospecting, to stake a claim and to exploit a deposit, as any Finnish citizen or corporation. 2010 ANNUAL REPORT 21 Table of Contents In general, prospecting does not require any special licence from the authorities, except under certain circumstances as set out in the Mining Act. The Proposal does not include any fundamental changes in this respect. If there are no impediments to granting a claim, the Ministry of Employment and the Economy (the "MEE") is obliged to grant the applicant a prospecting licence, which is required if the prospector wishes to examine the area in order to determine the size and the scope of the deposit. A prospecting licence is in force for one to five years, depending on the scope of the search for mineable minerals, and the MEE has no power of discretion as to the material merits of the mining operation. Under the Proposal, a prospecting licence would be in force for a maximum period of four years and could be extended for three-year periods up to a maximum of 15 years. The Proposal would also change the licensing authority and the application procedure in order to permit more comprehensive hearings of the parties. In order to obtain the rights to the mineable minerals located on a claim, the claimant must apply to the MEE for the appropriation of a mining patent. When the mining patent procedure has become final regarding all matters other than compensation, the MEE must issue the mining operator a mining certificate which gives the holder the right to fully exploit all mineable minerals found in the mining patent. Under the Proposal, a mining patent is to be replaced by a mining licence and, before the mining operator can start exploiting the land, a mining survey under the revised Mining Act by the surveying office would be required. Also, an expropriation licence relating to the mining area may be required if the mining operator and the owner of the land cannot come to a voluntary agreement on the use of the land in question for mining purposes. If in the public interest, the expropriation licence will be granted by the Council of State to the mining operator. When the mining survey has become final regarding all matters other than compensation and the surveying office's decision has become non-appealable, the mining operator can start exploiting the land. Mining operations must be carried out in accordance with laws and regulations concerning conservation and environmental protection issues. Under the Environmental Protection Act, mining activities require an environmental permit which may be issued either for a definite or indefinite period of time. The Environmental Protection Act is based on the principles of prevention and minimization of damages and hazards, application of the best available technology, application of the best environmental practice and "polluter pays". The Act on Compensation for Environmental Damage includes provisions on the compensation for damage to a person or a property resulting from pollution of water, air, soil, noise, vibration, radiation, light, heat, smell or other similar nuisances, caused by an activity carried out at a fixed location. This act is based on the principle of strict liability. In addition to an environmental permit, mining operators require several other permits and are subject to other obligations under environmental protection legislation. According to the Act on Environmental Impact Assessment Procedure, certain projects require compliance with an environmental impact assessment procedure. These include major projects with a considerable impact on the environment, such as the excavation, enrichment and handling of metals and other minerals in cases where the excavated material is estimated to exceed 550,000 tonnes annually. A permit authority may not give its approval to an activity covered by the scope of the Act on the Environmental Impact Assessment Procedure without having taken an environmental impact assessment report into consideration. Mexico Mining in Mexico is subject to the Mining Law, a federal law. Under the Mexican Constitution, all minerals belong to the Mexican Nation. Private parties may explore and extract minerals pursuant to mining concessions granted by the executive branch of the Mexican government, as a general rule to whoever first claims them. While the Mining Law touches briefly upon labour, occupational and worker health and safety standards, these are primarily dealt with by the Federal Labour Law. The Mining Law also briefly addresses environmental matters, which are primarily regulated by the General Law of Ecological Balance and Protection of the Environment, also of federal jurisdiction. The primary agencies with jurisdiction over mining activities are the Ministry of the Economy, the Ministry of Labor and Social Welfare and the Ministry of the Environment and Natural Resources. The National Water Commission has jurisdiction regarding the granting of water rights and the Ministry of Defense with respect to the use of explosives. Concessions are granted for 50 years, renewable once. The main obligations to keep concessions current are the semi-annual payment of mining duties (taxes), based on the surface area of the concession, and the performance of work in the areas covered by the concessions, which is evidenced by minimum expenditures or by the extraction of ore. 22 AGNICO-EAGLE MINES LIMITED Table of Contents Organizational Structure The Company's significant subsidiaries (all of which are directly or indirectly wholly-owned by the Company, unless otherwise indicated) are Riddarhyttan, 1715495 Ontario Inc., Agnico-Eagle Mines Sweden Cooperatie U.A., which owns all of the shares of Agnico-Eagle Sweden AB, a Swedish company through which the Company holds its interest in Riddarhyttan, Oijarvi Resources Oy and Agnico-Eagle AB, a Swedish company through which Riddarhyttan holds its interest in Agnico-Eagle Finland Oy, a Finnish company through which the Kittila Mine is held. In addition, the Company's interest in the Pinos Altos Mine in northern Mexico is held through its indirect wholly-owned Mexican subsidiary, Agnico Eagle Mexico S.A. de C.V., which is owned, in part, by 1641315 Ontario Inc. and Tenedora Agnico Eagle Mexico S.A. de C.V., which is owned in part by Agnico-Eagle Mines Mexico Cooperatie U.A. The LaRonde Mine (including the LaRonde Mine extension), the Goldex Mine, the Lapa Mine, the Meadowbank Mine and the Meliadine project are owned directly by the Company. The Company's wholly-owned subsidiaries, Servicios Agnico Eagle Mexico, S.A. de C.V., Servicios Pinos Altos, S.A. de C.V. and Minera Agave, S.A. de C.V. provide services in connection with the Company's operations in Mexico. The Company's operations in the United States are conducted through Agnico-Eagle (USA) Limited. The following chart sets out the corporate structure of the Company, each of its significant subsidiaries and certain other subsidiaries, together with the jurisdiction of organization of the Company and each such subsidiary as at March 18, 2011: Agnico-Eagle Organizational Chart 1In January 2011, Agnico-Eagle Sweden AB, Agnico-Eagle AB and Riddarhyttan Resources AB began the process of merging with Agnico-Eagle Sweden AB as the continuing entity. The merger is expected to be effective on or about March 28, 2011. 2010 ANNUAL REPORT 23 Table of Contents Property, Plant and Equipment Location Map of the Abitibi Region LaRonde Mine The LaRonde Mine is situated approximately halfway between the City of Rouyen-Noranda and the City of Val d'Or in northwestern Quebec (approximately 470 kilometres northwest of Montreal, Quebec) in the municipalities of Preissac and Cadillac. At December 31, 2010, the LaRonde Mine was estimated to contain proven and probable mineral reserves of approximately 4.8 million ounces of gold comprised of 34.7 million tonnes of ore grading 4.32 grams per tonne. The Company's LaRonde Mine consists of the LaRonde property and the adjacent El Coco and Terrex properties, each of which is 100% owned and operated by the Company. The LaRonde Mine can be accessed either from Val d'Or in the east or from Rouyn-Noranda in the west, which are located approximately 60 kilometres from the LaRonde Mine via Quebec provincial highway No. 117. The LaRonde Mine is situated approximately two kilometres north of highway No. 117 on Quebec regional highway No. 395. The Company has access to the Canadian National Railway at Cadillac, Quebec, approximately six kilometres from the LaRonde Mine. The LaRonde Mine operates under mining leases obtained from the Ministry of Natural Resources and Wildlife (Quebec) and under certificates of approval granted by the Ministry of Sustainable Development, Environment and Parks (Quebec). The LaRonde property consists of 35 contiguous mining claims and one provincial mining lease and covers in total 1,044.9 hectares. The El Coco property consists of 22 contiguous mining claims and one provincial mining lease and covers in total 356.7 hectares. The Terrex property consists of 21 mining claims that cover in total 424.4 hectares. The mining leases on the LaRonde and El Coco properties expire in 2018 and 2021, respectively, and are automatically renewable for three further ten-year terms upon payment of a small fee. The Company also has three surface rights leases that cover in total approximately 250.5 hectares that relate to the water pipeline right of way from Lake Preissac and the eastern extension of the LaRonde tailings pond #7 on the El Coco property. The surface rights leases are renewable annually. 24 AGNICO-EAGLE MINES LIMITED Table of Contents Location Map of the LaRonde Mine The LaRonde Mine includes underground operations at the LaRonde and El Coco properties that can both be accessed from the Penna Shaft, a mill, a treatment plant, a secondary crusher building and related facilities. The El Coco property is subject to a 50% net profits interest in favour of Barrick Gold Corporation ("Barrick") on future production from approximately 500 metres east of the LaRonde property boundary. The remaining 1,500 metres is subject to a 4% net smelter return royalty. This area of the property is now substantially mined out and the Company has not paid royalties since 2004 and does not expect to pay royalties in 2011. In 2003, exploration work started to extend outside of the LaRonde property onto the Terrex property where a down-plunge extension of Zone 20 North was discovered. The Terrex property is subject to a 5% net profits royalty to Delfer Gold Mines Inc. and a 2% net smelter return royalty to Barrick. The Company does not expect to pay royalties on this part of the property in 2011. In addition, the Company owns 100% of the Sphinx property immediately to the east of the El Coco property. In 2011, payable gold production at the LaRonde Mine is expected to decline to approximately 157,000 ounces, and total cash costs per ounce are expected to be approximately $54. The Abitibi region has a continental climate with average annual rainfall of 64 centimetres and average annual snowfall of 318 centimetres. The average monthly temperatures range from a minimum of -23 degrees Celsius in January to a maximum of 23 degrees Celsius in July. Under normal circumstances, mining operations are conducted year-round without interruption due to weather conditions. The Company believes that the Abitibi region of northwestern Quebec has sufficient experienced mining personnel to staff its operations in the Abitibi region. The elevation is 337 metres above sea level. The LaRonde property is relatively flat with a maximum relief of approximately 40 metres. The topography gently slopes down from north to south and is characterized by boreal-type forest on LaRonde and the nearby properties. All of the LaRonde Mine's power requirements are supplied by Hydro-Quebec through connections to its main power transmission grid. Water used in the LaRonde Mine's operations is sourced from Lake Preissac and is transported approximately four kilometres to the minesite through a surface pipeline. 2010 ANNUAL REPORT 25 Table of Contents Mining and Milling Facilities Surface Plan of the LaRonde Mine The LaRonde Mine was originally developed utilizing a 1,207-metre shaft (Shaft #1) and an underground ramp access system. The ramp access system is available down to Level 25 of Shaft #1 and continues down to Level 248 at the Penna Shaft. The mineral reserve accessible from Shaft #1 was depleted in September 2000 and Shaft #1 is no longer in use. A second production shaft (Shaft #2), located approximately 1.2 kilometres to the east of Shaft #1, was completed in 1994 to a depth of 525 metres and was used to mine Zones 6 and 7. Both ore zones were depleted in March 2000 and the workings were allowed to flood up to Level 6 (approximately 280 metres). A third shaft (the Penna Shaft), located approximately 800 metres to the east of Shaft #1, was completed down to a depth of 2,250 metres in March 2000. The Penna Shaft is used to mine Zones 20 North, 20 South, 6 and 7. In 2009, as part of the LaRonde Mine extension, the Company completed construction of an 823-metre internal shaft from Level 206 to access the ore below Level 245, approximately 2,858 metres below surface. Mining Methods Four mining methods have historically been used at the LaRonde Mine: open pit for the three surface deposits; sublevel retreat; longitudinal retreat with cemented backfill; and transverse open stoping with both cemented and unconsolidated backfill. The primary source of ore at the LaRonde Mine continues to be from underground mining methods. During 2010, two mining methods were used: longitudinal retreat with cemented backfill (or pastefill) and transverse open stoping with both cemented (or pastefill) and unconsolidated backfill. In the underground mine, sublevels are driven at 30-metre and 40-metre vertical intervals, depending on the depth. Stopes are undercut in 15-metre panels. In the longitudinal method, panels are mined in 15-metre sections and backfilled with 100% cemented rock fill or paste fill from the paste backfill plant completed in 2000 and located on the surface at the processing facility. In the transverse open stoping method, 50% 26 AGNICO-EAGLE MINES LIMITED Table of Contents of the ore is mined in the first pass and filled with cemented rock fill or paste fill. On the second pass, the remainder of the ore is mined and filled with unconsolidated waste rock fill or cemented paste backfill. Surface Facilities Surface facilities at the LaRonde Mine include a processing plant with a daily capacity of 7,200 tonnes of ore, which has been expanded four times since 1987 from the original rate of 1,630 tonnes per day. Beginning in 1999, transition to the LaRonde Mine poly-metallic massive sulphide orebody required several modifications to the processing plant which consisted of a new coarse ore handling system, new SAG and ball mill, the addition of a zinc flotation circuit and capacity increases to the existing copper flotation and precious metals circuits. In 2008, the installation of a limited copper/lead separation flotation circuit, following the copper flotation circuit, was completed. Also in 2008, operation of a small cyanidation plant, for the treatment of sulphide concentrate from the Goldex Mine, began. LaRonde is also the site for the Lapa Mine ore processing plant (1,500 tonnes per day), which the Company commissioned in the second quarter of 2009. The ore requires a series of grinding, copper/lead flotation and separation, zinc flotation and zinc tails precious metals leaching circuits, followed by a counter-current decantation circuit and Merrill Crowe precipitation. A paste backfill and cyanide destruction plant operate intermittently. The tailings area has a dedicated cyanide destruction and metals precipitation plant that water passes through prior to recirculating to the mill. A biological water treatment plant was commissioned in 2005 to address the build-up of thiocyanate in the tailings ponds at LaRonde. This was the result of the high sulphide content of the LaRonde ore and 90% recirculation of the process water. The plant uses bacteria to oxidize and destroy thiocyanate and removes phosphate from the water before it is released to the environment. The Goldex concentrate circuit consists of pulp received from the Goldex mill via truck and subsequent leaching of the pulp with cyanide. The leached material is sent to the Lapa cyanide leach with carbon circuit ("CIL") for gold recovery with Lapa residual pulp. The Lapa process consists of a two-stage grinding circuit to reduce the granularity of the ore. A gravity recovery circuit is incorporated into the grinding circuit that recovers up to 45% of the available gold, depending on feed grades. The residual pulp is leached in a conventional CIL circuit to dissolve the balance of the precious metal. The leached slurry from the Goldex concentrate circuit is mixed with the Lapa pulp for carbon contact. A carbon strip circuit recovers the gold from the carbon which is recycled to the leach circuit. Annual production at the LaRonde mill consists of approximately 48,000 tonnes of copper concentrate, up to 7,800 tonnes of lead concentrate and 136,000 tonnes of zinc concentrate. Gold recovery at the LaRonde Mine is distributed approximately 63% in the copper concentrate, 7% in the lead concentrate, 4.25% in the zinc concentrate and 13% via leaching. Mineral Recoveries During 2010, gold and silver recovery averaged 90.0% and 88.2%, respectively. Zinc recovery averaged 88.6% with a concentrate quality of 54.8% zinc. Copper recovery averaged 81.1% with a concentrate quality of 8.96% copper. Approximately 2.59 million tonnes of ore were processed averaging 7,102 tonnes of ore per day at 94.1% of available time. 2010 ANNUAL REPORT 27 Table of Contents The following table sets out the metal recoveries, concentrate grades and contained metals for the 2.59 million tonnes of ore extracted by the Company at the LaRonde Mine in 2010. Copper Concentrate (63,353 tonnes produced) Zinc Concentrate (121,160 tonnes produced) Lead Concentrate (427 tonnes produced) Head Grades Grade Recovery Grade Recovery Grade Recovery Dore Produced Overall Metal Recoveries Payable Production Gold 2.17 g/t 61.2 g/t 57.91% 2.29 g/t 5.49% 97.4 g/t 6.3% 37,879 oz 90.04% 162,647 oz Silver 57.04 g/t 1,472 g/t 52.9% 157 g/t 14.26% 2,859 g/t 7.03% 535,023 oz 88.20% 4,193,116 oz Copper 0.23% 8.96% 81.1% – – – – – 81.1% 4,223 t Lead 0.37% – – – – 57.38% 21.8% – 21.80% 1,954 t Zinc 3.204% – – 54.8% 88.64% – – – 88.64% 62,543 t Environmental Matters Currently, water is treated at various facilities at the LaRonde Mine operations. Water contained in the tailings to be used as underground backfill is treated to degrade cyanide using a sulphur dioxide and air process. The tailings entering the tailings pond are first decanted and the clear water subjected to natural cyanide degradation. This water is then transferred to sedimentation pond #1 to undergo a secondary treatment at a plant located between sedimentation ponds #1 and #2 that uses a peroxy-silica process to destroy cyanide, lime and coagulant to precipitate metals. The tailings pond occupies an area of about 175 hectares. Waste rock that is not used underground for backfill is brought up to the surface and stored in close proximity to the tailings pond to be used to build coffer dams inside the pond. A waste rock pile containing approximately one million tonnes of waste and occupying about nine hectares is located west of the mill. Due to the high sulphur content of the LaRonde ore, the Company has had to address toxicity issues in the tailings ponds since the 1990s. Since introducing and optimizing a biological treatment plant in 2005, the treatment process is now stable and the effluent has remained non-toxic since 2006. In 2006, the Company commenced an ammonia stripping operation involving an effluent partially treated by the biological treatment plant which allowed an increase in treatment flow rate, while keeping the final effluent toxicity-free. In 2009, to further increase the treatment flow rate of the biological plant, the Company commenced construction of ammonia stripping towers, which became operational in June 2010. In addition, water from mine dewatering and drainage water are treated to remove metals prior to discharge at a lime treatment plant located at the LaRonde mill. Capital Expenditures In 2006, the Company initiated construction to extend the infrastructure at the LaRonde Mine to access the ore below Level 245, referred to as the LaRonde Mine extension. The LaRonde Mine extension is expected to begin contributing to production in the fourth quarter of 2011. The LaRonde Mine extension infrastructure includes a new 823-metre internal shaft (completed in November 2009) starting from Level 203, which provides a total depth of 2,858 metres. A ramp will be used to access the lower part of the orebody up to 3,110 metres in depth. The internal winze system will be used to hoist ore from depth to facilities on Level 215, approximately 2,150 metres below surface, where it will be transferred to the Penna Shaft hoist. Excavation of the underground mining facilities is in progress. Capital expenditures at the LaRonde Mine during 2010 were approximately $97 million, which included $35 million on sustaining capital expenditures and $62 million comprised primarily of expenditures on the LaRonde Mine extension. Budgeted 2011 capital expenditures at the LaRonde Mine are $100 million, including $45 million on sustaining capital expenditures and capitalized exploration and $55 million on the LaRonde Mine extension. Another $16 million will be added to the carbon-in-pulp ("CIP") / high density sludge ("HDS") project. At the end of 2010, the capital cost of construction of the LaRonde Mine extension is estimated to be $246 million, of which the Company had incurred $186 million as of the end of 2010. Total capital expenditures for the LaRonde Mine and the LaRonde Mine extension are estimated at $292 million from 2011 to 2024 (including the CIP/HDS project). 28 AGNICO-EAGLE MINES LIMITED Table of Contents Development In 2010, a total of 14,855 metres of lateral development was completed. Development was focused on stope preparation of mining blocks for production in 2010 and 2011, especially the preparation of the lower mine production horizon. A total of 2,772 metres of development work was completed for the LaRonde Mine extension infrastructure and the ramp to access the LaRonde Mine extension. A total of 15,440 metres of lateral development is planned for 2011. The main focus of development work continues to be stope preparation. The Company plans to develop and prepare the access to Zone 20 South down to Level 245. For the LaRonde Mine extension, a total of 6,020 metres of development is planned, mainly to develop the ramp access from the new shaft to the orebody, to complete infrastructure around the new shaft and for future ventilation infrastructure. At the same time, development work will continue to prepare for mining below Level 245. Geology, Mineralization and Exploration Geology The LaRonde property is located near the southern boundary of the Archean-age (2.7 billion years old) Abitibi Subprovince and the Pontiac Subprovince within the Superior Geological Province of the Canadian Shield. The most important regional structure is the Cadillac-Larder Lake (CLL) fault zone marking the contact between the Abitibi and Pontiac Subprovinces, located approximately two kilometres to the south of the LaRonde property. The geology that underlies the LaRonde Mine consists of three east-west-trending, steeply south-dipping and generally south-facing regional groups of rock formations. From north to south, they are: (i) 400 metres (approximate true thickness) of the Kewagama Group, which is made up of a thick band of interbedded wacke; (ii) 1,500 metres of the Blake River Group, a volcanic assemblage that hosts all the known economic mineralization on the property; and (iii) 500 metres of the Cadillac Group, made up of a thick band of wacke interbedded with pelitic schist and minor iron formation. Zones of strong sericite and chlorite alteration that enclose massive to disseminated sulphide mineralization (including the ore that is mined for gold, silver, zinc, copper and lead at the LaRonde Mine) follow steeply dipping, east-west-trending, anastomosing shear zone structures within the Blake River Group volcanic units across the property. These shear zones are part of the larger Doyon-Dumagami Structural Zone that hosts several important gold occurrences (including the Doyon gold mine, the Westwood project and the former Bousquet mines) and has been traced for over ten kilometres within the Blake River Group, from the LaRonde Mine westward to the Mouska gold mine. Mineralization The gold-bearing zones at the LaRonde Mine are lenses of disseminated stringers through to massive, aggregates of coarse pyrite with zinc, copper and silver content. Ten zones that vary in size from 50,000 to 40,000,000 tonnes have been identified, of which four are (or are believed to be) economic. Gold content is not proportional to the total sulphide content but does increase with copper content. Gold values are also higher in areas where the pyrite lenses are crosscut by tightly spaced north-south fractures. These historical relationships, which were noted at LaRonde Shaft #1's Main Zone, are maintained at the Penna Shaft zones. The zinc-silver (i.e., Zone 20 North) mineralization with lower gold values, common in the upper mine, grades into gold-copper mineralization within the lower mine. Gold value enhancement associated with crosscutting north-south fractures also occurs within the LaRonde Mine. The predominant base metal sulphides within the LaRonde Mine are chalcopyrite (copper) and sphalerite (zinc). The Company believes that Zone 20 North is one of the largest gold-bearing massive sulphide mineralized zones known in the world and one of the largest mineralized zones known in the Abitibi region of Ontario and Quebec. Zone 20 North contains the majority of the mineral reserves and resources at the LaRonde Mine, including 32,931,912 tonnes of proven and probable mineral reserves grading 4.39 grams of gold per tonne, representing 95% of the total proven and probable mineral reserves at LaRonde, 5,296,186 tonnes of indicated mineral resources grading 1.70 grams of gold per tonne, representing 76% of the total measured and indicated mineral resources at LaRonde, and 9,470,764 tonnes of inferred mineral resources grading 4.04 grams of gold per tonne, representing 82% of the total inferred mineral resources at LaRonde. The depth of Zone 20 North extends between 700 metres below surface and 3,500 metres below surface, and possibly lower. With increased access on the lower levels of the mine (i.e. from level 215 to level 255), the transformation from a "zinc/silver" orebody to a "gold/copper" deposit is expected to continue during 2011. 2010 ANNUAL REPORT 29 Table of Contents Zone 20 North can be divided into an upper zinc/silver-enriched zone and a lower gold/copper-enriched zone. The zinc zone has been traced over a vertical distance of 1,700 metres and a horizontal distance of 570 metres, with thicknesses approaching 40 metres. The gold zone has been traced over a vertical distance of over 2,200 metres and a horizontal distance of 900 metres, with thicknesses varying from 3 to 40 metres. The zinc zone consists of massive zinc/silver mineralization containing 50% to 90% massive pyrite and 10% to 50% massive light brown sphalerite. The gold zone mineralization consists of 30% to 70% finely disseminated to massive pyrite containing 1% to 10% chalcopyrite veinlets, minor disseminated sphalerite and rare specks of visible gold. Gold grades are generally related to the chalcopyrite or copper content. At depth, the massive sulphide lens becomes richer in gold and copper. During 2010, 2.3 million tonnes of ore grading 2.05 grams of gold per tonne, 60.0 grams of silver per tonne, 3.40% zinc, 0.22% copper and 0.39% lead were mined from Zone 20 North. Exploration The combined tonnage of proven and probable mineral reserves at the LaRonde Mine for year-end 2010 is 34.7 million tonnes which represents a 1% increase in the amount compared to year-end 2009 (34.4 million tonnes). This mineral reserve includes the replacement of 2.6 million tonnes of ore that were mined in 2010. The Company's ability to sustain its level of proven and probable mineral reserves was primarily due to continued successful exploration results at depth as well as the increase in the three-year average gold price used for the year-end 2010 estimates. Diamond drilling is used for exploration on the LaRonde property. In 2010, a total of 212 holes were drilled on the LaRonde property for a total length of 19,188 metres, compared to 268 holes for a total length of 30,699 metres in 2009. Of the drilling in 2010, 187 holes (7,775 metres) were for production stope delineation, 21 holes (6,016 metres) were for definition drilling and 4 holes (5,397 metres) were for exploration. In 2009, 140 holes (8,272 metres) were for production stope delineation, 114 holes (17,024 metres) were for definition drilling and 14 holes (5,403 metres) were for exploration. Expenditures on diamond drilling at the LaRonde Mine during 2010 were approximately $2.4 million, including $1.1 million in definition and delineation drilling expenses charged to operating costs at the LaRonde Mine. Expenditures on exploration in 2010 were $1.3 million, and are expected to be $2.1 million in 2011. The main focus of the 2010 exploration program was continuing the investigation of Zone 20 North at depth. This program was conducted from the Level 215 exploration drift, approximately 2,150 metres below the surface. The first hole of the program was completed at the end of 2009 to a final length of 1,852 metres. This hole intersected Zone 20 North at a depth of 3,520 metres below surface, which is approximately 410 metres below the current reserves envelope. The intersection returned 14.3 metres (true width) grading 3.03 grams of gold per tonne. In 2010, a second branch was drilled from this mother hole and returned 4.1 metres grading 1.77 grams of gold per tonne at a depth of 3,595 metres below surface. A second further hole was initiated in 2010 and drilling was still in progress at the end of the year. The drilling will continue in 2011. In addition, definition and delineation drilling was undertaken mainly in Zone 20 North and Zone 20 South to assist in final mining stope design. Zone 20 North was the main focus of the definition drilling in 2010. Infill drilling in 2010 from Level 260 to Level 245 confirmed the previous Zone 20 North reserves with no significant gains or losses. The other focus of definition drilling in 2010 was Zone 20 South. The year-end 2009 estimates showed blocks of inferred resources in a parallel zone less than 15 metres north of Zone 20 South. As a result of 2010 drilling combined with higher gold prices, the two zones have been merged to form many mining blocks between Level 200 and Level 170. This represents a net gain of 29,200 ounces of gold (comprising 471,000 tonnes grading 1.93 grams of gold per tonne) in probable reserves in Zone 20 South. Bousquet and Ellison Properties The Bousquet property is located immediately west of the LaRonde Mine and consists of two mining leases covering 80.0 hectares and 31 claims covering 384.9 hectares. The property, along with various equipment and other mining properties, was acquired from Barrick in September 2003 for $3.9 million in cash, $1.5 million in common shares of the Company and the assumption of specific reclamation and other obligations related to the Bousquet property. The property is subject to a 2% net smelter return royalty interest in favour of Barrick. From 2004 to 2007, the Company recovered 108,407 tonnes of ore grading 2.33 grams of gold per tonne from Zone 4 in a small open pit. In 2006 and 2007, the Company recovered 99,342 tonnes of ore grading 7.02 grams of gold per tonne from two small ore blocks underground at Bousquet. There has been no mining of this property since 2007. In 2010, the Company completed the first stage of a diamond drilling program consisting primarily of twinning and resampling historic holes to evaluate the production potential of an open pit at Bousquet Zone 5. This work led to an initial 30 AGNICO-EAGLE MINES LIMITED Table of Contents resource estimate for Zone 5. For the whole Bousquet property, including Zone 5, the December 31, 2010 indicated mineral resource is approximately 1.7 million tonnes grading 5.63 grams of gold per tonne. The inferred mineral resource is 20.5 million tonnes grading 2.32 grams of gold per tonne. Expenditures on exploration in 2010 were $0.2 million, which includes the cost of drilling 2,082 metres in seven holes. In 2011, the Company expects to spend $1.9 million on drilling 20,000 metres at Bousquet. The Ellison property is located immediately west of the Bousquet property and consists of eight claims covering 101.1 hectares. The property was acquired in August 2002 for C$0.5 million in cash and a commitment to spend C$0.5 million in exploration over four years. The commitment was fulfilled in 2004 and the property is 100% owned by the Company. The property is subject to a net smelter return royalty interest in favour of Yorbeau Resources Inc. that varies between 1.5% and 2.5% depending on the price of gold. Should commercial production from the Ellison property commence, the Company will be required to pay Yorbeau Resources Inc. an additional C$0.5 million in cash. The Company began a deep drilling program at Ellison in 2009 that continued throughout 2010. Late in 2010, a wedge from the original hole intercepted high grade gold mineralization approximately 2.6 kilometres below surface, interpreted to be in the Westwood horizon. This program is the first to identify the presence of significant gold mineralization in the down-dip extension of Westwood on the Ellison property. The potential exists for a large gold resource with similar geology to the LaRonde Extension. The December 31, 2010 indicated mineral resource at Ellison is approximately 0.4 million tonnes grading 5.68 grams of gold per tonne, and the inferred resource is 0.8 million tonnes grading 5.81 grams of gold per tonne. A follow-up exploration program, designed to trace the Westwood zone to the east and possibly define a new gold resource, is planned for Ellison in 2011, including 9,500 metres of drilling at a budget of $4.8 million. 2010 ANNUAL REPORT 31 Table of Contents Goldex Mine The Goldex Mine, which achieved commercial production in August 2008, is located in the City of Val d'Or, Quebec, approximately 60 kilometres east of the LaRonde Mine. At December 31, 2010 the Goldex Mine was estimated to have proven and probable mineral reserves of approximately 1.6 million ounces of gold comprised of 27.8 million tonnes of ore grading 1.75 grams per tonne. Location Map of the Goldex Mine The Goldex Mine is accessible by provincial highway. The elevation is approximately 302 metres above sea level. All of the Goldex Mine's power requirements are supplied by Hydro-Quebec through connections to its main power transmission grid. All of the water required at the Goldex Mine is sourced directly by aqueduct from the Thompson River immediately adjacent to the minesite or through recirculation of water from the surface pond and the auxiliary tailings pond. For additional information regarding the Abitibi region in which the Goldex Mine is located, including information with respect to climate, topography, vegetation and mining personnel, see "– Property, Plant and Equipment – LaRonde Mine". The Goldex Mine operates under a mining lease obtained from the Ministry of Natural Resources and Wildlife (Quebec) and under certificates of approval granted by the Ministry of Sustainable Development, Environment and Parks (Quebec). The Goldex property, in which the Company has a 100% working interest, consists of 20 contiguous mining claims and, since April 2006, one provincial mining lease (98.6 hectares), covering an aggregate of 273.3 hectares. The property is made up of three blocks: the Probe block (122.7 hectares); the Dalton block (10.4 hectares); and the Goldex Extension block (140.2 hectares). The claims are renewable every second year upon payment of a small fee. The mining lease expires in 2028 and is automatically renewable for three further ten-year terms upon payment of a small fee. The Company also has one lease covering 418.5 hectares of surface rights that are used for the auxiliary tailings pond. This lease is renewable annually upon payment of a small fee. The Goldex Mine includes underground operations that can be accessed from two shafts, a processing plant, an ore storage facility and other related facilities. The Goldex Extension Zone ("GEZ"), which is the gold deposit on which the Company is currently focusing its production efforts, was discovered in 1989 on the Goldex Extension block (although the Company believes a small portion of the GEZ occurs on the Dalton and Probe blocks). Probe Mines Ltd. holds a 5% net smelter return royalty interest on the Probe block. In 2010, exploration and development work continued on the zone located on the Probe block 150 metres above the western end of the GEZ (the "M-Zone"). 32 AGNICO-EAGLE MINES LIMITED Table of Contents In late 1997, the Company completed a mining study that indicated the deposit was not economically viable to mine at the then-prevailing gold price (approximately $323 per ounce of gold) using the mining approach chosen and drill-hole-indicated grade. The property was placed on care and maintenance and the workings were allowed to flood. In February 2005, a new mineral reserve and resource estimate was completed for the GEZ which, coupled with a feasibility study, led to a probable mineral reserve estimate of 1.6 million ounces of gold contained in 20.1 million tonnes of ore grading 2.54 grams of gold per tonne. The GEZ resource model was revised and, in March 2005, the Company approved a feasibility study and the construction of the Goldex Mine. The mine achieved commercial production on August 1, 2008 and has consistently operated at or above the designed rate of 6,900 tonnes per day. Based on the results of a scoping study completed in July 2009, the Company determined to expand the mine and mill operations at the Goldex Mine to 8,000 tonnes per day. This project was completed in 2010. Capital costs in connection with the expansion total $10 million. The crusher for the expansion was commissioned at the end of the first quarter of 2010 at a rate of 7,811 tonnes per day. Milling performance for December 2010 was at 7,951 tonnes per day. Optimization of surface crusher liners in the first quarter of 2011 is expected to improve tonnage. The Goldex Mine produced 184,386 ounces of gold in 2010 at total cash costs of $335 per ounce. It is anticipated that the Goldex Mine will produce approximately 183,538 ounces of gold in 2011 at estimated total cash costs per ounce of approximately $349. Mining and Milling Facilities Surface Plan of the Goldex Mine At the time the Company commenced construction of the Goldex Mine, the surface facilities included a headframe, a hoistroom, a surface building containing a mechanical shop, a warehouse and an office. In addition, the Goldex property 2010 ANNUAL REPORT 33 Table of Contents had a 790-metre deep shaft (Shaft #1), which provided access to underground workings. Shaft #1 is predominantly used to hoist waste rock from development activities. The sinking of a new production shaft was completed in 2007. The new shaft (Shaft #2) is a 5.5-metre diameter shaft with a 50-centimetre thick concrete lining and is used for ventilation as well as hoisting services. Shaft #2 is 865 metres deep and includes five stations. A refurbished friction hoist was installed for production and service duties, and an auxiliary hoist was installed for emergency and personnel service. The production hoist is equipped with one cage-skip. Each skip has a 21.5-tonne capacity and the shaft can hoist an average of 7,000 to 8,000 tonnes of ore per day. Mining Method The Goldex Mine uses a high volume bulk mining method, which is made possible through the use of large mining stopes. Drilling and blasting of 165-millimetre production holes is used to obtain a muck size large enough to be economically efficient. Using this method requires a percentage of the broken ore to be kept in the stope to reduce the backfilling cost and to reduce sloughing on the walls. Little ore and waste development is necessary to mine out the deposit. Surface Facilities Plant construction at the Goldex Mine commenced in the second quarter of 2006 and was completed in the first quarter of 2008. The plant reached design capacity in the second quarter of 2009. Grinding at the Goldex mill is done through a two-stage circuit comprised of a SAG mill and a ball mill. As part of the expansion project commenced in 2009, a surface crusher was added to reduce the size of ore transferred to the surface from 150 millimetres to 50 millimetres. A lamellar decanter was also added to recover small particles present in the water overflow of the concentrate thickener. The underflow pump of this thickener was upgraded following flotation circuit modification to increase the pull rate of the small particles. An increase in the capacity of the tailings pump is required. The project is ongoing and the Company expects that it will be finalized in March 2011. A lime silo will also be installed and commissioned in the second quarter of 2011. Approximately two-thirds of the gold is recovered through a gravity circuit, passed over shaking tables and smelted on site. The remainder of the gold and pyrite is recovered by a flotation process. The concentrate is then thickened and trucked to the mill at the LaRonde Mine where it is further treated by cyanidation. Gold recovered is consolidated with precious metals from the LaRonde and Lapa Mines. The Company is targeting an average gold recovery of 93.28% for 2011. In addition, surface facilities at the Goldex Mine include an electrical sub-station, a compressor building, a service building for administration and changing rooms, a warehouse building, a concrete headframe above Shaft #2, a hazardous waste storage facility and a dome covering the ore stockpile. In 2008, the processing plant building was commissioned along with the Manitou pumping station and its associated 24-kilometre pipeline. Mineral Recoveries During 2010, the Goldex mill processed approximately 2.78 million tonnes of ore, averaging approximately 7,620 tonnes of ore treated per day and operating at approximately 95% of available time. The following table sets out the metal recoveries at the Goldex Mine in 2010. Head Grades Gravity Recovery Flotation-Cyanidation Recovery Global Recovery Payable Production Gold 2.21 g/t 123,712 oz 63.24% 60,673 oz 29.98% 184,385 oz 93.22% 184,385 oz Environmental Matters Environmental permits for the construction and operation of an ore extracting infrastructure at the Goldex Mine were received from the Ministry of Sustainable Development, Environment and Parks (Quebec) in October 2005. The permits also covered the construction and operation of a sedimentation pond for mine water treatment and sewage facilities, and these facilities have been built at the Goldex Mine site. In June 2009, permits were revised to permit the expansion of the mine and mill operations to 8,500 tonnes per day. In November 2006, the Company and the Quebec government signed an agreement permitting the Company to dispose of the Goldex tailings at the Manitou minesite, a tailings site formerly used by an unrelated third party and abandoned to the Quebec government. The Manitou tailings site has issues relating to acid drainage and the construction of tailings facilities by the Company and the deposit of tailings from the Goldex plant on the Manitou tailings site was accepted by the 34 AGNICO-EAGLE MINES LIMITED Table of Contents Ministry of Sustainable Development, Environment and Parks (Quebec) as a valid rehabilitation plan to address the acid generation problem at Manitou. Under the agreement, the Company managed the construction and operation of the tailings facilities and the Quebec government paid all additional costs above the Company's budget for tailings facilities set out in the Goldex feasibility study. The Quebec government retains responsibility for all environmental contamination at the Manitou tailings site and for final closure of the facilities. In addition, the Company has built a separate tailings deposit area (auxiliary tailings pond) near the Goldex Mine. Environmental permits for the construction and operation of the auxiliary tailings pond at the Goldex Mine were received in March 2007. In 2010, 33,947 tonnes of Goldex tailings were discharged to the auxiliary pond for a total to date of 526,000 tonnes. At the Manitou site, 2.75 million tonnes of Goldex tailings were discharged for a total to date of 5.893 million tonnes. Capital Expenditures Capital expenditures at the Goldex Mine in 2010 were approximately $24.3 million, which included $3.2 million on sustaining capital expenditures, $3.4 million on the construction of facilities in the M-Zone and water management, $11.7 million in deferred development expenses and $2.9 million for other projects. Sustaining capital expenditures are expected to be approximately $9.9 million in 2011 and $16.4 million over the period from 2011 through 2015. Development During 2010, approximately 3,800 metres of lateral and vertical development were completed at a cost of $8.2 million. For 2011, 4,000 metres of development is planned with a budget of approximately $10.7 million (including $9.7 million for deferred development). In 2010, ramp access from Level 49 to Level 37 was completed. Geology, Mineralization and Exploration Geology Geologically, the Goldex property is similar to the LaRonde property and is located near the southern boundary of the Archean-age (2.7 billion years old) Abitibi Subprovince, a typical granite-greenstone terrane located within the Superior Province of the Canadian Shield. The southern contact of the Abitibi Subprovince with the Pontiac Subprovince is marked by the east-southeast trending CLL Fault Zone, the most important regional structural feature. The Goldex deposit is hosted within a quartz diorite sill, the "Goldex Granodiorite", located in a succession of mafic to ultramafic volcanic rocks that are all generally oriented west-northwest. The GEZ, which hosts most of the current mineral reserves, extends from 500 to 800 metres below the surface and is entirely hosted by the Goldex Granodiorite. The limits of the zone are defined by the intensity of the quartz vein stockwork envelope and by gold assays. The zone is almost egg-shaped; it is over 300 metres tall by 450 metres long (in a west-northwest direction) and its thickness increases rapidly from 25 metres along the east-west edges to almost 150 metres in the centre. Exploration efforts at Goldex were focused on satellite zones in 2010. Some of these satellite zones now contain reserves, including the M-Zone and the zone located at the south-eastern extension of the GEZ (the "E-Zone"). Both the M-Zone and the E-Zone are defined by quartz tourmaline veins and gold assays that are similar to the GEZ. The M-Zone has been defined on a length of 160 metres, a height of 120 metres and a thickness of 115 metres. The E-Zone has been defined on a length of 150 metres, a height of 110 metres and a thickness of 90 metres. Mineralization Gold mineralization at Goldex corresponds to the quartz-tourmaline vein deposit type. The Goldex gold-bearing quartz-tourmaline-pyrite veins and veinlets have strong structural control. The most significant structure directly related to mineralization is a discrete shear zone, the Goldex Mylonite, that is up to five metres wide and occurs within the Goldex Granodiorite, just south of the GEZ and most other gold occurrences. The quartz-tourmaline-pyrite vein mineralization is controlled by minor fracture zones that are oriented west-northwest and dip steeply north or south. The fractures are parallel to but north of the Goldex Mylonite. Within the GEZ are three vein sets, the most important of which are extensional-shear veins dipping 30 degrees south and usually less than 10 centimetres thick. The vein sets and associated alteration combine to form stacked envelopes up to 30 metres thick. Strong albite-sericite alteration of the host-rock quartz diorite surrounds the quartz-tourmaline-pyrite veins and covers almost 80% of the mineralized zone; outside of the envelopes, prior chlorite alteration affects the quartz diorite and gives it a darker grey-green colour. Occasionally, enclaves of relatively unaltered medium grey-green-coloured quartz diorite (with 2010 ANNUAL REPORT 35 Table of Contents no veining or gold) are found within the GEZ; they are included exceptionally as internal waste to allow for a smooth shape, required for mining purposes. Most of the gold occurs as microscopic particles that are almost always associated with pyrite, generally adjacent to grains and crystals but also 20% included within the pyrite. The gold-bearing pyrite occurs in the quartz-tourmaline veins and in narrow fractures in the sericite-albite-altered quartz diorite (generally immediately adjacent to the veins). Less than 1.5% of the gold occurs as the mineral calaverite, a gold telluride. Exploration In 2010, $3.9 million was spent on exploration at Goldex. A total of 122 holes were drilled using diamond drilling methods at the Goldex Mine for a total length of approximately 44 kilometres, compared to 52 holes for a total length of 8,917 metres in 2009. Initiated in 2009, the exploration drift on Level 84 was extended by 60 metres in 2010. Four different zones in the Goldex Granodiorite intrusive were drilled in 2010. The focus of the 11.7 kilometres of exploration drilling was the area above the M-Zone, with additional drilling on the eastern and western ends of the GEZ and above the E-Zone. In addition, approximately 11 kilometres of drilling was undertaken for resource-to-reserve conversion in the E-Zone and 21 kilometres to delineate a new inferred resource in the zone located inside the Goldex Granodiorite sill and extending approximately 325 metres high, 490 metres wide and 100 metres deep (the "D-Zone"). Like the GEZ, mineralization in the D-Zone is characterized by quartz tourmaline veins. The 2011 exploration program is budgeted to include 58,200 metres of diamond drilling. The primary target is the D-Zone with 40,700 metres of diamond drilling. The remainder of drilling will explore the area above the M-Zone (9,000 metres) and the sector to the east of the GEZ above the E-Zone (8,500 metres). Kittila Mine The Kittila Mine, which commenced commercial production in May 2009, is located approximately 900 kilometres north of Helsinki and 50 kilometres northeast of the town of Kittila in northern Finland. At December 31, 2010, the Kittila Mine was estimated to contain proven and probable mineral reserves of 9 million ounces of gold comprised of 32.7 million tonnes of ore grading 4.64 grams per tonne. The Kittila Mine is accessible by paved road from the village of Kiistala, which is located on the southern portion of the main claim block. The gold deposit is located near the small village of Rouravaara, approximately ten kilometres north of the village of Kiistala, accessible via a paved road. The property is close to infrastructure, including hydro power, an airport and the town of Kittila. The project also has access to a qualified labour force, including mining and construction contractors. The total landholdings surrounding and including the Kittila Mine comprise one mining licence covering an area of approximately 847 hectares, 129 individual tenements (valid claims) covering approximately 11,507 hectares and 227 claim applications covering approximately 20,207 hectares. The mineral titles form a continuous block around the Kittila mining licence. The block has been divided into the Suurikuusikko area, the Suurikuusikko West area and the Kittila mining licence centred at 25.4110 degrees longitude east and 67.9683 degrees latitude north. The boundary of the mining licence is determined by ground-surveyed points whereas the boundaries of the other tenements are not required to be surveyed. All of the tenements in the Kittila Mine are registered in the name of Agnico-Eagle Finland Oy, an indirect, wholly-owned subsidiary of the Company. According to the Finnish government's land tenure records, all tenements are in good standing. The expiry dates of the tenements vary from November 2011 up to June 2015. Tenements are valid between three and five years, provided a small annual fee is paid to maintain title, and extensions can be granted for three years or more. Agnico-Eagle Finland Oy also holds the mining licence in respect of the Kittila Mine. The mine is subject to a 2.0% net smelter return royalty payable to the Republic of Finland starting in 2011. The Kittila Mine area is sparsely populated and is situated between 200 and 245 metres above sea level. The topography is characterized by low rolling forested hills separated by marshes, lakes and interconnected rivers. The gold deposit is situated on an area of land that has no special use at present and there is sufficient land available for tailings facilities. Water requirements for the Kittila Mine are sourced from the nearby Seurujoki River, recirculation of water from pit dewatering and tailings pond water. The Kittila region is located within the South-West Lapland zone of the northern boreal vegetation zone characterized by spruce forests, marshes and bogs. 36 AGNICO-EAGLE MINES LIMITED Table of Contents The mine is located within the Arctic Circle but the climate is moderated by the Gulf Stream off the coast of Norway such that northern Finland's climate is comparable to that of eastern Canada. Winter temperatures range from -10 to -30 degrees Celsius, whereas summer temperatures range from 10 degrees Celsius to the mid-20s. Exploration and mining work can be carried out year-round. Because of its northern latitude, winter days are extremely short with a brief period of 24-hour darkness around the winter solstice. Conversely, summer days are very long with a brief period of 24-hour daylight in early summer around the summer solstice. Annual precipitation varies between five and 50 centimetres, one-third of which falls as snow. Snow accumulation usually begins in November and remains until March or April. Location Map of the Kittila Mine The Company acquired its 100%, indirect interest in the Kittila Mine through the acquisition of Riddarhyttan completed in November 2005. See "– History and Development of the Company". In June 2006, on the basis of an independently reviewed feasibility study, the Company approved construction of the Kittila Mine. The Kittila Mine is currently an open pit mining operation with underground mining via ramp access expected to be gradually phased in over three years. The initial underground stope was mined in early 2010. Ore is processed in a 3,000-tonne per day surface processing plant that was commissioned in late 2008. Limited gold concentrate production started in September 2008 and gold dore bar production commenced in January 2009. During 2010 throughput at the Kittila Mine approached design levels and gold recoveries continuted to improve. The Kittila Mine is anticipated to produce approximately 149,000 ounces of gold in 2011 at estimated total cash costs per ounce of approximately $548. Over the period of 2011 to 2023, total average gold production of approximately 150,000 ounces annually is anticipated. A scoping study is underway to assess the feasibility of significantly increasing the annual gold production. This could involve sinking a new shaft and expanding the Kittila mill. 2010 ANNUAL REPORT 37 Table of Contents Mining and Milling Facilities Surface Plan of the Kittila Mine The orebodies at Kittila are being mined initially from two open pits, followed by underground operations to mine the deposits at depth. Additional, smaller open pits will be used to mine any remaining mineral reserves close to the surface in the future. Open pit mining started in May 2008 and the extracted ore was stockpiled. As of December 2010, a total of 1.8 million tonnes of ore have been processed, 0.4 million tonnes of ore have been stockpiled and 25.8 million tonnes of waste rock have been excavated. Work on the ramp to access the underground reserves continued throughout 2010 and total underground development to date is approximately 14,500 metres. Underground mining commenced in the fourth quarter of 2010 and, as of December 2010, a total of 100,559 tonnes of ore have been mined from the underground portions of the mine. Mining Methods The Kittila Mine currently mines the Suurikuusikko orebody with a 160-metre deep open pit. Ore is mined in 7.5-metre benches together with waste rock using buffer blasting techniques and is loaded selectively to minimize dilution and maximize ore recovery. Hydraulic excavators load ore into 100-tonne trucks that haul the ore to the crusher and the waste 38 AGNICO-EAGLE MINES LIMITED Table of Contents rock to the waste disposal area. Approximately 3,000 tonnes of ore per day are fed to the concentrator. Surface mining is expected to continue through 2013, during which time the ramp access to the underground mine will continue to be developed. Underground development continued throughout the year and the first underground test stopes were mined in the first and second quarters of 2010. The underground mining method is open stoping with delayed backfill. Stopes are between 25 and 40 metres high and yield approximately 10,000 tonnes of ore per stope. To ensure sufficient ore production is available to supply the mill, approximately 5,000 metres of tunnels will be developed each year. After extraction, stopes will be filled with cemented backfill or paste fill to enable the safe extraction of ore in adjacent stopes. Ore will be trucked to the surface crusher via the ramp access system. Surface Facilities Construction of the processing plant and associated equipment was completed in 2008 and facilities on site include an office building, a maintenance facility for the open pit equipment, a warehouse, a maintenance shop, an oxygen plant, a processing plant, a tank farm, a crusher, conveyor housings and an ore bin. In addition, some temporary structures house contractor offices and work areas. The ore at Kittila is treated by grinding, flotation, pressure oxidation and carbon-in-leach circuits. Gold is recovered from the carbon in a Zadra elution circuit and is recovered from the solution using electrowinning and then poured into dore bars using an electric induction furnace. Mineral Recoveries In 2010, the Kittila mill processed 960,365 tonnes of ore with an availability of 82.5% for an average throughput of 3,189 tonnes per day. Low mill availability was caused by maintenance issues associated with the autoclave and scrubber, mainly related to leaking mechanical seals, brick lining failures in the autoclave and blocked pipelines on the scrubber. The following table sets out the gold production at the Kittila Mine in 2010: Head Grade Dore Produced Overall Metal Recovery Payable Production Gold 5.41 g/t 126,028 oz 75.50% 126,205 oz Flotation recoveries were stable during 2010 and flotation recovery averaged 91.87% during the year. Trials are still in progress with the aim to further increase the flotation recovery. An in-house metallurgical laboratory to be built in 2011 will allow further flotation test work to be undertaken to attempt to optimize flotation recoveries in 2011. Ore processing at Kittila consists of two stages. In the first stage, ore is enriched by flotation and in the second stage the gold is extracted by pressure oxidation and cyanide-in-leach processes. The first half of the year was a challenge for the second stage of the ore processing and the global recoveries (that is, the combination of recoveries from flotation and CIL) averaged 69.4%. The poor recovery rates were attributable to the formation of gold-chloride compound in the autoclave, which was successfully reduced in the last half of the year and, as a result, the global recovery increased to an average of 81.4%. Modifications inside the autoclave allowed for better oxygen distribution management, which resulted in better sludge flow and oxidation within the autoclave, leading to better recoveries. Also, further optimizing and improved control of the process enabled continuous improvement in recoveries. A large amount of test work was done in 2010 and the testing and optimization of the process will continue in 2011. Large-scale test-work is ongoing to find optimized pressure oxidation and results are expected in 2011. Environmental Matters The Company currently holds a mining licence, an environmental permit and operational permits in respect of the Kittila Mine. All permits necessary to begin production were received during 2008, including an environmental permit update to change from a biological oxidation process to a pressure oxidation process and to change the slopes of the waste rock pile to decrease the footprint. 2010 ANNUAL REPORT 39 Table of Contents The construction of the first phase of the tailings dam and waterproof bottom layer was completed in the fall of 2008. This first phase is sufficient to hold tailings from three years of production. Work began on the second phase in 2009. Water from dewatering the mine and water used in the mine and mill is collected and treated by sedimentation. Emissions and environmental impact are monitored in accordance with the comprehensive monitoring program that has been approved by the Finnish environmental authorities. There are no material environmental liabilities related to the Kittila Mine. A permit to increase mine process water discharge limits was granted in 2010. Capital Expenditures Capital expenditures at the Kittila Mine during 2010 were approximately $72 million, which included mill modification costs, underground mine development costs, exploration and conversion drilling costs within the mining licence area and sustaining capital costs. The Company expects capital expenditures at the Kittila Mine in 2011 to be approximately $68 million, most of which will be used for mining equipment for underground mining, development and construction of underground mining infrastructure, construction of a paste backfill plant and exploration and conversion drilling. Development Mining at the Suurikuusikko and Roura open pits progressed throughout 2010 with a total of 1,113,000 tonnes of ore and nine million tonnes of waste mined from the open pit. The Company expects that 750,000 tonnes of ore and 4.7 million tonnes of waste will be mined from the Suurikuusikko and Roura pits during 2011. Total costs for open pit development in 2010 were $23.2 million. In 2010, underground development progressed in both the Rouravaara and Suurikuusikko zones with 5,047 metres of ramp and sublevel access development completed during the year. The first test stope was mined near the end of 2009. A total of 39,176 tonnes of ore from development and 61,383 tonnes of stope ore were mined in 2010. The Company expects to complete 6,000 metres of lateral development and 680 metres of vertical development during 2011. Geology, Mineralization and Exploration Geology The Kittila Mine is situated within the Kittila Greenstone belt, part of the Lapland Greenstone belt in the Proterozoic-age Svecofennian geologic province. The appearance and geology of the area is similar to that of the Abitibi region of the Canadian Shield. In northern Finland, the bedrock is typically covered by a thin but uniform blanket of unconsolidated glacial till. Bedrock exposures are scarce and irregularly distributed. The mine area is underlain by mafic volcanic and sedimentary rocks metamorphosed to greenschist assemblages and assigned to the Kittila group. The major rock units trend north to north-northeast and are near-vertical. The volcanics are further sub-divided into iron-rich tholeiitic basalts (Kautoselka Formation) located to the west and magnesium-rich tholeiitic basalt, coarse volcaniclastic units, graphitic schist and minor chemical sedimentary rocks (Vesmajarvi Formation) located to the east. The contact between these two rock units consists of a transitional zone (the Porkonen Formation) varying between 50 and 200 metres in thickness. This zone is strongly sheared, brecciated and characterized by intense hydrothermal alteration and gold mineralization, features consistent with major brittle-ductile deformation zones. It includes the north-northeast-oriented Suurikuusikko Trend. Mineralization The Porkonen Formation hosts the Kittila gold deposit, which contains multiple mineralized zones stretching over a strike length of more than 25 kilometres. Most of the work has been focused on the 4.5-kilometre stretch that hosts the known gold reserves and resources. From north to south, the zones are Rimminvuoma ("Rimpi-S"), North Rouravaara ("Roura-N"), Central Rouravaara ("Roura-C"), depth extension of Rouravaara and Suurikuusikko ("Suuri/Roura Deep"), Suurikuusikko ("Suuri"), Etela and Ketola. The Suuri and Suuri/Roura Deep zones include several parallel sub-zones that have previously been referred to as Main East, Main Central and Main West. The Suuri zone hosts approximately 38% of the current probable gold reserve estimate on a contained-gold basis, while Suuri/Roura Deep has approximately 20%, Roura-C approximately 12%, Roura Deep approximately 20%, Roura-N approximately 3%, Rimpi-S approximately 4%, Ketola approximately 1% and Etela approximately 0.2%. Gold mineralization in these zones is associated with intense hydrothermal alteration (carbonate-albite-sulphide), and is almost exclusively refractory, locked inside fine-grained sulphide minerals: arsenopyrite (approximately 73%) or pyrite (approximately 23%). The rest is "free gold", which is manifested as extremely small grains of gold in pyrite. 40 AGNICO-EAGLE MINES LIMITED Table of Contents Exploration In 1986, the discovery of coarse visible gold in quartz-carbonate veining along a road cut near the village of Kiistala alerted the Geological Survey of Finland ("GTK") to the gold exploration potential of the area. Following this discovery, GTK initiated regional exploration over the area and deployed a wide range of indirect exploration tools to explore this relatively unexplored area. Over the period from 1987 to 2005, GTK and later Riddarhyttan undertook drilling programs and other testing on the property. After it acquired the property in 1998, Riddarhyttan continued to investigate the metallurgical properties of the refractory gold mineralization with the objective of demonstrating its recoverability and assessing suitable processing scenarios and initiated engineering and environmental studies to assess the feasibility of a mining project. Diamond drilling is used for exploration on the Kittila property. Most of the work on the mining licence area has focused on the Suuri and Roura zones. Up to the end of December 2010, a total of 1,870 drill holes, totalling 557,397 metres, have been completed on the property. In 2010, between nine and 12 drill machines worked on the Kittila property: two to three drills on underground infill drilling; six to ten drills on mine exploration; and two to three drills on resource-to-reserve conversion drilling. A total of 501 holes were completed for a length of 134,596 metres. Of these drill holes, 329 drill holes (35,784 metres) were for definition drilling, 63 drill holes (34,413 metres) were for conversion drilling and 109 drill holes (61,399 metres) were related to mine exploration. Total expenditures for diamond drilling in 2010 were $27.7 million, including $5.2 million for definition and delineation drilling. Exploration during 2010 increased proven and probable gold reserves to 4.9 million ounces (32.7 million tonnes of ore grading 4.64 grams per tonne). Most of the increase came from the Roura Deep zone (901,272 ounces) and the Suuri Deep zone (190,928 ounces). Indicated mineral resources decreased by 5.2 million tonnes to 15.3 million tonnes of ore grading 2.4 grams per tonne. Inferred mineral resources increased by 3.0 million tonnes to 8.3 million tonnes of ore grading 2.5 grams per tonne. The decrease of indicated mineral resources reflected the successful conversion of resources to reserves, especially in the Suuri Deep and Roura Deep zones. The successful deep drilling program in 2010 at the Roura Deep zone, which is located immediately below the Roura zone and north of the Suuri Deep zone, has confirmed that most of the Roura ore lenses are present in the Roura Deep zone and most of the ore lenses in the Suuri Deep zone continue north to the Roura Deep zone. The gold mineralization is open at depth and to the north, and these areas will be further tested in 2012. An extensive resource-to-reserve conversion drilling campaign was carried out at Suuri, Roura and Roura-N in 2010. As a result of this work, probable reserves increased by 106,343 ounces from Roura and Roura-N, but drilling at Suuri did not increase reserves significantly. Roura North and Rimpi-S will be the main targets for resource-to-reserve conversion drilling in 2011. Outside of the Kittila mining licence area, systematic geochemical sampling and diamond drilling continued on targets along the Suurikuusikko Trend, and a number of new targets were tested by diamond drilling. Encouraging results were received from a new gold zone in the Kuotko area located approximately ten kilometres north of the mine construction site as well as from the Hako area located one kilometre north of the mining licence area. A total of 242 diamond drill holes totalling 54,033 metres have been drilled on exploration targets outside of the mining licence area from 2006 to 2010. The 2011 exploration budget for the Kittila Mine is approximately $17.3 million ($11.0 million for minesite exploration, $3.2 million for resource-to-reserve conversion and $3.0 million for construction of an exploration ramp at the 600-metre mine level between 500 and 600 metres below the surface), and includes over 66,000 metres in diamond drilling (34,200 metres for minesite exploration and 22,000 metres for resource-to-reserve conversion), using up to seven drills throughout the year to help further identify the gold reserve and resource potential of the Kittila property. In addition, $1.2 million of exploration expenditures, including an estimated 10,000 metres of diamond drilling, is planned for exploration along the 25-kilometre Suurikuusikko Trend. 2010 ANNUAL REPORT 41 Table of Contents Lapa Mine The Lapa Mine, which achieved commercial production in May 2009, is located approximately 11 kilometres east of the LaRonde Mine near Cadillac, Quebec. At December 31, 2010, the Lapa Mine was estimated to contain proven and probable mineral reserves of 0.7 million ounces of gold comprised of 2.8 million tonnes of ore grading 7.4 grams per tonne. The Lapa property is made up of the Tonawanda property, which consists of 43 contiguous mining claims and one provincial mining lease covering an aggregate of 702.4 hectares, and the Zulapa property, which consists of one mining concession of 93.5 hectares. Location Map of the Lapa Mine The Company's initial interest in the Lapa property was acquired in 2002 through an option agreement with Breakwater Resources Ltd. ("Breakwater"). The Company undertook an aggressive exploration program and discovered a new gold deposit almost 300 metres below the surface. In 2003, the Company purchased the Lapa property from Breakwater for a payment of $8.9 million, a 1% net smelter return royalty on the Tonawanda property and a 0.5% net smelter return royalty on the Zulapa property. In 2008, the Company purchased all royalties from Breakwater for C$6.35 million. In addition, both the Zulapa and Tonawanda properties are subject to a 5% net profit royalty payable to Alfer Inc. and René Amyot. In 2004, an additional claim of 9.4 hectares was added to the Company's holdings at the Lapa Mine. In January 2009, a mining lease covering 66.8 hectares was entered into with the Ministry of Natural Resources and Wildlife (Quebec). The Lapa Mine is accessible by provincial highway. The elevation varies between approximately 320 and 390 metres above sea level. All of the Lapa Mine's power requirements are supplied by Hydro-Quebec through connections to its main power transmission grid. All of the water required at the Lapa Mine is sourced from the Heva river located 3.5 kilometres to the south of the mine. The water is pumped into an existing open pit nearby the property that has been allowed to flood and from which the mine is supplied. The topography slopes relatively gently from north to south. The property is generally covered by a boreal-type forest consisting mainly of black spruce and white pine with minor amounts of birch and poplar. For additional information regarding the Abitibi region in which the Lapa Mine is located, see "– Property, Plant and Equipment – LaRonde Mine". Gold production during 2011 at the Lapa Mine is expected to be approximately 125,000 ounces at estimated total cash costs per ounce of approximately $518. 42 AGNICO-EAGLE MINES LIMITED Table of Contents Mining and Milling Facilities Surface Plan of the Lapa Mine The Lapa site hosts an underground mining operation and the ore is trucked to the processing facility at the LaRonde Mine, which has been modified to treat the ore, recover the gold and store the residues. Tailings from the Lapa Mine are deposited in the tailings pond at the LaRonde Mine. In July 2004, the Company initiated the sinking of an 825-metre deep shaft at the Lapa property. In April 2006, 2,800 tonnes of ore development was extracted at Lapa and was estimated to contain on average 10.65 grams of gold per tonne. These results and results from other sampling methods were incorporated into a feasibility study and in June 2006, the Company accelerated construction of the Lapa Mine. This construction included extending the shaft to a depth of 1,369 metres, which was completed in October 2007. Significant additional construction was required in order for the Lapa Mine to achieve commercial production in May 2009, including the construction of the mill. Mining Methods Two underground mining methods are used at the Lapa Mine: longitudinal retreat with cemented backfill and locally transverse open stoping with cemented backfill. Sublevels are driven at 30-metre vertical intervals. Stopes are mined in 12-metre sections and backfilled with 100% cemented rock fill. Excavated ore from the Lapa site is trucked via provincial highway to the processing facility at the LaRonde Mine. Surface Facilities The infrastructure on the Lapa property includes the refurbished former LaRonde Shaft #1 headframe and shafthouse, service buildings, temporary offices, a settling pond for waste water, dry facilities, an ore bin, a diesel reservoir and a cement plant. In November 2007, lateral development began on three horizons. A backfill plant was commissioned in December 2008 and the sedimentation pond was extended in 2007 to control suspended solids from underground dewatering discharge. 2010 ANNUAL REPORT 43 Table of Contents Ore at the Lapa Mine is processed through grinding, gravity and leaching circuits. Dedicated milling facilities have been integrated into the mill at the LaRonde Mine. Based on an average ore head grade of 8.30 grams per tonne, gold recovery averaged 79.94% in 2010. During the fourth quarter of 2010, recovery averaged 82.68% after modifications to the gravity circuit in 2010 and is expected to be at the target of 83.0% in 2011. In addition, the Company is attempting to reduce the mining dilution caused by weaker than expected rock conditions in the south wall, which is mainly composed of talc chlorite schist. Mineral Recoveries In 2010, the Lapa Mine produced 571,279 tonnes of ore grading 8.26 grams of gold per tonne and 19,540 tonnes of ore were added to the stockpile. The Lapa processing facility treated 551,739 tonnes of ore in 2010 (approximately 1,512 tonnes per day) and operated at about 96.5% of available time. Head Grades Gold in Dore Produced Overall Metal Recoveries Payable Production Gold 8.30 g/t 117,456 oz 79.94% 117,456 oz Environmental Matters Water used underground at the Lapa Mine was initially re-circulated from mine dewatering after settling in the sedimentation pond. The re-circulation led to ammonia content in the water, and the Company experienced occasional toxicity problems in the water pond in 2008 and 2009. To address the ammonia content in the water, the Company built a 3.5-kilometre pipeline to obtain fresh water from the Heva River. The pipeline was commissioned in November 2009. The Company also commissioned a water treatment plant on site in 2010, which was completed in the fourth quarter of 2010, to reduce the ammonia from mine dewatering. Output is currently within the target range at approximately ten parts per million of ammonia and average efficiency is at approximately 70%. Optimization of the plant is ongoing. A sedimentation pond is used to remove suspended solids from the dewatering water before either release to the environment or re-use in the underground mining operation. The waste rock pile naturally drains towards the sedimentation pond. A waste rock sampling program implemented during the shaft sinking phase verified the non-acid generating nature of the waste rock. Water effluent from the sedimentation pond is being sampled as required under the Quebec mining effluent guidelines, and is expected to comply with the water quality criteria. The mill residues will be sent to the LaRonde tailings area. There are no known environmental liabilities associated with the Lapa site. The Certificates of Authorization to proceed with mine production and with mill construction were issued by the Ministry of Sustainable Development, Environment and Parks (Quebec) in October and December 2007, respectively. The Certificate of Authorization for mill and tailings production was received in 2008. Capital Expenditures The Company incurred approximately $33 million in capital expenditures at the Lapa Mine in 2010 and expects to incur approximately $18.2 million in 2011 of which $8.4 million relates to deferred development, $4.1 million to sustaining capital expenditures (including underground construction and mining equipment) and $5.7 million for exploration. Development In 2010, a total of 7,765 metres of lateral development was completed. Development focused on permanent drifts (ramps and haulage way) and stope preparation of mining blocks set for production in 2010 and 2011. Development work was done on three separate horizons: Level 77, Level 101 and Level 125. Geology, Mineralization and Exploration Geology The Lapa property is geologically similar to the LaRonde property and is also located near the southern boundary of the Archean-age (2.7 billion years old) Abitibi Subprovince and the Pontiac Subprovince within the Superior Province of the 44 AGNICO-EAGLE MINES LIMITED Table of Contents Canadian Shield. The most important regional structure is the CLL fault zone marking the contact between the Abitibi and Pontiac Subprovinces. The fault zone passes through the property from west to east, and is marked by schists and mafic to ultramafic volcanic flows that comprise the Piché group (up to approximately 300 metres thick in the mine area). On the Lapa property, the fault zone displays a "Z" shaped fold to which all of the lithologic groups in the region conform. Feldspathic dykes cut the Piché group, especially near the fold. North of the Piché group lies the Cadillac sedimentary group, which consists of 500 metres or more of well-banded wacke, conglomerate and siltstone with intercalations of iron formation. The Pontiac group sedimentary rocks (up to approximately 300 metres thick) that occur to the south of the Piché group are similar to the Cadillac group but do not contain conglomerate nor iron formation. Mineralization All of the known gold mineralization along the CLL fault zone is epigenetic (late) vein type, controlled by the structure. The mineralization is associated with the fault zone and occurs within or immediately adjacent to the Piché group rocks. The Lapa deposit is comprised of the Contact zone and five satellite zones. The Contact zone accounts for approximately 85% of the mineral reserves. The ore zones are made up of multiple quartz veins and veinlets, often smoky and anastomosing, within a sheared and altered envelope containing minor sulphides and visible gold. The Contact zone is generally located at the contact between the Piché group and the Cadillac group. The satellite zones are located within the Piché group at a distance varying from ten to 50 metres from the contact with the Cadillac group, except for the Contact North zone, which is located approximately ten metres north of the Contact zone within the Cadillac group. The sheared envelope consists of millimetre-thick foliation bands of biotite or sericite with silica and, in places, cuts across rock units. Quartz veins and millimetre-sized veinlets parallel to the foliation account for 5% to 25% of the mineralization. Visible gold is common in the veins and veinlets but can also be found in the altered host rock. Sulphides account for 1% to 3% of the mineralization; the most common sulphides, in order of decreasing importance, are arsenopyrite, pyrite, pyrrhotite and stibnite. Graphite is also rarely observed as inclusions in smoky quartz veins. The Contact and satellite zones are tabular mineralized envelopes oriented east-west and dipping very steeply to the north, turning south at depth. The economic portion of the zone has been traced from depths of approximately 450 metres to more than 1,300 metres below surface. The Contact zone has an average strike length of 300 metres, varies in thickness from 2.8 to 5.0 metres and is open at depth. Locally some thicker intervals have been intersected but their continuity has not been demonstrated. The satellite zones have thicknesses similar to the Contact zone. Exploration Diamond drilling in 2010 concentrated on confirming and expanding the known orebodies (Contact zone and the other satellite zones) in the immediate vicinity of the ore zones. The exploration program at the Lapa Mine in 2010 primarily tested the eastern area of the Contact zone reserve at roughly 1,000 metres depth below the surface and 300 metres east of the Contact zone reserve limit. Good results, including visible gold, were returned and additional resources were identified. The 2011 program will focus on expanding mineral resources in this area. Overall, there was a reduction of approximately 167,000 ounces of gold in reserves at Lapa from 2009 to 2010 after mining 150,000 ounces of gold. The net reduction of 17,000 ounces in reserves was a result of a lower-than-expected grade from 2010 delineation diamond drilling in the lower portion of the mine. Mineral resources at the Lapa Mine remained mostly unchanged. These results are incorporated in the December 31, 2010 mineral reserve and resource estimates. In 2010, a total of 264 holes were drilled on the Lapa property for a total length of 25,660 metres, compared to 353 holes for a total length of 24,945 metres in 2009. Of the drilling in 2010, 207 holes (13,263 metres) were for production stope delineation, 8 holes (1,477 metres) were for definition drilling and 49 holes (10,920 metres) were for exploration. In 2009, 322 holes (19,248 metres) were for production stope delineation, 7 holes (1,451 metres) were for definition drilling and 24 holes (4,247 metres) were for deep exploration. Expenditure on diamond drilling at the Lapa Mine during 2010 was approximately $2.0 million including $1.27 million in definition and delineation drilling expenses charged to operating costs. In 2011, the Company expects to spend $5.7 million on exploration, including $3.6 million on the excavation of a track drift toward the east. In 2011, 34% of the exploration drilling budget will be used for exploration in close vicinity of the mine infrastructure and 66% will be used for drilling from the exploration drift. 2010 ANNUAL REPORT 45 Table of Contents Pinos Altos Mine The Pinos Altos Mine commenced commercial production in November 2009. It is located on an 11,000-hectare property in the Sierra Madre gold belt, 285 kilometres west of the City of Chihuahua in the State of Chihuahua in northern Mexico. At December 31, 2010, the Pinos Altos Mine was estimated to contain proven and probable mineral reserves of 3.3 million ounces of gold and 92 million ounces of silver comprised of 44.2 million tonnes of ore grading 2.30 grams of gold per tonne and 64.78 grams of silver per tonne. The Pinos Altos property is made up of three blocks: the Parrena Concessions (19 concessions, 6,041.1 hectares), the Madrono Concessions (17 concessions, 873.3 hectares) and the Pinos Altos Concession (one concession, 4,192.2 hectares). Location Map of the Pinos Altos Mine The Madrono Concessions (which cover approximately 74% of the current mineral resources) are subject to a net smelter royalty of 3.5% payable to Minerales El Madrono S.A. de C.V. ("Madrono"). The Pinos Altos Concession (which covers approximately 26% of the current mineral resources) is subject to a 2.5% net smelter return royalty payable to the Consejo de Recursos Minerales, a Mexican Federal Government agency. After 2029, this portion of the property will also be subject to a 3.5% net smelter return royalty payable to Madrono. The assets at Pinos Altos acquired by the Company in 2006 included an assignment of rights under contracts to explore and exploit the Madrono Concessions and the Pinos Altos Concession, the right to use up to 400 hectares of land owned by Madrono for mining installations for a period of 20 years after formal mining operations have been initiated and sole ownership of the Parrena Concessions. During 2008, the Company and Madrono entered an agreement under which the Company acquired further surface rights for open pit mining operations and additional facilities. Infrastructure payments, surface rights payments and advance royalty payments totalling $35.5 million were made to Madrono in 2009 in respect of this agreement. In 2006, the Company concluded negotiations with communal land owners (ejidos) and others for the purchase of 5,745 hectares of land contained within the Parrena and Pinos Altos Concessions. In addition, a temporary occupation agreement with a 30-year term expiring in 2036 was negotiated with ejido Jesus del Monte for 1,470 hectares of land covered by these same concession blocks. The acquisition of these surface rights for the geologically prospective lands within the district surrounding Pinos Altos will facilitate future exploration and mining development in these areas. The Pinos Altos Mine is directly accessible by a paved interstate highway that links the cities of Chihuahua and Hermosillo and is within ten kilometres of an extension of the state power grid. Existing and planned underground mine workings will intercept water resources sufficient to sustain the requirements for future operation. The land position is sufficient for 46 AGNICO-EAGLE MINES LIMITED Table of Contents construction of all planned surface, infrastructure and mining facilities at the Pinos Altos Mine, including its tailings impoundment area. The Company further believes that a sufficient local and trained workforce is available in northern Mexico to support the operation of the mine. The Pinos Altos property is characterized by moderate to rough terrain with mixed forest (pine and oak) and altitudes that vary from 1,770 metres to 2,490 metres above sea level. The climate is sub-humid, with about one metre of annual precipitation. The average annual temperature is 18.3 degrees Celsius. Exploration and mining work can be carried out year-round. In August 2007, on the basis of an independently reviewed feasibility study, the Company approved construction of a mine at Pinos Altos. The mine achieved commercial production in November 2009. The Pinos Altos Mine produced 131,097 ounces of gold and 1,186,452 ounces of silver in 2010 at total cash costs per ounce of gold of $425. In 2011, gold production is expected to be approximately 199,000 ounces and silver production is expected to be approximately 2.1 million ounces from Pinos Altos, including operations at Creston Mascota. Total cash costs per ounce of gold are forecast at approximately $406. Over the period of 2011 to 2026, combined gold production from Pinos Altos, including Creston Mascota, is expected to average approximately 170,000 ounces of gold per year. Based on a feasibility study prepared in 2009, the Company determined to build a stand-alone heap leach operation at the satellite Creston Mascota open pit deposit. Creston Mascota is expected to produce approximately 50,000 ounces of gold per year during its five-year mine life. Capital costs in connection with the project are expected to total $62 million, of which approximately $7 million will be incurred in 2011. The first gold pour from Creston Mascota occurred on December 28, 2010 and payable gold production in 2010 was 665.6 ounces. Commercial production from Creston Mascota is expected to be achieved in the second quarter of 2011. The Company has engaged the local communities in the project area with hiring, education support and medical support programs to ensure that the project provides long-term benefits to the residents living and working in the region. The Company received formal recognition from the Governor of Chihuahua State in April 2008 for distinction as a socially responsible company. In 2010, for the third consecutive year, the Company was designated a socially responsible company by the Mexian Centre for Philanthropy and the Alliance for Social Responsibility of Enterprises. Approximately two-thirds of the operating workforce at Pinos Altos are locally hired and more than 99% of the permanent workforce are Mexican nationals. 2010 ANNUAL REPORT 47 Table of Contents Mining and Milling Facilities Surface Plan of the Pinos Altos Mine In 2010, the first full year of operations at Pinos Altos, most of the ore supplied to the mill was from open pit operations. The first stopes from the underground operation were mined in the second quarter of the year. Two additional tailings filters were installed at the Pinos Altos mill to alleviate below expected levels of throughput, and during the fourth quarter of 2010, the Pinos Altos mill processed, on average, 4,501 tonnes of ore per day or approximately 112.5% of the original design capacity of 4,000 tonnes per day. In addition, an underground paste backfill plant was installed and commissioned in 2010. Construction of the heap leach operation at Creston Mascota was more than 90% complete at the end of 2010 and pre-production mining and processing had commenced by year-end. Mining Methods The surface operations at the Pinos Altos Mine use traditional open pit mining techniques with bench heights of seven metres with double benches on the footwall and single benching on the hanging wall. Mining is accomplished with front end loaders, trucks, track drills and various support equipment. Based upon geotechnical evaluations, the final pit slopes will vary between 45 degrees and 50 degrees. Performance at the open pit mining operation at Pinos Altos during 2010 continues to indicate that the equipment, mining methods and personnel selected for the project are satisfactory for future production phases. Approximately 29 million tonnes of ore, overburden and waste were mined during 2010, which exceeded the planned design capacity of 25 million tonnes per year. During the first ten years of the project's life, it is expected that approximately half of the ore volume processed will be derived from open pit operations, principally at Santo Niño, Oberon de Weber and Creston Mascota. Underground mine production will produce the balance of the ore for the processing plant. The underground mine, which commenced operations in the second quarter of 2010, uses the long hole sublevel stoping method to extract the ore. The Company has considerable expertise with this mining method, having used the same method at the LaRonde Mine in Quebec. This method has also been used at various other Mexican mining operations. The stope height is planned at 30 metres and the stope width at 15 metres. Ore is hauled to the surface utilizing underground trucks via a ramp system. The paste backfill system and ventilation system were commissioned in the fourth quarter of 2010 and are now fully operational. During 2010, approximately 331,000 tonnes of ore were mined from the underground portion of the mine. At full capacity, the underground mine is expected to produce a maximum of 4,000 tonnes of ore per day. Performance of the underground mine continues to indicate that the equipment, mining methods, ground control and personnel selected are satisfactory for future production phases. A scoping study is expected to be completed in the 48 AGNICO-EAGLE MINES LIMITED Table of Contents fourth quarter of 2011 to evaluate the potential benefit of building a shaft installation to improve the efficiency of the underground mine. Total lateral development completed as of December 31, 2010 was approximately 17 kilometres. Surface Facilities The principal mineral processing facilities at the Pinos Altos Mine are designed to process 4,000 tonnes of ore per day in a conventional process plant circuit which includes single-stage crushing, grinding in a SAG and ball mill in closed loop, gravity separation followed by agitated leaching, counter-current decantation and metals recovery in the Merrill-Crowe process. Tailings are detoxified and filtered and then used for paste backfill in the underground mine or deposited as dry tailings in an engineered tailings impoundment area. During the initial operation of the mill in the fourth quarter of 2009 and the first two quarters of 2010, the tailings filtration capacity was insufficient to allow processing of the original design capacity of 4,000 tonnes per day due to the presence of more alteration and clay in the near-surface mineralization than had been previously expected. This capacity limitation was resolved by the installation of two additional tailings filters and, by the fourth quarter of 2010, the tailings filtration capacity was in excess of 4,000 tonnes per day. Low grade ore at Pinos Altos is processed in a heap leach system designed to accommodate approximately five million tonnes of mineralized material over the life of the project, the production from heap leach operations is expected to be relatively minor, contributing about 5% of total metal production planned for the life of the mine. A separate heap leach operation and ancillary support facilities were built at the Creston Mascota deposit, which is designed to process approximately 4,000 tonnes of ore per day in a three stage crushing, agglomeration and heap leach circuit with carbon adsorption. This project began commissioning in the latter part of 2010, with commercial production expected in the second quarter of 2011. Based on early performance of the mine and process facilities at Creston Mascota, the equipment, mining methods and personnel are satisfactory for completion of the planned production phases. Creston Mascota is expected to produce approximately 50,000 ounces of gold per year during a five-year mine life. Surface facilities at the Pinos Altos Mine include a heap leach pad, pond, liner and pumping system; administrative support offices and change room facilities; camp facilities; a laboratory; a process plant shop; a maintenance shop; a generated power station; surface power transmission lines and substations; the engineered tailings management system; and a warehouse. Over the life of the mine, recoveries of gold and silver in the milling circuit at Pinos Altos (other than from the Creston Mascota operation) are expected to average approximately 94% and 50%, respectively. Precious metals recovery from low grade ore processed in the Pinos Altos heap leach facility will average about 68% for gold and 12% for silver. Heap leach recoveries for Creston Mascota ore are expected to average 71% for gold and 16% for silver. Mineral Recoveries During 2010, the Pinos Altos mill processed 1.3 million tonnes of ore, averaging approximately 3,637 tonnes of ore treated per day and operating at approximately 95.9% of available time. The following table sets out the metal recoveries at the Pinos Altos mill in 2010. Head Grade Dore Produced Overall Metal Recovery Payable Production Gold 2.90 g/t 115,907 oz 93.54% 115,666 oz Silver 64.99 g/t 1,119,627 oz 40.2% 1,104,820 oz An additional 990,781 tonnes of ore were processed and placed on the heap leach pad with an average grade of 0.71 grams of gold per tonne and 21.15 grams of silver per tonne. Cumulative metals recovery on the heap leach pad are 52.5% gold and 9.9% silver. Heap leach recovery is following the expected cumulative recovery curve and it is expected that the ultimate recovery of 68% for gold and 12% for silver will be achieved when leaching is completed. Total metal production (from mill and heap leach) at Pinos Altos, including Creston Mascota, during 2010 was 131,097 ounces of gold and 1,186,352 ounces of silver. 2010 ANNUAL REPORT 49 Table of Contents Environmental Matters The Pinos Altos Mine has received the necessary permit authorizations for construction and operation of a mine, including a Change of Land Use permit and an Environmental Impact Study approval from the Mexican environmental agency ("SEMARNAT"). As of December 31, 2010, all permits necessary for the operation of the Pinos Altos Mine, including the operations at the Creston Mascota deposit, had been received and requests for modifications to allow for future expansion of facilities, including at the Creston Mascota deposit, had been approved or were under review by SEMARNAT. Pinos Altos uses the dry stack tailings technology to minimize the geotechnical and environmental risk that can be associated with the rainfall intensities and topographic relief in the Sierra Madre region of Mexico. All of the Mexican environmental regulatory requirements are expected to be met or exceeded by the Pinos Altos Mine (including operations at the Creston Mascota deposit). Capital Expenditures Capital expenditures at the Pinos Altos Mine during 2010 were approximately $61.0 million. Capital expenditures relating to operations at the Creston Mascota deposit during 2010 were approximately $43.4 million. The Company expects sustaining capital expenditures at Pinos Altos to be approximately $4.8 million in 2011 with average sustaining capital of approximately $3.7 million per year for a projected mine life of approximately 15 years. Approximately $0.5 million in development capital is forecast at Creston Mascota in 2011 with sustaining capital of $0.9 million during its anticipated five year mine life. Development At December 31, 2010 more than 77.7 million tonnes of overburden had been removed from the open pit mine at Pinos Altos and more than 16.9 kilometres of lateral development had been completed in the underground mine. At Creston Mascota, approximately 3.8 million tonnes of ore and overburden had been removed from the open pit mine as of December 31, 2010. Geology, Mineralization and Exploration Geology The Pinos Altos Mine is in the northern part of the Sierra Madre geologic province, on the northeast margin of the Ocampo Caldera, which hosts many epithermal gold and silver occurrences including the nearby Ocampo mining operation and Moris mine. The property is underlain by Tertiary-age (less than 45 million years old) volcanic and intrusive rocks that have been disturbed by faulting. The volcanic rocks belong to the lower volcanic complex and the discordantly-overlying upper volcanic supergroup. The lower volcanic complex is represented on the property by the Navosaigame conglomerates (including thinly-bedded sandstone and siltstone) and the El Madrono volcanics (felsic tuffs and lavas intercalated with rhyolitic tuffs, sandy volcanoclastics and sediments). The upper volcanic group is made up of the Victoria ignimbrites (explosive felsic volcanics), the Frijolar andesites (massive to flow-banded, porphyritic flows) and the Buenavista ignimbrites (dacitic to rhyolitic pyroclastics). Intermediate and felsic dykes as well as rhyolitic domes intrude all of these units. The Santo Niño andesite is a dyke that intrudes along the Santo Niño fault zone. Structure on the property is dominated by a 10-kilometre by 3-kilometre horst, a fault-uplifted block structure oriented west-northwest, that is bounded on the south by the south-dipping Santo Niño fault and on the north by the north-dipping Reyna de Plata fault. Quartz-gold vein deposits are emplaced along these faults and along transfer faults that splay from the Santo Niño fault. Mineralization Gold and silver mineralization at the Pinos Altos Mine consists of low sulphidation epithermal type hydrothermal veins and breccias. The Santo Niño structure outcrops over a distance of roughly six kilometres. It strikes at 060 degrees azimuth on its eastern portion and turns to strike roughly 090 degrees azimuth on its western fringe. The structure dips at 70 degrees towards the south. The four mineralized sectors hosted by the Santo Niño structure consist of discontinuous quartz rich lenses named from east to west: El Apache, Oberon de Weber, Santo Niño and Cerro Colorado. 50 AGNICO-EAGLE MINES LIMITED Table of Contents The El Apache lens is the most weakly mineralized. The area hosts a weakly developed white quartz dominated breccia. Gold values are low and erratic over its roughly 750 metre strike length. Past drilling suggests that this zone is of limited extent at depth. The Oberon de Weber lens has been followed on surface and by diamond drilling over an extent of roughly 500 metres. Shallow holes drilled by the Company show good continuity both in grade and thickness over roughly 550 metres. From previous drilling done by Penoles, continuity at depth appears to be erratic with a weakly defined western rake. The Santo Niño lens is the most vertically extensive of these lenses. It has been traced to a depth of approximately 750 metres below surface. The vein is followed on surface over a distance of 550 metres and discontinuously up to 650 metres. Beyond its western and eastern extents, the Santo Niño andesite is massive and only weakly altered. Gold grades found are systematically associated with green quartz brecciated andesite. The Cerro Colorado lens is structurally more complex than the three described above. Near the surface, it is marked by a complex superposition of brittle faults with mineralized zones which are difficult to correlate from hole to hole. Its relation to the Santo Niño fault zone is not clearly defined. Two deeper holes drilled by the Company during this campaign suggest better grade continuity at depth. The San Eligio zone is located approximately 250 metres north of Santo Niño. The host rock is brecciated Victoria Ignimbrite with, rarely, stockworks. There is no andesite in this sector. Unlike the other lenses, the San Eligio lens dips towards the north. The lateral extent seems to be continuous for 950 metres. Its average width is five metres and never exceeds 15 metres. Surface mapping and prospecting has suggested good potential for additional mineralization on strike and at depths below 150 metres. Visible gold has been seen in the drill core. The minerals present are indicative of an oxidized, epithermal, low sulphidation (and likely low sulphide) precious metals vein system rich in silver. The temperature of formation is thought to have been below 300 degrees Celsius, as no selenium minerals have been found to date. The presence of kaolinite and dickite are indicative of an acidic environment. The presence of hematite crystals in the centre of acanthite indicates that the deposit was probably formed under oxidative conditions. Several other promising zones are associated with the horst feature in the northwest part of the property. The Creston Mascota deposit is 7 kilometres northwest of the Santo Niño deposit, and is similar but dips shallowly to the west. Creston Mascota is about 1,000 metres long and 4 to 40 metres wide, and extends from surface to more than 200 metres depth. The deposit will be exploited by open pit and heap leach starting in 2011. Ore production began in July 2010, with the first gold poured in December 2010. Exploration In 2010, minesite exploration activities were primarily focused on definition and delineation of the resources at Santo Niño, Oberon de Weber, San Eligio and Creston Mascota. A total of 14.9 kilometres of minesite exploration drilling, 5.7 kilometres of definition drilling and 10.6 kilometres of delineation drilling were completed during the year. Regional exploration in 2010 focused on the El Cubiro, Sinter and Reyna de Plata prospects. Diamond drilling consisted of 36.5 kilometres in 107 drill holes. Detailed geological and structural mapping and sampling was done in the El Cubiro, Mascota and Cerro la Plata areas. More than 14,000 core samples and 1,777 rock samples were sent to a certified laboratory and assayed mainly for gold and silver. The recently discovered Cubiro mineralization is two kilometres west of Creston Mascota. Cubiro is a surface deposit that strikes northwest, has a steep dip and has been followed along strike for approximately 850 metres. Drilling has intersected significant gold and silver mineralization up to 30 metres wide. The Cubiro deposit is split by a fault that caused 200 metres of displacement to the west, which has been traced by drilling. The zone is still open to the west and possibly at depth and to the east. The Sinter zone is 1,500 metres north northeast of the Santo Niño zone and is part of the Reyna de Plata gold structure. The steeply dipping mineralization is four to 35 metres wide and almost 900 metres long, with over 350 metres of vertical depth. Sinter is being evaluated for its open pit mining and heap leach potential. 2010 ANNUAL REPORT 51 Table of Contents Meadowbank Mine The Meadowbank Mine, which achieved commercial production in March 2010, is located in the Third Portage Lake area in the Kivalliq District of Nunavut in northern Canada, approximately 70 kilometres north of Baker Lake. At December 31, 2010, the Meadowbank Mine was estimated to contain proven and probable mineral reserves of 3.49 million ounces of gold comprised of 34.10 million tonnes of ore grading 3.18 grams of gold per tonne. The Company acquired its 100% interest in the Meadowbank Mine in 2007 as the result of the acquisition of Cumberland (see "– History and Development of the Company"). The fresh water required for domestic camp use, mining and milling is obtained from the intake barge at Third Portage Lake. Power is supplied by a 29-megawatt diesel electric power generation plant with heat recovery. Location Map of the Meadowbank Mine The Meadowbank Mine is held under ten Crown mining leases, three exploration concessions and 57 Crown mineral claims. The Crown mining leases, which cover the Portage, Goose Island and Goose South deposits, are administered under federal legislation. The mining leases, which have renewable ten-year terms, have no annual work commitments but are subject to annual rent fees that vary according to their renewal date. The mining leases cover approximately 7,400 hectares and expire in either 2016 or 2019. Annual rent currently totals C$18,273. The production lease with the KIA is a surface lease covering 1,354 hectares and requires payment of C$124,530 annually. Production from subsurface lease areas is subject to a royalty of up to 14% of the adjusted net profits, as defined in the Territorial Mining Regulations. In order to conduct exploration on the Inuit-owned lands at Meadowbank, the Company must receive approval for an annual work proposal from the KIA, the body that holds the surface rights in the Kivalliq District and administers land use in the region through various boards. The Nunavut Water Board, one such board, provided the recommendation to the Ministry of Indian Affairs and Northern Development (Canada) to grant the Meadowbank Mine's construction and operating licences in July 2008. The Company has obtained all of the approvals and licences required to build and operate the Meadowbank Mine. 52 AGNICO-EAGLE MINES LIMITED Table of Contents The three Meadowbank exploration concessions comprise approximately 23,100 hectares and are granted by Nunavut Tunngavik, the corporation responsible for administering subsurface mineral rights on Inuit-owned lands in Nunavut. Exploration concessions cover the Vault deposit at Meadowbank and in 2011 will require annual rental fees of approximately C$92,504 and exploration expenses of approximately C$693,780. During the exploration phase, the concessions can be held for up to 20 years and the concessions can be converted into production leases with annual fees of C$1 per hectare, but no annual work commitments. Production from the concessions is subject to a 12% net profits interest royalty from which annual deductions are limited to 85% of the gross revenue. The 57 Crown mineral claims cover approximately 54,131 hectares at Meadowbank and are subject to land fees and work commitments. Land fees are payable only when work is filed. The most recent filing was in 2009, when approximately C$5,911 in land fees were paid and approximately C$292,410 in assessment work was submitted. The Kivalliq region in which the Meadowbank Mine is located has an arid arctic climate. The Meadowbank property is situated in an area characterized by low, rolling hills that are covered predominantly in heath tundra with numerous lakes and ponds. Elevation ranges from approximately 130 metres at lakeshores up to 200 metres on ridge crests. Operations at the Meadowbank Mine are expected to be year-round with only minor weather-related interruptions to mining operations; however, these interruptions are not expected to affect ore availability for milling operations or other operating activities. The Meadowbank Mine is accessible from Baker Lake, located 70 kilometres to the south, over a 110-kilometre all-weather road completed in March 2008. Baker Lake provides 2.5 months of summer shipping access via Hudson Bay and year-round airport facilities. The Meadowbank Mine also has a 1,100-metre long gravel airstrip, permitting access by air. The Company will use ocean transportation for fuel, equipment, bulk materials and supplies from Montreal, Quebec, (or Hudson Bay port facilities) via barges and ships into Baker Lake during the summer port access period that starts at the end of July in each year. Fuel and supplies are transported year-round to the site from Baker Lake by conventional tractor trailer units using an all-weather private access road. Transportation for personnel and air cargo are provided on scheduled or chartered flights. The permanent bases for employees from which to service the Meadowbank Mine are Val D'Or and Montreal in Quebec and the Kivalliq communities. Since February 2009, all chartered flights have landed directly at Meadowbank. The Meadowbank Mine achieved commercial production in March 2010 and produced 265,659 ounces of gold in 2010 at total cash costs per ounce of $693 and the Company expects that the Meadowbank Mine will produce an average of 399,000 ounces of gold per year from 2012 to 2015 with total cash costs per ounce expected to average $511 over these years. In 2011, total cash costs at Meadowbank are expected to be approximately $597 per ounce. In 2012, the total cash costs per ounce are forecast to rise to approximately $655. Both of these levels are considerably higher than the life of mine average due to relatively high stripping ratios in those years. In 2011, payable gold production at Meadowbank is expected to be approximately 362,000 ounces, reflecting a slower than expected ramp-up to design rates as a result of crushing issues. A feasibility study is currently underway for the potential construction of an underground exploration ramp at the southern end of the deposit in order to allow exploration below the 500-metre level and south of the Goose pit. Drilling done in 2009 and 2010 on the underground resource increased continuity over a 700-metre strike length and up to 500 metres at depth. Results of the feasibility study are expected in the second quarter of 2011. 2010 ANNUAL REPORT 53 Table of Contents Mining and Milling Facilities Surface Plan of the Meadowbank Mine Meadowbank has three major deposits that have sufficient drilling definition to sustain reserves: Portage, Goose and Vault. By the end of 2009, all of the camp infrastructure (dormitories and kitchen), a mill, a service building shop and generator buildings were built. All required aggregates used in the mining process are produced from waste material taken from the north end of the Portage pit. In 2008, a dyke was constructed to fully access the north half of the Portage pit in preparation for pit development in 2009 in order to have it ready for production in 2010. Construction of a second major dyke (the Bay-Goose dyke) to access the southern portion of Portage and the Goose Island pits commenced in the summer of 2009 and is expected to be completed in April 2011. Three dykes (Saddle Dam 1 and 2 and Stormwater Dykes) were also built for the impoundment of tailings in 2009 and 2010. In 2011, the Company will construct an eight-kilometre access road to service the Vault pit and will build the first phase of an additional major dyke (Central Dyke), which is required for the impoundment of the tailings for the life of the mine. Also, the Company is currently planning, subject to receipt of the required permits, to extend the airstrip to accommodate the landing of a Boeing 737. Mining Methods Mining at the Meadowbank Mine is done by open pit with trucks and excavators. Ore is extracted conventionally using drilling and blasting with truck haulage to a primary gyratory crusher located adjacent to the mill. The marginal-grade material (that is, material grading under the cut-off grade at a gold price of $1,000 per ounce but which has the potential of increasing reserves at the end of the mine life if metal prices justify the processing of such material) is separated and 54 AGNICO-EAGLE MINES LIMITED Table of Contents stockpiled for future processing. Also, a sub-grade material stockpile (that is, material for which extraction and stockpile has already been paid and currently grades too low to be processed) will be created for potential processing at the end of the mine life. Waste rock is hauled to one of two waste storage areas on the property used for dyke construction or fill material or dumped into selective areas of the open pits that have previously been mined out. Mining will initially be concentrated in the Portage pit area. Waste material from the pre-stripping will be used as bulk construction materials for dykes, as well as for construction fill material around the site. During pre-production, ore grade material was stockpiled close to the primary crusher. From 2009 through 2013, all of the ore is scheduled to be sourced from the Portage pit. Waste material will be used to complete the construction of the Bay-Goose, Central, Stormwater and 7 Saddle Dam dykes, with the remaining waste hauled to a primary dump north of Second Portage Lake. With the completion of the Bay-Goose dyke, the Goose Island pit will be brought into production in 2013. The Company anticipates that these two pits will operate concurrently for a period of two years, from 2013 through 2014. Waste stripping is scheduled to commence in the Vault pit in 2014, with the start of ore mining anticipated in 2014 as the Goose Island pit becomes depleted. During the last four years of the current mine life, estimated to begin in 2015, mining will be exclusively from the Vault pit. Surface Facilities The accommodations complex at the Meadowbank Mine consists of a permanent camp with capacity for 364 employees and a temporary camp to accommodate 200 extra workers. The camp is supported with a sewage treatment, solid waste disposal and potable water plant. In 2008, the exploration group was relocated eight kilometres south of the minesite location to a separate camp with an 80-person capacity. Plant site facilities include a mill building, a maintenance mechanical shop building, a generator building, an assay lab and a heavy vehicle maintenance shop. A structure comprised of two separate crushers will flank the main process complex. Power is supplied by an 29-megawatt diesel electric power generation plant with heat recovery and an onsite fuel storage (five million litres) and distribution system. The mill-service-power complex is connected to the accommodations complex by enclosed corridors. In addition, the Company will build peripheral infrastructure including tailings and waste impoundment areas. Facilities constructed at Baker Lake include a barge landing site located three kilometres east of the community and a storage compound. A fuel storage and distribution complex with a 40-million litre capacity has been built next to the barge landing facility. The process design is based on a conventional gold plant flowsheet consisting of two-stage crushing, grinding, gravity concentration, cyanide leaching and gold recovery in a CIP circuit. The mill is designed for year-round operations with a design capacity of 8,500 tonnes per day. The overall gold recovery is projected to be approximately 93.4%, based on projections from metallurgical test work, with approximately 40% typically recovered in the gravity circuit. The run-of-mine ore is transported to the crusher using an off-road truck. The ore is dumped into the gyratory crusher or into designated ore-type stockpiles. The product from the primary crusher is conveyed to the cone crusher in closed circuit with a vibrating screen. The crushed ore is delivered to the coarse ore stockpile and ore from the stockpile is conveyed to the mill. The grinding circuit is comprised of a primary SAG mill operated in open circuit and a secondary ball mill operated in closed circuit with cyclones. A portion of the cyclone underflow stream is sent to the concentrator, which separates the heavy minerals from the ore. The grinding circuit incorporates a gravity process to recover free gold and the free gold concentrate is leached in an intensive cyanide leach-direct electrowinning recovery process. The cyclone overflow is sent to the grinding thickener. The clarified overflow is recycled to the grinding circuit and thickened underflow is pumped to a pre-aeration and leach circuit. The cyanide circuit consists of seven tanks providing approximately 42 hours retention time. The leached slurry flows to a train of six CIP tanks. Gold in the solution flowing from the leaching circuit is adsorbed into the activated carbon. Gold is recovered from the carbon in a Zadra elution circuit and is recovered from the solution using an electrowinning recovery process. The gold sludge is then poured into dore bars using an electric induction furnace. The CIP tailings are treated for the destruction of cyanide using the standard sulphur-dioxide-air process. The detoxified tailings are then pumped to the permanent tailings facility. The tailings storage is designed for zero discharge, with all process water being reclaimed for re-use in the mill to minimize the water requirements. 2010 ANNUAL REPORT 55 Table of Contents Mineral Recoveries Gold recoveries are expected to average 93.4% for all deposits. The different ore zones have slightly different grind sensitivities to gold recovery and, as such, different particle size distributions are recommended as target grinds in the process. The use of a slightly coarser grind for the Vault ores will allow all three of the ore zones to be processed at a consistent process throughput. During 2010, gold recovery averaged 93.95%. Approximately two million tonnes of ore were processed, averaging 6,422 tonnes of ore per day with the mill operating 84% of available time. The following table sets out the metal recoveries contained for the 2.04 million tonnes of ore extracted at the Meadowbank Mine in 2010. Head Grade Overall Metal Recovery Payable Production Gold 4.33 g/t 93.9% 265,659 oz Environmental Matters (including Inuit Impact and Benefit Agreement) The development of the Meadowbank Mine was subject to an extensive environmental review process under the Nunavut Land Claims Agreement administered by the Nunavut Impact Review Board (the "NIRB"). On December 30, 2006, a predecessor to the Company received the Project Certificate from the NIRB, which includes the terms and conditions to ensure the integrity of the development process. The Nunavut Water Board provided the recommendation to the Ministry of Indian Affairs and Northern Development (Canada) to grant the Meadowbank Mine's construction and operation under a water licence in July 2008. In February 2007, a predecessor to the Company and the Nunavut government signed a Development Partnership Agreement (the "DPA") with respect to the Meadowbank Mine. The DPA provides a framework for stakeholders including the federal and municipal governments and the KIA, to maximize the long-term socio-economic benefits of the Meadowbank Mine to Nunavut. An Inuit Impact Benefit Agreement for the Meadowbank Mine (the "IIBA") was signed with the KIA in March 2006. The IIBA ensures that local employment, training and business opportunities arising from all phases of the project are accessible to the Kivalliq Inuit. The IIBA also outlines the special considerations and compensation that Cumberland agreed to provide to the Inuit regarding traditional, social and cultural matters. The Company currently holds a renewable exploration lease from the KIA that expires December 31, 2015. In July 2008, the Company signed a production lease for the construction and the operation of the mine, the mill and all related activities. In April 2008, the Company and KIA signed a water compensation agreement for the Meadowbank Mine addressing Inuit rights under the Land Claims Agreement respecting compensation for water use and water impacts associated with the project. The Meadowbank Mine consists of several gold-bearing deposits: Portage, Goose and Vault. A series of six dykes have or will be built to isolate the mining activities from neighbouring lakes. Waste rock from the Portage, Goose Island and Vault pits will be stored in the Portage and Vault rock storage facility. The control strategy to minimize the onset of oxidation and the subsequent generation of acid mine drainage includes freeze control of the waste rock through permafrost encapsulation and capping with an insulating convective layer of neutralizing rock (ultramafic and non-acid generating volcanic rocks). Because the site is underlain by about 450 metres of permafrost, the waste rock below the capping layer is expected to freeze, resulting in low rates of acid rock drainage generation in the long term. Tailings are stored in the Second Portage arm. Initially the tailings will be deposited in a subaqueous environment, but the majority of tailings will be deposited on tailings beaches. A reclamation pond will be operated within the tailings storage facility. The control strategy to minimize water infiltration into the tailings storage facility and the migration of constituents out of the facility includes freeze control of the tailings through permafrost encapsulation. A four-metre-thick dry cover of acid neutralizing ultramafic rockfill will be placed over the tailings as an insulating convective layer to confine the permafrost active layer within relatively inert materials. The water management objective for the project is to minimize the potential impact on the quality of surface water and groundwater resources at the site. Diversion ditches will be constructed to avoid the contact of clean runoff water with areas affected by the mine or mining activities. Contact water originating from affected areas will be intercepted, collected, 56 AGNICO-EAGLE MINES LIMITED Table of Contents conveyed to the tailings storage facility for re-use in process or decanted to treatment (if needed) prior to release to receiving lakes. Capital Expenditures/Development A total of $54 million has been budgeted to be spent at the Meadowbank Mine (excluding exploration) in 2011, including $15 million on dyke construction, $26 million on sustaining capital and equipment and $13 million on the construction of a new secondary crushing plant. The Meadowbank Mine started production in 2010. Total capital costs of construction incurred since the date of acquisition by the Company amounted to $721 million. The mine life is expected to be ten years. Geology, Mineralization and Exploration Geology The Meadowbank Mine comprises a number of Archean-age gold deposits hosted within polydeformed volcanic and sedimentary rocks of the Woodburn Lake Group, part of the Western Churchill supergroup in northern Canada. Three minable gold deposits – Goose, Portage and Vault – have been discovered along the 25-kilometre long Meadowbank gold trend, and the PDF deposit (a fourth deposit) has been outlined on the northeast gold trend. These known gold resources are within 225 metres of the surface, making the project amenable to open pit mining. Mineralization The predominant mineralization found in the Portage and Goose deposits is pyrrhotite, which is found as a replacement of magnetite in the oxide facies iron formation host rock. To a lesser extent, pyrite and chalcopyrite may be found and, on rare occasions, arsenopyrite may be associated with the other sulphides. The mineralization is usually restricted to several metres in length laterally, but vertically may extend to over several hundred metres. The sulphides primarily occur as narrow stringers or bands of disseminated sulphides that almost always crosscut the main foliation and/or bedding which would imply an epigenetic mode of emplacement. The percentage of sulphides is quite variable and may range from trace to semi-massive amounts over several centimetres to several metres in length. The higher gold grades and the occasional occurrence of visible gold are almost always associated with greater than 20% sulphide content. The main mineralized banded iron formation unit is bounded by an ultramafic unit to the west which locally occurs interlayered with the banded iron formation and to the east by an intermediate to felsic metavolcaniclastic unit. In the Vault deposit, pyrite is the principal ore bearing sulphide. The disseminated sulphides occur along sheared horizons that have been sericitized and silicified. These zones are several metres wide and may continue for hundreds of metres along strike and down dip. Three of the four known gold deposits are currently planned to be mined. The Goose Island and Portage deposits are hosted within highly deformed, magnetite-rich iron formation rocks, while intermediate volcanic rock assemblages host the majority of the mineralization at the more northerly Vault deposit. The fourth deposit, PDF, shows the same characteristics as Vault, though it is not currently anticipated to be a mineable deposit. Defined over a 1.85-kilometre strike length and across lateral extents ranging from 100 to 230 metres, the geometry of the Portage deposit consists of general north-northwest-striking ore zones that are highly folded. The mineralization in the lower limb of the fold is typically six to eight metres in true thickness, reaching up to 20 metres in the hinge area. The Goose Island deposit is located just south of the Portage deposit and is also associated with iron formation but exhibits different geometry, with a north-south trend and a steep westerly dip. Mineralized zones typically occur as a single unit near surface, splaying into several limbs at depth. The deposit is currently defined over a 750-metre strike length and down to 500 metres at depth (mainly in the southern end), with true thicknesses of three to 12 metres (reaching up to 20 metres locally). The Goose underground resource (100 to 500 metres at depth) extends 700 metres to the south of the Goose pit. The ore zones show the same characteristics as the Goose pit which is two to five main zones sub-parallel and undulating. The average thickness rarely exceeds three to five metres. The Vault deposit is located seven kilometres northeast of the Portage and Goose deposits. It is planar and shallow-dipping with a defined strike of 1,100 metres. The deposit has been disturbed by two sets of normal faults striking east-west and north-south and dipping moderately to the southeast and steeply to the east, respectively. The main lens has an average true thickness of eight to 12 metres, reaching as high as 18 metres locally. The hanging wall lenses are typically three to five metres, and up to seven metres, in true thickness. 2010 ANNUAL REPORT 57 Table of Contents Exploration Grass roots exploration in the project area began as early as 1980. As some interesting targets arose, several companies conducted various types of work between 1980 and 2007. Throughout these years, six deposits were the main focus of exploration: Portage, Cannu, Bay Zone, Goose, Vault and PDF. Over time, the Cannu, Bay Zone and Portage deposits were combined into one mineable deposit referred to as Portage. Exploration has extended the Goose Island deposit southward, adding the Goose South and Gosling zones. In 2009, the mine exploration group took over the pit and adjacent areas. Three goals were targeted: exploration drilling, resource conversion and waste pad condemnation. Diamond drilling is used for exploration at Meadowbank. In 2010, the focus of mine exploration was on testing the underground potential at the Goose deposit, resource conversions at the Vault deposit and on the south continuity at the Portage and Goose deposits. On the Goose underground deposit, a total of 32 holes for 17,570 metres were drilled from 200 to 750 metres in depth. These holes greatly increased the continuity and understanding of the mineralization distribution. On the Vault deposit, a total of 39 holes for 5,943 metres were drilled from 25 to 200 metres in depth. These holes were aimed at converting resources close to the pit shell and also to extending resources to the south-west continuity towards the Turn Lake porphyry. On the southern portion of the Portage deposit, a total of 18 holes for 7,408 metres were drilled from 50 to 250 metres in depth with the aim of converting resources directly south of Portage pit and other inferred occurrences within a close proximity to the pit. On the Goose south trend, a total of 13 holes for 7,320 metres were drilled from 150 to 250 metres in depth. These holes were aimed at following the south trend of the Portage-Goose iron formation. In 2010, 113 holes totalling 29,822 metres were drilled at Meadowbank. The drilling was predominantly to expand the Goose deposit at depth and towards the south, as well as to conduct infill drilling in areas where large gaps occurred between auriferous intersections. The program was successful in expanding the Goose deposit at depth and towards the south. For 2011, the mine exploration program has four main goals: exploring the southern trend of the Goose deposit at depth; exploring the Goose underground deposit towards the south to extend resources; following-up on the regional results of testing on the far west iron formation and the geophysics of the Turn Lake porphyry completed in 2010; and continuing resource conversion work initiated on the Vault deposit in 2010. The program will be completed in phases and conducted between January and June 2011. Drilling carried out in 2009 and 2010 returned significant results on the Goose underground and Vault deposits. At the Goose underground deposit, the increase in indicated mineral resources comes from a confirmation of continuity towards the south and at depth. At the Vault deposit, the increase in mineral reserves is the result of converting resources to reserves along the east pit wall. Positive drill results show continuity of mineralization toward the southwest, indicating that the pit can be expanded in that direction. Meliadine Project The Meliadine project is an advanced exploration property located near the western shore of Hudson Bay in the Kivalliq region of Nunavut, about 25 kilometres north of the hamlet of Rankin Inlet and 290 kilometres southeast of the Meadowbank Mine. The closest major city is Winnipeg, Manitoba, about 1,500 kilometres to the south. Agnico-Eagle acquired its 100% interest in the Meliadine project through its acquisition of Comaplex in July 2010 (see "– History and Development of the Company"). The mineral reserves and resources of the Meliadine project are estimated at December 31, 2010, to contain probable mineral reserves of 2.6 million ounces of gold comprised of 9.47 million tonnes of ore grading 8.54 grams per tonne. In addition, the project has 8.8 million tonnes of indicated mineral resources grading 5.21 grams of gold per tonne, and 11.8 million tonnes of inferred mineral resources grading 6.94 grams of gold per tonne. The Meliadine property is a large, almost entirely contiguous land package that is nearly 80 kilometres long. It consists of 52,173 hectares of mineral rights, of which 51,285 hectares are held under the Canada Mining Regulations and administered by the Department of Indian Affairs and Northern Development and referred to as Crown Land. The Crown Land is made up of mining claims covering 887 hectares and mineral leases covering 51,285 hectares. There are also 3,719 hectares of subsurface Nunavut Tunngavik Inc. concessions administered by a division of the Nunavut Territorial government. The Kivalliq region has an arid arctic climate. The Meliadine property is mainly covered by glacial overburden with the presence of deep-seated permafrost. The property is about 60 metres above sea level in low-lying topography with numerous lakes. Surface waters are usually frozen by early October and remain frozen until early June. Surface geological 58 AGNICO-EAGLE MINES LIMITED Table of Contents work can be carried out from mid-May to mid-October, while exploration drilling can take place throughout the year, though is reduced in January and February due to cold and darkness. Equipment, fuel and dry goods are transported on the annual warm-weather sealift by barge to Rankin Inlet via Hudson Bay. Ocean-going barges from Churchill, Manitoba or eastern Canadian ports can access the community from late June to early October. Churchill, which is approximately 470 kilometres south of Rankin Inlet, has a deep-water port facility and a year-round rail link to locations to the south. Personnel, perishables and lighter goods arrive at the Rankin Inlet regional airport by commercial or charter airline, from which they can be flown to the property by chartered helicopter. An all-weather gravel road extends from Rankin Inlet to the Meliadine River, approximately 15 kilometres away from the property, but there is winter-road access for tracked vehicles from Rankin Inlet directly to the Meliadine exploration camp from late December to mid-May. The Company proposes to build a 27.4-kilometre long open access all-weather road linking Rankin Inlet with the project site to support the underground program. A project description of the road was submitted to the NIRB in January 2011. It proposes the continuation of the existing road from Char River to the project site, with a small section being built to the edge of the Meliadine Lake near the Discovery deposit. This road would potentially be built in 2011 and 2012. Exploration personnel for the Meliadine project are mainly sourced from other parts of Canada on a fly-in/fly-out rotation from Winnipeg, Manitoba, approximately 1,500 kilometres south of the Meliadine property, although there is preferential employment of qualified people from the Kivalliq region. The hamlet of Rankin Inlet has developed a strong taskforce of entrepreneurs that provide a wide variety of services, such as freight expediting, equipment supply and outfitting. Location Map of the Meliadine Project 2010 ANNUAL REPORT 59 Table of Contents Facilities Surface Plan of the Meliadine Project Current facilities at the Meliadine project include the Meliadine exploration camp located on the shore of Meliadine Lake, approximately 2.3 kilometres north of the Tiriganiaq deposit. The camp is constructed of Weatherhaven tents and can accommodate up to 80 personnel. Covered wooden walkways connect all tents to the washrooms and kitchen facilities. A 100-person, self-contained trailer camp, complete with two diesel generators, will be installed adjacent to the existing exploration camp in early 2011. Power is currently generated using diesel generators for the Meliadine exploration camp on an as-required basis. Potable water for the Meliadine camp is pumped from Meliadine Lake and water for the previous underground operations and surface drill programmes is pumped from Pump Lake. The current water licence allows for a maximum daily water use of 290 cubic metres (Meliadine West), while a request for an amendment to the water licence was filed in October 2010 with the Nunavut Water Board (Meliadine East) to increase water use to 299 cubic metres per day. The Meliadine exploration camp has an incinerator on site to burn all flammable materials, such as camp and food wastes. Plastics and metal objects, along with incinerator ash, are set aside for transport to be disposed of in the Rankin Inlet landfill. All hazardous and liquid wastes are held at the Meliadine site for transport to a waste management company in southern Canada. 60 AGNICO-EAGLE MINES LIMITED Table of Contents Sewage has been treated through a Biodisk treatment system since the summer of 2010. Run-off water is contained in the primary water containment area and released only when sampling results meet acceptable water quality standards. Routine water sampling has been conducted since the mid-1990s and reported annually to the authorities. The Meliadine East camp on Atulik Lake was decommissioned during the summer of 2010 with completion in the winter of 2010 and 2011. The core shack and storage building remain at the former camp site. An underground portal allowing access to an exploration decline was built at the Tiriganiaq deposit in 2007 and 2008 in order to extract a bulk sample for study purposes. A waste rock and ore storage pad was generated during excavation of the decline and a sampling tower was installed for processing the bulk sample. There is a two-kilometre road between the Meliadine exploration camp and the portal site. The feasibility study that is underway is considering, among other things, the location of potential open pit and underground mines, ore storage areas, a mineral processing plant site and tailings storage and waste rock disposal areas. Environmental Matters (including Inuit Impact Benefit Agreement) Land and environmental management in the region of the Meliadine project is generally governed by the provisions of the Nunavut Land Claims Agreement ("NLCA"). Pursuant to the NLCA, land use leases must be obtained from the KIA. The Meliadine project has been granted a commercial lease for exploration and underground development activity, a prospecting and land use lease for exploration and development activities, an exploration land use lease for exploration and drilling on the Inuit-owned lands of Meliadine East and a parcel drilling permit for drilling activity on Inuit-owned lands. A number of right-of-way leases covering road access to the Meliadine property and esker quarrying on the Inuit-owned lands were also granted by the KIA. Pursuant to the NLCA, an exploration water licence and a bulk sample water licence were granted by the Nunavut Water Board (the "NWB"). An application was made to the NIRB and the NWB for the construction of an access road to the Meliadine camp to be able to carry out the exploration program year-round. A Project Certificate from the NIRB is the next approval required by the Meliadine project. Other operating permits and licences can only be issued after such Project Certificate is received. An Inuit Impact Benefit Agreement and an Inuit Water Compensation Agreement will also need to be negotiated with the KIA. 2010 ANNUAL REPORT 61 Table of Contents Geology, Mineralization and Exploration Geology and Mineralization Archean volcanic and sedimentary rocks of the Meliadine greenstone belt underlie the property, which is mainly covered by glacial overburden with deep-seated permafrost and is part of the Western Churchill supergroup in northern Canada. The rock layers have been folded, sheared and metamorphosed, and have been truncated by the Pyke Fault, a regional structure that extends the entire 80-kilometre length of the large property. The Pyke Fault appears to control gold mineralization on the Meliadine property. At the southern edge of the fault is a series of oxide iron formations that host all six Meliadine deposits currently known. The deposits consist of multiple lodes of mesothermal quartz-vein stockworks, laminated veins and sulphidized iron formation mineralization with strike lengths of up to three kilometres. The Upper Oxide iron formation hosts the Tiriganiaq and Wolf North zones. The two Lower Lean iron formations contain the F Zone, Pump, Wolf Main and Wesmeg deposits, which are all within five kilometres of Tiriganiaq. The Discovery deposit is 17 kilometres east southeast of Tiriganiaq and is hosted by the Upper Oxide iron formation. Each of these deposits has mineralization within 120 metres of surface, making them potentially mineable by open pit methods. They also have deeper ore that could potentially be mined with underground methods. Exploration The Meliadine property has been explored for gold from 1987 through 2010 at a cost of C$166.8 million by former owners Asamera Inc., Rio Algom Limited, Comaplex, Cumberland and Western Mining International, as well as the Company and numerous reputable consultants. For many years the property was divided into two halves – Meliadine East and Meliadine West – which were consolidated into the Meliadine property in December 2009. A detailed history of exploration on the property is given in a technical report by the Company posted on SEDAR on March 8, 2011. Lack of outcropping bedrock in the area resulted in the use of high-density magnetic surveying followed by diamond drilling as the most common and successful exploration strategy on the property. This has included 193,318 metres of drilling in 682 holes from 1993 through 2010, as well as geophysical surveying, prospecting and sampling. In 2007 and 2008, there was an underground exploration and bulk sample program on the Tiriganiaq deposit. This was followed by a Preliminary Assessment for the property in 2009, which indicated the potential of the project to support a mining operation. In 2010, there were 128 exploration drill holes (32,000 metres) at Meliadine, of which 53% were drilled by the Company after acquiring the property in July 2010. Agnico-Eagle spent $10 million on exploration from July through December 2010. The Company initiated a $62 million exploration diamond drilling program in February 2011. Approximately 200,000 metres of drilling is planned through early 2013, mainly to convert mineral resources to reserves at Tiriganiaq. Another $68 million has been budgeted through early 2013 to complete an underground bulk sample, feasibility study, permitting and the construction of an all-weather road linking the project to Rankin Inlet. Regional Exploration Activities During 2010, the Company continued to actively explore in Quebec, Ontario, Nunavut, Nevada, Finland, Mexico and Argentina. The Canadian exploration activities were focused on the Ellison/Bousquet and Maritime/Lapa mining camps in Quebec, as well as on the Meadowbank property in Nunavut where activities were conducted both within and outside the mining lease and the newly acquired Meliadine project, also in Nunavut. In the United States, exploration activities during 2010 were concentrated on the West Pequop project located in northeast Nevada. At the LaRonde, Goldex, Lapa, Pinos Altos and Kittila Mines, the Company continued aggressive exploration programs around the current mines. Most of the exploration budget was spent on drilling programs near the mine infrastructure, along previously recognized gold trends. At the end of 2010, the Company's land holdings in Canada consisted of 78 projects comprised of 2,911 mineral titles covering an aggregate of 222,825 hectares. Land holdings in the United States consisted of 11 properties comprised of 3,058 mineral titles covering an aggregate of 26,176 hectares. Land holdings in Finland consisted of three groups of properties comprised of 136 mineral titles covering an aggregate of 11,949 hectares. Land holdings in Mexico consisted of three projects comprised of 43 mining concession titles covering an aggregate of 58,340 hectares. Land holdings in Argentina consisted of one project with two mineral titles covering an aggregate of 2,691 hectares. 62 AGNICO-EAGLE MINES LIMITED Table of Contents The total amount spent on regional exploration in 2010 was $48.2 million, which included drilling 500 holes for an aggregate of approximately 125 kilometres. The budget for regional exploration expenditures in 2011 is approximately $101 million, including approximately 214 kilometres of drilling. Mineral Reserves and Mineral Resources Cautionary Note to Investors Concerning Estimates of Measured and Indicated Mineral Resources This section uses the terms "measured mineral resources" and "indicated mineral resources". Investors are advised that while these terms are recognized and required by Canadian regulations, the SEC does not recognize them. Investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into mineral reserves. Cautionary Note to Investors Concerning Estimates of Inferred Mineral Resources This section uses the term "inferred mineral resources". Investors are advised that while this term is recognized and required by Canadian regulations, the SEC does not recognize it. "Inferred mineral resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that any part or all of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that any part or all of an inferred mineral resource exists, or is economically or legally mineable. The preparation of the information set forth below with respect to the mineral reserves at the LaRonde Mine (which includes mineral reserves at the LaRonde Mine extension), the Goldex, Lapa, Kittila, Pinos Altos, Meadowbank Mines and the Meliadine project has been supervised by the Company's Vice-President, Project Development, Marc Legault, P.Eng, a "qualified person" as that term is defined in NI 43-101. The Company's mineral reserves estimate was derived from internally generated data or audited reports. The criteria set forth in NI 43-101 for reserve definitions and guidelines for classification of mineral reserve are similar to those used by Guide 7. However, the definitions in NI 43-101 differ in certain respects from those under Guide 7. Under Guide 7, among other things, a mineral reserve estimate must have a "final" or "bankable" feasibility study. Guide 7 also requires the use of commodity prices that reflect current economic conditions at the time of reserve determination which Staff of the SEC has interpreted to mean historic three-year average prices. In addition to the differences noted above, Guide 7 does not recognize mineral resources. The assumptions used for the 2010 mineral reserves and resources estimate reported by the Company in this Form 20-F were based on three-year average prices for the period ending December 31, 2010 of $1,024 per ounce gold, $16.62 per ounce silver, $0.86 per pound zinc, $2.97 per pound copper, $0.90 per pound lead and exchange rates of C$1.08 per $1.00, 12.43 Mexican pesos per $1.00 and $1.40 per €1.00. The assumptions used for the 2009 mineral reserves and resources estimate used by the Company in this Form 20-F were based on three-year average prices for the period ending December 31, 2009 of $848 per ounce gold, $14.35 per ounce silver, $1.03 per pound zinc, $3.15 per pound copper, $0.97 per pound lead and exchange rates of C$1.09 per $1.00, 11.00 Mexican pesos per $1.00 and $1.37 per €1.00. The assumptions used for the 2008 mineral reserves and resources estimate reported by the Company in this Form 20-F were based on three-year average prices for the period ending December 31, 2008 of $725 per ounce gold, $13.32 per ounce silver, $1.27 per pound zinc, $3.15 per pound copper and exchange rates of C$1.09 per $1.00, 11.00 Mexican pesos per $1.00 and $1.37 per €1.00. Other assumptions used for estimating 2009 and 2008 mineral reserve and resource information may be found in the Company's annual filings in respect of the years ended December 31, 2009 and 2010 ANNUAL REPORT 63 Table of Contents December 31, 2008, respectively. Set out below are the reserve estimates as calculated in accordance with NI 43-101 and Guide 7, respectively (tonnages and contained gold quantities are rounded to the nearest thousand): National Instrument 43-101 Industry Guide No. 7 Property Tonnes Gold Grade (g/t) Contained Gold (oz) Tonnes Gold Grade (g/t) Contained Gold (oz) Proven Reserves LaRonde (underground) 4,838,000 2.36 366,000 4,838,000 2.36 366,000 Goldex (underground) 14,804,000 1.87 890,000 14,804,000 1.87 890,000 Kittila (open pit) 395,000 4.19 53,000 395,000 4.19 53,000 Kittila (underground) 8,000 6.00 2,000 8,000 6.00 2,000 Kittila total proven 403,000 4.23 55,000 403,000 4.23 55,000 Lapa (underground) 1,122,000 7.24 261,000 1,122,000 7.24 261,000 Pinos Altos (open pit) 1,078,000 0.89 31,000 1,078,000 0.89 31,000 Pinos Altos (underground) 1,786,000 2.52 144,000 1,786,000 2.52 144,000 Pinos Altos total proven 2,864,000 1.90 175,000 2,864,000 1.90 175,000 Meadowbank (open pit) 839,000 3.13 85,000 839,000 3.13 85,000 Total Proven Reserves 24,870,000 2.29 1,832,000 24,870,000 2.29 1,832,000 Probable Reserves LaRonde (underground) 29,892,000 4.63 4,452,000 29,892,000 4.63 4,452,000 Goldex (underground) 12,990,000 1.62 676,000 12,990,000 1.62 676,000 Kittila (open pit) 1,657,000 5.28 281,000 1,657,000 5.28 281,000 Kittila (underground) 30,672,000 4.61 4,544,000 30,672,000 4.61 4,544,000 Kittila total probable 32,329,000 4.64 4,825,000 32,329,000 4.64 4,825,000 Lapa (underground) 1,709,000 7.56 416,000 1,709,000 7.56 416,000 Meliadine (open pit) 4,287,000 6.91 953,000 4,287,000 6.91 953,000 Meliadine (underground) 5,180,000 9.89 1,647,000 5,180,000 9.89 1,647,000 Meliadine total probable 9,467,000 8.54 2,600,000 9,467,000 8.54 2,600,000 Pinos Altos (open pit) 16,987,000 1.98 1,083,000 16,987,000 1.98 1,083,000 Pinos Altos (underground) 24,311,000 2.58 2,013,000 24,311,000 2.58 2,013,000 Pinos Altos total probable 41,298,000 2.33 3,096,000 41,298,000 2.33 3,096,000 Meadowbank (open pit) 33,259,000 3.18 3,402,000 33,259,000 3.18 3,402,000 Total Probable Reserves 160,944,000 3.76 19,467,000 160,944,000 3.76 19,467,000 Total Proven and Probable Reserves 185,814,000 3.57 21,299,000 185,814,000 3.57 21,299,000 In the following tables setting out mineral reserve information about the Company's mineral projects, tonnage information is rounded to the nearest thousand tonnes, the total contained gold ounces stated do not include equivalent gold ounces for byproduct metals contained in the mineral reserve and the reported metal grades in the estimates represent in-place grades and do not reflect losses in the recovery process, that is, the metallurgical losses associated with processing the extracted ore. The mineral reserve and mineral resource figures presented in this Form 20-F are estimates, and no assurance can be given that the anticipated tonnages and grades will be achieved or that the indicated level of recovery will be realized. 64 AGNICO-EAGLE MINES LIMITED Table of Contents LaRonde Mineral Reserves and Mineral Resources As at December 31, 2010 2009 2008 Gold Proven mineral reserves – tonnes 3,200,000 2,700,000 2,300,000 Average grade – gold grams per tonne 3.07 3.37 3.95 Probable mineral reserves – tonnes 27,900,000 26,500,000 26,500,000 Average grade – gold grams per tonne 4.90 5.16 5.23 Zinc Proven mineral reserves – tonnes 1,600,000 2,100,000 1,800,000 Average grade – gold grams per tonne 0.95 1.03 1.19 Probable – tonnes 2,000,000 3,100,000 5,200,000 Average grade – gold grams per tonne 1.01 0.99 0.94 Total proven and probable mineral reserves – tonnes 34,700,000 34,400,000 35,800,000 Average grade – gold grams per tonne 4.32 4.39 4.32 Total contained gold ounces 4,818,000 4,849,000 4,974,000 Notes: (1)The 2010 proven and probable mineral reserves set forth in the table above are based on a net smelter return cut-off value of the ore that varies between C$71.00 per tonne and C$80.00 per tonne depending on the deposit. The Company's historical metallurgical recovery rates at the LaRonde Mine from January 1, 2004 to December 31, 2010 averaged 90.0% for gold, 88.2% for silver, 81.1% for zinc, 88.6% for copper and 21.8% for lead. The Company estimates that a 10% change in the gold price would result in an approximate 0.5% change in mineral reserves. (2)In addition to the mineral reserves set out above, at December 31, 2010, the LaRonde Mine contained indicated mineral resources of 6.9 million tonnes grading 1.89 grams of gold per tonne and inferred mineral resources of 11.5 million tonnes grading 3.72 grams of gold per tonne. (3)The following table shows the reconciliation of mineral reserves (in nearest thousand tonnes) at the LaRonde Mine by category at December 31, 2010 with those at December 31, 2009. Revision means additional mineral reserves converted from mineral resources or other categories of mineral reserves and mineral reserves added from exploration activities during 2010. Proven Probable Total December 31, 2009 4,755 29,625 34,380 Mined in 2010 2,592 0 2,592 Revision 2,675 267 2,942 December 31, 2010 4,838 29,892 34,729 (4)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the LaRonde Mine may be found in the Technical Report on the 2005 LaRonde Mineral Resource & Mineral Reserve Estimate filed with Canadian securities regulatory authorities on SEDAR on March 23, 2005. 2010 ANNUAL REPORT 65 Table of Contents Goldex Mineral Reserves and Mineral Resources As at December 31, 2010 2009 2008 Gold Proven mineral reserves – tonnes 14,804,000 5,217,000 434,000 Average grade – gold grams per tonne 1.87 2.02 1.95 Probable mineral reserves – tonnes 12,990,000 19,524,000 23,391,000 Average grade – gold grams per tonne 1.62 2.06 2.05 Total proven and probable mineral reserves – tonnes 27,794,000 24,741,000 23,825,000 Average grade – gold grams per tonne 1.75 2.05 2.05 Total contained gold ounces 1,566,000 1,630,000 1,571,000 Notes: (1)The 2010 proven and probable mineral reserves were estimated using an assumed metallurgical gold recovery of 92.2%. Mining costs were estimated to be C$20.21 per tonne. The cut-off grade used for mineral reserves was between 0.7 grams of gold per tonne and 0.9 grams of gold per tonne, depending on the zone. The Company estimates that a 10% change in the gold price would result in no change in mineral reserves. (2)In addition to the mineral reserves set out above, at December 31, 2010, the Goldex Mine contained indicated mineral resources of 8.3 million tonnes grading 1.77 grams of gold per tonne and inferred mineral resources of 25.8 million tonnes grading 1.67 grams of gold per tonne. (3)The following table shows the reconciliation of mineral reserves (in nearest thousand tonnes) at the Goldex Mine by category at December 31, 2010 with those at December 31, 2009. Revision means additional mineral reserves converted from mineral resources or other categories of mineral reserves and mineral reserves added from exploration activities during 2010. Proven Probable Total December 31, 2009 5,217 19,524 24,741 Mined in 2010 824 1,958 2,782 Revision 10,411 (4,576 ) 5,835 December 31, 2010 14,804 12,990 27,794 (4)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Goldex Mine may be found in the Technical Report on the Estimation of Mineral Resource and Reserves for the Goldex Extension Zone filed with the Canadian securities regulatory authorities on SEDAR on October 27, 2005. 66 AGNICO-EAGLE MINES LIMITED Table of Contents Kittila Mineral Reserves and Mineral Resources As at December 31, 2010 2009 2008 Gold Proven mineral reserves – tonnes 403,000 257,000 199,000 Average grade – gold grams per tonne 4.23 3.71 4.84 Probable mineral reserves – tonnes 32,329,000 25,704,000 21,171,000 Average grade – gold grams per tonne 4.64 4.83 4.69 Total proven and probable mineral reserves – tonnes 32,732,000 25,961,000 21,370,000 Average grade – gold grams per tonne 4.64 4.82 4.69 Total contained gold ounces 4,880,000 4,025,000 3,225,000 Notes: (1)The 2010 proven and probable mineral reserve and mineral resource estimates were calculated using a metallurgical gold recovery of 89.3%. Gold cut-off grades used were 1.85 grams per tonne, undiluted (1.65 grams per tonne, diluted) for open pit reserves and between 2.97 grams per tonne and 3.24 grams per tonne, undiluted (between 2.52 grams per tonne and 2.79 grams per tonne, diluted), depending on the deposit, for underground reserves. The open pit operating cost is estimated to be €33.99 per tonne, while the underground operating cost is estimated to vary between €52.06 per tonne and €57.65 per tonne, depending on the deposit. The Company estimates that a 10% change in the gold price would result in an approximate 5% change in mineral reserves. (2)In addition to the mineral reserves set out above, at December 31, 2010, the Kittila Mine contained indicated mineral resources of 15.3 million tonnes grading 2.41 grams of gold per tonne and inferred mineral resources of 8.3 million tonnes grading 2.50 grams of gold per tonne. (3)The breakdown of proven and probable mineral reserves between planned open pit operations and underground operations at the Kittila Mine (with tonnage and contained ounces rounded to the nearest thousand) is: Category Mining Method Tonnes Gold Grade (g/t) Contained Gold (oz) Proven mineral reserve Open pit 395,000 4.19 53,000 Proven mineral reserve Underground 8,000 6.00 2,000 Total proven mineral reserve 403,000 4.23 55,000 Probable mineral reserve Open pit 1,657,000 5.28 281,000 Probable mineral reserve Underground 30,672,000 4.61 4,544,000 Total probable mineral reserve 32,329,000 4.64 4,826,000 (4)The following table shows the reconciliation of mineral reserves (in nearest thousand tonnes) at the Kittila Mine by category at December 31, 2010 with those at December 31, 2009. Revision means additional mineral reserves converted from mineral resources or other categories of mineral reserves and mineral reserves added from exploration activities during 2010. Proven Probable Total December 31, 2009 257 25,704 25,961 Mined in 2010 960 0 960 Revision 1,106 6,625 7,731 December 31, 2010 403 32,329 32,732 (5)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Kittila Mine may be found in the Technical Report on the December 31, 2009, Mineral Resource and Mineral Reserve Estimate and the Suuri Extension Project, Kittila Mine, Finland, filed with the Canadian securities regulatory authorities on SEDAR on March 4, 2010. 2010 ANNUAL REPORT 67 Table of Contents Lapa Mineral Reserves and Mineral Resources As at December 31, 2010 2009 2008 Gold Proven mineral reserves – tonnes 1,122,000 897,000 23,000 Average grade – gold grams per tonne 7.24 8.33 7.53 Probable mineral reserves – tonnes 1,709,000 2,319,000 3,730,000 Average grade – gold grams per tonne 7.56 8.09 8.80 Total proven and probable mineral reserves – tonnes 2,831,000 3,216,000 3,753,000 Average grade – gold grams per tonne 7.43 8.16 8.79 Total contained gold ounces 677,000 843,000 1,061,000 Notes: (1)The 2010 mineral reserve and mineral resource estimates were calculated using an assumed metallurgical gold recovery of 80% and a cut-off grade of 4.1 grams of gold per tonne. The operating cost per tonne estimate for the Lapa Mine was C$115.86. The Company estimates that a 10% change in the gold price would result in an approximate 7% change in mineral reserves. (2)In addition to the mineral reserves set out above, at December 31, 2010, the Lapa Mine contained indicated mineral resources of 1.8 million tonnes grading 4.10 grams of gold per tonne and inferred mineral resources of 0.5 million tonnes grading 8.27 grams of gold per tonne. (3)The following table shows the reconciliation of mineral reserves (in nearest thousand tonnes) at the Lapa Mine by category at December 31, 2010 with those at December 31, 2009. Revision means additional mineral reserves converted from mineral resources or other categories of mineral reserves and mineral reserves added from exploration activities during 2010. Proven Probable Total December 31, 2009 897 2,319 3,216 Mined in 2010 519 0 519 Revision 744 (610 ) 134 December 31, 2010 1,122 1,709 2,831 (4)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Lapa Mine may be found in the Technical Report on the Lapa Gold Project, Cadillac Township, Quebec, Canada filed with Canadian securities regulatory authorities on SEDAR on June 8, 2006. 68 AGNICO-EAGLE MINES LIMITED Table of Contents Pinos Altos Mineral Reserves and Mineral Resources As at December 31, 2010 2009 2008 Gold and Silver Proven mineral reserves – tonnes 2,864,000 880,000 97,000 Average gold grade – grams per tonne 1.90 1.51 1.35 Average silver grade – grams per tonne 54.06 26.53 19.08 Probable mineral reserves – tonnes 41,298,000 41,080,000 41,669,000 Average gold grade – grams per tonne 2.33 2.54 2.68 Average silver grade – grams per tonne 65.53 70.31 74.61 Total proven and probable mineral reserves – tonnes 44,162,000 41,960,000 41,766,000 Average gold grade – grams per tonne 2.30 2.52 2.68 Average silver grade – grams per tonne 64.78 69.39 74.48 Total contained gold ounces 3,271,000 3,396,000 3,593,000 Total contained silver ounces 91,982,000 93,613,000 100,010,000 Notes: (1)The 2010 proven and probable mineral reserve estimate is based on a net smelter return cut-off value of the open pit ore between $5.81 per tonne and $22.08 per tonne, depending on the deposit, and a net smelter return cut-off value of the underground ore of $43.30 per tonne. The metallurgical gold recovery used in the reserve estimate varied between 59% and 96.5%, depending on the deposit. The metallurgical silver recovery used in the reserve estimate varied between 11% and 52.0%, depending on the deposit. The Company estimates that a 10% change in the gold price would result in an approximate 2% change in mineral reserves. (2)In addition to the mineral reserves set out above, at December 31, 2010, the Pinos Altos Mine contained indicated mineral resources of 25.6 million tonnes grading 1.02 grams of gold per tonne and 21.34 grams of silver per tonne and inferred mineral resources of 25.7 million tonnes grading 1.09 grams of gold per tonne and 23.46 grams of silver per tonne. (3)The proven and probable mineral reserves of the Pinos Altos Mine set forth in the table above include stockpiled proven mineral reserves from the Creston Mascota deposit of 0.4 million tonnes grading 1.01 grams of gold per tonne and 3.23 grams of silver per tonne and probable mineral reserves from the Creston Mascota deposit of 7.2 million tonnes grading 1.52 grams of gold per tonne and 15.82 grams of silver per tonne. The indicated mineral resource at the Pinos Altos Mine also includes indicated mineral resources from the Creston Mascota deposit of 5.3 million tonnes grading 0.72 grams of gold per tonne and 6.78 grams of silver per tonne. The inferred mineral resource at the Pinos Altos Mine also includes inferred mineral resources from the Creston Mascota deposit of 2.5 million tonnes grading 0.88 grams of gold per tonne and 8.16 grams of silver per tonne. (4)The breakdown of mineral reserves between planned open pit operations and underground operations at the Pinos Altos Mine (with tonnage and contained ounces rounded to the nearest thousand) is: Category Mining Method Tonnes Gold Grade (g/t) Silver Grade (g/t) Contained Gold (oz) Contained Silver (oz) Proven mineral reserve Open pit stock pile 1,078,000 0.89 13.26 31,000 460,000 Proven mineral reserve Underground 1,786,000 2.52 78.68 144,000 4,518,000 Total proven mineral reserve 2,864,000 1.90 54.06 175,000 4,977,400 Probable mineral reserve Open pit 16,987,000 1.98 45.34 1,083,000 24,761,000 Probable mineral reserve Underground 24,311,000 2.58 79.64 2,013,000 62,243,000 Total probable mineral reserve 41,298,000 2.33 65.53 3,096,000 87,004,000 2010 ANNUAL REPORT 69 Table of Contents (5)The following table shows the reconciliation of mineral reserves (in nearest thousand tonnes) at the Pinos Altos Mine by category at December 31, 2010 with those at December 31, 2009. Revision means additional mineral reserves converted from mineral resources or other categories of mineral reserves and mineral reserves added from exploration activities during 2010. Proven Probable Total December 31, 2009 880 41,080 41,960 Mined in 2010 2,437 0 2,437 Revision 4,421 218 4,639 December 31, 2010 2,864 41,298 44,162 (6)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Pinos Altos Mine may be found in the Pinos Altos Gold-Silver Mining Project, Chihuahua State, Mexico, Technical Report on the Mineral Resources and Reserves as of December 31, 2008 filed with the Canadian securities regulatory authorities on SEDAR on March 25, 2009. Meadowbank Mineral Reserves and Mineral Resources As at December 31, 2010 2009 2008 Gold Proven mineral reserves – tonnes 839,000 600,000 – Average grade – gold grams per tonne 3.13 4.57 – Probable mineral reserves – tonnes 33,259,000 31,600,000 32,773,000 Average grade – gold grams per tonne 3.18 3.51 3.45 Total proven and probable mineral reserves – tonnes 34,098,000 32,200,000 32,773,000 Average grade – gold grams per tonne 3.18 3.53 3.45 Total contained gold ounces 3,486,000 3,655,000 3,638,000 Notes: (1)The 2010 mineral reserve and mineral resource estimates were calculated using a metallurgical gold recovery of 93.1%. The cut-off grade used to determine the open pit reserves varied from 1.27 grams of gold per tonne to 1.30 grams of gold per tonne, depending on the deposit. The estimated operating cost used for the 2010 mineral reserve estimate varied between C$41.99 per tonne and C$42.90 per tonne, depending on the deposit. The Company estimates that a 10% change in the gold price would result in an approximate 2% change in mineral reserves. (2)In addition to the mineral reserves set out above, at December 31, 2010, the Meadowbank Mine contained indicated mineral resources of 25.8 million tonnes grading 1.67 grams of gold per tonne and inferred mineral resources of 10.2 million tonnes of ore grading 2.15 grams of gold per tonne. (3)The following table shows the reconciliation of mineral reserves (in nearest thousand tonnes) at the Meadowbank Mine by category at December 31, 2010 with those at December 31, 2009. Revision means additional mineral reserves converted from mineral resources or other categories of mineral reserves and mineral reserves added from exploration activities during 2010. Proven Probable Total December 31, 2009 600 31,600 32,200 Mined in 2010 2,570 0 2,570 Revision 2,809 1,659 4,468 December 31, 2010 839 33,259 34,098 (4)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Meadowbank Mine may be found in the Technical Report on the Mineral Resources and Mineral Reserves dated September 30, 2008, Meadowbank Gold Project, Nunavut, Canada filed with Canadian securities regulatory authorities on SEDAR on December 15, 2008. 70 AGNICO-EAGLE MINES LIMITED Table of Contents Meliadine Mineral Reserves and Mineral Resources As at December 31, 2010 2009 2008 Gold Proven mineral reserves – tonnes 0 – – Average grade – gold grams per tonne – – – Probable mineral reserves – tonnes 9,467,000 – – Average grade – gold grams per tonne 8.54 – – Total proven and probable mineral reserves – tonnes 9,467,000 – – Average grade – gold grams per tonne 8.54 – – Total contained gold ounces 2,600,000 – – Notes: (1)The 2010 mineral reserve and mineral resource estimates were calculated using a metallurgical gold recovery of 95.6%. The cut-off grade used to determine the open pit reserves was 2.33 grams of gold per tonne, undiluted (2.03 grams of gold per tonne, diluted), and the cut-off grade used to determine the underground reserves was 6.3 grams of gold per tonne, undiluted (4.88 grams of gold per tonne, diluted). The estimated operating cost used for the 2010 mineral reserve estimate was C$103.14 per tonne for open pit and C$165.65 per tonne for underground. The Company estimates that a 10% change in the gold price would result in an approximate 2% change in mineral reserves. (2)In addition to the mineral reserves set out above, at December 31, 2010, the Meliadine project contained indicated mineral resources of 8.8 million tonnes grading 5.21 grams of gold per tonne and inferred mineral resources of 11.8 million tonnes of ore grading 6.94 grams of gold per tonne. (3)The breakdown of mineral reserves between planned open pit operations and underground operations at the Meliadine project (with tonnage and contained ounces rounded to the nearest thousand) is: Category Mining Method Tonnes Gold Grade (g/t) Contained Gold (oz) Probable mineral reserve Open pit 4,287,000 6.91 953,000 Probable mineral reserve Underground 5,180,000 9.89 1,647,000 Total probable mineral reserve 9,467,000 8.54 2,600,000 (4)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Meliadine project may be found in the Technical Report on the December 31, 2010 Mineral Resource and Mineral Reserve Estimate, Meliadine Gold Project, Nunavut, Canada, dated February 16, 2011, filed with the Canadian securities regulatory authorities on SEDAR on March 8, 2011. Risk Mitigation The Company mitigates the likelihood and potential severity of the various risks it encounters in its day-to-day operations through the application of high standards in the planning, construction and operation of mining facilities. In addition, emphasis is placed on hiring and retaining competent personnel and developing their skills through training in safety and loss control. The Company's operating and technical personnel have a solid track record of developing and operating precious metal mines and several of the Company's mines have been recognized for excellence in this regard with various safety and development awards. Nevertheless, the Company and its employees continue with a focused effort to improve workplace safety and the Company has placed additional emphasis on safety procedure training for both mining and supervisory employees. The Company also mitigates some of the Company's normal business risk through the purchase of insurance coverage. An Insurable Risk Management Policy, approved by the Board, governs the purchase of insurance coverage and only permits the purchase of coverage from insurance companies of the highest credit quality. For a more complete list of the risk factors affecting the Company, please see "Item 3 Key Information – Risk Factors". 2010 ANNUAL REPORT 71 Table of Contents Glossary of Selected Mining Terms "alteration" Any physical or chemical change in a rock or mineral subsequent to formation. Milder and more localized than metamorphism. "anastomosing" A network of branching and rejoining fault or vein surfaces or surface traces. "andesite" A dark-coloured igneous, calc-alkaline volcanic rock, of intermediate composition (containing between 52-63% silica). "assay" An analysis to determine the presence, absence or concentration of one or more chemical components. "bedrock" The solid rock underlying surface deposits. "breccia" Said of rock formations consisting mostly of angular fragments hosted by a fine-grained matrix. "brittle" Of minerals, proneness to fracture under low stress. A quality affecting behaviour during comminution of ore, whereby one species fractures more readily than others in the material being crushed. "bulk mining" A mining method in which large quantities of low-grade ore are mined without an attempt to segregate the high-grade portions. "byproduct metal" A secondary or additional metal recovered from the processing of rock. "carbon-in-leach process" A process step in which granular activated carbon particles much larger than the ground ore particles are introduced into the ore pulp. Cyanide leaching and precious metal adsorption onto the activated carbon occur simultaneously. The loaded activated carbon is mechanically screened to separate it from the barren ore pulp and processed to remove the precious metals and prepare it for reuse. "carbon-in-pulp (CIP) circuit" A process by which soluble gold within a finely ground slurry is recovered by adsorption onto coarser activated carbon. A CIP circuit comprises a series of tanks through which leached slurry flows. Gold is captured onto captive activated carbon that will periodically be moved counter-currently from tank to tank. Head tank carbon is extracted periodically to further recover adsorbed gold before being returned to the circuit tails tank. "clast" A fragment of mineral, rock or organic structure that has been moved individually from its place of origin. "concentrate" The clean product recovered in froth flotation. "conglomerate" A sedimentary rock consisting of rounded, water-worn pebbles or boulders cemented into a solid mass. "counter-current decantation" Clarifying wash water and concentrating tailings by use of several thickeners in series. The water flows in the opposite direction from the solids. The final products are slurry that is removed as fluid mud and clear water that is reused in the circuit. "crosscut" A horizontal opening driven from a shaft at or near right angles to the strike of a vein or other orebody. "cut-off grade" (A) In respect of mineral resources, the lowest grade below which the mineralized rock currently cannot reasonably be expected to be economically extracted. (B) In respect of mineral reserves, the lowest grade below which the mineralized rock currently cannot be economically extracted as demonstrated by either a preliminary feasibility study or a feasibility study. Cut-off grades vary between deposits depending upon the amenability of ore to gold extraction and upon costs of production and metal prices. 72 AGNICO-EAGLE MINES LIMITED Table of Contents "deposit" A mineralized body that has been physically delineated by sufficient drilling, trenching and/or underground work and found to be of sufficient average grade of metal or metals to warrant further exploration and/or development expenditures; such a deposit does not qualify as a commercially mineable orebody or as containing mineral reserves, until final legal, technical and economic factors have been resolved. "development" The preparation of a mining property or area so that an orebody can be analyzed and its tonnage and quality estimated. Development is an intermediate stage between exploration and mining. "diamond drill hole" A borehole drilled using a bit inset with diamonds as the rock-cutting tool. The bit cuts a circular channel around a core of rock that can be recovered to provide a more-or-less continuous and complete columnar sample of the rock penetrated. "dilution" The effect of waste rock or low-grade ore being included in mined ore, increasing tonnage mined and lowering the overall ore grade. "dip" The angle at which a surface is inclined from the horizontal. "discordant" Said of a contact between an igneous intrusion and the country rock that is not parallel to the foliation or the bedding planes of the latter. "disseminated" Said of a mineral deposit (especially of metals) in which the desired minerals occur as scattered particles in the rock, but in sufficient quantity to make the deposit an ore. Some disseminated deposits are very large. "drift" A horizontal underground opening that follows along the length of a vein or rock formation, as opposed to a crosscut that crosses the rock formation. "ductile" Of rock, able to sustain, under a given set of conditions, 5% to 10% deformation before fracturing or faulting. "dyke" An earthen embankment, as around a drill sump or tank, or to impound a body of water or mill tailings. Also, a tabular body of igneous rock that cuts across the structure of adjacent rocks. "electrowinning" An electrochemical process in which a metal dissolved within an electrolyte is plated onto an electrode. Used to recover metals such as copper and gold from solution in the leaching of concentrates, etc. "envelope" 1. The outer or covering part of a fold, especially of a folded structure that includes some sort of structural break. 2. A metamorphic rock surrounding an igneous intrusion. 3. In a mineral, an outer part different in origin from an inner part. "epigenetic" An orebody formed by hydrothermal fluids and gases that were introduced into the host rocks from elsewhere, filling cavities in the host rock. "epithermal" A hydrothermal mineral deposit formed within one kilometre of the Earth's surface and in the temperature range of 50 to 200 degrees Celsius, occurring mainly as veins. Also, said of that depositional environment. "extensional-shear vein" A vein put in place in an extension fracture caused by the deformation of a rock. "fault" A fracture or a fracture zone in crustal rocks along which there has been displacement of the two sides relative to one another parallel to the fracture. The displacement may be a few inches or many kilometres long. 2010 ANNUAL REPORT 73 Table of Contents "feasibility study" A comprehensive study of a mineral deposit in which all geological, engineering, legal, operating, economic, social, environmental and other relevant factors are considered in sufficient detail that it could reasonably serve as the basis for a final decision by a financial institution about whether to finance the development of the deposit for mineral production. A "preliminary feasibility study" or "pre-feasibility study" is a comprehensive study of the viability of a mineral project that has advanced to a stage where the mining method (in the case of underground mining) or the pit configuration (in the case of an open pit) has been established, and an effective method of mineral processing has been determined. It includes a financial analysis based on reasonable assumptions of technical, engineering, legal, operating, economic, social and environmental factors and the evaluation of other relevant factors that are sufficient for a qualified person, acting reasonably, to determine if all or part of the mineral resource may be classified as a mineral reserve. "flotation" A process for concentrating minerals based on the selective adhesion of certain minerals to air bubbles in a mixture of water and ground ore. When the right chemicals are added to a frothy water bath of ore that has been ground to the consistency of talcum powder, the minerals will float to the surface. The metal-rich flotation concentrate is then skimmed off the surface. "foliation" A general term for a planar arrangement of textural or structural features in any type of rock, especially the planar structure that results from flattening of the constituent grains of a metamorphic rock. "fracture" A general term for any break in a rock, whether or not it causes displacement, due to mechanical failure by stress. Fractures include cracks, joints and faults. "free gold" Gold not combined with other substances. "glacial till" Dominantly unsorted and unstratified drift, generally unconsolidated, deposited directly by and underneath a glacier without subsequent reworking by meltwater, and consisting of a heterogeneous mixture of clay, silt, sand, gravel and boulders ranging widely in size and shape. Also referred to as "till" and ice-laid drift. "grade" The relative quality of the percentage of metal content in a mineralized body, i.e., grams of gold per tonne of rock. "head grade" The average grade of ore fed into a mill. "hectare" A metric measurement of area. 1 hectare = 10,000 square meters = 2.47 acres. "horst" An up-faulted block of rock. "hydrothermal alteration" Alteration of rocks or minerals by reaction with hydrothermal fluids. "indicated mineral resource" The part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters and to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be reasonably assumed. Mineral resources that are not mineral reserves do not have demonstrated economic viability. While this term is recognized and required by Canadian regulations, the SEC does not recognize it. Investors are cautioned not to assume that any part or all of the mineral deposits in this category will ever be converted into mineral reserves. 74 AGNICO-EAGLE MINES LIMITED Table of Contents "inferred mineral resource" The part of a mineral resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. While this term is recognized and required by Canadian regulations, the SEC does not recognize it. Investors are cautioned not to assume that any part or all of the mineral deposits in this category will ever be converted into mineral reserves. Investors are cautioned not to assume that part of or all of an inferred mineral resource exists, or is economically or legally mineable. "infill drilling" Drilling within a defined mineralized area to improve the definition of known mineralization. "intrusive" A body of igneous rock formed by the consolidation of magma intruded below surface into other rocks, in contrast to lavas, which are extruded upon the Earth's surface. "iron formation" A chemical sedimentary rock, typically thin-bedded or finely laminated, containing at least 15% iron of sedimentary origin and commonly containing layers of chert. "kilometre" A metric measurement of distance. 1.0 kilometre = 0.62 miles. "lens" Generally used to describe a body of ore that is thick in the middle and tapers towards the ends, resembling a convex lens. "lithologic groups" Geological groups. "lode" A mineral deposit consisting of a zone of veins, veinlets or disseminations. "longitudinal retreat" An underground mining method where the ore is excavated in horizontal slices along the orebody and the stoping starts below and advances upwards. The ore is recovered underneath in the stope. "massive" Said of a mineral deposit, especially of sulphides, characterized by a great concentration of ore in one place, as opposed to a disseminated or vein-like deposit. Said of any rock that has a homogeneous texture or fabric over a large area, with an absence of layering or any similar directional structure. "matrix" The non-valuable minerals in an ore, i.e., gangue. "measured mineral resource" The part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics are so well established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic parameters and to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm both geological and grade continuity. While this term is recognized and required by Canadian regulations, the SEC does not recognize it. Investors are cautioned not to assume that any part or all of the mineral deposits in this category will ever be converted into mineral reserves. "Merrill-Crowe process" A separation technique for removing gold from a cyanide solution. The solution is separated from the ore by methods such as filtration and counter-current decantation, and then the gold is precipitated onto zinc dust. Silver and copper may also precipitate. The precipitate is filtered to capture the gold slimes, which are further refined, e.g., by smelting, to remove the zinc and by treating with nitric acid to dissolve the silver. 2010 ANNUAL REPORT 75 Table of Contents "mesothermal deposit" A mineral deposit formed at moderate temperature and pressure by deposition from hydrothermal fluids along a fissure or other opening in rock at an intermediate depth. "metallurgical properties" Properties characterizing metals and minerals behaviour under various processing techniques. "metamorphism" The process by which the form or structure of sedimentary or igneous rocks is changed by heat and pressure. "mill" A mineral treatment plant in which crushing, wet grinding and further treatment of ore is conducted. "mineral reserve" The economically mineable part of a mineral resource. The economics of the mineral reserve should be demonstrated by a feasibility study. This study must include adequate information on mining, processing, metallurgical, economic and other relevant factors that demonstrate, at the time of reporting, that economic extraction is justified. A mineral reserve includes diluting materials and allowances for losses that may occur when the material is mined. "mineral resource" A concentration or occurrence of natural solid inorganic material or natural solid fossilized organic material in or on the Earth's crust in such form and quantity and of such a grade or quality that it has reasonable prospects for economic extraction. The location, quantity, grade, geological characteristics and continuity of a mineral resource are known, estimated or interpreted from specific geological evidence and knowledge. "muck" Finely blasted rock (ore or waste) underground. "net smelter return royalty" A phrase used to describe a royalty payment made by a producer of metals based on gross metal production from the property, less deduction of certain limited costs including smelting, refining, transportation and insurance costs. "ounce" A measurement of mass. 1 troy ounce = 31.1035 grams. "outcrop" An exposure of bedrock at the surface. "oxidation" A chemical reaction caused by exposure to oxygen, which results in a change in the chemical composition of a mineral. "oxidative" Descriptive of an oxidation reaction. "phenocryst" A term for large crystals or mineral grains occurring in the matrix or groundmass of a porphyry. "plunge" The inclination of a fold axis or other linear structure from a horizontal plane, measured in the vertical plane. "polydeformed" A rock that has been subjected to more than one instance of folding, faulting, shearing, compression or extension as a result of various tectonic forces. "porphyritic" Rock texture in which one or more minerals has a larger grain size than the accompanying minerals. "porphyry" Any igneous rock in which relatively large crystals, called phenocrysts, are set in a fine-grained groundmass. "pressure oxidation process" A process by which sulphide minerals are oxidized in order to expose gold that is encapsulated in the mineral lattice. The main component of a pressure oxidation circuit consists of one or more pressurized vessels (autoclaves). Oxygen level, process temperature and acidity are the primary control parameters of such units. "probable mineral reserve" The economically mineable part of an indicated mineral resource demonstrated by a feasibility study. 76 AGNICO-EAGLE MINES LIMITED Table of Contents "proven mineral reserve" The economically mineable part of a measured mineral resource demonstrated by a feasibility study. "pyroclastic" Produced by explosive or aerial ejection of ash, fragments and glassy material from a volcanic vent. Term applicable to the rocks and rock layers as well as to the textures so formed. "recovery" A term used in process metallurgy to indicate the proportion of valuable material obtained in the processing of an ore. It is generally stated as a percentage of valuable metal in the ore that is recovered compared to the total valuable metal present in the ore before processing. "reverse circulation drilling" A type of drilling into rock using a solid bit to produce a hole and deliver rock chips (rather than core) to surface for analysis. Less expensive and faster than diamond drilling but not as accurate. "run-of-mine ore" The mined ore as it is delivered, prior to sorting, stockpiling or treatment. "schist" A strongly foliated crystalline rock that can be readily split into think flakes or slabs due to the well developed parallelism of more than 50% of the minerals present in it. "scrubber" A device for separating particulate material from a waste gas stream. "semi-autogenous grinding" or "SAG" A method of grinding rock whereby larger chunks of the rock itself and steel balls form the grinding media. "shear" or "shearing" The deformation of rocks by lateral movement along innumerable parallel planes, generally resulting from pressure and producing such metamorphic structures as cleavage and schistosity. "sill" An intrusive sheet of igneous rock of roughly uniform thickness that has been forced between the bedding planes of existing rock. "slurry" Fine rock particles in circulating water. "stope development" Driving subsidiary openings to prepare blocks of ore for extraction by stoping. "strike" The bearing of the outcrop of an inclined bed, vein or fault plane on a horizontal surface; the direction of a horizontal line perpendicular to the direction of the dip. "stringers" Mineral veinlets or filaments occurring in a discontinuous subparallel pattern in a host rock. "sublevel retreat" An underground mining method in which the ore is excavated in horizontal slices along the orebody, starting below and advancing upwards. The ore is recovered underneath in the stope. "tabular" Said of a feature having two dimensions that are much larger or longer than the third, such as a dyke. "tailings" Material rejected from the mill after most of the recoverable valuable minerals have been extracted. "tailings dam" A natural or man-made confined area suitable for depositing tailings. "tailings pond" A low-lying depression used to confine tailings, the prime function of which is to allow enough time for metals to settle out or for cyanide to be naturally destroyed before the water is discharged into the local watershed. "tenement" A synonym of mineral title. "thickness" The distance at right angles between the hanging wall and the footwall of a lode or lens. "tonne" A metric measurement of mass. 1 tonne = 1,000 kilograms = 2,204.6 pounds. 2010 ANNUAL REPORT 77 Table of Contents "transfer fault" A structure that can accommodate lateral variations of deformation and strain. "transverse open stoping" An underground mining method in which the ore is excavated in horizontal slices perpendicular to the orebody length and the stoping starts below and advances upwards. The ore is recovered underneath the stope through a drawpoint system. "twinned drill hole" A borehole drilled very close to an original hole in the same direction and dip in order to verify the results from the original drill hole. "vein" Minerals filling a fissure, fault or crack in rock. "wacke" A "dirty" sandstone that consists of a mixture of poorly sorted mineral and rock fragments in an abundant matrix of clay and fine silt. "winze" An internal mine shaft. "Zadra elution circuit" The process in this part of a gold mill strips gold and silver from carbon granules and puts them into solution. "zone" An area of distinct mineralization, i.e., a deposit. 78 AGNICO-EAGLE MINES LIMITED Table of Contents | 20-F |
| 2009 | Item 4. Information on the Company | History and Development of the Company The Company is an established Canadian-based international gold producer with mining operations in northwestern Quebec, northern Mexico, northern Finland and Nunavut and exploration activities in Canada, Europe, Latin America and the United States. The Company's operating history includes over three decades of continuous gold production primarily from underground operations. Since its formation on June 1, 1972, the Company has produced almost 5.5 million ounces of gold. For definitions of certain technical terms used in the following discussion, see "— Property, Plant and Equipment — Glossary of Selected Mining Terms". The Company's strategy is to focus on the continued exploration, development and expansion of its properties in politically stable jurisdictions. The Company has spent over $2 billion on the development of five new mines over the last three years. Through this development program, the Company transformed itself from a regionally focused, one mine producer to a multi-mine international gold producer with five operating, 100% owned mines (with one additional operating mine expected by the first quarter of 2010). Since 1988, the LaRonde Mine, in the Abitibi region of Quebec, has been the Company's flagship operation, producing approximately 4 million ounces of gold as well as valuable byproducts. The Goldex Mine is 60 kilometres east of the LaRonde Mine, and the Lapa Mine, the Company's highest grade mine, is 11 kilometres east of the LaRonde Mine. The synergies between these sites contribute to the Company's status as a low cost producer. The Kittila Mine, in Finland, achieved commercial production in May 2009, has a long reserve life and has significant production expansion potential. The Pinos Altos Mine, in Mexico, achieved commercial production in November 2009 and also has significant production expansion potential. Commissioning of the Company's sixth mine, Meadowbank, in Nunavut, is currently underway and the Company had its first dore bar pour at the Meadowbank Mine in February 2010. In addition, the Company plans to pursue opportunities for growth in gold production and gold reserves through the prudent acquisition or development of exploration properties, development properties, producing properties and other mining businesses in the Americas and Europe. The Company believes that its total cash costs per ounce place it among the lowest quartile of producers in the gold mining industry. In 2009, the Company produced 492,972 ounces of gold at total cash costs per ounce of $347 net of revenues from byproduct metals. For 2010, the Company expects to produce 1,057,200 ounces of gold at a total cash costs per ounce of gold produced of approximately $399 net of byproduct revenue. These expected higher total cash costs compared to 2009 reflect the commencement of mining operations at the Meadowbank Mine, which is expected to have higher total cash costs per ounce compared to the Company's average; higher costs associated with the transition to underground mining operations at the Pinos Altos Mine and the Kittila Mine; and increased production from the Company's mines and mine projects that do not contain byproduct metals. In addition, the higher total cash costs per ounce also reflect the Canadian dollar strengthening against the U.S. dollar, recent escalations in labour, shipping and transportation costs and the ramp-up of operations at the Pinos Altos Mine during 2010. See "Note to Investors Concerning Certain Measures of Performance" for a discussion of the use of the non-US GAAP measure total cash costs per ounce. The Company has traditionally sold all of its production at the spot price of gold due to its general policy not to sell forward its future gold production. The Company operates through four segments: Canada, Europe, Latin America and the United States. The Quebec Region includes the LaRonde Mine, the LaRonde Mine extension project, the Goldex Mine and the Lapa Mine, each of which is held directly by the Company. In 2009, the Quebec Region accounted for 82.2% of the Company's gold production, comprised of 41.3% from the LaRonde Mine, 30.2% from the Goldex Mine and 10.7% from the Lapa Mine. In 2010, the Company anticipates that the Quebec Region will account for 43.4% of the Company's gold production, of which 17.0%, 15.5% and 10.9% of the Company's gold production will come from the LaRonde Mine, the Goldex Mine and the Lapa Mine, respectively. The Company's operations in the European Region are conducted through its indirect subsidiary, Agnico-Eagle AB, which owns the Kittila Mine in Finland. In 2009, the Kittila Mine accounted for 14.6% of the Company's gold production and the Company anticipates that in 2010 the Kittila Mine will account for 13.9% of the Company's gold production. The Company's operations in the Latin American Region are conducted through its subsidiary, Agnico Eagle Mexico S.A. de C.V., which owns the Pinos Altos Mine and the Creston Mascota deposit. In 2009, the Pinos Altos Mine accounted for 3.3% of the Company's gold production and the Company anticipates that in 2010 the Pinos Altos Mine will account for 14.3% of the Company's gold production. The Nunavut Region is comprised of the Meadowbank Mine, which is held directly by the Company. The Meadowbank Mine, which is expected to achieve commercial production in the first quarter of 2010, will account for approximately 28% of the Company's 2010 gold production. In addition, the Company has an international exploration office in Reno, Nevada. The following table sets out the date of acquisition, the date of commencement of construction and the date of achieving commercial production for the Company's mines and mine projects. Agnico-Eagle's expertise in acquiring and developing mines is shown through the successful launch of six operating mines. LaRonde 1992 (1) 1985 1988 Goldex December 1993 (1) July 2005 August 2008 Kittila November 2005 June 2006 May 2009 Lapa June 2003 (1) June 2006 May 2009 Pinos Altos March 2006 August 2007 November 2009 Meadowbank April 2007 Pre-April 2007 March 2010 (2) Notes: (1)Date when 100% ownership was acquired. (2)Anticipated. The Company's exploration program focuses primarily on the identification of new mineral reserves and resources and new development opportunities in proven gold producing regions. Current exploration activities are concentrated in Canada, Europe, Latin America and the United States. Several projects were evaluated during the year in other countries where the Company believes the potential for gold occurrences is excellent and which the Company believes to be politically stable and supportive of the mining industry. The Company currently manages 78 properties in Canada, 11 properties in Nevada and Idaho in the United States, three properties in Finland, four properties in Mexico and three properties in Argentina. Exploration activities are managed from offices in Val d'Or, Quebec; Reno, Nevada; Chihuahua, Mexico; Helsinki and Kittila, Finland; and Vancouver, British Columbia. In addition, the Company continuously evaluates opportunities to make strategic acquisitions. Three of the Company's new mines or projects came from relatively recent acquisitions. In the second quarter of 2004, the Company acquired an approximate 14% ownership interest in Riddarhyttan Resources AB ("Riddarhyttan"), a Swedish precious and base metals exploration and development company that was at the time listed on the Stockholm Stock Exchange. In November 2005, the Company completed a tender offer (the "Riddarhyttan Offer") for all of the issued and outstanding shares of Riddarhyttan that it did not own. The Company issued 10,023,882 of its common shares and paid and committed an aggregate of $5.1 million cash as consideration to Riddarhyttan shareholders in connection with the Riddarhyttan Offer. The Company, through wholly-owned subsidiaries, currently holds 100% of Riddarhyttan. Riddarhyttan, through its wholly-owned subsidiary, Agnico-Eagle AB, is the 100% owner of the Kittila Mine, located approximately 900 kilometres north of Helsinki near the town of Kittila in Finnish Lapland. In the first quarter of 2005, the Company entered into an exploration and option agreement with Industrias Penoles S.A. de C.V. ("Penoles") to acquire the Pinos Altos property in northern Mexico. The Pinos Altos property is comprised of approximately 11,000 hectares in the Sierra Madre gold belt, approximately 225 kilometres west of the city of Chihuahua in the state of Chihuahua in northern Mexico. In February 2006, the Company exercised its option and acquired the Pinos Altos property on March 15, 2006. Under the terms of the exploration and option agreement, the purchase price of $66.8 million was comprised of $32.5 million in cash and 2,063,635 common shares of the Company. In February 2007, the Company made an exchange offer for all of the outstanding shares of Cumberland Resources Ltd. ("Cumberland") not already owned by the Company. At the time, Cumberland was a pre-production development stage company listed on the Toronto Stock Exchange (the "TSX") and American Stock Exchange. In May 2007, the Company acquired approximately 92% of the issued and outstanding shares of Cumberland that it did not previously own and, in July 2007, the Company completed the acquisition of all Cumberland shares by way of a compulsory acquisition. The Company issued 13,768,510 of its common shares and paid $9.6 million in cash as consideration to Cumberland shareholders in connection with its acquisition of Cumberland. In 2009, the Company's capital expenditures were $657 million. The 2009 capital expenditures included $76 million at the LaRonde Mine (which included approximately $39 million of expenditures relating to the LaRonde Mine extension), $22 million at the Goldex Mine, $90 million at the Kittila Mine (which included $36 million of expenditures on construction of the underground mine), $47 million at the Lapa Mine (which included $22 million on construction of the mine), $133 million at the Pinos Altos Mine and $288 million at the Meadowbank Mine. In addition, the Company spent $36 million on exploration activities at the Company's grassroots exploration properties. Budgeted 2010 exploration and capital expenditures of $478 million include $96 million at the LaRonde Mine (including $67 million on the LaRonde Mine extension), $14 million at the Goldex Mine, $29 million at the Lapa Mine, $92 million at the Pinos Altos Mine (including $54 million on the construction and development at the Creston Mascota deposit), $59 million at the Kittila Mine, $112 million at the Meadowbank Mine (including $10.5 million on the construction of the mine) and $37 million in capitalized exploration expenditures. In addition, the Company plans exploration expenditures on grassroots exploration projects of approximately $39 million. Depending on the success of the exploration programs at these and other properties, the Company may be required to make additional capital expenditures for exploration, development and pre-production. The financing for the expenditures set out above is expected to be from internally generated cash flow from operations, from the Company's existing cash balances and from drawdowns of the Company's bank credit facilities. In addition, on March 19, 2010 the Company announced it had received non-binding commitments from institutional investors in the United States and Canada to purchase in a private placement $600 million of guaranteed senior unsecured notes due in 2017, 2020 and 2022 (the "Notes"). The Notes are expected to have a weighted average maturity of 9.84 years, weighted average yield of 6.59% and restrictive convenants and events of default substantially similar to the Company's bank credit facilities. Proceeds from the offering of the Notes will be used to repay amounts under the Company's bank credit facilities. Closing of the transaction is expected to occur in April 2010. Based on current funding available to the Company (excluding the Notes) and expected cash flows from operations, the Company believes it has sufficient funds available to fund its projected capital expenditures for all its properties. Capital expenditures by the Company in 2008 and 2007 were $909 million and $523 million, respectively. The 2008 capital expenditures included $75 million at the LaRonde Mine (which was comprised of $38 million of sustaining capital expenditures and $37 million comprised primarily of expenditures on the LaRonde Mine extension), $53 million at the Goldex Mine, $196 million at the Kittila Mine, $89 million at the Lapa Mine, $176 million at the Pinos Altos Mine and $314 million at the Meadowbank Mine. In addition, the Company spent $35 million on exploration activities at the Company's grassroots exploration properties. The 2007 capital expenditures included $87 million at the LaRonde Mine (which was comprised of $34 million of sustaining capital expenditures and $53 million comprised primarily of expenditures on the LaRonde Mine extension and the ramp below Level 215), $105 million at the Goldex Mine, $94 million at the Kittila Mine, $29 million at the Lapa Mine and $170 million at the Meadowbank Mine. The Company was formed by articles of amalgamation under the laws of the Province of Ontario on June 1, 1972, as a result of the amalgamation of Agnico Mines Limited ("Agnico Mines") and Eagle Gold Mines Limited ("Eagle"). Agnico Mines was incorporated under the laws of the Province of Ontario on January 21, 1953 under the name "Cobalt Consolidated Mining Corporation Limited". Eagle was incorporated under the laws of the Province of Ontario on August 14, 1945. On December 19, 1989, Agnico-Eagle acquired the remaining 57% interest in Dumagami Mines Limited not already owned by it, as a consequence of the amalgamation of Dumagami Mines Limited with a wholly-owned subsidiary of Agnico-Eagle, to continue as one company under the name Dumagami Mines Inc. ("Dumagami"). On December 29, 1992, Dumagami transferred all of its property and assets, including the LaRonde Mine, to Agnico-Eagle and was subsequently dissolved. On December 8, 1993, the Company acquired the remaining 46.3% interest in Goldex Mines Limited not already owned by it, as a consequence of the amalgamation of Goldex Mines Limited with a wholly-owned subsidiary of the Company, to continue as one company under the name Goldex Mines Limited. On January 1, 1996, the Company amalgamated with two wholly-owned subsidiaries, including Goldex Mines Limited. In October 2001, under a plan of arrangement, the Company amalgamated with an associated corporation, Mentor Exploration and Development Co., Limited ("Mentor"). In connection with the arrangement, the Company issued 369,348 of its common shares in consideration for the acquisition of all of the issued and outstanding shares of Mentor that it did not already own. On August 1, 2007, the Company, Agnico-Eagle Acquisition Corporation, Cumberland and a wholly-owned subsidiary of Cumberland, Meadowbank Mining Corporation, amalgamated under the laws of the Province of Ontario and continued under the name of Agnico-Eagle Mines Limited. The Company's executive and registered office is located at Suite 400, 145 King Street East, Toronto, Ontario, Canada M5C 2Y7; telephone number (416) 947-1212; website: http://www.agnico-eagle.com. The information contained on the website is not part of this Form 20-F. The Company's principal place of business in the United States is located at 8725 Technology Way, Suite B, Reno, Nevada 89521. Business Overview The Company believes that it has a number of key operating strengths that provide distinct competitive advantages. Growth Profile. The Company has a proven track record of increasing production capacity at existing operations through a combination of acquisitions, operational improvements, expansions and development. The Company anticipates increasing its production to over 1.0 million ounces of gold in 2010 with continued growth to 2014. The Company's production growth in 2010 is expected to come principally from the Meadowbank Mine, which achieved commercial production in the first quarter of 2010, as well as from the continued operational improvements at the Kittila, Lapa and Pinos Altos Mines. Over the last three years, the Company has spent over $2 billion on the development of five new mines, and its significant extension of the LaRonde Mine at depth. With the large majority of mine development projects complete and with five mines expected to achieve steady state operational status, capital expenditures are expected to decline materially from 2010 onward, significantly increasing free cash flow. The remaining capital expenditure is primarily for incremental expansion projects and completion of the Meadowbank Mine. Operations in Politically Stable, Mining-Friendly Regions. The Company and its predecessors have over three decades of continuous gold production experience and expertise in metals mining. The Company's operations and exploration and development projects are located in regions that are supportive of the mining industry. Three of the Company's producing mines and one of its construction projects are located in northwestern Quebec, one of North America's principal gold-producing regions. The Province of Quebec had the highest "policy potential index" for any mining jurisdiction in the world in the Fraser Institute's 2008-2009 survey of mining companies. The policy potential index measures the effects on exploration of a variety of government policies related to the mining industry. The Company's Kittila Mine in northern Finland, Pinos Altos Mine in northern Mexico and Meadowbank Mine in Nunavut are located in regions which the Company believes are also supportive of the mining industry. Low-Cost, Efficient Operations. The Company believes that its total cash costs per ounce place it among the lowest quartile of producers in the gold mining industry, with total cash costs per ounce of gold produced at $347 for 2009 and $162 per ounce for 2008. These relatively low cash costs are attributable to the economies of scale afforded by the Company's mining operations, as well as byproduct revenues from the LaRonde and Pinos Altos Mines and sharing of resources among its three operating mines in northwestern Quebec. In addition, the Company believes its highly motivated work force contributes significantly to continued operational improvements and to the Company's low-cost producer status. Strong Operating Base. Through its acquisition, exploration and development program, the Company has been transformed from a regionally focused, single mine producer to a multi-mine international gold producer with six operating, 100% owned mines. The Company's existing operations at the LaRonde Mine provide a strong economic base for additional mineral reserve and production development at the property and in the Abitibi region of northwestern Quebec and for the development of its mines and projects in Nunavut, Finland and Mexico. The experience gained through building and operating the LaRonde Mine has assisted with the Company's development of its other mine projects. In addition, the extensive infrastructure associated with the LaRonde Mine supports the nearby Goldex and Lapa Mines, and the construction of infrastructure to access the deposits at the LaRonde Mine extension. Highly Experienced Management Team. The Company's senior management team has an average of over 20 years of experience in the mining industry. Management's significant experience has underpinned the Company's historical growth and provides a solid base upon which to expand the Company's operations. Based on these strengths, the Company's corporate strategy is to grow low-cost production and reserves in mining-friendly regions. Optimize and Further Expand Operations. The Company continues to focus its resources and efforts on the exploration and development of its properties in Quebec, Nunavut, Finland and Mexico with a view to increasing annual gold production and gold mineral reserves. Leverage Mining Experience. The Company believes it can benefit not only from the existing infrastructure at its mines but also from the geological knowledge that it has gained in mining and developing its properties. The Company's strategy is to capitalize on its mining expertise to exploit fully the potential of its properties. Expand Gold Reserves. The Company is conducting drilling programs at all of its properties with a goal of further increasing its gold reserves. In 2009, on a contained gold ounces basis, the Company increased its gold reserves to 18.4 million ounces (162.4 million tonnes grading 3.52 grams of gold per tonne), an increase of 2% over December 31, 2008 levels, including the replacement of 492,972 ounces of gold mined. Growth Through Primary Exploration and Acquisitions. The Company's growth strategy has been to pursue the expansion of its development base through the acquisition of additional properties in the Americas and Europe. Historically, the Company's producing properties have resulted from a combination of investments in advanced exploration companies and primary exploration activities. By investing in pre-development stage companies, the Company believes that it has been able to acquire control of projects at favourable prices and reasonable valuations. The Company's property acquisition strategy has evolved more recently to include joint ventures and partnerships and the acquisition of development and producing properties. Mining Legislation and Regulation Canada The mining industry in Canada operates under both federal and provincial or territorial legislation governing prospecting and the exploration, development, operation and decommissioning of mines and mineral processing facilities. Such legislation relates to the method of acquisition and ownership of mining rights, labour, occupational or worker health and safety standards, royalties, mining, exports, reclamation, closure and rehabilitation of mines and other matters. The mining industry in Canada is also subject to extensive laws and regulations at both the federal and provincial or territorial levels concerning the protection of the environment. The primary federal regulatory authorities with jurisdiction over the Company's mining operations in respect of environmental matters are the Department of Fisheries and Oceans (Canada) and Environment Canada. The construction, development and operation of a mine, mill or refinery requires compliance with applicable environmental laws and regulations and/or review processes, including obtaining land use permits, water permits, air emissions certifications, industrial depollution attestations, hazardous substances management and similar authorizations from various governmental agencies. Environmental laws and regulations impose high standards on the mining industry to reduce or eliminate the effects of waste generated by mining and processing operations and subsequently deposited on the ground or affecting the air or water. Laws and regulations regarding the decommissioning, reclamation and rehabilitation of mines may require approval of reclamation plans, provision of financial guarantees and long-term management of closed mines. Quebec In Quebec, mining rights are governed by the Mining Act (Quebec) and, subject to limited exceptions, are owned by the province. A mining claim entitles its holder to explore for minerals on the subject land. It remains in force for a term of two years from the date it is registered and may be renewed indefinitely subject to continued exploration works in relation thereto. In order to retain title to mining claims, in addition to paying a small bi-annual rental fee currently ranging from C$26 to C$120 per claim depending on its location of area (as set by Quebec government regulations), exploration work (or an equivalent value cash payment) has to be completed in advance (either on the claim or on adjacent mining claims, concessions or leases) and filed with the Ministry of Natural Resources and Wildlife (Quebec). The amount of exploration work required bi-annually currently ranges from C$48 to C$3,600 per claim depending on its location, area and period of validity (as set by Quebec government regulations). In 1966, the mining concession system set out for lands containing mineralized zones in the Mining Act (Quebec) was replaced by a system of mining leases but the mining concessions sold prior to such replacement remain in force. A mining lease entitles its holder to mine and remove valuable mineral substances from the subject land, provided it pays the annual rent set by Quebec government regulations, which currently ranges from C$21 per hectare (on privately held land) to C$43 per hectare (on land owned by the province). Leases are granted initially for a term of 20 years and are renewable up to three times, each for a duration of ten years. After the third renewal, the Minister of Natural Resources and Wildlife (Quebec) may grant an extension thereof on the conditions, for the rental and for the term he or she determines. Bill 79, an Act to amend the Mining Act, was introduced in the Quebec National Assembly in December 2009 and, if adopted, will amend a number of rules relating to the mining regime in Quebec, mainly to stimulate mining exploration. However, it is too early to determine the final form that the amendments will take and what effect, if any, these amendments may have on the Company's operations. In Quebec, the primary provincial regulatory authorities with jurisdiction over the Company's mining operations in respect of environmental matters are the Ministry of Sustainable Development, Environment and Parks (Quebec) and the Ministry of Natural Resources and Wildlife (Quebec). Nunavut As a result of the Nunavut Land Claims Agreement (the "Land Claims Agreement") of July 1993, ownership of large tracts of land was granted to the Inuit. These Inuit-owned lands include areas with high mineral potential. Further, as a result of other rights granted to the Inuit in the Land Claims Agreement, Inuit organizations play an important role in the management of natural resources and the environment in Nunavut. These duties are shared among the federal and territorial governments and Inuit organizations. Under the Land Claims Agreement, the Inuit own surface rights to certain lands representing approximately 16% of Nunavut. For a portion of the Inuit-owned lands representing approximately 2% of Nunavut, the Inuit also own mineral (subsurface) rights in addition to the surface rights. In Nunavut, the Crown's mineral rights are administered by the Department of Indian and Northern Affairs (Canada) in accordance with the Northwest Territories and Nunavut Mining Regulations (the "Territorial Mining Regulations") under the Territorial Lands Act (Canada). The Inuit mineral rights in subsurface Inuit-owned lands are owned and administered by Nunavut Tunngavik Incorporated ("Nunavut Tunngavik"), a corporation representing the Inuit people of Nunavut. Future production from Nunavut Tunngavik-administered mineral claims is subject to production leases which include a 12% net profits interest royalty from which annual deductions are limited to 85% of gross revenue. Production from Crown mining leases is subject to a royalty of up to 14% of adjusted net profits, as defined in the Territorial Mining Regulations. Before the operation of a major development project as defined in the land claim can begin, developers must also negotiate an impact benefits agreement with the regional Inuit Association. The Kivalliq Inuit Association (the "KIA") is the Inuit organization that holds surface rights to the Inuit-owned lands in the Kivalliq region and is responsible for administering surface rights on these lands on behalf of the Inuit of the region. In order to conduct exploration work on Inuit-owned lands, the Company is required to submit a project proposal or work plan. This proposal is subject to approval by the KIA for surface land tenure and to review by other boards established by the Land Claims Agreement to determine environmental effects and, if needed, to grant water rights. Federal and territorial government departments participate in the reviews conducted by these boards. For mine development, the Company requires a surface lease and water compensation agreement with the KIA and a licence for the use of water, including the deposit of waste. During mine construction and operations, the Company is subject to additional Nunavut and federal government regulations related to environmental, safety, fire and other operational matters. Finland Mining legislation in Finland consists of the Mining Act and the Mining Decree, which are currently being amended. Initial proposed amendments to the Mining Act were released in October 2008 with the aim that a revised Mining Act would come into force in January 2011. The Council of State introduced the proposal for a revised Mining Act (the "Proposal") to Parliament on December 22, 2009, which may be amended during its reading in Parliament. Unless otherwise stated below, this summary reflects the Mining Act as currently in force. In Finland, any corporation having its principal place of business or central administration within the European Economic Area is entitled to the same rights to carry out prospecting, to stake a claim and to exploit a deposit, as any Finnish citizen or corporation. In general, prospecting does not require any special licence from the authorities, except under certain circumstances as set out in the Mining Act. The Proposal does not include any fundamental changes in this respect. If there are no impediments to granting a claim, the Ministry of Employment and the Economy (the "MEE") is obliged to grant the applicant a prospecting licence, which is required if the prospector wishes to examine the area in order to determine the size and the scope of the deposit. A prospecting licence is in force for one to five years, depending on the scope of the search for mineable minerals, and the MEE has no power of discretion as to the material merits of the mining operation. Under the Proposal, a prospecting license would be in force for a maximum period of four years and it could be extended for three-year periods up to a maximum of 15 years. The Proposal would also change the licensing authority and the application procedure in order to permit more comprehensive hearings of the parties. In order to obtain the rights to the mineable minerals located on a claim, the claimant must apply to the MEE for the appropriation of a mining patent. When the mining patent procedure has become final regarding all matters other than compensation, the MEE must issue the mining operator a mining certificate which gives the holder the right to fully exploit all mineable minerals found in the mining patent. Under the Proposal, a mining patent is to be replaced by a mining license and, before the mining operator can start exploiting the land, a mining survey under the revised Mining Act by the surveying office would be required. Also, an expropriation license relating to the mining area may be required if the mining operator and the owner of the land cannot come to a voluntary agreement on the use of the land in question for mining purposes. If in the public interest, the expropriation license will be granted by the Council of State to the mining operator. When the mining survey has become final regarding all matters other than compensation and the surveying office's decision has become non-appealable, the mining operator can start exploiting the land. Mining operations must be carried out in accordance with laws and regulations concerning conservation and environmental protection issues. Under the Environmental Protection Act, mining activities require an environmental permit which may be issued either for a definite or indefinite period of time. The Environmental Protection Act is based on the principles of prevention and minimization of damages and hazards, application of the best available technology, application of the best environmental practice and "polluter pays". The Act on Compensation for Environmental Damage includes provisions on the compensation for damage to a person or a property resulting from pollution of water, air or soil, noise, vibration, radiation, light, heat or smell, or other similar nuisances, caused by an activity carried out at a fixed location. This act is based on the principle of strict liability. In addition to an environmental permit, mining operators require several other permits and are subject to other obligations under environmental protection legislation. According to the Act on Environmental Impact Assessment Procedure, certain projects require compliance with an environmental impact assessment procedure. These include major projects with a considerable impact on the environment, such as the excavation, enrichment and handling of metals and other minerals in cases where the excavated material is estimated to exceed 550,000 tonnes annually. A permit authority may not give its approval to an activity covered by the scope of the Act on the Environmental Impact Assessment Procedure without having taken an environmental impact assessment report into consideration. Mexico Mining in Mexico is subject to the Mining Law, a federal law. Under the Mexican Constitution, all minerals belong to the Mexican Nation. Private parties may explore and extract minerals pursuant to mining concessions granted by the executive branch of the Mexican government, as a general rule to whoever first claims them. While the Mining Law touches briefly upon labour, occupational and worker health and safety standards, these are primarily dealt with by the Federal Labour Law. The Mining Law also briefly addresses environmental matters, which are primarily regulated by the General Law of Ecological Balance and Protection of the Environment, also of federal jurisdiction. The primary agencies with jurisdiction over mining activities are the Ministry of the Economy, the Ministry of Labor and Social Welfare and the Ministry of the Environment and Natural Resources. The National Water Commission has jurisdiction regarding the granting of water rights and the Ministry of Defense with respect to the use of explosives. Concessions are granted for 50 years, renewable once. The main obligations to keep concessions current are the semi-annual payment of mining duties (taxes), based on the surface area of the concession, and the performance of work in the areas covered by the concessions, which is evidenced by minimum expenditures or by the extraction of ore. Organizational Structure The Company's significant subsidiaries (all of which are wholly-owned, unless otherwise indicated) are Riddarhyttan, 1715495 Ontario Inc., which owns all of the shares of Agnico-Eagle Sweden AB, a Swedish company through which the Company holds its interest in Riddarhyttan, and Agnico-Eagle AB, a Swedish company through which Riddarhyttan holds its interest in the Kittila Mine. In addition, the Company's interest in the Pinos Altos Mine in northern Mexico is held through its wholly-owned Mexican subsidiary, Agnico Eagle Mexico S.A. de C.V., which is owned, in part, by 1641315 Ontario Inc. The Company's only other significant subsidiaries are Agnico-Eagle (Delaware) LLC, Agnico-Eagle (Delaware) II LLC and Agnico-Eagle (Delaware) III LLC, each a limited liability company organized under the laws of Delaware. The LaRonde Mine (including the LaRonde Mine extension), the Goldex Mine, the Lapa Mine and the Meadowbank Mine are owned directly by the Company. The Company's wholly-owned subsidiaries, Servicios Agnico Eagle Mexico, S.A. de C.V. and Servicios Pinos Altos, S.A. de C.V., provide services in connection with the Company's operations in Mexico. Riddarhyttan Resources Oy provides services in connection with the Company's operations at the Kittila Mine in Finland. The Company's operations in the United States are conducted through Agnico-Eagle (USA) Limited. The following chart sets out the corporate structure of the Company, each of its significant subsidiaries and certain other subsidiaries, together with the jurisdiction of organization of the Company and each such subsidiary as at March 22, 2010: Agnico-Eagle Organizational Chart Property, Plant and Equipment Location Map of the Abitibi Region LaRonde Mine The LaRonde Mine is situated approximately 60 kilometres west of the City of Val d'Or in northwestern Quebec (approximately 470 kilometres northwest of Montreal, Quebec) in the municipalities of Preissac and Cadillac. At December 31, 2009, the LaRonde Mine was estimated to contain proven mineral reserves of approximately 358,000 ounces of gold comprised of 4.8 million tonnes of ore grading 2.34 grams per tonne and probable mineral reserves of 4.5 million ounces of gold comprised of 29.6 million tonnes of ore grading 4.72 grams per tonne. The Company's LaRonde Mine consists of the LaRonde property and the adjacent El Coco and Terrex properties, each of which is 100% owned and operated by the Company. The LaRonde Mine can be accessed either from Val d'Or in the east or from Rouyn-Noranda in the west, which are located approximately 60 kilometres from the LaRonde Mine via Quebec provincial highway No. 117. The LaRonde Mine is situated approximately two kilometres north of highway No. 117 on Quebec regional highway No. 395. The Company has access to the Canadian National Railway at Cadillac, Quebec, approximately six kilometres from the LaRonde Mine. The elevation is 337 metres above sea level. The LaRonde property is relatively flat with a maximum relief of approximately 40 metres. The topography gently slopes down from north to south and is characterized by boreal-type forest on LaRonde and the nearby properties. All of the LaRonde Mine's power requirements are supplied by Hydro-Quebec through connections to its main power transmission grid. Water used in the LaRonde Mine's operations is sourced from Lake Preissac and is transported approximately four kilometres to the minesite through a surface pipeline. The LaRonde Mine operates under mining leases obtained from the Ministry of Natural Resources and Wildlife (Quebec) and under certificates of approval granted by the Ministry of Sustainable Development, Environment and Parks (Quebec). The LaRonde property consists of 35 contiguous mining claims and one provincial mining lease and covers in total 1,044.9 hectares. The El Coco property consists of 22 contiguous mining claims and one provincial mining lease and covers in total 356.7 hectares. The Terrex property consists of 21 mining claims that cover in total 424.4 hectares. The mining leases on the LaRonde and El Coco properties expire in 2018 and 2021, respectively, and are automatically renewable for three further ten-year terms upon payment of a small fee. The Company also has two surface rights leases that cover in total approximately 122.3 hectares that relate to the water pipeline right of way from Lake Preissac and the eastern extension of the LaRonde tailings pond #7 on the El Coco property. The surface rights leases are renewable annually. Location Map of the LaRonde Mine The LaRonde Mine includes underground operations at the LaRonde and El Coco properties that can both be accessed from the Penna Shaft, a mill, a treatment plant, a secondary crusher building and related facilities. The El Coco property is subject to a 50% net profits interest in favour of Barrick Gold Corporation ("Barrick") on future production from approximately 500 metres east of the LaRonde property boundary. The remaining 1,500 metres is subject to a 4% net smelter return royalty. This area of the property is now substantially mined out and the Company has not paid royalties since 2004 and does not expect to pay royalties in 2010. In 2003, exploration work started to extend outside of the LaRonde property on to the Terrex property where a down-plunge extension of Zone 20 North was discovered. The Terrex property is subject to a 5% net profits royalty to Delfer Gold Mines Inc. and a 2% net smelter return royalty to Barrick. The Company does not expect to pay royalties on this part of the property in 2010. In addition, the Company owns 100% of the Sphinx property immediately to the east of the El Coco property. In 2010, payable gold production at the LaRonde Mine is expected to decline to approximately 180,000 ounces, and total cash costs per ounce are expected to be approximately $227. The Abitibi region has a continental climate with average annual rainfall of 64 centimetres and average annual snowfall of 318 centimetres. The average monthly temperatures range from a minimum of -23 degrees Celsius in January to a maximum of 23 degrees Celsius in July. Under normal circumstances, mining operations are conducted year round without interruption due to weather conditions. The Company believes that the Abitibi region of northwestern Quebec has sufficient experienced mining personnel to staff its operations in the Abitibi region. Mining and Milling Facilities Surface Plan of the LaRonde Mine The LaRonde Mine was originally developed utilizing a 1,207-metre shaft (Shaft #1) and an underground ramp access system. The ramp access system is available down to the Level 25 of Shaft #1 and then continues down to Level 248 at the Penna Shaft. The mineral reserve accessible from Shaft #1 was depleted in September 2000 and Shaft #1 is no longer in use. A second production shaft (Shaft #2), located approximately 1.2 kilometres to the east of Shaft #1, was completed in 1994 to a depth of 525 metres and was used to mine Zones 6 and 7. Both ore zones were depleted in March 2000 and the workings were allowed to flood up to Level 6 (approximately 280 metres). A third shaft (the Penna Shaft), located approximately 800 metres to the east of Shaft #1, was completed down to a depth of 2,250 metres in March 2000. The Penna Shaft is used to mine Zones 20 North, 20 South, 6 and 7. In 2009, as part of the LaRonde Mine extension, the Company completed construction of an 823-metre internal shaft from Level 206 to access the ore below Level 245, approximately 2,858 metres below surface. Mining Methods Four mining methods have historically been used at the LaRonde Mine: open pit for the three surface deposits; sublevel retreat; longitudinal retreat with cemented backfill; and transverse open stoping with both cemented and unconsolidated backfill. The primary source of ore at the LaRonde Mine continues to be from underground mining methods. During 2009, two mining methods were used: longitudinal retreat with cemented backfill and transverse open stoping with both cemented and unconsolidated backfill. In the underground mine, sublevels are driven at 30-metre and 40-metre vertical intervals, depending on the depth. Stopes are undercut in 15-metre panels. In the longitudinal method, panels are mined in 15-metre sections and backfilled with 100% cemented rock fill or paste fill from the paste backfill plant completed in 2000 and located on the surface at the processing facility. In the transverse open stoping method, 50% of the ore is mined in the first pass and filled with cemented rock fill or paste fill. On the second pass, the remainder of the ore is mined and filled with unconsolidated waste rock fill or cemented paste backfill. Surface Facilities Surface facilities at the LaRonde Mine include a processing plant with a daily capacity of 7,200 tonnes of ore, which has been expanded four times since 1987 from the original rate of 1,630 tonnes per day. Beginning in 1999, transition to the LaRonde Mine poly-metallic massive sulphide orebody required several modifications to the processing plant which consisted of a new coarse ore handling system, new SAG and ball mill, the addition of a zinc flotation circuit and capacity increases to the existing copper flotation and precious metals circuits. In 2008, the installation of a limited copper/lead separation flotation circuit, following the copper flotation circuit, was completed. Also in 2008, operation of a small cyanidation plant, for the treatment of sulphide concentrate from the Goldex Mine, began. LaRonde is also the site for the Lapa Mine ore processing plant (1,500 tonnes per day), which the Company commissioned in the second quarter of 2009. Annual production at the LaRonde mill consists of approximately 63,000 tonnes of copper concentrate, up to 2,800 tonnes of lead concentrate and 147,000 tonnes of zinc concentrate. Gold recovery at the LaRonde Mine is distributed approximately 70% in the copper concentrate, 5% in the lead concentrate, 4.25% in the zinc concentrate and 13% in the refinery. Mineral Recoveries During 2009, gold and silver recovery averaged 90.3% and 87.7%, respectively. Zinc recovery averaged 87.7% with a concentrate quality of 54.2% zinc. Copper recovery averaged 86.2% with a concentrate quality of 11.6% copper. Approximately 2.55 million tonnes of ore were processed averaging 6,975 tonnes of ore per day at 93.6% of available time. The following table sets out the metal recoveries, concentrate grades and contained metals for the 2.55 million tonnes of ore extracted by the Company at the LaRonde Mine in 2009. Gold 2.75 g/t 77.5 g/t 70.14% 3.03 g/t 5.28% 52.5 g/t 0.18% 32,849 oz 90.32% 203,494 oz Silver 62.98g/t 1,547 g/t 61.14% 178.0 g/t 13.54% 2,066 g/t 0.55% 642,304 oz 87.70% 3,919,055 oz Copper 0.34% 11.61% 86.17% — — — — — 86.17% 6,671 t Lead 0.31% — — — — 50.85% 2.75% — 2.75% 207 t Zinc 2.96% — — 54.25% 87.74% — — — 87.74% 56,186 t Environmental Matters Currently, water is treated at various facilities at the LaRonde Mine operations. Water contained in the tailings to be used as underground backfill is treated to degrade cyanide using a sulphur dioxide and air process. The tailings entering the tailings pond are first decanted and the clear water subjected to natural cyanide degradation. This water is then transferred to sedimentation pond #1 to undergo a secondary treatment at a plant located between sedimentation ponds #1 and #2 that uses a peroxy-silica process to destroy cyanide, lime and coagulant to precipitate metals. The tailings pond occupies an area of about 120 hectares. Waste rock that is not used underground for backfill is brought up to the surface and stored in close proximity to the tailings pond to be used to build coffer dams inside the pond. A waste rock pile containing approximately one million tonnes of waste and occupying about nine hectares is located west of the mill. Due to the high sulphur content of the LaRonde ore, the Company has had to address toxicity issues in the tailings ponds since the 1990's. Since introducing and optimizing a biological treatment plant in 2005, the treatment process is now stable and the effluent has remained non-toxic since 2006. In 2006 the Company commenced an ammonia stripping operation of an effluent partially treated by the biological treatment plant which allowed an increase in treatment flow rate, while keeping the final effluent toxicity free. In 2009, to further increase treatment flow rate of the biological plant, the Company commenced construction of ammonia stripping towers, which should be in operation by April 2010. In addition, water from mine dewatering and drainage water are treated to remove metals prior to discharge at a lime treatment plant located at the LaRonde mill. Capital Expenditures In 2006, the Company initiated construction to extend the infrastructure at the LaRonde Mine to access the ore below Level 245, referred to as the LaRonde Mine extension. The LaRonde Mine extension is expected to begin contributing to production in 2011. The LaRonde Mine extension infrastructure includes a new 823-metre internal shaft (completed in November 2009) starting from Level 203, to a total depth of 2,858 metres. A ramp will be used to access the lower part of the orebody (to 3,110 metres in depth). The internal winze system will be used to hoist ore from depth to facilities on Level 215, approximately 2,150 metres below surface, where it will be transferred to the Penna Shaft hoist. Excavation of the underground mining facilities is in progress. Capital expenditures at the LaRonde Mine during 2009 were approximately $76 million, which included $37 million on sustaining capital expenditures and $39 million comprised primarily of expenditures on the LaRonde Mine extension. Budgeted 2010 capital expenditures at the LaRonde Mine are $96 million, including $29 million on sustaining capital expenditures and $67 million on the LaRonde Mine extension. At the end of 2009, the project capital cost of construction of the LaRonde Mine extension is estimated to be $230 million, of which the Company had incurred $124 million as of the end of 2009. Total capital expenditures for the LaRonde Mine and the LaRonde Mine extension are estimated at $403 million from 2009 to 2024. Development In 2009, a total of 12,256 metres of lateral development was completed. Development was focused on stope preparation of mining blocks for production in 2009 and 2010, especially the preparation of the lower mine production horizon. A total of 2,004 metres of development work was completed for the LaRonde Mine extension mainly for ventilation infrastructure. This development work also included construction work on the ramp to access the LaRonde Mine extension. A total of 14,400 metres of lateral development is planned for 2010. The main focus of development work continues to be stope preparation. The Company plans to develop and prepare the access to Zone 20 South down to Level 245. For the LaRonde Mine extension, a total of 5,365 metres of development is planned mainly to develop the ramp access from the new shaft to the orebody and to complete infrastructure around the new shaft and for future ventilation infrastructure. At the same time, development work will continue to prepare for mining below Level 245. Geology, Mineralization and Exploration Geology The LaRonde property is located near the southern boundary of the Archean-age (2.7-billion years old) Abitibi Subprovince and the Pontiac Subprovince within the Superior Geological Province of the Canadian Shield. The most important regional structure is the Cadillac-Larder Lake (CLL) fault zone marking the contact between the Abitibi and Pontiac Subprovinces, located approximately two kilometres to the south of the LaRonde property. The geology that underlies the LaRonde Mine consists of three east-west-trending, steeply south-dipping and generally south-facing regional groups of rock formations. From north to south, they are: (i) 400 metres (approximate true thickness) of the Kewagama Group, which is made up of a thick band of interbedded wacke; (ii) 1,500 metres of the Blake River Group, a volcanic assemblage that hosts all the known economic mineralization on the property; and (iii) 500 metres of the Cadillac Group, made up of a thick band of wacke interbedded with pelitic schist and minor iron formation. Zones of strong sericite and chlorite alteration that enclose massive to disseminated sulphide mineralization (including the ore that is mined for gold, silver, zinc, copper and lead at the LaRonde Mine) follow steeply dipping, east-west-trending, anastomosing shear zone structures within the Blake River Group volcanic units across the property. These shear zones are part of the larger Doyon-Dumagami Structural Zone that hosts several important gold occurrences (including the Doyon gold mine and the former Bousquet mines) and has been traced for over ten kilometres within the Blake River Group, from the LaRonde Mine westward to the Mouska gold mine. Mineralization The gold-bearing zones at the LaRonde Mine are lenses of disseminated stringers through to massive, aggregates of coarse pyrite with zinc, copper and silver content. Ten zones that vary in size from 50,000 to 40,000,000 tonnes have been identified, of which four are (or are believed to be) economic. Gold content is not proportional to the total sulphide content but does increase with copper content. Gold values are also higher in areas where the pyrite lenses are crosscut by tightly spaced north-south fractures. These historical relationships, which were noted at LaRonde Shaft #1's Main Zone, are maintained at the Penna Shaft zones. The zinc-silver (i.e., Zone 20 North) mineralization with lower gold values, common in the upper mine, grades into gold-copper mineralization within the lower mine. Gold value enhancement associated with crosscutting north-south fractures also occurs within the LaRonde Mine. The predominant base metal sulphides within the LaRonde Mine are chalcopyrite (copper) and sphalerite (zinc). The Company believes that Zone 20 North is one of the largest gold-bearing massive sulphide mineralized zones known in the world and one of the largest mineralized zones known in the Abitibi region of Ontario and Quebec. Zone 20 North contains the majority of the mineral reserves and resources at the LaRonde Mine, including 32,467,717 tonnes of proven and probable mineral reserves grading 4.46 grams of gold per tonne, representing 94% of the total proven and probable mineral reserve at LaRonde, 5,280,356 tonnes of indicated mineral resource grading 1.68 grams of gold per tonne, representing 81% of the total measured and indicated mineral resource at LaRonde, and 10,322,738 tonnes of inferred mineral resource grading 4.00 grams of gold per tonne, representing 94% of the total inferred mineral resource at LaRonde. The depth of Zone 20 North extends between 700 metres below surface and 3,500 metres below surface, and possibly lower. With increased access on the lower levels of the mine (i.e., Levels 215, 224, 239 and 245), the transformation from a "zinc/silver" orebody to a "gold/copper" deposit is expected to continue during 2010. Zone 20 North can be divided into an upper zinc/silver-enriched zone and a lower gold/copper-enriched zone. The zinc zone has been traced over a vertical distance of 1,700 metres and a horizontal distance of 570 metres, with thicknesses approaching 40 metres. The gold zone has been traced over a vertical distance of over 2,200 metres and a horizontal distance of 900 metres, with thicknesses varying from 3 to 40 metres. The zinc zone consists of massive zinc/silver mineralization containing 50% to 90% massive pyrite and 10% to 50% massive light brown sphalerite. The gold zone mineralization consists of 30% to 70% finely disseminated to massive pyrite containing 1% to 10% chalcopyrite veinlets, minor disseminated sphalerite and rare specks of visible gold. Gold grades are generally related to the chalcopyrite or copper content. At depth, the massive sulphide lens becomes richer in gold and copper. During 2009, 2.4 million tonnes of ore grading 2.63 grams of gold per tonne, 63.5 grams of silver per tonne, 2.98% zinc, 0.33% copper and 0.32% lead were mined from Zone 20 North. Exploration The combined tonnage of proven and probable mineral reserves at the LaRonde Mine for year-end 2009 is 34.4 million tonnes which represents a 3% increase in the amount compared to year-end 2008. This mineral reserve includes the replacement of 2.5 million tonnes of ore that were mined in 2009. The Company's ability to sustain its level of proven and probable mineral reserves was primarily due to continued successful exploration results at depth as well as the increase in the three-year average gold price used for the year-end 2009 estimates. An exploration program was initiated in 2009 to investigate the ultimate depth of Zone 20 North. The first hole of this program was completed at the end of 2009 with a final depth of 1,852 metres and intersected Zone 20 North at a depth of 3,520 metres below surface, which is approximately 410 metres below the current reserves envelope. The intersection returned 14.3 metres (true length) grading 3.03 grams of gold per tonne. This program was conducted from the Level 215 exploration drift, approximately 2,150 metres below the surface, and drilling will continue in 2010. In 2009, a total of 268 holes were drilled on the LaRonde property for a total length of 30,699 metres, compared to 245 holes for a total length of 28,039 metres in 2008. Of the drilling in 2009, 140 holes (8,272 metres) were for production stope delineation, 114 holes (17,024 metres) were definition drilling and 14 holes (5,403 metres) were for exploration. In 2008, 178 holes (10,323 metres) were for production stope delineation, 53 holes (7,628 metres) were definition drilling and 14 holes (10,088 metres) were for deep exploration (below Level 245). Expenditures on diamond drilling at the LaRonde Mine during 2009 were approximately $3.3 million, including $1.9 million in definition and delineation drilling expenses charged to operating costs at the LaRonde Mine. Expenditures on exploration in 2009 were $1.3 million, and are expected to be $3.8 million in 2010. In addition, some definition and delineation drilling was completed to assist in final mining stope design, mainly of Zone 20 North and Zone 20 South. Zone 20 North was the main focus of the definition drilling completed in 2009. The results of infill drilling in 2009 in Zone 20 North from Level 260 to Level 215, combined with the higher gold price used for the 2009 year-end mineral reserve and resource estimates, contributed to an increase of mineral reserves of 57,000 ounces of gold (729,000 tonnes of ore grading 2.43 grams of gold per tonne). Another focus of definition drilling in 2009 was Zone 20 South. This zone was intersected from Level 170 to Level 152 when there were no reserves in 2008 year-end estimates. This represents a net gain of 38,400 ounces of probable mineral reserves (363,000 tonnes grading 3.29 grams of gold per tonne). Goldex Mine The Goldex Mine, which achieved commercial production in August 2008, is located in the City of Val d'Or, Quebec, approximately 60 kilometres east of the LaRonde Mine. At December 31, 2009, the Goldex Mine was estimated to have proven mineral reserves of approximately 338,858 ounces of gold comprised of 5.2 million tonnes of ore grading 2.02 grams gold per tonne and probable mineral reserves of 1.29 million ounces of gold comprised of 19.5 million tonnes of ore grading 2.06 grams gold per tonne. Location Map of the Goldex Mine The Goldex Mine is accessible by provincial highway. The elevation is approximately 302 metres above sea level. All of the Goldex Mine's power requirements are supplied by Hydro-Quebec through connections to its main power transmission grid. All of the water required at the Goldex Mine is sourced directly by aqueduct from the Thompson River immediately adjacent to the minesite or through recirculation of water from the surface pond and the auxiliary tailings pond. For additional information regarding the Abitibi region in which the Goldex Mine is located, see "— Property, Plant and Equipment — LaRonde Mine". The Goldex Mine operates under a mining lease obtained from the Ministry of Natural Resources and Wildlife (Quebec) and under certificates of approval granted by the Ministry of Sustainable Development, Environment and Parks (Quebec). The Goldex property, in which the Company has a 100% working interest, consists of 20 contiguous mining claims and, since April 2006, one provincial mining lease (98.6 hectares), covering an aggregate of 273.3 hectares. The property is made up of three blocks: the Probe block (122.7 hectares); the Dalton block (10.4 hectares); and the Goldex Extension block (140.2 hectares). The claims are renewable every second year upon payment of a small fee. The mining lease expires in 2028 and is automatically renewable for three further ten-year terms upon payment of a small fee. The Company also has one lease covering 418.5 hectares of surface rights that are used for the auxiliary tailings pond. This lease is renewable annually upon payment of a small fee. The Goldex Mine includes underground operations that can be accessed from two shafts, a processing plant, an ore storage facility and other related facilities. The Goldex Extension Zone ("GEZ"), which is the gold deposit on which the Company is currently focusing its production efforts, was discovered in 1989 on the Goldex Extension block (although the Company believes a small portion of the GEZ occurs on the Dalton and Probe blocks). Probe Mines Ltd. holds a 5% net smelter return royalty interest on the Probe block. In 2009, exploration work on the Main zone located on the Probe block to the west of the current mining area continued. In late 1997, the Company completed a mining study that indicated the deposit was not economically viable to mine at the then-prevailing gold price (approximately $323 per ounce of gold) using the mining approach chosen and drill-hole-indicated grade. The property was placed on care and maintenance and the workings were allowed to flood. In February 2005, a new mineral reserve and resource estimate was completed for the GEZ which, coupled with a feasibility study, led to a probable mineral reserve estimate of 1.6 million ounces of gold contained in 20.1 million tonnes of ore grading 2.54 grams of gold per tonne. The GEZ resource model was revised and, in March 2005, the Company approved a feasibility study and the construction of the Goldex Mine. The mine achieved commercial production on August 1, 2008 and has consistently operated at or above the designed rate of 6,900 tonnes per day. The Goldex Mine produced 148,849 ounces of gold in 2009 at total cash costs of $365 per ounce. It is anticipated to produce approximately 169,000 ounces of gold in 2010 at estimated total cash costs per ounce of approximately $325. Based on the results of a scoping study completed in July 2009, the Company determined to expand the mine and mill operations at the Goldex Mine to 8,000 tonnes per day. This project is expected to be completed in early 2011. Capital costs in connection with the expansion total $10 million, which are expected to be incurred in 2010. Mining and Milling Facilities Surface Plan of the Goldex Mine At the time the Company commenced construction of the Goldex Mine, the surface facilities included a headframe, a hoistroom, a surface building containing a mechanical shop, a warehouse and an office. In addition, the Goldex property had a 790-metre deep shaft (Shaft #1), which provided access to underground workings. Shaft #1 is predominantly used to hoist waste rock from development activities. The sinking of a new production shaft was completed in 2007. The new shaft (Shaft #2) is a 5.5-metre diameter shaft with a 50-centimetre thick concrete lining and is used for ventilation as well as hoisting services. Shaft #2 is 865 metres deep and includes five stations. A refurbished friction hoist was installed for production and service duties, and an auxiliary hoist was installed for emergency and personnel service. The production hoist is equipped with one cage-skip. Each skip has a 21.5-tonne capacity, and the shaft can hoist an average of 7,000 to 8,000 tonnes of ore per day. Mining Method The Goldex Mine uses a high volume bulk mining method, which is made possible through the use of large mining stopes. Drilling and blasting of 165-millimetre production holes is used to obtain a muck size large enough to be economically efficient. Using this method requires a percentage of the broken ore to be kept in the stope to reduce the backfilling cost and to reduce sloughing on the walls. Little ore and waste development is necessary to mine out the deposit. Surface Facilities Plant construction at the Goldex Mine commenced in the second quarter of 2006 and was completed in the first quarter of 2008. The plant reached design capacity in the second quarter of 2009. Grinding at the Goldex mill is done through a two-stage circuit comprised of a SAG mill and a ball mill. As part of the 2009 expansion project a surface crusher was added to reduce the size of ore transferred to the surface from 150 millimetres to 50 millimetres. Approximately two-thirds of the gold is recovered through a gravity circuit, passed over shaking tables and smelted on site. The remainder of the gold and pyrite is recovered by a flotation process. The concentrate is then thickened and trucked to the mill at the LaRonde Mine where it is further treated by cyanidation. Gold recovered is consolidated with precious metals from the LaRonde and Lapa Mines. The Company is targeting an average gold recovery of 92.1%. In addition, surface facilities at the Goldex Mine include an electrical sub-station, a compressor building, a service building for administration and changing rooms, a warehouse building, a concrete headframe above Shaft #2, a hazardous waste storage facility and a dome covering the ore stockpile. In 2008, the processing plant building was commissioned along with the Manitou pumping station and its associated 24-kilometre pipeline. Mineral Recoveries During 2009, the Goldex mill processed approximately 2.61 million tonnes of ore, averaging approximately 7,163 tonnes of ore treated per day and operating at approximately 95% of available time. The following table sets out the metal recoveries at the Goldex Mine in 2009. Gold 1.98 g/t 107,232 oz 64.10% 41,617 oz 24.9% 148,849 oz 89.0% 148,849 oz Environmental Matters Environmental permits for the construction and operation of an ore extracting infrastructure at the Goldex Mine were received from the Ministry of Sustainable Development, Environment and Parks (Quebec) in October 2005. The permits also covered the construction and operation of a sedimentation pond for mine water treatment and sewage facilities, and these facilities have been built at the Goldex Mine site. In June 2009, permits were revised to permit the expansion of the mine and mill operations to 8,500 tonnes per day. In November 2006, the Company and the Quebec government signed an agreement permitting the Company to dispose of the Goldex tailings at the Manitou minesite, a tailings site formerly used by an unrelated third party and abandoned to the Quebec government. The Manitou tailings site has issues relating to acid drainage and the construction of tailings facilities by the Company and the deposit of tailings from the Goldex plant on the Manitou tailings site was accepted by the Ministry of Sustainable Development, Environment and Parks (Quebec) as a valid rehabilitation plan to address the acid generation problem at Manitou. Under the agreement, the Company managed the construction and operation of the tailings facilities and the Quebec government paid all additional costs above the Company's budget for tailings facilities set out in the Goldex feasibility study. The Quebec government retains responsibility for all environmental contamination at the Manitou tailings site and for final closure of the facilities. In addition, the Company has built a separate tailings deposition area (auxiliary tailings pond) near the Goldex Mine. Environmental permits for the construction and operation of the auxiliary tailings pond at the Goldex Mine were received in March 2007. In 2009, 6,000 tonnes of Goldex tailings were discharged to the auxiliary pond for a total to date of 493,000 tonnes. At the Manitou site, 2.57 million tonnes of Goldex tailings were discharged for a total to date of 3.2 million tonnes. Capital Expenditures Capital expenditures at the Goldex Mine in 2009 were approximately $24 million, which included $4 million on sustaining capital expenditures, $9 million for the mill expansion project, $2 million for exploration, $8 million in deferred development expenses and $1 million for other projects. Sustaining capital expenditures are expected to be $4.5 million in 2010 and $17.6 million over the period from 2010 through 2014. Development During 2009, approximately 5,000 metres of lateral and vertical development were completed at a cost of $12 million. For 2010, 3,115 metres of development is planned with a budget of $10 million (including $9 million for deferred development). In addition, ramp access from Level 49 to Level 37 will be completed in 2010. Geology, Mineralization and Exploration Geology Geologically, the Goldex property is similar to the LaRonde property and is located near the southern boundary of the Archean-age (2.7 billion years old) Abitibi Subprovince, a typical granite-greenstone terrane located within the Superior Province of the Canadian Shield. The southern contact of the Abitibi Subprovince with the Pontiac Subprovince is marked by the east-southeast trending CLL Fault Zone, the most important regional structural feature. The Goldex deposit is hosted within a quartz diorite sill, the Goldex Granodiorite, located in a succession of mafic to ultramafic volcanic rocks that are all generally oriented west-northwest. The GEZ, which hosts all of the current mineral reserves, extends from 500 to 800 metres below the surface and is entirely hosted by the Goldex Granodiorite. The limits of the zone are defined by the intensity of the quartz vein stockwork envelope and by gold assays. The zone is almost egg-shaped; it is over 300 metres tall by 450 metres long (in a west-northwest direction) and its thickness increases rapidly from 25 metres along the east-west edges to almost 150 metres in the centre. Mineralization Gold mineralization at Goldex corresponds to the quartz-tourmaline vein deposit type. The Goldex gold-bearing quartz-tourmaline-pyrite veins and veinlets have strong structural control. The most significant structure directly related to mineralization is a discrete shear zone, the Goldex Mylonite, that is up to five metres wide and occurs within the Goldex Granodiorite, just south of the GEZ and most other gold occurrences. The quartz-tourmaline-pyrite vein mineralization is controlled by minor fracture zones that are oriented west-northwest and dip steeply north or south. The fractures are parallel to but north of the Goldex Mylonite. Within the GEZ are three vein sets, the most important of which are extensional-shear veins dipping 30 degrees south and usually less than 10 centimetres thick. The vein sets and associated alteration combine to form stacked envelopes up to 30 metres thick. Strong albite-sericite alteration of the host-rock quartz diorite surrounds the quartz-tourmaline-pyrite veins and covers almost 80% of the mineralized zone; outside of the envelopes, prior chlorite alteration affects the quartz diorite and gives it a darker grey-green colour. Occasionally, enclaves of relatively unaltered medium grey-green-coloured quartz diorite (with no veining or gold) are found within the GEZ; they are included exceptionally as internal waste to allow for a smooth shape, required for mining purposes. Most of the gold occurs as microscopic particles that are almost always associated with pyrite, generally adjacent to grains and crystals but also 20% included within the pyrite. The gold-bearing pyrite occurs in the quartz-tourmaline veins and in narrow fractures in the sericite-albite-altered quartz diorite (generally immediately adjacent to the veins). Less than 1.5% of the gold occurs as the mineral calaverite, a gold telluride. Exploration In 2009, 52 holes for a total length of 8,917 metres were drilled at the Goldex Mine with 212 metres of lateral development on Level 84 for exploration purposes. Four zones, all located in the Goldex Granodiorite intrusive, have been drilled. Thirty-three holes for 5,014 metres were drilled in the M-zone (a zone similar to the GEZ located 150 metres above the western end of the GEZ); M-zone is the main contributor to the increase in mineral reserves during 2009. Thirteen holes for 2,275 metres were drilled to define the western end of the S-zone, located 40 metres above the GEZ. Six holes were drilled in the E-zone to initiate the E-zone conversion program (including one hole drilled at depth below the E-zone (GEZ Deep)). Results of the 2009 exploration program converted 3.6 million tonnes of mineral resources at year-end 2008 into 3.2 million tonnes of probable mineral reserves at year-end 2009 and redefined the inferred mineral resources of the S-zone from 0.6 million tonnes at year-end 2008 to 1.5 million tonnes at year-end 2009. More exploration is needed to define the possible extension or repetition of the zone at depth and in its east-west extensions. The inferred mineralization in the eastern portion of the property extends 175 metres east and 125 metres below the current envelope of probable mineral reserves. The zone is open above Level 73 to the east-southeast for approximately 300 metres. The 2010 exploration program is projected to include 28,206 metres of drilling. The primary target is GEZ Deep below the actual production levels. The remainder of drilling will be dedicated to conversion of the E-zone resources to reserves and to explore to the west and east of the GEZ and the south zones. Kittila Mine The Kittila Mine, which commenced commercial production in May 2009, is located approximately 900 kilometres north of Helsinki and 50 kilometres northeast of the town of Kittila in northern Finland. At December 31, 2009, the Kittila Mine was estimated to contain probable mineral reserves of 4.0 million ounces of gold comprised of 26.0 million tonnes of ore grading 4.83 grams per tonne. The Kittila Mine is accessible by paved road from the village of Kiistala, which is located on the southern portion of the main claim block. The gold deposit is located near the small village of Rouravaara, approximately ten kilometres north of the village of Kiistala, accessible via a paved road. The property is close to infrastructure, including hydro power, an airport and the town of Kittila. The project also has access to a qualified labour force, including mining and construction contractors. The total landholdings surrounding and including the Kittila Mine comprise one mining licence covering an area of approximately 847 hectares, 130 individual tenements (valid claims) covering approximately 11,130 hectares and 152 claim applications covering approximately 13,730 hectares. The mineral titles form a continuous block around the Kittila mining licence. The block has been divided into the Suurikuusikko area, the Suurikuusikko West area and the Kittila mining licence centred at 25.4110 degrees longitude east and 67.9683 degrees latitude north. The boundary of the mining licence is determined by ground-surveyed points whereas the boundaries of the other tenements are not required to be surveyed. All of the tenements in the Kittila Mine are registered in the name of Agnico-Eagle AB, an indirect, wholly-owned subsidiary of the Company. According to the Finnish government's land tenure records, all tenements are in good standing. The expiry dates of the tenements vary from April 2010 up to June 2014. Tenements are valid between three and five years, provided a small annual fee is paid to maintain title, and extensions can be granted for three years or more. Agnico-Eagle AB also holds the mining licence in respect of the Kittila Mine. The mine is subject to a 2.0% net smelter return royalty payable to the Republic of Finland starting in 2011. The Kittila Mine area is sparsely populated and is situated between 200 and 245 metres elevation above sea level. The topography is characterized by low rolling forested hills separated by marshes, lakes and interconnected rivers. The gold deposit is situated on an area of land that has no special use at present and there is sufficient land available for tailings facilities. Water requirements for the Kittila Mine are sourced from the nearby Seurujoki River, recirculation of water from pit dewatering and tailings pond water. The Kittila region is located within the South-West Lapland zone of the northern boreal vegetation zone characterized by spruce forests, marshes and bogs. The mine is located within the Arctic Circle but the climate is moderated by the Gulf Stream off the coast of Norway such that northern Finland's climate is comparable to that of eastern Canada. Winter temperatures range from -10 to -30 degrees Celsius, whereas summer temperatures range from 10 degrees Celsius to the mid-20s. Exploration and mining work can be carried out year round. Because of its northern latitude, winter days are extremely short with a brief period of 24-hour darkness around the winter solstice. Conversely, summer days are very long with a brief period of 24-hour daylight in early summer around the summer solstice. Annual precipitation varies between five and 50 centimetres, one-third of which falls as snow. Snow accumulation usually begins in November and remains until March or April. Location Map of the Kittila Mine The Company acquired its 100%, indirect interest in the Kittila Mine through the acquisition of Riddarhyttan completed in November 2005. See "— History and Development of the Company". In June 2006, on the basis of an independently reviewed feasibility study, the Company approved construction of the Kittila Mine. The Kittila Mine is currently an open pit mining operation with underground mining via ramp access expected to be gradually phased in over three years. The initial underground stope was mined in early 2010. Ore is processed in a 3,000-tonne per day surface processing plant that was commissioned in late 2008. Limited gold concentrate production started in September 2008 and gold dore bar production commenced in January 2009. The Kittila Mine is anticipated to produce approximately 147,000 ounces of gold in 2010 at estimated total cash costs per ounce of approximately $502. Over the period of 2010 to 2023, total average gold production of approximately 150,000 ounces annually is anticipated. A scoping study is underway to assess the feasibility of significantly increasing the annual gold production. This could involve sinking a new shaft and expanding the Kittila mill. Mining and Milling Facilities Surface Plan of the Kittila Mine The orebodies at Kittila are being mined initially from two open pits, followed by underground operations to mine the deposits at depth. Additional, smaller open pits will be used to mine any remaining mineral reserves close to the surface in the future. Open pit mining started in May 2008 and the extracted ore was stockpiled. As of December 2009, a total of 862,000 tonnes of ore have been processed, 263,234 tonnes of ore stockpiled and 16.9 million tonnes of waste rock had been excavated. Work on the ramp to access the underground reserves continued and total underground development to date is approximately 9,500 metres. Mining Methods The Kittila Mine currently mines the Suurikuusikko orebody with a 160-metre deep open pit. Ore is mined in 7.5-metre benches together with waste rock using buffer blasting techniques and is loaded selectively to minimize dilution and maximize ore recovery. Hydraulic excavators load ore into 100-tonne trucks that haul the ore to the crusher and the waste rock to the waste disposal area. Approximately 3,000 tonnes of ore per day are fed to the concentrator. Surface mining is expected to continue through 2013, during which time the ramp access to the underground mine will continue to be developed. The underground mining method will be open stoping with delayed backfill. Stopes will be from 25 to 40 metres high and yield approximately 10,000 tonnes of ore per stope. To ensure sufficient ore production is available to supply the mill, approximately 5,000 metres of tunnels will be developed each year. After extraction, stopes will be filled with cemented backfill or paste fill to enable the safe extraction of ore in adjacent stopes. Ore will be trucked to the surface crusher via the ramp access system. Surface Facilities Construction of the processing plant and associated equipment was completed in 2008 and facilities on site include an office building, a maintenance facility for the open pit equipment, a warehouse, a maintenance shop, an oxygen plant, a processing plant, a tank farm, a crusher, conveyor housings and an ore bin. In addition, some temporary structures house contractor offices and work areas. The ore at Kittila is treated by grinding, flotation, pressure oxidation and carbon-in-leach circuits. Gold is recovered from the carbon in a Zadra elution circuit and is recovered from solution using electrowinning and then poured into dore bars using an electric induction furnace. Mineral Recoveries In 2009, the Kittila mill processed 750,660 tonnes of ore with an availability of 80% for an average throughput of 2,570 tonnes per day. Low mill availability was caused by maintenance issues associated with the autoclave, mainly leaking seals on valves and blocked air pipes caused by continuous start-stop cycles. During the last quarter of 2009, there were very few autoclave stoppages and leaking seals and blocked pipes were not an issue. Mill availability in the fourth quarter of 2009 was 84% with a total throughput of 250,964 tonnes. The following table sets out the gold production at the Kittila Mine in 2009: Gold 5.02 g/t 72,207 oz 59.60% 71,838 oz Optimization of flotation recoveries has gone well and recoveries in the latter part of the year were consistently greater than 91%. Trials are still in progress with the aim to increase the flotation recovery even further. Batch laboratory flotation test-work is underway to optimize this process. At the start of production, carbon-in-leach recoveries were between 60% and 75% but deteriorated quickly and were only approximately 25% by the end of February. Poor recovery was attributed to the formation of a chloride compound in the autoclave resulting in dissolved gold being absorbed by organic carbon contained in the ore before reaching the carbon-in-leach circuit. To reduce and better control the effect of the chloride, changes were made to the flow-sheet. The changes included removing the acidulation stage; stopping the recycling of autoclave discharge back to the autoclave feed; and optimizing the distribution management of the autoclave oxygen. By June recovery had improved to 80% and since then, in trials, recoveries have at times reached over 90%. The carbon-in-leach recovery, however, has not been consistent. Further optimization and development work is ongoing. Environmental Matters The Company currently holds a mining licence, an environmental permit and operational permits in respect of the Kittila Mine. All permits necessary to begin production were received during 2008, including an environmental permit update to change from a biological oxidation process to a pressure oxidation process and to change the slopes of the waste rock pile to decrease the footprint. The construction of the first phase of the tailings dam and waterproof bottom layer was completed in the fall of 2008. This first phase is sufficient to hold tailings from three years of production. Work began on the second phase in 2009. Water from dewatering the mine and water used in the mine and mill is collected and treated by sedimentation. Emissions and environmental impact are monitored in accordance with the comprehensive monitoring program that has been approved by the Finnish environmental authorities. There are no material environmental liabilities related to the Kittila Mine. Capital Expenditures Capital expenditures at the Kittila Mine during 2009 were approximately $90 million, which included deferred production costs prior to commencement of commercial production as of May 1, 2009, mill modification costs, underground mine development costs, exploration and conversion drilling costs within the mining licence area and sustaining capital costs. The Company expects capital expenditures at the Kittila Mine in 2010 to be approximately $57.3 million, most of which will be used for mining equipment for underground mining, development and construction of underground mining infrastructure and exploration and conversion drilling. Development Mining at the Suurikuusikko open pit progressed throughout 2009 with a total of 781,000 tonnes of ore and nine million tonnes of waste mined from the open pit. The Company expects that 879,000 tonnes of ore and 8.6 million tonnes of waste will be mined from the Suurikuusikko pit during 2010. An additional 116,000 tonnes of ore and 900,000 tonnes of waste is expected to be mined from the Rouravaara pit during 2010. Total costs for open pit development in 2009 were $21 million. In 2009, underground development progressed in both the Rouravaara and Suurikuusikko zones with 4,232 metres of ramp and sublevel access development completed during the year. The first test stope was mined near the end of 2009. A total of 2,500 tonnes of ore from development and 1,620 tonnes of stope ore were mined in 2009. The Company expects to complete 5,040 metres of lateral development and 540 metres of vertical development during 2010. Geology, Mineralization and Exploration Geology The Kittila Mine is situated within the Kittila Greenstone belt, part of the Lapland Greenstone belt in the Proterozoic-age Svecofennian geologic province. The appearance and geology of the area is similar to that of the Abitibi region of the Canadian Shield. In northern Finland, the bedrock is typically covered by a thin but uniform blanket of unconsolidated glacial till. Bedrock exposures are scarce and irregularly distributed. The mine area is underlain by mafic volcanic and sedimentary rocks metamorphosed to greenschist assemblages and assigned to the Kittila Group. The major rock units trend north to north-northeast and are near-vertical. The volcanics are further sub-divided into iron-rich tholeiitic basalts (Kautoselka Formation) located to the west and magnesium-rich tholeiitic basalt, coarse volcaniclastic units, graphitic schist and minor chemical sedimentary rocks (Vesmajarvi Formation) located to the east. The contact between these two rock units consists of a transitional zone (the Porkonen Formation) varying between 50 and 200 metres in thickness. This zone is strongly sheared, brecciated and characterized by intense hydrothermal alteration and gold mineralization, features consistent with major brittle-ductile deformation zones. It includes the north-northeast-oriented Suurikuusikko Trend. Mineralization The Porkonen Formation hosts the Kittila gold deposit, which contains multiple mineralized zones stretching over a strike length of more than 25 kilometres. Most of the work has been focused on the 4.5-kilometre stretch that hosts the known gold reserves and resources. From north to south, the zones are Rimminvuoma ("Rimpi-S"), North Rouravaara ("Roura-N"), Central Rouravaara ("Roura-C"), depth extension of Rouravaara and Suurikuusikko ("Suuri/Roura Deep"), Suurikuusikko ("Suuri"), Etela and Ketola. The Suuri and Suuri/Roura Deep zones include several parallel sub-zones that have previously been referred to as Main East, Main Central and Main West. The Suuri zone hosts approximately 53% of the current probable gold reserve estimate on a contained-gold basis, while Suuri/Roura Deep has approximately 23%, Roura-C approximately 13%, Roura-N approximately 3% and Rimpi-S approximately 5%. Gold mineralization in these zones is associated with intense hydrothermal alteration (carbonate-albite-sulphide), and is almost exclusively refractory, locked inside fine-grained sulphide minerals: arsenopyrite (approximately 73%) or pyrite (approximately 23%). The rest is "free gold", which is manifested as extremely small grains of gold in pyrite. Exploration In 1986, the discovery of coarse visible gold in quartz-carbonate veining along a road cut near the village of Kiistala alerted the Geological Survey of Finland ("GTK") to the gold exploration potential of the area. Following this discovery, GTK initiated regional exploration over the area and deployed a wide range of indirect exploration tools to explore this relatively unexplored area. Over the period from 1987 to 2005, GTK and later Riddarhyttan undertook drilling programs and other testing on the property. After it acquired the property in 1998, Riddarhyttan continued to investigate the metallurgical properties of the refractory gold mineralization with the objective of demonstrating its recoverability and assessing suitable processing scenarios and initiated engineering and environmental studies to assess the feasibility of a mining project. Most of the work on the mining licence area has focused on the Suuri and Roura zones. Up to the end of December 2009, a total of 1,478 drill holes, totalling 418,449 metres, have been completed on the property. In 2009, between six and 11 drill machines worked on the Kittila property: two to three drills on underground infill drilling; three to eight drills on mine exploration; and one to three drills on resource-to-reserve conversion drilling. A total of 336 holes were completed for a length of 105,886 metres. Of these drill holes, 1160 drill holes (17,138 metres) were for definition drilling, 109 drill holes (32,072 metres) were for conversion drilling and 111 drill holes (56,672 metres) were related to mine exploration. Total expenditures for diamond drilling in 2009 were $21.0 million, including $2.4 million for definition and delineation drilling. Exploration during 2009 increased proven and probable gold reserves to 4.0 million ounces (26.0 million tonnes of ore grading 4.8 grams per tonne). Most of the increase came from the Suuri/Roura Deep zone (921,904 ounces) and the Rimpi-S zone (194,694 ounces). Indicated mineral resources increased to 20.5 million tonnes of ore grading 2.1 grams per tonne. Inferred mineral resources were 5.3 million tonnes of ore grading 3.4 grams per tonne. This decrease reflected the successful conversion of resources to reserves, especially in the Suuri/Roura Deep and Rimpi-S zones. The main Suuri zone is made up of three roughly parallel subzones, each containing several ore lenses — East, Central and West. The successful deep drilling campaign during 2009 at the Suuri/Roura Deep zone immediately below the Suuri zone has confirmed that most of the Suuri ore lenses can be traced deeper in the Suuri/Roura Deep zone. Mineralization is still open at depth and to the north, and these areas will be further tested in 2010. An extensive resource to reserve conversion drilling campaign was carried out at Roura-N and Rimpi-S in 2009. As a result of this work, probable reserves increased by 40,021 ounces from Roura-N and by 198,694 ounces from Rimpi-S. The northernmost part of Rimpi-S is still open at depth and to the north. This area will also be tested in 2010. Outside of the Kittila mining licence area, systematic geochemical sampling and diamond drilling continued on targets along the Suurikuusikko Trend, and a number of new targets were tested by diamond drilling. Encouraging results were received from a new gold zone in the Kuotko area located approximately ten kilometres north of the mine construction site as well as from the Hako area located one kilometre north of the mining licence area. A total of 191 diamond drill holes totalling 41,033 metres have been drilled on exploration targets outside of the mining licence area from 2006 to 2008. The 2010 exploration budget for the Kittila Mine is approximately $12.6 million ($9.5 million for minesite exploration and $3.5 million for resource to reserve conversion), and includes over 65,000 metres in diamond drilling (40,000 metres for minesite exploration and 25,000 metres for resource to reserve conversion), using up to nine drills throughout the year to help further identify the gold reserve and resource potential of the Kittila property. In addition, $2.0 million of exploration expenditures, including an estimated 13,000 metres of diamond drilling, is planned for exploration along the 25-kilometre Suurikuusikko Trend. Lapa Mine The Lapa Mine, which achieved commercial production in May 2009, is located approximately 11 kilometres east of the LaRonde Mine near Cadillac, Quebec. At December 31, 2009, the Lapa Mine was estimated to contain proven and probable mineral reserves of 0.8 million ounces of gold comprised of 3.2 million tonnes of ore grading 8.2 grams per tonne. The Lapa property is made up of the Tonawanda property, which consists of 43 contiguous mining claims and one provincial mining lease covering an aggregate of 702.4 hectares, and the Zulapa property, which consists of one mining concession of 93.5 hectares. Location Map of the Lapa Mine The Company's initial interest in the Lapa property was acquired in 2002 through an option agreement with Breakwater Resources Ltd. ("Breakwater"). The Company undertook an aggressive exploration program and discovered a new gold deposit almost 300 metres below the surface. In 2003, the Company purchased the Lapa property from Breakwater for a payment of $8.9 million, a 1% net smelter return royalty on the Tonawanda property and a 0.5% net smelter return royalty on the Zulapa property. In 2008, the Company purchased all royalties from Breakwater for C$6.35 million. In addition, both the Zulapa and Tonawanda properties are subject to a 5% net profit royalty payable to Alfer Inc. and René Amyot. In 2004, an additional claim of 9.4 hectares was added to the Company's holdings at the Lapa Mine. In January 2009, a mining lease covering 66.83 hectares was entered into with the Ministry of Natural Resources and Wildlife (Quebec). The Lapa Mine is accessible by provincial highway. The elevation varies between approximately 320 and 390 metres above sea level. All of the Lapa Mine's power requirements are supplied by Hydro-Quebec through connections to its main power transmission grid. All of the water required at the Lapa Mine is sourced from the Heva river located 3.5 kilometres to the south of the mine. The water is pumped into an existing open pit nearby the property that has been allowed to flood and from which the mine is supplied. The topography slopes relatively gently from north to south. The property is generally covered by a boreal-type forest consisting mainly of black spruce and white pine with minor amounts of birch and poplar. For additional information regarding the Abitibi region in which the Lapa Mine is located, see "— Property, Plant and Equipment — LaRonde Mine". Gold production during 2010 at the Lapa Mine is expected to be approximately 115,000 ounces at estimated total cash costs per ounce of approximately $506. Mining and Milling Facilities Surface Plan of the Lapa Mine The Lapa site hosts an underground mining operation and the ore is trucked to the processing facility at the LaRonde Mine, which has been modified to treat the ore, recover the gold and store the residues. Tailings from the Lapa Mine are deposited in the tailings pond at the LaRonde Mine. In July 2004, the Company initiated sinking an 825-metre deep shaft at the Lapa property. In April 2006, 2,800 tonnes of ore development was extracted at Lapa and was estimated to contain on average 10.65 grams of gold per tonne. The results and results from other sampling methods were incorporated into a feasibility study and in June 2006, the Company accelerated construction of the Lapa Mine. This construction included extending the shaft to a depth of 1,369 metres, which was completed in October 2007. Significant additional construction was required in order for the Lapa Mine to achieve commercial production in May 2009, including the construction of the mill. Mining Methods Two underground mining methods are used at the Lapa Mine: longitudinal retreat with cemented backfill and locally transverse open stoping with cemented backfill. Sublevels are driven at 30-metre vertical intervals. Stopes are mined in 12-metre sections and backfilled with 100% cemented rock fill. Excavated ore from the Lapa site is trucked via provincial highway to the processing facility at the LaRonde Mine. Surface Facilities The infrastructure on the Lapa property includes the refurbished former LaRonde Shaft #1 headframe and shafthouse, service buildings, temporary offices, a settling pond for waste water, dry facilities, an ore bin, a diesel reservoir and a cement plant. In November 2007, lateral development began on three horizons. A backfill plant was commissioned in December 2008 and the sedimentation pond was extended in 2007 to control suspended solids from underground dewatering discharge. Ore at the Lapa Mine is processed through grinding, gravity and leaching circuits. Dedicated milling facilities have been integrated into the facilities at the LaRonde Mine. Based on an average ore head grade of 7.29 grams per tonne, gold recovery averaged 76.03% in 2009. At the end of 2009, recovery was close to 80% and recovery is expected to be at the target of 85.65% after modifications to the gravity circuit in 2010. In addition, the Company is attempting to reduce the mining dilution caused by weaker than expected rock conditions in the south wall, which is mainly composed of talc chlorite schist. Mineral Recoveries From the achievement of commercial production in May 2009 to year-end, the Lapa Mine produced 299,430 tonnes of ore grading 7.29 grams of gold per tonne. The Lapa processing facility on average treated approximately 1,221 tonnes per day during this period, and operated at about 93.8% of available time. Gold 7.29 g/t 53,382 oz 76.03% 52,602 oz Environmental Matters Water used underground at the Lapa Mine was initially re-circulated from mine dewatering after settling in the sedimentation pond. The re-circulation led to ammonia content in the water, and the Company experienced occasional toxicity problems in the water pond in 2008 and 2009. To address the ammonia content in the water, the Company built a 3.5-kilometre pipeline to obtain fresh water from the Heva River. The pipeline was commissioned in November 2009 and appears to have remedied the toxicity problems. A sedimentation pond is used to remove suspended solids from the dewatering water before either release to the environment or re-use in the underground mining operation. The waste rock pile naturally drains towards the sedimentation pond. A waste rock sampling program implemented during the shaft sinking phase verified the non-acid generating nature of the waste rock. Water effluent from the sedimentation pond is being sampled as required under the Quebec mining effluent guidelines, and is expected to comply with the water quality criteria. The mill residues will be sent to the LaRonde tailings area. There are no known environmental liabilities associated with the Lapa site. The Certificates of Authorization to proceed with mine production and with mill construction were issued by the Ministry of Sustainable Development, Environment and Parks (Quebec) in October and December 2007, respectively. The Certificate of Authorization for mill and tailings production was received in 2008. Capital Expenditures The Company incurred approximately $44.7 million in capital expenditures at the Lapa Mine in 2009 and expects to incur approximately $31.8 million in 2010 of which $17.3 million relates to deferred development, $10 million to sustaining capital expenditures (including underground construction and mining equipment) and $3.6 million for exploration. Development In 2009, a total of 10,874 metres of lateral development was completed. Development focused on permanent drifts (ramps and haulage way) and stope preparation of mining blocks set for production in 2009 and 2010. Development work was done on three separate horizons: Level 77, Level 101 and Level 125. Geology, Mineralization and Exploration Geology The Lapa property is geologically similar to the LaRonde property and is also located near the southern boundary of the Archean-age (2.7-billion-years-old) Abitibi Subprovince and the Pontiac Subprovince within the Superior Province of the Canadian Shield. The most important regional structure is the CLL fault zone marking the contact between the Abitibi and Pontiac Subprovinces. The fault zone passes through the property from west to east, and is marked by schists and mafic to ultramafic volcanic flows that comprise the Piché group (up to approximately 300 metres thick in the mine area). On the Lapa property, the fault zone displays a "Z" shaped fold to which all of the lithologic groups in the region conform. Feldspathic dykes cut the Piché group, especially near the fold. North of the Piché group lies the Cadillac sedimentary group, which consists of 500 metres or more of well-banded wacke, conglomerate and siltstone with intercalations of iron formation. The Pontiac group sedimentary rocks (up to approximately 300 metres thick) that occur to the south of the Piché group are similar to the Cadillac group but do not contain conglomerate nor iron formation. Mineralization All of the known gold mineralization along the CLL fault zone is epigenetic (late) vein, type, controlled by the structure. The mineralization is associated with the fault zone and occurs within or immediately adjacent to the Piché group rocks. The Lapa deposit is comprised of the Contact zone and five satellite zones. The Contact zone accounts for approximately 85% of the mineral reserves. The ore zones are made up of multiple quartz veins and veinlets, often smoky and anastomosing, within a sheared and altered envelope containing minor sulphides and visible gold. The Contact zone is generally located at the contact between the Piché group and the Cadillac group. The satellite zones are located within the Piché group at a distance varying from ten to 50 metres from the contact with the Cadillac group except for the Contact North zone, which is located approximately ten metres north of the Contact zone within the Cadillac group. The sheared envelope consists of millimetre-thick foliation bands of biotite or sericite with silica and, in places, cuts across rock units. Quartz veins and millimetre-sized veinlets parallel to the foliation account for 5% to 25% of the mineralization. Visible gold is common in the veins and veinlets but can also be found in the altered host rock. Sulphides account for 1% to 3% of the mineralization; the most common sulphides, in order of decreasing importance, are arsenopyrite, pyrite, pyrrhotite and stibnite. Graphite is also rarely observed as inclusions in smoky quartz veins. The Contact and satellite zones are tabular mineralized envelopes oriented east-west and dipping very steeply to the north, turning south at depth. The economic portion of the zone has been traced from depths of approximately 450 metres to more than 1,500 metres below surface. The Contact zone has an average strike length of 300 metres, varies in thickness from 2.8 to 5.0 metres and is open at depth. Locally some thicker intervals have been intersected but their continuity has not been demonstrated. The satellite zones have thicknesses similar to the Contact zone. Exploration Drilling in 2009 concentrated on confirming and expanding the known orebodies (Contact zone and the other satellite zones) in the immediate vicinity of the ore zones. The exploration program at the Lapa Mine in 2009 primarily tested the eastern area of the Contact zone reserve at roughly 1,000 metres depth below the surface and 300 metres east of the Contact zone reserve limit. Good results, including visible gold, were returned and additional resources were identified. The 2010 program will focus on mineral resource to mineral reserve conversion in this area. Overall, there was a reduction of approximately 120,000 ounces in gold reserves and resources at Lapa from 2008 to 2009 after mining 80,000 ounces of gold. The reduction was a result of a lower than expected grade in the lower portion of the mine and a higher dilution factor applied to the reserves and resources. These results are incorporated in the December 31, 2009 mineral reserve and resource estimate. In 2009, a total of 353 holes were drilled on the Lapa property for a total length of 24,945 metres, compared to 170 holes for a total length of 16,546 metres in 2008. Of the drilling in 2009, 322 holes (19,248 metres) were for production stope delineation, 7 holes (1,451 metres) were for definition drilling and 24 holes (4,247 metres) were for exploration. In 2008, 134 holes (6,709 metres) were for production stope delineation, 21 holes (4,745 metres) were for definition drilling and 15 holes (5,092 metres) were for deep exploration. Expenditure on diamond drilling at the Lapa Mine during 2009 was approximately $2.0 million including $1.7 million in definition and delineation drilling expenses charged to operating costs. In 2010, the Company expects to spend $4.3 million on exploration, including $3.6 million for the excavation of a track drift toward the east. In 2010, 45% of the exploration drilling budget will be used for exploration in close vicinity of the mine infrastructure and 55% will be used for drilling from the exploration drift. Pinos Altos Mine The Pinos Altos Mine commenced commercial production in November 2009. It is located on an 11,000-hectare property in the Sierra Madre gold belt, 285 kilometres west of the City of Chihuahua in the State of Chihuahua in northern Mexico. At December 31, 2009, the Pinos Altos Mine was estimated to contain proven and probable mineral reserves of 3.4 million ounces of gold and 94 million ounces of silver comprised of 42.0 million tonnes of ore grading 2.52 grams of gold per tonne and 69.39 grams of silver per tonne. The Pinos Altos property is made up of three blocks: the Parrena Concessions (19 concessions, 6,041.1 hectares), the Madrono Concessions (17 concessions, 873.3 hectares) and the Pinos Altos Concession (one concession, 4,192.2 hectares). Location Map of the Pinos Altos Mine The Madrono Concessions (which cover approximately 74% of the current mineral resource) are subject to a net smelter royalty of 3.5% payable to Minerales El Madrono S.A. de C.V. ("Madrono"). The Pinos Altos Concession (which covers approximately 26% of the current mineral resource) is subject to a 2.5% net smelter return royalty payable to the Consejo de Recursos Minerales, a Mexican Federal Government agency. After 2029, this portion of the property will also be subject to a 3.5% net smelter return royalty payable to Madrono. The assets at Pinos Altos acquired by the Company in 2006 included an assignment of rights under contracts to explore and exploit the Madrono Concessions and the Pinos Altos Concession, the right to use up to 400 hectares of land owned by Madrono for mining installations for a period of 20 years after formal mining operations have been initiated and sole ownership of the Parrena Concessions. During 2008, the Company and Madrono entered an agreement under which the Company acquired further surface rights for open pit mining operations and additional facilities. Infrastructure payments, surface rights payments and advance royalty payments totalling $35.5 million were made to Madrono in 2009 in respect of this agreement. In 2006, the Company concluded negotiations with communal land owners (ejidos) and others for the purchase of 5,745 hectares of lands contained within the Parrena and Pinos Altos Concessions. In addition, a temporary occupation agreement with a 30-year term expiring in 2036 was negotiated with ejido Jesus del Monte for 1,470 hectares of land covered by these same concession blocks. The acquisition of these surface rights for the geologically prospective lands within the district surrounding Pinos Altos will facilitate future exploration and mining development in these areas. The Pinos Altos Mine is directly accessible by a paved interstate highway that links the cities of Chihuahua and Hermosillo and is within ten kilometres of an extension of the state power grid. Existing and planned underground mine workings will intercept water resources sufficient to sustain the requirements for future operation. The land position is sufficient for construction of all planned surface, infrastructure and mining facilities at the Pinos Altos Mine, including its tailings impoundment area. The Company further believes that a sufficient local and trained workforce is available in northern Mexico to support the operation of the mine. The Pinos Altos property is characterized by moderate to rough terrain with mixed forest (pine and oak) and altitudes that vary from 1,770 metres to 2,490 metres above sea level. The climate is sub-humid, with about one metre of annual precipitation. The average annual temperature is 18.3 degrees Celsius. Exploration and mining work can be carried out year round. In August 2007, on the basis of an independently reviewed feasibility study, the Company approved construction of a mine at Pinos Altos. The mine achieved commercial production in November 2009. The Pinos Altos Mine produced 16,189 ounces of gold and 116,000 ounces of silver in 2009 at total cash costs per ounce of gold of $596. Gold production in 2010 is expected to be approximately 150,000 ounces at estimated total cash costs per ounce of approximately $401 and silver production in 2010 is expected to be approximately 1,590,000 ounces. Over the period of 2010 to 2028, the mine (including production from the Creston Mascota deposit) is expected to produce an average of 170,000 ounces of gold per year. An optimized mine plan and budget incorporating the mineral reserves at December 31, 2009 will be adapted by the Company during 2010. Due to the increase in proven and probable mineral reserves at Pinos Altos, this optimized mine plan will be accretive to the aforementioned August 2007 feasibility study. Based on a feasibility study prepared in 2009, the Company determined to build a stand-alone heap leach operation at the satellite Creston Mascota deposit. Construction activities for this project have been initiated for planned commencement of commercial operations in early 2011. Creston Mascota is expected to produce approximately 50,000 ounces of gold per year during its five-year mine life. Capital costs in connection with the project are expected to total $62 million, of which $8 million was incurred in 2009 and $54 million is expected to be incurred in 2010. The Company has engaged the local communities in the project area with hiring, education support and medical support programs to ensure that the project provides long-term benefits to the residents living and working in the region. The Company received formal recognition from the Governor of Chihuahua State in April 2008 for distinction as a socially responsible company. Mining and Milling Facilities Surface Plan of the Pinos Altos Mine During 2009, major construction activity at the Pinos Altos Mine included the completion of the pre-production development of the underground and open pit mines, completion of construction for the processing and surface infrastructure facilities and commissioning and start-up of the process facilities. Mining Methods The surface operations at the Pinos Altos Mine use traditional open pit mining techniques with bench heights of seven metres with double benches on the footwall and single benching on the hanging wall. Mining is accomplished with front end loaders, trucks, track drills and various support equipment. At full capacity, the open pit mines will extract approximately 15 million tonnes of total material (overburden plus mineral) annually. Based upon geotechnical evaluations, the final pit slopes will vary between 45 degrees and 50 degrees. Performance of the open pit mining operation at Pinos Altos during the pre-production phase indicated that the equipment, mining methods and personnel selected for the project were satisfactory for future production phases. During the first ten years of the project life, it is expected that approximately half of the ore volume processed will be derived from open pit operations, principally at Santo Nino, Oberon de Weber and Creston Mascota. Underground mine production will produce the balance of the ore for the processing plant. The underground mine will utilize the long hole sublevel stoping method to extract the ore. The Company has considerable expertise with this mining method at the LaRonde Mine in Quebec and this method is also well understood at various Mexican mining operations. The stope height is planned at 30 metres and stope width at 15 metres. Ore will be hauled to the surface utilizing underground trucks via a ramp system which is currently under development. Paste backfill will be used to stabilize the mined-out stopes. Ventilation of the underground mine will operate through raise bores, fans and the ramp system. At full capacity, the underground mine is expected to produce a maximum of 4,000 tonnes of ore per day. Performance of the lateral development underground during 2008 was sufficient to indicate that the equipment, mining methods, ground control and personnel selected were satisfactory for future production phases. During 2009, the Company completed the ventilation raises and underground infrastructure including a shop, a warehouse, pump stations and service bays. The Company anticipates that ore production from the underground mine will begin by the first quarter of 2010. Surface Facilities The principal mineral processing facilities at the Pinos Altos Mine are designed to process 4,000 tonnes of ore per day in a conventional process plant circuit which includes single-stage crushing, grinding in a SAG and ball mill in closed loop, gravity separation followed by agitated leaching, counter-current decantation and metals recovery in the Merrill-Crowe process. Tailings are detoxified and filtered and then used for paste backfill in the underground mine or deposited as dry tailings in an engineered tailings impoundment area. Low grade ore is processed in a heap leach system designed to accommodate approximately five million tonnes of mineralized material over the life of the project, the production from heap leach operations is expected to be relatively minor, contributing about 5% of total metal production planned for the life of the mine. A separate heap leach operation and ancillary support facilities are being built for the Creston Mascota deposit, which is expected to process approximately 4,000 tonnes of ore per day in a three-stage crushing, agglomeration and heap leach circuit with carbon adsorption. Surface facilities at the Pinos Altos Mine include a heap leach pad, pond, liner and pumping system; administrative support offices and change room facilities; camp facilities; a laboratory; a process plant shop; a maintenance shop; a generated power station; surface power transmission lines and substations; the engineered tailings management system; and a warehouse. Over the life of the mine, recoveries of gold and silver in the milling circuit at Pinos Altos are expected to average approximately 95% and 53%, respectively. Precious metals recovery from low grade ore processed using heap leach techniques at Pinos Altos will be lower at about 68% for gold and 12% for silver. Heap leach recoveries for Creston Mascota ore are expected to average 71% for gold and 16% for silver. Start-up of the Pinos Altos mill was affected by increased quantities of clay minerals in the initial ore processed resulting in a subsequent limitation on the ability to filter tailings. At the end of 2009, processing rates were at approximately 2,300 tonnes per day compared to the 4,000 tonnes per day design capacity. Several measure are being used to increase throughput to target rates, including installation of additional filtration capacity and the blending of ores to minimize the impact of clay alteration. Target rates are expected to be reached in mid-2010. Mineral Recoveries During 2009, the Pinos Altos mill processed 198,181 tonnes of ore, averaging approximately 130 tonnes of ore treated per day and operating at approximately 70% of available time. The following table sets out the metal recoveries at the Pinos Altos mill in 2009. Gold 1.08 g/t 12,155 oz 92% 16,189 oz Silver 49.5 g/t 103,141 oz 34% 116,000 oz An additional 347,512 tonnes of ore were processed and placed on the heap leach pad with an average grade of 1.1 grams of gold per tonne and 24.8 grams of silver per tonne. Cumulative metals recovery on the heap leach pad are 35.3% gold and 5.3% silver following the planned recovery curve and it is expected that the ultimate recovery of 68% for gold and 12% for silver will be achieved when the approximate one-year leaching cycle is completed on this low grade heap leach ore. Total metal production (from mill and heap leach) at Pinos Altos during 2009 was 16,561 ounces of gold and 118,164 ounces of silver. Environmental Matters The Pinos Altos Mine has received the necessary permit authorizations for construction and operation of a mine, including a Change of Land Use permit and an Environmental Impact Study approval from the Mexican environmental agency ("SEMARNAT"). As of December 31, 2009, all permits necessary for the operation of the Pinos Altos Mine, including the operations at the Creston Mascota deposit, had been received and requests for modifications to allow for future expansion of facilities, including at the Creston Mascota deposit, had been approved or were under review by SEMARNAT. Pinos Altos will employ dry stack tailings technology to minimize the geotechnical and environmental risk that can be associated with the rainfall intensities and topographic relief in the Sierra Madre region of Mexico. All of the Mexican environmental regulatory requirements are expected to be met or exceeded by the Pinos Altos Mine. Capital Expenditures Capital expenditures at the Pinos Altos Mine during 2009 were approximately $143.4 million, which included $40.9 million in mining equipment and pre-production development expenses; $79.4 million in infrastructure and process facilities construction; $9.6 million in expenses related to Creston Mascota; and $13.5 million in exploration and other regional expenses. The Company expects sustaining capital expenditures at Pinos Altos to be approximately $41 million in 2010 and average sustaining capital of approximately $6 million per year for a projected mine life of approximately 20 years. Approximately $52 million in development capital is forecast at Creston Mascota in 2010 with sustaining capital of $2 million during the five year mine life. Capital costs for the Creston Mascota development are estimated at $62 million. Commercial operations at Creston Mascota are planned for early 2011 with production of approximately 50,000 ounces of gold annually for a mine life of approximately five years. Development At December 31, 2009 more than 30 million tonnes of overburden had been removed from the open pit mine and more than nine kilometres of lateral development had been completed in the underground mine. Geology, Mineralization and Exploration Geology The Pinos Altos Mine is in the northern part of the Sierra Madre geologic province, on the northeast margin of the Ocampo Caldera, which hosts many epithermal gold and silver occurrences including the nearby Ocampo mining operation and Moris mine. The property is underlain by Tertiary-age (less than 45-million-years-old) volcanic and intrusive rocks that have been disturbed by faulting. The volcanic rocks belong to the lower volcanic complex and the discordantly-overlying upper volcanic supergroup. The lower volcanic complex is represented on the property by the Navosaigame conglomerates (including thinly-bedded sandstone and siltstone) and the El Madrono volcanics (felsic tuffs and lavas intercalated with rhyolitic tuffs, sandy volcanoclastics and sediments). The upper volcanic group is made up of the Victoria ignimbrites (explosive felsic volcanics), the Frijolar andesites (massive to flow-banded, porphyritic flows) and the Buenavista ignimbrites (dacitic to rhyolitic pyroclastics). Intermediate and felsic dykes as well as rhyolitic domes intrude all of these units. The Santo Nino andesite is a dyke that intrudes along the Santo Nino fault zone. Structure on the property is dominated by a 10-kilometre by 3-kilometre horst, a fault-uplifted block structure oriented west-northwest, that is bounded on the south by the south-dipping Santo Nino fault and on the north by the north-dipping Reyna de Plata fault. Quartz-gold vein deposits are emplaced along these faults and along transfer faults that splay from the Santo Nino fault. Mineralization Gold and silver mineralization at the Pinos Altos Mine consists of low sulphidation epithermal type hydrothermal veins and breccias. The Santo Nino structure outcrops over a distance of roughly six kilometres. It strikes at 060 degrees azimuth on its eastern portion and turns to strike roughly 090 degrees azimuth on its western fringe. The structure dips at 70 degrees towards the south. The four mineralized sectors hosted by the Santo Nino structure consist of discontinuous quartz rich lenses named from east to west: El Apache, Oberon de Weber, Santo Nino and Cerro Colorado. The El Apache lens is the most weakly mineralized. The area hosts a weakly developed white quartz dominated breccia. Gold values are low and erratic over its roughly 750 metre strike length. Past drilling suggests that this zone is of limited extent at depth. The Oberon de Weber lens has been followed on surface and by diamond drilling over an extent of roughly 500 metres. Shallow holes drilled by the Company show good continuity both in grade and thickness over roughly 550 metres. From previous drilling done by Penoles, continuity at depth appears to be erratic with a weakly defined western rake. The Santo Nino lens is the most vertically extensive of these lenses. It has been traced to a depth of approximately 750 metres below surface. The vein is followed on surface over a distance of 550 metres and discontinuously up to 650 metres. Beyond its western and eastern extents, the Santo Nino andesite is massive and only weakly altered. Gold grades found are systematically associated with green quartz brecciated andestite. The Cerro Colorado lens is structurally more complex than the three described above. Near the surface, it is marked by a complex superposition of brittle faults with mineralized zones which are difficult to correlate from hole to hole. Its relation to the Santo Nino fault zone is not clearly defined. Two deeper holes done by the Company during this campaign suggest better grade continuity at depth. The San Eligio zone is located approximately 250 metres north of Santo Nino. The host rock is brecciated Victoria Ignimbrite with, rarely, stockworks. There is no andesite in this sector. Unlike the other lenses, the San Eligio lens dips towards the north. The lateral extent seems to be continuous for 950 metres. Its average width is five metres and never exceeds 15 metres. Surface mapping and prospecting has suggested good potential for additional mineralization on strike and at depths below 150 metres. Visible gold has been seen in the drill core. The minerals present are indicative of an oxidized, epithermal, low sulphidation (and likely low sulphide) precious metals vein system rich in silver. The temperature of formation is thought to have been below 300 degrees Celsius, as no selenium minerals have been found to date. The presence of kaolinite and dickite are indicative of an acidic environment. The presence of hematite crystals in the centre of acanthite indicates that the deposit was probably formed under oxidative conditions. Several other promising zones are associated with the horst feature in the northwest part of the property. The Creston Mascota deposit is 7 kilometres northwest of the Santo Nino deposit, and is similar but dips shallowly to the west. Creston Mascota is about 1,000 metres long and 4 to 40 metres wide, and extends from surface to more than 200 metres depth. The deposit will be exploited by open pit and heap leach starting in 2011. Exploration In 2009, minesite exploration activities focused on delineation of the resources at San Eligio and exploration of the lateral and deep extents of the Cerro Colorado and Santo Nino orebodies. A total of 34.9 kilometres of minesite exploration and 13.9 kilometres of definition drilling were completed during the year. The result of the drilling was a small contraction in the minesite reserves and resources. The San Eligio zone continues to be open to the west and at depth. Regional exploration in 2009 focused on the El Cubiro, Sinter and Reyna de Plata prospects. Diamond drilling consisted of 37.0 kilometres in 175 drill holes. Detailed geological and structural mapping and sampling was done in the El Cubiro, Mascota and Cerro la Plata areas. Almost 15,600 core samples and 2,330 rock-chip samples were sent to a certified laboratory and assayed mainly for gold and silver. The recently-discovered Cubiro mineralization is two kilometres west of Creston Mascota. Cubiro is a surface deposit that strikes northwest, has a steep dip and has been followed along strike for approximately 850 metres. Drilling has intersected significant gold and silver mineralization up to 30 metres wide. The Cubiro deposit remains open in all directions. The Sinter zone, 1,500 metres north-northeast of the Santo Nino zone, is part of the Reyna de Plata gold structure. The steeply-dipping mineralization is 4 to 35 metres wide and almost 900 metres long, with over 350 metres of vertical depth. Sinter is being evaluated for its open pit mining and heap leach potential. Meadowbank Mine The Meadowbank Mine, which achieved commercial production in March 2010, is located in the Third Portage Lake area in the Kivalliq District of Nunavut in northern Canada, approximately 70 kilometres north of Baker Lake. At December 31, 2009, the Meadowbank Mine was estimated to contain probable mineral reserves of 3.66 million ounces of gold comprised of 32.2 million tonnes of ore grading 3.53 grams of gold per tonne. The Company acquired its 100% interest in the Meadowbank Mine in 2007, as the result of the successful acquisition of Cumberland (see "— History and Development of the Company"). Location Map of the Meadowbank Mine The Meadowbank Mine is held under ten Crown mining leases, three exploration concessions and 11 Crown mineral claims. The Crown mining leases, which cover the Portage, Goose Island and Goose South deposits, are administered under federal legislation. The mining leases, which have renewable ten-year terms, have no annual work commitments but are subject to annual rent fees that vary according to their renewal date. The mining leases cover approximately 7,400 hectares and expire in either 2016 or 2019. Annual rent currently totals C$18,273. The production lease with the KIA is a surface lease covering 1,354 hectares and requires payment of C$124,530 annually. Production from subsurface lease areas is subject to a royalty of up to 14% of the adjusted net profits, as defined in the Territorial Mining Regulations. In order to conduct exploration on the Inuit-owned lands at Meadowbank, the Company must receive approval for an annual work proposal from the KIA, the body that holds the surface rights in the Kivalliq District and administers land use in the region through various boards. The Nunavut Water Board, one such board, provided the recommendation to the Ministry of Indian Affairs and Northern Development (Canada) to grant the Meadowbank Mine's construction and operating licences in July 2008. The Company has obtained all of the approvals and licences required to build and operate the Meadowbank Mine. The three Meadowbank exploration concessions comprise approximately 23,100 hectares and are granted by Nunavut Tunngavik, the corporation responsible for administering subsurface mineral rights on Inuit-owned lands in Nunavut. Exploration concessions cover the Vault deposit at Meadowbank and in 2010 will require annual rental fees of approximately C$58,000 and exploration expenses of approximately C$416,000. During the exploration phase, the concessions can be held for up to 20 years and the concessions can be converted into production leases with annual fees of C$1 per hectare, but no annual work commitments. Production from the concessions is subject to a 12% net profits interest royalty from which annual deductions are limited to 85% of the gross revenue. The 23 Crown mineral claims cover approximately 18,500 hectares at Meadowbank and are subject to land fees and work commitments. Land fees are payable only when work is filed. The most recent filing was in 2009, when approximately C$4,568 in land fees were paid and approximately C$931,505 in assessment work was submitted. The Kivalliq region in which the Meadowbank Mine is located has an arid arctic climate. The Meadowbank property is situated in an area characterized by low, rolling hills that are covered predominantly in heath tundra with numerous lakes and ponds. Elevation ranges from approximately 130 metres at lakeshores up to 200 metres on ridge crests. Operations at the Meadowbank Mine are expected to be year round with only minor weather-related interruptions to mining operations; however, these interruptions are not expected to affect ore availability for milling operations or other operating activities. The Meadowbank Mine is accessible from Baker Lake, located 70 kilometres to the south, over a 110-kilometre all-weather road completed in March 2008. Baker Lake provides 2.5 months of summer shipping access via Hudson Bay and year round airport facilities. The Meadowbank Mine also has a 1,100-metre long gravel airstrip, permitting access by air. The Company will use ocean transportation for fuel, equipment, bulk materials and supplies from Montreal, Quebec, (or Hudson Bay port facilities) via barges and ships into Baker Lake during the summer port access period that starts at the end of July in each year. Fuel and supplies are transported to the site from Baker Lake by conventional tractor trailer units. Transportation for personnel and air cargo are provided on scheduled or chartered flights. The permanent bases for employees from which to service the Meadowbank Mine are Val D'Or and Montreal in Quebec and the Kivalliq communities. Since February 2009, all chartered flights have landed directly at Meadowbank. The Company anticipates the Meadowbank Mine will achieve commercial production during the first quarter of 2010 and produce approximately 300,000 ounces of gold in 2010 at an estimated total cash costs per ounce of $460 and an average of 350,000 ounces of gold per year from 2010 to 2018 with total cash costs per ounce expected to average $520 over these years. A scoping study is currently underway to assess the feasibility of increasing production from 8,500 tonnes per day to 10,000 tonnes per day by accelerating development from the Goose Island and Portage open pits and potentially building a ramp-access underground operation at the southern end of the deposit. Results of the scoping study are expected in the second quarter of 2010. Drilling done in 2009 on the underground resource increased the continuity over a 700-metre strike length and up to 500 metres at depth. A feasibility study is underway and results will be available early 2010. Mining and Milling Facilities Surface Plan of the Meadowbank Mine Meadowbank has three major deposits that have sufficient drilling definition to sustain reserves. By the end of 2009, all of the camp infrastructure (dormitories and kitchen), a mill, a service building shop and generator buildings were built. All required aggregates used in the mining process are produced from waste material taken from the north end of the Portage pit. In 2008, a dyke was constructed to fully access the north half of the Portage pit in preparation for pit development in 2009 in order to have it ready for production in 2010. Future construction will include building a second major dyke (the Bay-Goose dyke) to access the southern portion of Portage and the Goose Island pits. In 2011, the Company will construct an eight-kilometre access road to service the Vault pit. Mining Methods Mining at the Meadowbank Mine is done by open pit with trucks and excavators. Ore is extracted conventionally using drilling and blasting with truck haulage to a primary gyratory crusher located adjacent to the mill. The marginal grade material (that is, material grading between actual cut-off and break even cut-off) is separated and stockpiled for future processing. Also, a sub-grade material stockpile (that is, material for which extraction and stockpile has already been paid for and currently grades too low to be processed) will be created for potential processing at the end of the mine life. Waste rock is hauled to one of two waste storage areas on the property, used for dyke construction or fill material or dumped into selective areas of the open pits that have previously been mined out. Mining will initially be concentrated in the Portage pit area. Waste material from the pre-stripping will be used as bulk construction materials for dykes, as well as for construction fill material around the site. During pre-production, ore grade material was stockpiled close to the primary crusher. From 2009 through 2013, all of the ore is scheduled to be sourced from the Portage pit. Waste material will be used to complete the construction of the Bay-Goose, Central, Stormwater and 7 Saddle Dam dykes, with the remaining waste hauled to a primary dump north of Second Portage Lake. With the completion of the Bay-Goose dyke, the Goose Island pit will be brought into production in 2013. The Company anticipates that these two pits will operate concurrently for a period of one year, from 2013 through 2014. Waste stripping is scheduled to commence in the Vault pit in 2014, with the start of ore mining anticipated in 2014 as the Goose Island pit becomes depleted. During the last four years of the current mine life, estimated to begin in 2015, mining will be exclusively from the Vault pit. Surface Facilities The accommodations complex at the Meadowbank Mine consists of a permanent camp with capacity for 364 employees and a temporary camp to accommodate 200 extra workers. The camp is supported with a sewage treatment, solid waste disposal and potable water plant. In 2008, the exploration group was relocated eight kilometres south of the minesite location to a separate camp with an 80-person capacity. Plant site facilities include a mill building, a maintenance mechanical shop building, a generator building, an assay lab and a heavy vehicle maintenance shop. A separate crusher structure will flank the main process complex. Power is supplied by an 26.4-megawatt diesel electric power generation plant with heat recovery and an onsite fuel storage (5 million litres) and distribution system. The mill-service-power complex is connected to the accommodations complex by enclosed corridors. In addition, the Company will build peripheral infrastructure including tailings and waste impoundment areas. Facilities constructed at Baker Lake include a barge landing site located three kilometres east of the community and a storage compound. A fuel storage and distribution complex with a 40-million litre capacity has been built next to the barge landing facility. The process design is based on a conventional gold plant flowsheet consisting of primary gyratory crushing, grinding, gravity concentration, cyanide leaching and gold recovery in a carbon-in-pulp ("CIP") circuit. The mill is designed to operate 365 days per year with a design capacity of 8,500 tonnes per day. The overall gold recovery is projected to be approximately 93.4%, based on projections from metallurgical test work, with approximately 40% typically recovered in the gravity circuit. The Company will use crushed ore that will be fed to a coarse ore stockpile and then reclaimed by a SAG mill operating in closed circuit with a pebble crusher. The SAG mill operates together with a ball mill to reduce the ore to approximately 80% passing 60 to 90 microns, depending on the ore type and its hardness. The ball mill operates in closed circuit with cyclones. The grinding circuit incorporates a gravity process to recover free gold and the free gold concentrate is leached in an intensive cyanide leach-direct electrowinning recovery process. The cyclone overflow is thickened prior to pre-aeration with air and leaching in agitated tanks. The leached slurry is directed to a six-tank CIP system for gold recovery. Gold in solution from the leaching circuit is recovered on carbon and subsequently stripped and then recovered from the strip solution by electrowinning, followed by smelting and the production of a dore bar. The CIP tailings will be treated for the destruction of cyanide using the standard sulphur-dioxide-air process. The detoxified tailings will be pumped to the permanent tailings facility. The tailings storage is designed for zero discharge, with all process water being reclaimed for re-use in the mill to minimize the water requirements for the project. Mineral Recoveries Gold recoveries are expected to average 93.4% for all deposits. The different ore zones have slightly different grind sensitivities to gold recovery and, as such, different particle size distributions are recommended as target grinds in the process. The use of a slightly coarser grind for the Vault ores will allow all three of the ore zones to be processed at a consistent process throughput. Environmental Matters (including Inuit Impact and Benefit Agreement) The development of the Meadowbank Mine was subject to an extensive environmental review process under the Nunavut Land Claims Agreement administered by the Nunavut Impact Review Board (the "NIRB"). On December 30, 2006, a predecessor to the Company received the Project Certificate from the NIRB, which includes the terms and conditions to ensure the integrity of the development process. The Nunavut Water Board provided the recommendation to the Ministry of Indian Affairs and Northern Development (Canada) to grant the Meadowbank Mine's construction and operation under a water licence in July 2008. In February 2007, a predecessor to the Company and the Nunavut government signed a Development Partnership Agreement (the "DPA") with respect to the Meadowbank Mine. The DPA provides a framework for stakeholders including the federal and municipal governments and the KIA, to maximize the long-term socio-economic benefits of the Meadowbank Mine to Nunavut. An Inuit Impact Benefit Agreement for the Meadowbank Mine (the "IIBA") was signed with the KIA in March 2006. The IIBA ensures that local employment, training and business opportunities arising from all phases of the project are accessible to the Kivalliq Inuit. The IIBA also outlines the special considerations and compensation that Cumberland agreed to provide to the Inuit regarding traditional, social and cultural matters. The Company currently holds a renewable exploration lease from the KIA that expires December 31, 2010. In July 2008, the Company signed a production lease for the construction and the operation of the mine, the mill and all related activities. In April 2008, the Company and KIA signed a water compensation agreement for the Meadowbank Mine addressing Inuit rights under the Land Claims Agreement respecting compensation for water use and water impacts associated with the project. The Meadowbank Mine consists of several gold-bearing deposits: Portage, Goose and Vault. A series of six dykes have or will be built to isolate the mining activities from neighbouring lakes. Waste rock from the Portage, Goose Island and Vault pits will be stored in the Portage and Vault rock storage facility. The control strategy to minimize the onset of oxidation and the subsequent generation of acid mine drainage includes freeze control of the waste rock through permafrost encapsulation and capping with an insulating convective layer of neutralizing rock (ultramafic and non-acid generating volcanic rocks). Because the site is underlain by about 450 metres of permafrost, the waste rock below the capping layer is expected to freeze, resulting in low rates of acid rock drainage generation in the long term. Tailings will be stored in the Second Portage arm. Initially the tailings will be deposited in a subaqueous environment, but the majority of tailings will be deposited on tailings beaches. A reclamation pond will be operated within the tailings storage facility. The control strategy to minimize water infiltration into the tailings storage facility and the migration of constituents out of the facility includes freeze control of the tailings through permafrost encapsulation. A four-metre-thick dry cover of acid neutralizing ultramafic rockfill will be placed over the tailings as an insulating convective layer to confine the permafrost active layer within relatively inert materials. The water management objective for the project is to minimize the potential impact on the quality of surface water and groundwater resources at the site. Diversion ditches will be constructed to avoid the contact of clean runoff water with areas affected by the mine or mining activities. Contact water originating from affected areas will be intercepted, collected, conveyed to the tailings storage facility for re-use in process or decanted to treatment (if needed) prior to release to receiving lakes. Capital Expenditures/Development A total of $105 million has been budgeted to be spent at the Meadowbank Mine (excluding exploration) in 2010, including $48 million on dyke construction, $38 million on sustaining capital and equipment and $10 million on mining pre-production and deferred stripping. The mine is expected to start production in 2010. Total capital costs of construction incurred since the date of acquisition by the Company amounted to $721 million. The mine life is expected to be ten years. Geology, Mineralization and Exploration Geology The Meadowbank Mine comprises a number of Archean-age gold deposits hosted within polydeformed volcanic and sedimentary rocks of the Woodburn Lake Group, part of the Western Churchill supergroup in northern Canada. Three minable gold deposits — Goose, Portage and Vault — have been discovered along the 25-kilometre long Meadowbank gold trend, and the PDF deposit has been outlined on the northeast gold trend. These known gold resources are within 225 metres of the surface, making the project amenable to open pit mining. Mineralization The predominant mineralization found in the Portage and Goose deposits is pyrrhotite, which is found as a replacement of magnetite in the oxide facies iron formation host rock. To a lesser extent, pyrite and chalcopyrite may be found and, on rare occasions, arsenopyrite may be associated with the other sulphides. The mineralization is usually restricted to several metres in length laterally, but vertically may extend to over several hundred metres. The sulphides primarily occur as narrow stringers or bands of disseminated sulphides that almost always crosscut the main foliation and/or bedding which would imply an epigenetic mode of emplacement. The percentage of sulphides is quite variable and may range from trace to semi-massive amounts over several centimetres to several metres in length. The higher gold grades and the occasional occurrence of visible gold are almost always associated with greater than 20% sulphide content. The main mineralized banded iron formation unit is bounded by an ultramafic unit to the west which locally occurs interlayered with the banded iron formation and to the east by an intermediate to felsic metavolcaniclastic unit. In the Vault deposit, pyrite is the principal ore bearing sulphide. The disseminated sulphides occur along sheared horizons that have been sericitized and silicified. These zones are several metres wide and may continue for hundreds of metres along strike and down dip. Three of the four known gold deposits are currently planned to be mined. The Goose Island and Portage deposits are hosted within highly deformed, magnetite-rich iron formation rocks, while intermediate volcanic rock assemblages host the majority of the mineralization at the more northerly Vault deposit. The fourth deposit, PDF, shows the same characteristics as Vault, though it is not currently anticipated to be a mineable deposit. Defined over a 1.85-kilometre strike length and across lateral extents ranging from 100 to 230 metres, the geometry of the Portage deposit consists of general north-northwest-striking ore zones that are highly folded. The mineralization in the lower limb of the fold is typically six to eight metres in true thickness, reaching up to 20 metres in the hinge area. The Goose Island deposit is located just south of the Portage deposit and is also associated with iron formation but exhibits different geometry, with a north-south trend and a steep westerly dip. Mineralized zones typically occur as a single unit near surface, splaying into several limbs at depth. The deposit is currently defined over a 750-metre strike length and down to 500 metres at depth (mainly in the southern end), with true thicknesses of three to 12 metres (reaching up to 20 metres locally). The Goose underground resource (100 to 500 metres at depth) extends 700 metres to the south of the Goose pit. The ore zones show the same characteristics as the Goose pit which is two to five main zones sub-parallel and undulating. The average thickness rarely exceed three to five metres. The Vault deposit is located seven kilometres northeast of the Portage and Goose deposits. It is planar and shallow-dipping with a defined strike of 1,100 metres. The deposit has been disturbed by two sets of normal faults striking east-west and north-south and dipping moderately to the southeast and steeply to the east, respectively. The main lens has an average true thickness of eight to 12 metres, reaching as high as 18 metres locally. The hanging wall lenses are typically three to five metres, and up to seven metres, in true thickness. Exploration Grass roots exploration in the project area began as early as 1980. As some interesting targets arose, several companies conducted various types of work between 1980 and 2007. Throughout these years, six deposits were the main focus of exploration: Portage, Cannu, Bay Zone, Goose, Vault and PDF. Over time, the Cannu, Bay Zone and Portage deposits were combined into one mineable deposit. Exploration has extended the Goose Island deposit southward, adding the Goose South and Gosling zones. In 2009, the mine exploration group took over the pit and adjacent areas. Three goals were targeted: exploration drilling, resource conversion and waste pad condemnation. The main focus of exploration was on underground potential at the Goose deposit. A total of 77 holes for 22,207 metres were drilled from 100 to 500 metres in depth. These holes greatly increased the continuity and understanding of the mineralization distribution. Other targets were the Goose-Portage gap, up to 100 metres in depth. These holes showed a lack of continuity between Portage South and Goose North. Nonetheless, deeper holes in the area pointed to the presence of a package of iron formations related to Goose deposit. Holes drilled on the west limb of Portage deposit focussed on raising the level of geological continuity under the Second Portage arm, with marginal impact on the overall reserves of the Portage deposit. Exploration expenditures of $7.0 million for a phase 1 of the mine and $2.0 million for regional exploration are planned for 2010. The Vault deposit will also be tested. Additionally, surface regional programs will be executed to follow up on known gold occurrences and identified gold and base metal showing on the regional scale of the property. In 2009, 113 holes totalling 29,822 metres were drilled at Meadowbank. The drilling was predominantly to expand the Goose deposit at depth and towards the south, as well as to conduct infill drilling in areas where large gaps occurred between auriferous intersections. The program was successful in expanding the Goose deposit at depth and towards the south. For 2010, the mine exploration program has three main goals: exploring the Goose-Portage gap at depth; filling gaps in the Goose underground area, including completing the 100 to 500 metre resource conversion coverage; and extending the continuity of the Goose underground zones to the south. A new theory of where auriferous banded iron formation should occur between the Portage and Goose deposits will be tested with additional testing further south and at depth along possible ore shoots within the host unit. The program will be completed in phases and will be conducted between January and June. Some holes will be drilled on Vault, especially on Vault South. Exploration Activities During 2009, the Company continued to actively explore in Quebec, Ontario, Nunavut, Nevada, Finland and Mexico and began exploration in Argentina. The Canadian exploration activities were focused on the Bousquet and Lapa mining camps in Quebec, as well as on the Meadowbank property in Nunavut where activities were conducted both within and outside the mining lease. In the United States, exploration activities during 2009 were concentrated on the West Pequop project located in northeast Nevada. At the Pinos Altos and Kittila Mines, the Company continued aggressive exploration programs around the current mines. In both countries, most of the exploration budget was spent on drilling programs near the mine infrastructure, along previously recognized gold trends. At the end of December 2009, land holdings of the Company in Canada consisted of 78 projects comprised of 2,911 mineral titles (claims, mining leases, etc.) covering an aggregate of 222,825 hectares. Land holdings in the United States consisted of 11 properties comprised of 3,058 mineral titles covering an aggregate of 26,176 hectares. Land holdings in Finland consisted of three groups of properties comprised of 168 mineral titles covering an aggregate of 20,030 hectares. Land holdings in Mexico consisted of four projects comprised of 47 mining concession titles covering an aggregate of 63,990 hectares. New land holdings in Argentina in 2009 consisted of one project with two mineral titles covering an aggregate of 2,691 hectares. The total amount spent on regional exploration in 2009 was $32.9 million, which included drilling 500 holes for an aggregate of approximately 125 kilometres. The budget for regional exploration expenditures in 2010 is approximately $38.9 million, including approximately 116 kilometres of drilling. Mineral Reserves and Mineral Resources Cautionary Note to Investors Concerning Estimates of Measured and Indicated Mineral Resources This section uses the terms "measured mineral resources" and "indicated mineral resources". Investors are advised that while these terms are recognized and required by Canadian regulations, the SEC does not recognize them. Investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into mineral reserves. Cautionary Note to Investors Concerning Estimates of Inferred Mineral Resources This section uses the term "inferred mineral resources". Investors are advised that while this term is recognized and required by Canadian regulations, the SEC does not recognize it. "Inferred mineral resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that any part of or all of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies. Investors are cautioned not to assume that any part or all of an inferred mineral resource exists, or is economically or legally mineable. The preparation of the information set forth below with respect to the mineral reserves at the LaRonde Mine (which includes mineral reserves at the LaRonde Mine extension), the Goldex, Lapa, Kittila, Pinos Altos and Meadowbank Mines has been supervised by the Company's Vice-President, Project Development, Marc Legault, P.Eng, a "qualified person" as that term is defined in NI 43-101. The Company's mineral reserves estimate was derived from internally generated data or audited reports. The criteria set forth in NI 43-101 for reserve definitions and guidelines for classification of mineral reserve are similar to those used by Guide 7. However, the definitions in NI 43-101 differ in certain respects from those under Guide 7. Under Guide 7, among other things, a mineral reserve estimate must have a "final" or "bankable" feasibility study. Guide 7 also requires the use of commodity prices that reflect current economic conditions at the time of reserve determination which Staff of the SEC has interpreted to mean historic three-year average prices. In addition to the differences noted above, Guide 7 does not recognize mineral resources. The assumptions used for the 2009 mineral reserves and resources estimate reported by the Company in this Form 20-F were based on three-year average prices for the period ending December 31, 2009 of $848 per ounce gold, $14.35 per ounce silver, $1.03 per pound zinc, $2.91 per pound copper, $0.97 per pound lead and exchange rates of C$1.09 per $1.00, 11.85 Mexican pesos per $1.00 and $1.41 per €1.00. The assumptions used for the 2008 mineral reserves and resources estimate reported by the Company in this Form 20-F were based on three-year average prices for the period ending December 31, 2008 of $725 per ounce gold, $13.32 per ounce silver, $1.27 per pound zinc, $3.15 per pound copper and exchange rates of C$1.09 per $1.00, 11.00 Mexican pesos per $1.00 and $1.37 per €1.00. Other assumptions used for estimating 2008 and 2007 mineral reserve and resource information may be found in the Company's annual filings in respect of the years ended December 31, 2008 and December 31, 2007, respectively. Set out below are the reserve estimates as calculated in accordance with NI 43-101 and Guide 7, respectively (tonnages and contained gold quantities are rounded to the nearest thousand): Proven Reserves LaRonde (underground) 4,755,000 2.34 358,000 4,755,000 2.34 358,000 Goldex (underground) 5,217,000 2.02 339,000 5,217,000 2.02 339,000 Kittila (open pit) 255,000 3.71 30,000 255,000 3.71 30,000 Kittila (underground) 1,000 3.81 0 1,000 3.81 0 Kittila total proven 257,000 3.71 31,000 257,000 3.71 31,000 Lapa (underground) 897,000 8.33 240,000 897,000 8.33 240,000 Pinos Altos (open pit) 880,000 1.51 43,000 880,000 1.51 43,000 Meadowbank (open pit) 600,000 4.57 88,000 600,000 4.57 88,000 Total Proven Reserves 12,605,000 2.71 1,098,000 12,605,000 2.71 1,098,000 Probable Reserves LaRonde (underground) 29,625,000 4.72 4,492,000 29,625,000 4.72 4,492,000 Goldex (underground) 19,524,000 2.06 1,291,000 19,524,000 2.06 1,291,000 Kittila (open pit) 3,053,000 5.05 496,000 3,053,000 5.05 496,000 Kittila (underground) 22,651,000 4.80 3,499,000 22,651,000 4.80 3,499,000 Kittila total probable 25,704,000 4.83 3,995,000 25,704,000 4.83 3,994,000 Lapa (underground) 2,319,000 8.09 603,000 2,319,000 8.09 603,000 Pinos Altos (open pit) 18,101,000 2.05 1,195,000 18,101,000 2.05 1,195,000 Pinos Altos (underground) 22,979,000 2.92 2,158,000 22,979,000 2.92 2,158,000 Pinos Altos total probable 41,080,000 2.54 3,353,000 41,080,000 2.54 3,353,000 Meadowbank (open pit) 31,600,000 3.51 3,567,000 31,600,000 3.51 3,567,000 Total Probable Reserves 149,852,000 3.59 17,300,000 149,852,000 3.59 17,300,000 Total Proven and Probable Reserves 162,458,000 3.52 18,398,000 162,458,000 3.52 18,398,000 In the following tables setting out mineral reserve information about the Company's mineral projects, tonnage information is rounded to the nearest thousand tonnes, the total contained gold ounces stated do not include equivalent gold ounces for byproduct metals contained in the mineral reserve and the reported metal grades in the estimates represent in-place grades and do not reflect losses in the recovery process, that is, the metallurgical losses associated with processing the extracted ore. The mineral reserve and mineral resource figures presented in this Form 20-F are estimates, and no assurance can be given that the anticipated tonnages and grades will be achieved or that the indicated level of recovery will be realized. LaRonde Mineral Reserves and Mineral Resources Gold Proven mineral reserves — tonnes 2,700,000 2,300,000 2,800,000 Average grade — gold grams per tonne 3.37 3.95 3.98 Probable mineral reserves — tonnes 26,500,000 26,500,000 25,600,000 Average grade — gold grams per tonne 5.16 5.23 5.37 Zinc Proven mineral reserves — tonnes 2,100,000 1,800,000 1,900,000 Average grade — gold grams per tonne 1.03 1.19 1.06 Probable — tonnes 3,100,000 5,200,000 4,600,000 Average grade — gold grams per tonne 0.99 0.94 0.80 Total proven and probable mineral reserves — tonnes 34,400,000 35,800,000 34,900,000 Average grade — gold grams per tonne 4.39 4.32 4.42 Total contained gold ounces 4,849,000 4,974,000 4,958,000 Notes: (1)The 2009 proven and probable mineral reserves set forth in the table above are based on net smelter return cut-off value of the ore that varies between C$66.00 per tonne and C$77.00 per tonne depending on the deposit. The Company's historical metallurgical recovery rates at the LaRonde Mine from January 1, 2003 to December 31, 2009 averaged 91.0% for gold, 86.2% for silver, 85.1% for zinc and 81.9% for copper. The Company estimates that a 10% change in the gold price would result in an approximate 2% change in mineral reserves. (2)In addition to the mineral reserves set out above, at December 31, 2009, the LaRonde Mine contained indicated mineral resources of 6.5 million tonnes grading 1.85 grams of gold per tonne and inferred mineral resources of 10.9 million tonnes grading 3.93 grams of gold per tonne. (3)The following table shows the reconciliation of mineral reserves (in nearest thousand tonnes) at the LaRonde Mine by category at December 31, 2009 with those at December 31, 2008. Revision means additional mineral reserves converted from mineral resources or other categories of mineral reserves and mineral reserves added from exploration activities during 2009. December 31, 2008 4,075 31,735 35,810 Mined in 2009 2,546 0 2,546 Revision 3,226 (2,110 ) 1,116 December 31, 2009 4,755 29,625 34,380 (4)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the LaRonde Mine may be found in the Technical Report on the 2005 LaRonde Mineral Resource & Mineral Reserve Estimate filed with Canadian securities regulatory authorities on SEDAR on March 23, 2005. Goldex Mineral Reserves and Mineral Resources Gold Proven mineral reserves — tonnes 5,217,000 434,000 250,000 Average grade — gold grams per tonne 2.02 1.95 2.23 Probable mineral reserves — tonnes 19,524,000 23,391,000 22,800,000 Average grade — gold grams per tonne 2.06 2.05 2.20 Total proven and probable mineral reserves — tonnes 24,741,000 23,825,000 23,100,000 Average grade — gold grams per tonne 2.05 2.05 2.20 Total contained gold ounces 1,630,000 1,571,000 1,634,000 Notes: (1)The 2009 proven and probable mineral reserves were estimated using an assumed metallurgical gold recovery of 90.0%. Mining costs were estimated to vary between C$19.52 per tonne and C$36.20 per tonne, depending on the deposit. The cut-off grade used for mineral reserves was 1.37 grams of gold per tonne. The Company estimates that a 10% change in the gold price would result in no change in mineral reserves. (2)In addition to the mineral reserves set out above, at December 31, 2009, the Goldex Mine contained indicated mineral resources of 0.2 million tonnes grading 1.79 grams of gold per tonne and inferred mineral resources of 10.5 million tonnes grading 2.37 grams of gold per tonne. (3)The following table shows the reconciliation of mineral reserves (in nearest thousand tonnes) at the Goldex Mine by category at December 31, 2009 with those at December 31, 2008. Revision means additional mineral reserves converted from mineral resources or other categories of mineral reserves and mineral reserves added from exploration activities during 2009. December 31, 2008 434 23,391 23,825 Mined in 2009 2,615 0 2,615 Revision 7,398 (3,867 ) 3,531 December 31, 2009 5,217 19,524 24,741 (4)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Goldex Mine may be found in the Technical Report on the Estimation of Mineral Resource and Reserves for the Goldex Extension Zone filed with the Canadian securities regulatory authorities on SEDAR on October 27, 2005. Kittila Mineral Reserves and Mineral Resources Gold Proven mineral reserves — tonnes 257,000 199,000 — Average grade — gold grams per tonne 3.71 4.84 — Probable mineral reserves — tonnes 25,704,000 21,171,000 18,205,000 Average grade — gold grams per tonne 4.83 4.69 5.12 Total proven and probable mineral reserves — tonnes 25,961,000 21,370,000 18,205,000 Average grade — gold grams per tonne 4.82 4.69 5.12 Total contained gold ounces 4,025,000 3,225,000 2,996,000 Notes: (1)The 2009 proven and probable mineral reserve and mineral resource estimates were calculated using a metallurgical gold recovery of 89.3%. Gold cut-off grades used were 1.0 gram per tonne for open pit reserves and between 2.8 grams per tonne and 3.1 grams per tonne, depending on the deposit, for underground reserves. The open pit operating cost is estimated to be €33.28 per tonne, while the underground operating cost is estimated to vary between €47.64 per tonne and €52.63 per tonne, depending on the deposit. The Company estimates that a 10% change in the gold price would result in an approximate 11% change in mineral reserves. (2)In addition to the mineral reserves set out above, at December 31, 2009, the Kittila Mine contained indicated mineral resources of 20.5 million tonnes grading 2.19 grams of gold per tonne and inferred mineral resources of 5.3 million tonnes grading 3.42 grams of gold per tonne. (3)The breakdown of proven and probable mineral reserves between planned open pit operations and underground operations at the Kittila Mine (with tonnage and contained ounces rounded to the nearest thousand) is: Proven mineral reserve Open pit 255,000 3.71 30,000 Proven mineral reserve Underground 1,000 3.81 0 Total proven mineral reserve 257,000 3.71 31,000 Probable mineral reserve Open pit 3,053,000 5.05 496,000 Probable mineral reserve Underground 22,651,000 4.80 3,499,000 Total probable mineral reserve 25,704,000 4.83 3,994,000 (4)The following table shows the reconciliation of mineral reserves (in nearest thousand tonnes) at the Kittila Mine by category at December 31, 2009 with those at December 31, 2008. Revision means additional mineral reserves converted from mineral resources or other categories of mineral reserves and mineral reserves added from exploration activities during 2009. December 31, 2008 199 21,171 21,370 Mined in 2009 563 0 563 Revision 621 4,533 5,154 December 31, 2009 257 25,704 25,961 (5)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Kittila Mine may be found in the Technical Report on the December 31, 2009, Mineral Resource and Mineral Reserve Estimate and the Suuri Extension Project, Kittila Mine, Finland, filed with the Canadian securities regulatory authorities on SEDAR on March 4, 2010. Lapa Mineral Reserves and Mineral Resources Gold Proven mineral reserves — tonnes 897,000 23,000 2,800 Average grade — gold grams per tonne 8.33 7.53 10.65 Probable mineral reserves — tonnes 2,319,000 3,730,000 3,755,600 Average grade — gold grams per tonne 8.09 8.80 8.86 Total proven and probable mineral reserves — tonnes 3,216,000 3,753,000 3,758,000 Average grade — gold grams per tonne 8.16 8.79 8.87 Total contained gold ounces 843,000 1,061,000 1,071,000 Notes: (1)The 2009 mineral reserve and mineral resource estimates were calculated using an assumed metallurgical gold recovery of 80% and a cut-off grade of 4.2 grams of gold per tonne. The operating cost per tonne estimate for the Lapa Mine was C$101.23. The Company estimates that a 10% change in the gold price would result in an approximate 13% change in mineral reserves. (2)In addition to the mineral reserves set out above, at December 31, 2009, the Lapa Mine contained indicated mineral resources of 1.7 million tonnes grading 4.63 grams of gold per tonne and inferred mineral resources of 0.4 million tonnes grading 7.90 grams of gold per tonne. (3)The following table shows the reconciliation of mineral reserves (in nearest thousand tonnes) at the Lapa Mine by category at December 31, 2009 with those at December 31, 2008. Revision means additional mineral reserves converted from mineral resources or other categories of mineral reserves and mineral reserves added from exploration activities during 2009. December 31, 2008 23 3,730 3,753 Mined in 2009 299 0 299 Revision 1,173 (1,411 ) (238 ) December 31, 2009 897 2,319 3,216 (5)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Lapa Mine may be found in the Technical Report on the Lapa Gold Project, Cadillac Township, Quebec, Canada filed with Canadian securities regulatory authorities on SEDAR on June 8, 2006. Pinos Altos Mineral Reserves and Mineral Resources Proven mineral reserves — tonnes 880,000 97,000 — Average gold grade — grams per tonne 1.51 1.35 — Average silver grade — grams per tonne 26.53 19,308 — Probable mineral reserves — tonnes 41,080,000 41,669,000 24,657,000 Average gold grade — grams per tonne 2.54 2.68 3.21 Average silver grade — grams per tonne 70.31 74.61 92.21 Total proven and probable mineral reserves — tonnes 41,960,000 41,766,000 24,700,000 Average gold grade — grams per tonne 2.52 2.68 3.21 Average silver grade — grams per tonne 69.39 74.48 92.21 Total contained gold ounces 3,396,000 3,593,000 2,547,000 Total contained silver ounces 93,613,000 100,010,000 73,100,000 Notes: (1)The 2009 proven and probable mineral reserve estimate is based on a net smelter return cut-off value of the open pit ore between $7.45 per tonne and $20.43 per tonne, depending on the deposit, and a net smelter return cut-off value of the underground ore of $46.13 per tonne. The metallurgical gold recovery used in the reserve estimate varied between 59% and 96.5%, depending on the deposit. The metallurgical silver recovery used in the reserve estimate varied between 11% and 52.0%, depending on the deposit. The Company estimates that a 10% change in the gold price would result in an approximate 2% change in mineral reserves. (2)In addition to the mineral reserves set out above, at December 31, 2009, the Pinos Altos Mine contained indicated mineral resources of 15.7 million tonnes grading 0.91 grams of gold per tonne and 26.84 grams of silver per tonne and inferred mineral resources of 15.7 million tonnes grading 1.38 grams of gold per tonne and 22.53 grams of silver per tonne. (3)The proven and probable mineral reserves of the Pinos Altos Mine set forth in the table above include probable mineral reserves from the Creston Mascota deposit of 6.7 million tonnes grading 1.67 grams of gold per tonne and 16.94 grams of silver per tonne. The indicated mineral resource at the Pinos Altos Mine also includes indicated mineral resources from the Creston Mascota deposit of 5.7 million tonnes grading 0.76 grams of gold per tonne and 7.6 grams of silver per tonne. The inferred mineral resource at the Pinos Altos Mine also includes inferred mineral resources from the Creston Mascota deposit of 1.4 million tonnes grading 0.97 grams of gold per tonne and 9.56 grams of silver per tonne. (4)The breakdown of mineral reserves between planned open pit operations and underground operations at the Pinos Altos Mine (with tonnage and contained ounces rounded to the nearest thousand) is: Proven mineral reserve Open pit stock pile 880,000 1.51 26.35 43,000 745,000 Probable mineral reserve Open pit 18,101,000 2.05 49.30 1,195,000 28,690,000 Probable mineral reserve Underground 22,979,000 2.92 86.87 2,158,000 64,177,000 Total probable mineral reserve 41,080,000 2.54 70.31 3,353,000 92,867,000 (5)The following table shows the reconciliation of mineral reserves (in nearest thousand tonnes) at the Pinos Altos Mine by category at December 31, 2009 with those at December 31, 2008. Revision means additional mineral reserves converted from mineral resources or other categories of mineral reserves and mineral reserves added from exploration activities during 2009. December 31, 2008 97 41,669 41,766 Mined in 2009 227 0 227 Revision 1,010 (588 ) 422 December 31, 2009 880 41,080 41,960 (6)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Pinos Altos Mine may be found in the Pinos Altos Gold-Silver Mining Project, Chihuahua State, Mexico, Technical Report on the Mineral Resources and Reserves as of December 31, 2008 filed with the Canadian securities regulatory authorities on SEDAR on March 25, 2009. Meadowbank Mineral Reserves and Mineral Resources Gold Proven mineral reserves — tonnes 600,000 — — Average grade — gold grams per tonne 4.57 — — Probable mineral reserves — tonnes 31,600,000 32,773,000 29,261,000 Average grade — gold grams per tonne 3.51 3.45 3.67 Total proven and probable mineral reserves — tonnes 32,200,000 32,773,000 29,261,000 Average grade — gold grams per tonne 3.53 3.45 3.67 Total contained gold ounces 3,655,000 3,638,000 3,453,000 Notes: (1)The 2009 mineral reserve and mineral resource estimates were calculated using a metallurgical gold recovery of 93.4%. The cut-off grade used to determine the open pit reserves varied from 1.35 grams of gold per tonne to 1.37 grams of gold per tonne, depending on the deposit. The estimated operating cost used for the 2009 mineral reserve estimate varied between C$40.23 per tonne and C$40.69 per tonne, depending on the deposit. The Company estimates that a 10% change in the gold price would result in an approximate 2% change in mineral reserves. (2)In addition to the mineral reserves set out above, at December 31, 2009, the Meadowbank Mine contained indicated mineral resources of 42.4 million tonnes grading 2.43 grams of gold per tonne and inferred mineral resources of 9.2 million tonnes of ore grading 2.54 grams of gold per tonne. (3)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Meadowbank Mine may be found in the Technical Report on the Mineral Resources and Mineral Reserves Dated September 30, 2008, Meadowbank Gold Project, Nunavut, Canada filed with the Canadian securities regulatory authorities on SEDAR on December 15, 2008. Risk Mitigation The Company mitigates the likelihood and potential severity of the various risks it encounters in its day-to-day operations through the application of high standards in the planning, construction and operation of mining facilities. In addition, emphasis is placed on hiring and retaining competent personnel and developing their skills through training in safety and loss control. The Company's operating and technical personnel have a solid track record of developing and operating precious metal mines and several of the Company's mines have been recognized for excellence in this regard with various safety and development awards. Nevertheless, the Company and its employees continue with a focused effort to improve workplace safety and the Company has placed additional emphasis on safety procedure training for both mining and supervisory employees. The Company also mitigates some of the Company's normal business risk through the purchase of insurance coverage. An Insurable Risk Management Policy, approved by the Board, governs the purchase of insurance coverage and only permits the purchase of coverage from insurance companies of the highest credit quality. For a more complete list of the risk factors affecting the Company, please see "Item 3 Key Information — Risk Factors". Glossary of Selected Mining Terms "alteration" Any physical or chemical change in a rock or mineral subsequent to formation. Milder and more localized than metamorphism. "anastomosing" A network of branching and rejoining fault or vein surfaces or surface traces. "andesite" A dark-coloured igneous, calc-alkaline volcanic rock, of intermediate composition (containing between 52-63% silica). "assay" An analysis to determine the presence, absence or concentration of one or more chemical components. "basin" An area in which sediments accumulate. "bedrock" The solid rock underlying surface deposits. "breccia" Said of rock formations consisting mostly of angular fragments hosted by a fine-grained matrix. "brittle" Of minerals, proneness to fracture under low stress. A quality affecting behaviour during comminution of ore, whereby one species fractures more readily than others in the material being crushed. "bulk mining" A mining method in which large quantities of low-grade ore are mined without an attempt to segregate the high-grade portions. "byproduct metal" A secondary or additional metal recovered from the processing of rock. "carbon-in-leach process" A process step in which granular activated carbon particles much larger than the ground ore particles are introduced into the ore pulp. Cyanide leaching and precious metal adsorption onto the activated carbon occur simultaneously. The loaded activated carbon is mechanically screened to separate it from the barren ore pulp and processed to remove the precious metals and prepare it for reuse. "carbon-in-pulp (CIP) circuit" A process by which soluble gold within a finely ground slurry is recovered by adsorption onto coarser activated carbon. A CIP circuit comprises a series of tanks through which leached slurry flows. Gold is captured onto captive activated carbon that will periodically be moved counter-currently from tank to tank. Head tank carbon is extracted periodically to further recover adsorbed gold before being returned to the circuit tails tank. "clast" A fragment of mineral, rock or organic structure that has been moved individually from its place of origin. "concentrate" The clean product recovered in froth flotation. "conglomerate" A sedimentary rock consisting of rounded, water-worn pebbles or boulders cemented into a solid mass. "contact zone" A zone where two rock types meet. May be characterized by alteration, metamorphism or deformation. "counter-current decantation" Clarifying wash water and concentrating tailings by use of several thickeners in series. The water flows in the opposite direction from the solids. The final products are slurry that is removed as fluid mud, and clear water that is reused in the circuit. "crosscut" A horizontal opening driven from a shaft at or near right angles to the strike of a vein or other orebody. "cut-off grade" (A) In respect of mineral resources, the lowest grade below which the mineralized rock currently cannot reasonably be expected to be economically extracted. (B) In respect of mineral reserves, the lowest grade below which the mineralized rock currently cannot be economically extracted as demonstrated by either a preliminary feasibility study or a feasibility study. Cut-off grades vary between deposits depending upon the amenability of ore to gold extraction and upon costs of production and metal prices. "deposit" A mineralized body that has been physically delineated by sufficient drilling, trenching and/or underground work, and found to be of sufficient average grade of metal or metals to warrant further exploration and/or development expenditures; such a deposit does not qualify as a commercially mineable orebody or as containing mineral reserves, until final legal, technical and economic factors have been resolved. "development" The preparation of a mining property or area so that an orebody can be analyzed and its tonnage and quality estimated. Development is an intermediate stage between exploration and mining. "dilution" The effect of waste rock or low-grade ore being included in mined ore, increasing tonnage mined and lowering the overall ore grade. "dip" The angle at which a surface is inclined from the horizontal. "discordant" Said of a contact between an igneous intrusion and the country rock that is not parallel to the foliation or the bedding planes of the latter. "disseminated" Said of a mineral deposit (especially of metals) in which the desired minerals occur as scattered particles in the rock, but in sufficient quantity to make the deposit an ore. Some disseminated deposits are very large. "drift" A horizontal underground opening that follows along the length of a vein or rock formation, as opposed to a crosscut that crosses the rock formation. "ductile" Of rock, able to sustain, under a given set of conditions, 5% to 10% deformation before fracturing or faulting. "dyke" An earthen embankment, as around a drill sump or tank, or to impound a body of water or mill tailings. Also, a tabular body of igneous rock that cuts across the structure of adjacent rocks. "electrowinning" An electrochemical process in which a metal dissolved within an electrolyte is plated onto an electrode. Used to recover metals such as copper and gold from solution in the leaching of concentrates, etc. "envelope" 1. The outer or covering part of a fold, especially of a folded structure that includes some sort of structural break. 2. A metamorphic rock surrounding an igneous intrusion. 3. In a mineral, an outer part different in origin from an inner part. "epigenetic" An orebody formed by hydrothermal fluids and gases that were introduced into the host rocks from elsewhere, filling cavities in the host rock. "epithermal" A hydrothermal mineral deposit formed within one kilometre of the Earth's surface and in the temperature range of 50 to 200 degrees Celsius, occurring mainly as veins. Also, said of that depositional environment. "extensional-shear vein" A vein put in place in an extension fracture caused by the deformation of a rock. "fault" A fracture or a fracture zone in crustal rocks along which there has been displacement of the two sides relative to one another parallel to the fracture. The displacement may be a few inches or many kilometres long. "feasibility study" A comprehensive study of a mineral deposit in which all geological, engineering, legal, operating, economic, social, environmental and other relevant factors are considered in sufficient detail that it could reasonably serve as the basis for a final decision by a financial institution about whether to finance the development of the deposit for mineral production. A "preliminary feasibility study" or "pre-feasibility study" is a comprehensive study of the viability of a mineral project that has advanced to a stage where the mining method (in the case of underground mining) or the pit configuration (in the case of an open pit) has been established, and an effective method of mineral processing has been determined. It includes a financial analysis based on reasonable assumptions of technical, engineering, legal, operating, economic, social and environmental factors and the evaluation of other relevant factors that are sufficient for a qualified person, acting reasonably, to determine if all or part of the mineral resource may be classified as a mineral reserve. "float" A general term for loose fragments of ore or rock, especially on a hillside below an outcropping ledge or vein. "flotation" A process for concentrating minerals based on the selective adhesion of certain minerals to air bubbles in a mixture of water and ground ore. When the right chemicals are added to a frothy water bath of ore that has been ground to the consistency of talcum powder, the minerals will float to the surface. The metal-rich flotation concentrate is then skimmed off the surface "foliation" A general term for a planar arrangement of textural or structural features in any type of rock, especially the planar structure that results from flattening of the constituent grains of a metamorphic rock. "fracture" A general term for any break in a rock, whether or not it causes displacement, due to mechanical failure by stress. Fractures include cracks, joints and faults. "free gold" Gold not combined with other substances. "glacial till" Dominantly unsorted and unstratified drift, generally unconsolidated, deposited directly by and underneath a glacier without subsequent reworking by meltwater, and consisting of a heterogeneous mixture of clay, silt, sand, gravel and boulders ranging widely in size and shape. Also referred to as "till" and ice-laid drift. "grade" The relative quality of the percentage of metal content in a mineralized body, i.e., grams of gold per tonne of rock. "head grade" The average grade of ore fed into a mill. "hectare" A metric measurement of area. 1 hectare = 10,000 square meters = 2.47 acres. "hornblende phenocryst" A large and usually conspicuous crystal of a black to dark green mineral generally opaque called hornblende found in some volcanic and igneous rocks. "horst" An up-faulted block of rock. "hydrothermal alteration" Alteration of rocks or minerals by reaction with hydrothermal fluids. "indicated mineral resource" The part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters and to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be reasonably assumed. Mineral resources that are not mineral reserves do not have demonstrated economic viability. While this term is recognized and required by Canadian regulations, the SEC does not recognize it. Investors are cautioned not to assume that any part or all of the mineral deposits in this category will ever be converted into mineral reserves. "inferred mineral resource" The part of a mineral resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. While this term is recognized and required by Canadian regulations, the SEC does not recognize it. Investors are cautioned not to assume that any part or all of the mineral deposits in this category will ever be converted into mineral reserves. Investors are cautioned not to assume that part of or all of an inferred mineral resource exists, or is economically or legally mineable. "infill drilling" Drilling within a defined mineralized area to improve the definition of known mineralization. "intrusive" A body of igneous rock formed by the consolidation of magma intruded below surface into other rocks, in contrast to lavas, which are extruded upon the Earth's surface. "kilometre" A metric measurement of distance. 1.0 kilometre = 0.62 miles. "lapilli" Pyroclastics that may be essential, accessory or accidental in origin, of a size range that has been variously defined within the limits of 2 millimetres and 64 millimetres. The fragments may be either solidified or still viscous when they land (though some classifications restrict the term to the former); thus there is no characteristic shape. An individual fragment is called a "lapillus". "lens" Generally used to describe a body of ore that is thick in the middle and tapers towards the ends, resembling a convex lens. "lithologic units" Geological groups. "longitudinal retreat" An underground mining method where the ore is excavated in horizontal slices along the orebody and the stoping starts below and advances upwards. The ore is recovered underneath in the stope. "matrix" The non-valuable minerals in an ore, i.e., gangue. "measured mineral resource" The part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics are so well established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic parameters and to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm both geological and grade continuity. While this term is recognized and required by Canadian regulations, the SEC does not recognize it. Investors are cautioned not to assume that any part or all of the mineral deposits in this category will ever be converted into mineral reserves. "Merrill-Crowe process" A separation technique for removing gold from a cyanide solution. The solution is separated from the ore by methods such as filtration and counter-current decantation, and then the gold is precipitated onto zinc dust. Silver and copper may also precipitate. The precipitate is filtered to capture the gold slimes, which are further refined, e.g., by smelting, to remove the zinc and by treating with nitric acid to dissolve the silver. "metallurgical properties" Properties characterizing metals and minerals behaviour under various processing techniques. "metamorphism" The process by which the form or structure of sedimentary or igneous rocks is changed by heat and pressure. "mill" A mineral treatment plant in which crushing, wet grinding and further treatment of ore is conducted. "mineral reserve" The economically mineable part of a mineral resource. The economics of the mineral reserve should be demonstrated by a feasibility study. This study must include adequate information on mining, processing, metallurgical, economic and other relevant factors that demonstrate, at the time of reporting, that economic extraction is justified. A mineral reserve includes diluting materials and allowances for losses that may occur when the material is mined. "mineral resource" A concentration or occurrence of natural solid inorganic material or natural solid fossilized organic material in or on the Earth's crust in such form and quantity and of such a grade or quality that it has reasonable prospects for economic extraction. The location, quantity, grade, geological characteristics and continuity of a mineral resource are known, estimated or interpreted from specific geological evidence and knowledge. "net smelter return royalty" A phrase used to describe a royalty payment made by a producer of metals based on gross metal production from the property, less deduction of certain limited costs including smelting, refining, transportation and insurance costs. "orogenic gold deposit" A gold deposit formed by volcanism, subduction, plate divergence, folding or the movement of fault blocks. "ounce" 1 troy ounce = 31.103 grams. "outcrop" An exposure of bedrock at the surface. "oxidation" A chemical reaction caused by exposure to oxygen, which results in a change in the chemical composition of a mineral. "oxidative" Descriptive of an oxidation reaction. "phenocryst" A term for large crystals or mineral grains occurring in the matrix or groundmass of a porphyry. "plunge" The inclination of a fold axis or other linear structure from a horizontal plane, measured in the vertical plane. "polydeformed" A rock that has been subjected to more than one instance of folding, faulting, shearing, compression or extension as a result of various tectonic forces. "porphyritic" Rock texture in which one or more minerals has a larger grain size than the accompanying minerals. "porphyry" Any igneous rock in which relatively large crystals, called phenocrysts, are set in a fine-grained groundmass. "post-mineralization" Occurring after the mineralizing event has taken place. "pre-mineralization" Occurring before the mineralizing event has taken place. "pressure oxidation process" A process by which sulphide minerals are oxidized in order to expose gold that is encapsulated in the mineral lattice. The main component of a pressure oxidation circuit consists of one or more pressurized vessels (autoclaves). Oxygen level, process temperature and acidity are the primary control parameters of such units. "probable mineral reserve" The economically mineable part of an indicated mineral resource demonstrated by a feasibility study. "proven mineral reserve" The economically mineable part of a measured mineral resource demonstrated by a feasibility study. "pyroclastic" Produced by explosive or aerial ejection of ash, fragments and glassy material from a volcanic vent. Term applicable to the rocks and rock layers as well as to the textures so formed. "recovery" A term used in process metallurgy to indicate the proportion of valuable material obtained in the processing of an ore. It is generally stated as a percentage of valuable metal in the ore that is recovered compared to the total valuable metal present in the ore before processing. "schist" A strongly foliated crystalline rock that can be readily split into think flakes or slabs due to the well developed parallelism of more than 50% of the minerals present in it. "semi-autogenous grinding" or "SAG" A method of grinding rock whereby larger chunks of the rock itself and steel balls form the grinding media. "shear" or "shearing" The deformation of rocks by lateral movement along innumerable parallel planes, generally resulting from pressure and producing such metamorphic structures as cleavage and schistosity. "sill" An intrusive sheet of igneous rock of roughly uniform thickness that has been forced between the bedding planes of existing rock. "slurry" Fine rock particles in circulating water. "stope development" Driving subsidiary openings to prepare blocks of ore for extraction by stoping. "stratigraphic column" A sketched cross-section of the stacking of different layers of rock in an area. "strike" The bearing of the outcrop of an inclined bed, vein or fault plane on a horizontal surface; the direction of a horizontal line perpendicular to the direction of the dip. "sublevel retreat" An underground mining method in which the ore is excavated in horizontal slices along the orebody, starting below and advancing upwards. The ore is recovered underneath in the stope. "tabular" Said of a feature having two dimensions that are much larger or longer than the third, such as a dyke. "tailings" Material rejected from the mill after most of the recoverable valuable minerals have been extracted. "tailings dam" A natural or man-made confined area suitable for depositing tailings. "tailings pond" A low-lying depression used to confine tailings, the prime function of which is to allow enough time for metals to settle out or for cyanide to be naturally destroyed before the water is discharged into the local watershed. "tenement" A synonym of mineral title. "thickness" The distance at right angles between the hanging wall and the footwall of a lode or lens. "tonne" A metric measurement of mass. 1 tonne = 1,000 kilograms = 2,204.6 pounds. "transfer fault" A structure that can accommodate lateral variations of deformation and strain. "transverse open stoping" An underground mining method in which the ore is excavated in horizontal slices perpendicular to the orebody length and the stoping starts below and advances upwards. The ore is recovered underneath the stope through a drawpoint system. "vein" Minerals filling a fissure, fault or crack in rock. "winze" An internal mine shaft. "zone" An area of distinct mineralization, i.e., a deposit. | 20-F |
| 2008 | Item 4. Information on the Company | History and Development of the Company The Company is an established Canadian gold producer with mining operations in northwestern Quebec and northern Finland, mine construction projects in northwestern Quebec, Nunavut and northern Mexico and exploration activities in Canada, Finland, Mexico and the United States. The Company's operating history includes over three decades of continuous gold production primarily from underground operations. Since its formation on June 1, 1972, the Company has produced over 5.0 million ounces of gold. For definitions of certain technical terms used in the following discussion, see "— Property, Plant and Equipment — Glossary of Selected Mining Terms". The Company believes that its cash costs place it among the lowest quartile of producers in the gold mining industry. In 2008, the Company produced 276,762 ounces of gold at a total cash costs per ounce of $162, that is, net of revenues received from the sale of silver, zinc and copper byproducts. For 2009, the Company expects total cash costs per ounce of gold produced to be approximately $325. These expected higher costs compared to 2008 are due to lower assumed prices for byproduct metals from the LaRonde Mine than those realized in 2008 and higher production costs associated with gold sourced from the new Goldex Mine and Kittila Mine, which commenced operations in 2008, and the new mines at the Lapa mine project and the Pinos Altos mine project, both of which are expected to commence production in 2009. Of the mines that commenced operations in 2008 or the mine projects that are expected to commence production in 2009, only the Pinos Altos mine project contains byproduct metals. See "Note to Investors Concerning Certain Measures of Performance" for a discussion of the use of the non-US GAAP measure total cash costs per ounce. The Company has traditionally sold all of its production at the spot price of gold due to its general policy not to sell forward its future gold production. The Company's strategy is to focus on the continued exploration, development and expansion of its properties in the Abitibi region of Quebec in which the LaRonde Mine, the Goldex Mine and the Lapa mine project are situated, with a view to increasing annual gold production and gold mineral reserves. In addition, the Company will continue exploration, development and construction at the Kittila Mine in northern Finland, the Pinos Altos mine project in northern Mexico and the Meadowbank mine project in Nunavut. The Company also plans to pursue opportunities for growth in gold production and gold reserves through the acquisition or development of advanced exploration properties, development properties, producing properties and other mining businesses in the Americas or Europe. The Company operates through four regional units: the Quebec Region, the European Region, the Mexican Region and the Nunavut Region. The Quebec Region includes the LaRonde Mine, the LaRonde Mine extension project, the Goldex Mine and the Lapa mine project, each of which is held directly by the Company. The Company's operations in the European Region are conducted through its indirect subsidiary, Riddarhyttan Resources AB ("Riddarhyttan"), which indirectly owns the Kittila Mine in Finland. The Company's operations in the Mexican Region are conducted through its subsidiary, Agnico Eagle Mexico S.A. de C.V., which owns the Pinos Altos mine project. The Nunavut Region is comprised of the Meadowbank mine project, which is held directly by the Company. In addition, the Company has an international exploration office in Reno, Nevada. The LaRonde Mine accounted for approximately 86% of the Company's gold production in 2008 and will account for a significant portion in the future until the Goldex Mine and the Kittila Mine (both of which commenced production in 2008) and the Lapa mine project and the Pinos Altos mine project (which are scheduled to commence production in 2009) are brought into full production. Since the commissioning of the mill in 1988, the LaRonde Mine has produced over 4.0 million ounces of gold. In March 2000, the Company completed the Penna Shaft at the LaRonde Mine to a depth of 2,250 metres. Production was expanded at the LaRonde Mine to 6,350 tonnes of ore treated per day in October 2002 and the milling complex has been operating well above this level for the last five years. In May 2006, the Company initiated construction of the LaRonde Mine extension, additional infrastructure to extend the LaRonde Mine below Level 245 (previously referred to as the LaRonde II project). The following table sets out the date of acquisition, the date of commencement of construction and the date of initial production for the Company's new mines and mine projects. Goldex Mine December 1993 (1) July 2005 May 2008 (2) Kittila Mine November 2005 June 2006 September 2008 Lapa mine project June 2003 (1) June 2006 Second quarter of 2009 (3) Pinos Altos mine project March 2006 August 2007 Third quarter of 2009 (3) Meadowbank mine project April 2007 Pre-April 2007 First quarter of 2010 (3) Notes: (1)Date when 100% ownership was acquired. (2)Commenced commercial production on August 1, 2008. (3)Estimated. The Company's exploration program focuses primarily on the identification of new mineral reserve, mineral resource and development opportunities in proven gold producing regions. Current exploration activities are concentrated in northwestern Quebec, Nunavut, northern Finland, northern Mexico and Nevada. Several other projects were evaluated during the year in different countries where the Company believes the potential for gold occurrences is excellent and which the Company believes to be politically stable and supportive of the mining industry. The Company currently manages several projects which it owns or has an interest in. Currently, the Company manages 75 properties in eastern, central and western Canada, seven properties in Nevada and Idaho in the United States, three properties in Finland and four properties in Mexico. Until recently, all of the exploration activities have been managed from offices in Val d'Or, Quebec and Reno, Nevada. Since 2006, the Company opened administrative offices in Chihuahua, Mexico, in Helsinki and Kittila, Finland and in Vancouver, British Columbia for exploration and project evaluation. In addition, the Company continuously evaluates opportunities to make strategic acquisitions. In the second quarter of 2004, the Company acquired an approximate 14% ownership interest in Riddarhyttan, a Swedish precious and base metals exploration and development company that was at the time listed on the Stockholm Stock Exchange. In November 2005, the Company completed a tender offer (the "Riddarhyttan Offer") for all of the issued and outstanding shares of Riddarhyttan that it did not own. The Company issued 10,023,882 of its shares and paid and committed an aggregate of $5.1 million cash as consideration to Riddarhyttan shareholders in connection with the Riddarhyttan Offer. The Company, through wholly-owned subsidiaries, currently holds 100% of Riddarhyttan. Riddarhyttan, through its wholly-owned subsidiary, Agnico-Eagle AB, is the 100% owner of the Kittila Mine, located approximately 900 kilometres north of Helsinki near the town of Kittila in Finnish Lapland. In the first quarter of 2005, the Company entered into an exploration and option agreement with Industrias Penoles S.A. de C.V. ("Penoles") to acquire the Pinos Altos property in northern Mexico. The Pinos Altos property is comprised of approximately 11,000 hectares in the Sierra Madre gold belt, approximately 225 kilometres west of the city of Chihuahua in the state of Chihuahua in northern Mexico. In February 2006, the Company exercised the option and the Company acquired the Pinos Altos property on March 15, 2006. Under the terms of the exploration and option agreement, the purchase price of $66.8 million was comprised of $32.5 million in cash and 2,063,635 shares of the Company. In February 2007, the Company announced that it had signed an agreement with Cumberland Resources Ltd. ("Cumberland"), a pre-production development stage company listed on the Toronto Stock Exchange (the "TSX") and American Stock Exchange, under which the Company agreed to make an exchange offer for all of the outstanding shares of Cumberland not already owned by the Company. In May 2007, the Company announced that it had acquired over 92% of the issued and outstanding shares of Cumberland that it did not previously own and, in July 2007, the Company completed the acquisition of all Cumberland shares by way of a compulsory acquisition. The Company issued 13,768,510 of its shares and paid $8.6 million cash as consideration to Cumberland shareholders in connection with its acquisition of Cumberland. In 2008, the Company's capital expenditures were $909 million. The 2008 capital expenditures included $75 million at the LaRonde Mine (which was comprised of $38 million of sustaining capital expenditures and $37 million comprised mostly of expenditures on the LaRonde Mine extension), $53 million at the Goldex Mine, $196 million at the Kittila Mine, $89 million at the Lapa mine project, $176 million at the Pinos Altos mine project and $314 million at the Meadowbank mine project. In addition, the Company spent $35 million on exploration activities at the Company's grassroots exploration properties. Budgeted 2009 exploration and capital expenditures of $454 million include $68 million at the LaRonde Mine (including $33 million on sustaining capital expenditures and $40 million on the LaRonde Mine extension), $17 million at the Lapa mine project, $125 million at the Pinos Altos project and $155 million at the Meadowbank mine project. No capital expenditures have been budgeted for 2009 in respect of the Goldex Mine or the Kittila Mine. In addition, the Company plans exploration expenditures on grassroots exploration projects of approximately $32 million. The financing for these expenditures is expected to be from internally generated cash flow from operations, from the Company's existing cash balances and from drawdowns of the Company's bank credit facilities. Depending on the success of the exploration programs at these and other properties, the Company may be required to make additional capital expenditures for exploration, development and pre-production. Capital expenditures by the Company in 2007 and 2006 were $523 million and $149 million, respectively. The 2007 capital expenditures included $87 million at the LaRonde Mine (which was comprised of $34 million of sustaining capital expenditures and $53 million comprised mostly of expenditures on the LaRonde Mine extension and the ramp below Level 215), $105 million at the Goldex Mine, $94 million at the Kittila Mine, $29 million at the Lapa mine project and $170 million at the Meadowbank mine project. In 2006, these capital expenditures included $47 million at the LaRonde Mine (including the LaRonde Mine extension), $62 million at the Goldex Mine and $14 million at the Lapa mine project. The Company was formed by articles of amalgamation under the laws of the Province of Ontario on June 1, 1972, as a result of the amalgamation of Agnico Mines Limited ("Agnico Mines") and Eagle Gold Mines Limited ("Eagle"). Agnico Mines was incorporated under the laws of the Province of Ontario on January 21, 1953 under the name "Cobalt Consolidated Mining Corporation Limited". Eagle was incorporated under the laws of the Province of Ontario on August 14, 1945. On December 19, 1989, Agnico-Eagle acquired the remaining 57% interest in Dumagami Mines Limited not already owned by it, as a consequence of the amalgamation of Dumagami Mines Limited with a wholly-owned subsidiary of Agnico-Eagle, to continue as one company under the name Dumagami Mines Inc. ("Dumagami"). On December 29, 1992, Dumagami transferred all of its property and assets, including the LaRonde Mine, to Agnico-Eagle and was subsequently dissolved. On December 8, 1993, the Company acquired the remaining 46.3% interest in Goldex Mines Limited not already owned by it, as a consequence of the amalgamation of Goldex Mines Limited with a wholly-owned subsidiary of the Company, to continue as one company under the name Goldex Mines Limited. On January 1, 1996, the Company amalgamated with two wholly-owned subsidiaries, including Goldex Mines Limited. In October 2001, pursuant to a plan of arrangement, the Company amalgamated with an associated corporation, Mentor Exploration and Development Co., Limited ("Mentor"). In connection with the arrangement, the Company issued 369,348 common shares in consideration for the acquisition of all of the issued and outstanding shares of Mentor that it did not already own. On August 1, 2007, the Company, Agnico-Eagle Acquisition Corporation, Cumberland and a wholly-owned subsidiary of Cumberland, Meadowbank Mining Corporation, amalgamated under the laws of the Province of Ontario and continued under the name of Agnico-Eagle Mines Limited. The Company's executive and registered office is located at Suite 400, 145 King Street East, Toronto, Ontario, Canada M5C 2Y7; telephone number (416) 947-1212; website: http://www.agnico-eagle.com. The information contained on the website is not part of this Form 20-F. The Company's principal place of business in the United States is located at 5470 Louie Lane, Suite 102, Reno, Nevada 89511. Business Overview The Company believes that it has a number of key operating strengths that provide distinct, competitive advantages. Operations in Mining-Friendly Regions. The Company and its predecessors have over three decades of continuous gold production experience and expertise in metals mining. The Company's operations and exploration and development projects are located in regions that are supportive of the mining industry. Two of the Company's producing mines and two of its construction projects are located in northwestern Quebec, one of North America's principal gold-producing regions. The Company's Kittila Mine in northern Finland, Pinos Altos mine project in northern Mexico and Meadowbank mine project in Nunavut are located in regions which the Company believes are also supportive of the mining industry. Low-Cost, Efficient Producer. The Company believes that its cash costs place it among the lowest quartile of producers in the gold mining industry, with total cash costs per ounce of gold produced at $162 for 2008. These relatively low cash costs are attributable not only to the byproduct revenues from the LaRonde Mine but also to economies of scale afforded by the Company's large single shaft mine at the LaRonde Mine and its dedication to cost-efficient mining operations. In addition, the Company believes its highly motivated work force contributes significantly to continued operational improvements and to the Company's low-cost producer status. Strong Operating Base. The Company's existing operations at the LaRonde Mine provide a strong economic base for additional mineral reserve and production development at the property and in the Abitibi region of northwestern Quebec and for the development of its projects in Nunavut, Finland and Mexico. The experience gained through building and operating the LaRonde Mine has assisted with the Company's development of its other mine projects. In addition, the extensive infrastructure associated with the LaRonde Mine is expected to support the nearby Goldex Mine and Lapa mine project, and the construction of infrastructure to access the deposits at the LaRonde Mine extension. Highly Experienced Management Team. The Company's senior management team has an average of approximately 20 years of experience in the mining industry. Management's significant experience has underpinned the Company's historical growth and provides a solid base upon which to expand the Company's operations. The geological knowledge that management has gained through its years of experience in mining and developing the LaRonde Mine is expected to benefit the Company's current expansion program in Quebec, Nunavut, Finland and Mexico. Leverage Mining Experience. The Company believes it can benefit not only from the existing infrastructure at its mines but also from the geological knowledge that it has gained in mining and developing its properties. The Company's strategy is to capitalize on its mining expertise to exploit fully the potential of its properties. The Company's goal is to apply the proven operating principles of the LaRonde Mine to each of its existing and future properties. Optimize and Further Expand Operations. The Company continues to focus its resources and efforts on the exploration and development of its properties in Quebec, Nunavut, Finland and Mexico with a view to increasing annual gold production and gold reserves. Expand Gold Reserves. The Company is conducting drilling programs at all of its properties with a goal of further increasing its gold reserves. In 2008, on a contained gold ounces basis, the Company increased its gold reserves to 18.1 million ounces, an increase of 8% over December 31, 2007 levels, including the replacement of 276,762 ounces of gold mined. Growth Through Primary Exploration and Acquisitions. The Company's growth strategy has been to pursue the expansion of its development base through the acquisition of additional properties in the Americas and Europe. Historically, the Company's producing properties have resulted from a combination of investments in early-stage exploration companies and primary exploration activities. By investing in early-stage exploration companies, the Company believes that it has been able to acquire control of exploration properties at favourable prices. The Company's property acquisition strategy has evolved to include joint ventures and partnerships and the acquisition of development and producing properties. Mining Legislation and Regulation Canada The mining industry in Canada operates under both federal and provincial or territorial legislation governing prospecting and the exploration, development, operation and decommissioning of mines and mineral processing facilities. Such legislation relates to the method of acquisition and ownership of mining rights, labour, occupational or worker health and safety standards, royalties, mining, exports, reclamation, closure and rehabilitation of mines and other matters. The mining industry in Canada is also subject to extensive laws and regulations at both the federal and provincial or territorial levels concerning the protection of the environment. The primary federal regulatory authorities with jurisdiction over the Company's mining operations in respect of environmental matters is the Department of Fisheries and Oceans (Canada) and Environment Canada. The construction, development and operation of a mine, mill or refinery requires compliance with applicable environmental laws and regulations and/or review processes, including obtaining land use permits, water permits, air emissions certifications, industrial depollution attestations, hazardous substances management and similar authorizations from various governmental agencies. Environmental laws and regulations impose high standards on the mining industry to reduce or eliminate the effects of waste generated by mining and processing operations and subsequently deposited on the ground or affecting the air or water. Laws and regulations regarding the decommissioning, reclamation and rehabilitation of mines may require approval of reclamation plans, provision of financial guarantees and long-term management of closed mines. Quebec In Quebec, mining rights are governed by the Mining Act (Quebec) and, subject to limited exceptions, are owned by the province. A mining claim entitles its holder to explore for minerals on the subject land. It remains in force for a term of two years from the date it is registered and may be renewed indefinitely subject to continued exploration works in relation thereto. In order to retain title to mining claims, in addition to paying a small bi-annual rental fee, exploration work (or an equivalent value cash payment) has to be completed in advance (either on the claim or on adjacent mining claims, concessions or leases) and filed with the Ministry of Natural Resources and Wildlife (Quebec). The amount of exploration work (and bi-annual rental fee) required bi-annually currently ranges from C$48 to C$3,600 per claim depending on its location, area and period of validity (the rate is fixed by Quebec government regulations). In 1966, the mining concession system set out for lands containing mineralized zones in the Mining Act (Quebec) was replaced by a system of mining leases but the mining concessions sold prior to such replacement remain in force. A mining lease entitles its holder to mine and remove valuable mineral substances from the subject land, providing it pays the annual rent set by Quebec government regulations, which currently ranges from C$20 per hectare (on privately held land) to C$41 per hectare (on land owned by the province). Leases are granted initially for a term of 20 years and are renewable up to three times, each for a duration of 10 years. After the third renewal, the Minister of Natural Resources and Wildlife (Quebec) may grant an extension thereof on the conditions for the rental and for the term he or she determines. In Quebec, the primary provincial regulatory authorities with jurisdiction over the Company's mining operations in respect of environmental matters are the Ministry of Sustainable Development, Environment and Parks (Quebec) and the Ministry of Natural Resources and Wildlife (Quebec). Nunavut As a result of the Nunavut Land Claims Agreement (the "Land Claims Agreement") of July 1993, ownership of large tracts of land was granted to the Inuit. These Inuit owned lands include areas with high mineral potential. Further, as a result of other rights granted to the Inuit in the Land Claims Agreement, managerial responsibility with respect to natural resources and environment in Nunavut is shared between the federal government and Inuit organizations. Under the Land Claims Agreement, the Inuit own surface rights to certain lands representing approximately 16% of Nunavut. For a portion of the Inuit owned lands representing approximately 2% of Nunavut, the Inuit also own mineral (subsurface) rights in addition to the surface rights. In Nunavut, the Crown's mineral rights are administered by the Department of Indian and Northern Affairs (Canada) in accordance with the Northwest Territories and Nunavut Mining Regulations (the "Territorial Mining Regulations") under the Territorial Lands Act (Canada). The Inuit mineral rights in subsurface Inuit owned lands are owned and administered by Nunavut Tunngavik Incorporated ("Nunavut Tunngavik"), a corporation representing the Inuit people of Nunavut. Future production from Nunavut Tunngavik-administered mineral claims is subject to production leases which include a 12% net profits interest royalty from which annual deductions are limited to 85% of gross revenue. Production from Crown mining leases is subject to a royalty of up to 14% of adjusted net profits, as defined in the Territorial Mining Regulations. The Kivalliq Inuit Association (the "KIA") is the Inuit organization that holds surface rights to the Inuit owned lands in the Kivalliq region and is responsible for administering surface rights on these lands on behalf of the Inuit of the region. In order to conduct exploration work on Inuit owned lands, the Company is required to submit a project proposal or work plan. Such a proposal is subject to approval by the KIA for surface land tenure and to review by other boards established by the Land Claims Agreement to determine environmental effects and, if needed, to grant water rights. Federal and territorial government departments participate in the reviews conducted by these boards. For mine development, the Company will require a surface lease and water compensation agreement with the KIA and a licence for the use of water, including the deposit of waste. During mine construction and operations, the Company will be subject to additional Nunavut and federal government regulations related to environmental, safety, fire and other operational matters. Finland Mining legislation in Finland consists of the Mining Act and the Mining Decree, which are currently being amended. Initial proposed amendments to the Mining Act were released in October 2008 with the aim that a revised Mining Act would come into force in 2011. However, the process of amending the Mining Act is still in its early stages and it is not yet clear what effects, if any, possible planned amendments to the Mining Act would have on the Company's operations in Finland. In Finland, any corporation having its principal place of business or central administration within the European Economic Area is entitled to the same rights to carry out prospecting, to stake a claim and to exploit a deposit as any Finnish citizen or corporation. In general, prospecting does not require any special licence from the authorities, except under certain circumstances as set out in the Mining Act. If there are no impediments to granting a claim, the Ministry of Employment and the Economy (the "MEE") is obliged to grant the applicant a prospecting licence, which is required if the prospector wishes to examine the area in order to determine the size and scope of the deposit. A prospecting licence is in force for one to five years, depending on the scope of the search for mineable minerals, and the MEE has no power of discretion as to the material merits of the mining operation. In order to obtain the rights to the mineable minerals located on a claim, the claimant must apply to the MEE for the appropriation of a mining patent. When the mining patent procedure has become final regarding all matters other than compensation, the MEE must issue the mining operator a mining certificate which gives the holder the right to fully exploit all mineable minerals found in the mining patent. Mining operations must be carried out in accordance with laws and regulations concerning conservation and environmental protection issues. Under the Environmental Protection Act, mining activities require an environmental permit which is issued either for a definite or indefinite period of time. The Environmental Protection Act is based on the principles of prevention and minimization of damages and hazards, application of the best available technology, application of the best environmental practice and "polluter pays". The Act on Compensation for Environmental Damage includes provisions on the compensation for damage to a person or property resulting from pollution of water, air or soil, noise, vibration, radiation, light, heat or smell, or other similar nuisance, caused by an activity carried out at a fixed location. This Act is based on the principle of strict liability. In addition to the environmental permit, mining operators require several other permits and obligations under environmental protection legislation. According to the Land Use and Building Act, the buildings and construction required in mining require building permits. Furthermore, according to the Act on Environmental Impact Assessment Procedure, certain projects always require compliance with an environmental impact assessment procedure. These include major projects with a considerable impact on the environment, such as the excavation, enrichment and handling of metals and other minerals in cases where the excavated material is estimated to exceed 550,000 tonnes annually. A permit authority may not give its approval to an activity covered by the scope of the Act on the Environmental Impact Assessment Procedure without having taken an environmental impact assessment report into consideration. Mexico Mining in Mexico is subject to the Mining Law, a federal law. Under the Mexican Constitution, all minerals belong to the Mexican Nation. Private parties may explore and extract them pursuant to mining concessions granted by the executive branch of the Mexican Federal Government, as a general rule to whoever first claims them. While the Mining Law touches briefly upon labour, occupational or worker health and safety standards, these are primarily dealt with by the Federal Labour Law, also a federal statute. The Mining Law also briefly addresses environmental matters, which are primarily regulated by the General Law of Ecological Balance and Protection of the Environment, also of federal jurisdiction. The primary agencies with jurisdiction over mining activities are the Ministry of the Economy, the Ministry of Labor and Social Welfare and the Ministry of the Environment and Natural Resources. The National Water Commission has jurisdiction regarding the granting of water rights and the Ministry of Defense as concerns the use of explosives. Concessions are for 50 years, renewable once. The main obligations to keep concessions current are the semi-annual payment of mining duties (taxes), based on the surface area of the concession, and the performance of work in the areas covered by the concessions, which is evidenced by minimum expenditures or by the production of ore. Organizational Structure The Company's significant subsidiaries (all of which are wholly-owned, unless otherwise indicated) are Riddarhyttan, 1715495 Ontario Inc., which owns all of the shares of Agnico-Eagle Sweden AB, a Swedish company through which the Company holds its interest in Riddarhyttan, and Agnico-Eagle AB, a Swedish company through which Riddarhyttan holds its interest in the Kittila Mine. In addition, the Company's interest in the Pinos Altos mine project in northern Mexico is held through its wholly-owned Mexican subsidiary, Agnico Eagle Mexico S.A. de C.V., which is owned, in part, by 1641315 Ontario Inc. The Company's only other significant subsidiaries are Agnico-Eagle (Delaware) LLC, Agnico-Eagle (Delaware) LLC II and Agnico-Eagle (Delaware) LLC III, each a limited liability company organized under the laws of Delaware. The LaRonde Mine (including the LaRonde Mine extension), the Goldex Mine, the Lapa mine project and the Meadowbank mine project are owned directly by the Company. The Company's wholly-owned subsidiaries Servicios Agnico Eagle Mexico, S.A. de C.V. and Servicios Pinos Altos, S.A. de C.V. provide services in connection with the Company's operations in Mexico. Riddarhyttan Resources Oy provides services in connection with the Company's operations at the Kittila Mine in Finland. The Company's operations in the United States are conducted through Agnico-Eagle (USA) Limited. In addition, the Company has an approximate 15.8% interest in Stornoway Diamond Corporation ("Stornoway"), a TSX listed diamond exploration company, organized under the laws of British Columbia. See "Item 7 Major Shareholders and Related Party Transactions — Related Party Transactions". The following chart sets out the corporate structure of the Company together with the jurisdiction of organization of each of the Company's subsidiaries as at March 25, 2009: Agnico-Eagle Organizational Chart Property, Plant and Equipment Location Map of the Abitibi Region LaRonde Mine The LaRonde Mine is situated approximately 60 kilometres west of the City of Val d'Or in northwestern Quebec (approximately 650 kilometres northwest of Montreal, Quebec) in the municipalities of Preissac and Cadillac. At December 31, 2008, the LaRonde Mine was estimated to contain proven mineral reserves of approximately 362,000 ounces of gold comprised of 4.1 million tonnes of ore grading 2.76 grams per tonne and probable mineral reserves of 4.6 million ounces of gold comprised of 31.7 million tonnes of ore grading 4.52 grams per tonne. The Company's LaRonde Mine consists of the LaRonde property and the adjacent El Coco and Terrex properties, each of which is 100% owned and operated by the Company. The LaRonde Mine can be accessed either from Val d'Or in the east or from Rouyn-Noranda in the west, which are located approximately 60 kilometres from the LaRonde Mine via Quebec provincial highway No. 117. The LaRonde Mine is situated approximately two kilometres north of highway No. 117 on Quebec regional highway No. 395. The Company has access to the Canadian National Railway at Cadillac, Quebec, approximately six kilometres from the LaRonde Mine. The elevation is 337 metres above sea level. All of the LaRonde Mine's power requirements are supplied by Hydro-Quebec through connections to its main power transmission grid. Water used in the LaRonde Mine's operations is sourced from Lake Preissac and is transported approximately four kilometres to the mine site through a surface pipeline. The LaRonde Mine operates under mining leases obtained from the Ministry of Natural Resources and Wildlife (Quebec) and under certificates of approval granted by the Ministry of Sustainable Development, Environment and Parks (Quebec). The LaRonde property consists of 35 contiguous mining claims and one provincial mining lease and covers in total approximately 884.1 hectares. The El Coco property consists of 22 contiguous mining claims and one provincial mining lease and covers in total approximately 356.7 hectares. The Terrex property consists of 20 mining claims that cover in total approximately 408.4 hectares. The mining leases on the LaRonde and El Coco properties expire in 2018 and 2021, respectively, and are automatically renewable for three further ten-year terms upon payment of a small fee. The Company also has two surface rights leases that cover in total approximately 122.3 hectares that relate to the water pipeline right of way from Lake Preissac and the eastern extension of the LaRonde tailings pond #7 on the El Coco property. The surface rights leases are renewable annually. Location Map of the LaRonde Mine The LaRonde Mine includes underground operations at the LaRonde and El Coco properties that can both be accessed from the Penna Shaft, a mill, treatment plant, secondary crusher building and related facilities. The El Coco property is subject to a 50% net profits interest in favour of Barrick Gold Corporation ("Barrick") on future production from approximately 500 metres east of the LaRonde property boundary. The remaining 1,500 metres is subject to a 4% net smelter return royalty. This area of the property is now substantially mined out and the Company has not paid royalties since 2004 and does not expect to pay royalties in 2009. In 2003, exploration work started to extend outside of the LaRonde property on to the Terrex property where a down plunge extension of the 20 North gold zone was discovered. The Terrex property is subject to a 5% net profits royalty to Delfer Gold Mines Inc. and a 2% net smelter return royalty to Barrick. In addition, the Company owns 100% of the Sphinx property immediately to the east of the El Coco property. In 2009, payable gold production at the LaRonde Mine is expected to decline to approximately 203,000 ounces, and total cash costs per ounce are expected to be approximately $295. Over the 2009 through 2018 period, total cash costs per ounce are expected to average $315, with average gold production of 310,000 ounces annually. The climate of the region is continental with average annual rainfall of 64 centimetres and average annual snowfall of 318 centimetres. The average monthly temperatures range from a minimum of -23 degrees Celsius in January to a maximum of 23 degrees Celsius in July. Under normal circumstances, mining operations are conducted year round without interruption due to weather conditions. The Company believes that the Abitibi region of northwestern Quebec has sufficient experienced mining personnel to staff its operations at the LaRonde Mine. Mining and Milling Facilities The LaRonde Mine was originally developed utilizing a 1,207 metre shaft (Shaft #1) and an underground ramp access system. The ramp access system is available down to the Level 25 of Shaft #1 and then continues down to Level 242 at the Penna Shaft. The mineral reserve accessible from Shaft #1 was depleted in September 2000 and Shaft #1 is no longer in use. A second production shaft (Shaft #2), located approximately 1.2 kilometres to the east of Shaft #1, was completed in 1994 to a depth of 525 metres and was used to mine Zones 6 and 7. Both ore zones were depleted in March 2000 and the workings were allowed to flood up to Level 6 (approximately 280 metres). A third shaft (the Penna Shaft), located approximately 800 metres to the east of Shaft #1, was completed down to a depth of 2,250 metres in March 2000. The Penna Shaft is used to mine Zones 20 North, 20 South, 7 and 6. As part of the LaRonde Mine extension, the Company is currently sinking an 835 metre internal shaft from Level 215 to access the ore below Level 245. At December 31, 2008, this internal shaft extended 420 metres below Level 215 and will eventually reach a total depth of 835 metres below Level 215, or 2,880 metres below surface. Mining Methods Four mining methods have historically been used at the LaRonde Mine: open pit for the three surface deposits, sublevel retreat, longitudinal retreat with cemented backfill and transverse open stoping with both cemented and unconsolidated backfill. The primary source of ore at the LaRonde Mine continues to be from underground mining methods. During 2008, two mining methods were used: longitudinal retreat with cemented backfill and transverse open stoping with both cemented and unconsolidated backfill. In the underground mine, sublevels are driven at 30 metre and 40 metre vertical intervals, depending on the depth. Stopes are undercut in 15 metre panels. In the longitudinal method, panels are mined in 15 metre sections and backfilled with 100% cemented rock fill or paste fill from the paste backfill plant completed in 2000 and located on the surface at the processing facility. In the transverse open stoping method, 50% of the ore is mined in the first pass and filled with cemented rock fill or paste fill. On the second pass, the remainder of the ore is mined and filled with unconsolidated waste rock fill or cemented paste backfill. Surface Facilities Surface facilities at the LaRonde Mine include a processing plant with a daily capacity of 7,200 tonnes of ore, which has been expanded four times since 1987 from the original rate of 1,630 tonnes per day. Beginning in 1999, transition to the LaRonde Mine poly-metallic massive sulphide ore body required several modifications to the processing plant which consisted of a new coarse ore handling system, new SAG and ball mill, the addition of a zinc flotation circuit and capacity increases to the existing copper flotation and precious metals circuits. In 2008, the installation of a limited copper/lead separation flotation circuit, following the copper flotation circuit, was completed. Also in 2008, operation of a small cyanidation plant, for the treatment of sulphide concentrate from the Goldex Mine, began. LaRonde has also been selected to be the site for the Lapa mine project ore processing plant (1,500 tonnes per day), which the Company expects will be commissioned in the second quarter of 2009. Annual production at the LaRonde mill consists of approximately 60,000 tonnes of copper concentrate, up to 5,000 tonnes of lead concentrate and 150,000 tonnes of zinc concentrate. Gold recovery at the LaRonde Mine is distributed approximately 75% in the copper concentrate, 1% in the lead concentrate, 6% in the zinc concentrate and 18% in the refinery. Mineral Recoveries During 2008, gold and silver recovery averaged 90.3% and 86.5%, respectively. Zinc recovery averaged 87.7% with a concentrate quality of 54.6% zinc. Copper recovery averaged 86.4% with a concentrate quality of 12% copper. Over 2.64 million tonnes of ore were processed averaging 7,210 tonnes of ore per day at 94.2% of available time. The following table sets out the metal recoveries, concentrate grades and contained metals for the 2.64 million tonnes of ore extracted by the Company at the LaRonde Mine in 2008. Gold 2.82 g/t 80.4 g/t 67.50% 2.65 g/t 5.06% 84.2 g/t 1.16% 39,874 oz 90.28% 216,209 oz Silver 64.37 g/t 1,563 g/t 57.51% 159.4 g/t 13.31% 2916 g/t 1.76% 625,722 oz 86.47% 4,068,656 oz Copper 0.33% 12.07% 85.91% — — — — — 86.40% 6,922 t Lead 0.38% — — — — 56.59% 5.84% — 72.54% 554 t Zinc 3.35% — — 54.6% 87.74% — — — 87.74% 65,755 t Environmental Matters Currently, water is treated at various facilities at the LaRonde Mine operations. Water contained in the tailings to be used as underground backfill is treated to degrade cyanide using a sulphur dioxide and air process. The tailings entering the tailings pond are first decanted and the clear water subjected to natural cyanide degradation. This water is then transferred to sedimentation pond #1 to undergo a secondary treatment at a plant located between tailings ponds #1 and #2 that uses a peroxy-silica process to destroy cyanide, lime and coagulant to precipitate metals. The tailings pond occupies an area of about 120 hectares. Waste rock that is not used underground for backfill is brought up to surface and stored in close proximity to the tailings pond to be used for raising the dykes around the ponds. A waste rock pile containing approximately 1.3 million tonnes of waste and occupying about nine hectares is located west of the mill. Due to the high sulphur content of the LaRonde ore, the Company has experienced toxicity issues in the tailings ponds since the 1990's. These problems resulted in governmental notices of infraction, as recently as 2005, and required investment in several treatment mechanisms. Since introducing and optimizing a biological treatment plant, the treatment process is now stable and the effluent has remained non-toxic since 2006. A Certificate of Authorization was granted by the Ministry of Sustainable Development, Environment and Parks (Quebec) in 2006 to carry out an ammonia stripping operation of an effluent partially treated by the biological treatment plant. This allowed an increase in treatment flowrate, while keeping the final effluent toxicity free. The Certificate of Authorization was renewed in 2007 for an indefinite period. In addition, water from mine dewatering and drainage water are treated to remove metals prior to discharge at a lime treatment plant located at the LaRonde mill. Capital Expenditures In 2006, the Company initiated construction to extend the infrastructure at the LaRonde Mine to access the ore below Level 245, referred to as the LaRonde Mine extension. The LaRonde Mine extension is expected to begin contributing to production in 2011. The LaRonde Mine extension infrastructure includes a new 835 metre internal shaft starting from Level 203, to a total depth of approximately 2,880 metres. A ramp will be used to access the lower part of the ore body (to 3,110 metres in depth). The internal winze system will be used to hoist ore from depth to facilities on Level 215, approximately 2,150 metres below surface, where it will be transferred to the Penna Shaft hoist. Excavation of the underground mining facilities is in progress and, as of December 31, 2008, the shaft has been sunk to a depth of 2,570 metres. Capital expenditures at the LaRonde Mine during 2008 were approximately $75 million, which included $38 million on sustaining capital expenditure and $37 million comprised mostly of expenditures on the LaRonde Mine extension. Budgeted 2009 capital expenditures at the LaRonde Mine are $64 million, including $24 million on sustaining capital expenditures and $40 million on the LaRonde Mine extension, which will consist mostly of shaft sinking and upgrades to the ventilation system. Total capital cost of construction of the LaRonde Mine extension is estimated to be $235 million, of which the Company had incurred $97 million by the end of 2008. Development In 2008, a total of 11,324 metres of lateral development was completed. Development was focused on stope preparation of mining blocks for production in 2008 and 2009, especially the preparation of the lower mine production horizon. A total of 638 metres of development work was completed for the LaRonde Mine extension mainly for ventilation infrastructure. This development work also included construction work on the ramp to access the LaRonde Mine extension, that is the portion of the mine below Level 245. A total of 11,620 metres of lateral development is planned for 2009. The main focus of development work continues to be stope preparation. The Company plans to develop and prepare the access to Zone 20 South down to Level 245. For the LaRonde Mine extension, a total of 2,120 metres of development is planned mainly to continue the ramp access below Level 245, to complete infrastructure around the new shaft and for future ventilation infrastructure. A total of 304 metres of shaft sinking is planned for 2009. Geology, Mineralization and Exploration Geology Geologically, the LaRonde Mine property is located near the southern boundary of the Archean-age (2.7 billion years old) Abitibi Sub-Province and the Pontiac Sub-Province within the Superior Province of the Canadian Shield. The most important regional structure is the Cadillac-Larder Lake fault zone (the "CLL Fault Zone") marking the contact between the Abitibi and the Pontiac Sub-Provinces, located approximately two kilometres to the south of the LaRonde property. The geology that underlies the LaRonde Mine consists of three east-west trending, steeply south dipping and generally southward facing regional lithological units (geological groups). The units are, from north to south: (i) 400 metres of the Kewagama Group, which is made up of a thick band of interbedded wacke; (ii) 1,500 metres of the Blake River Group, a volcanic assemblage which hosts all the known economic mineralization on the property; and (iii) 500 metres of the Cadillac Group, made up of a thick band of wacke interbedded with pelitic schist and minor iron formation. Zones of strong sericite and chlorite alterations, which enclose massive to disseminated sulphide mineralization (in which gold, silver, copper and zinc are mined at the LaRonde Mine), follow steeply dipping, east-west trending, anastomosing shear zone structures within the Blake River Group volcanic units from east to west across the property. These shear zones comprise a larger structure, the Doyon-Dumagami Structural Zone, that hosts several important gold occurrences (including the Doyon gold mine and the former Bousquet mines) and has been traced for over 10 kilometres within the Blake River Group from the LaRonde Mine westward to the Mouska gold mine. Mineralization The gold bearing zones at the LaRonde Mine are lenses of disseminated, stringer through to massive, aggregates of coarse pyrite with zinc, copper and silver content. Ten zones that vary in size from 50,000 to 40,000,000 tonnes have been identified, of which four are (or are believed to be) economic. Gold content is not proportional to the total sulphide content but does increase with copper content. Gold values are also higher in areas where the pyrite lenses are cross-cut by tightly spaced north-south fractures. These historical relationships are maintained at the Penna Shaft zones. The zinc-silver (i.e. Zone 20 North) mineralization with lower gold values, common in the upper mine, grades into gold-copper mineralization within the lower mine. Gold value enhancement associated with cross-cutting north-south fractures also occurs within the LaRonde Mine. Predominant base metal sulphides within the LaRonde Mine are chalcopyrite (copper) and sphalerite (zinc). The Company believes that Zone 20 North is one of the largest gold bearing massive sulphide mineralized zones known in the world and one of the largest mineralized zones known in the Abitibi region of Ontario and Quebec. Zone 20 North contains the majority of the mineral reserve and resource at the LaRonde Mine, including 34,158,575 tonnes of proven and probable reserves grading 4.37 grams per tonne, representing 95% of the total proven and probable reserve at LaRonde, 5,263,322 tonnes of measured and indicated resource grading 1.61 grams per tonne, representing 83% of the total measured and indicated resource at LaRonde and 4,627,096 tonnes of inferred resource grading 6.08 grams per tonne, representing 94% of the total inferred resource at LaRonde. Zone 20 North initially occurs at a depth of 700 metres below surface and has been traced down to a depth of 3,100 metres below surface, and is still opened at depth. With increased access on the lower levels of the mine (i.e., Levels 170, 194, 215, 224 and 239), the transformation from a "zinc/silver" ore body to a "gold/copper" deposit continued during 2008. Zone 20 North can be divided into an upper zinc/silver-enriched zone and a lower gold/copper-enriched zone. The zinc zone has been traced over a vertical distance of 1,700 metres and a horizontal distance of 570 metres, with thicknesses approaching 40 metres. The gold zone has been traced over a vertical distance of over 2,200 metres and a horizontal distance of 900 metres, with thicknesses varying from three metres to 40 metres. The zinc zone consists of massive zinc/silver mineralization containing 50% to 90% massive pyrite and 10% to 50% massive light brown sphalerite. The gold zone mineralization consists of 30% to 70% finely disseminated to massive pyrite containing 1% to 10% chalcopyrite veinlets, minor disseminated sphalerite and rare specks of visible gold. Gold grades are generally related to the chalcopyrite or copper content. This is the same historical relationship noted at Shaft #1's Main Zone. At depth, the massive sulphide lens becomes richer in gold and copper. During 2008, 2.4 million tonnes of ore grading 2.69 grams of gold per tonne, 66.7 grams of silver per tonne, 0.33% copper, 3.41% zinc and 0.39% lead were mined from Zone 20 North. Exploration The combined tonnage of proven and probable mineral reserves at the LaRonde Mine for year-end 2008 is 35.8 million tonnes which represents a 4% increase in the amount compared to year-end 2007. This mineral reserve includes the replacement of 2.6 million tonnes that were mined in 2008. The Company's ability to sustain its level of proven and probable mineral reserves was primarily due to continued successful exploration results at depth as well as the increase in the three-year average metals prices used for the year-end 2008 estimates. The 2008 LaRonde Mine exploration program was a continuation of the diamond drilling from the Level 215 exploration drift, approximately 2,150 metres below the surface. This drift was extended west of the Penna Shaft in 2007 and 2008 and provides access for deep drilling along 2,000 metres of the Bousquet-LaRonde stratigraphy. Much of the 2008 drilling was undertaken to continue exploration to the west, below and in the deep extension of the Bousquet II deposit. Another important focus of the drilling was to start exploration at the eastern edge of the orebody. Most of the exploration work was done between 2,000 and 3,000 metres below surface. Systematic drilling along the Bousquet stratigraphy has been successful in the past, notably the discovery of the LaRonde deposit. Finally, some in-fill drilling was also completed within selected areas of the resource envelope below Level 245 to confirm continuity. In addition, some definition and delineation drilling was completed to assist in final mining stope design, mainly of Zone 20 North. In 2008, a total of 245 holes were drilled on the LaRonde property for a total length of 28,039 metres, compared to 195 holes for a total length of 35,319 metres in 2007. Of the drilling in 2008, 178 holes (10,323 metres) were for production stope delineation, 53 holes (7,628 metres) were definition drilling and 14 holes (10,088 metres) were for deep exploration (below Level 245). In 2007, 136 holes (8,587 metres) were for production stope delineation, 27 holes (6,052 metres) were definition drilling and 32 holes (20,680 metres) were for deep exploration (below Level 245). Expenditures on diamond drilling at the LaRonde Mine during 2008 were approximately $4.2 million, including $1.3 million in definition and delineation drilling expenses charged to operating costs at the LaRonde Mine. Expenditures on exploration in 2008 were $2.9 million and are expected to be $1.5 million in 2009. Zone 20 North was the main focus of the drilling completed in 2008. The results of 2008 in-fill drilling in Zone 20 North below Level 245, combined with the higher metal prices used for the 2008 year-end reserve and resource estimate, contributed to an increase of probable mineral reserves of 207,027 ounces of gold (2.6 million tonnes of ore grading 2.47 grams of gold per tonne) below Level 245. In 2006 and 2007, step-out drilling west of the known resource-reserve envelope below Level 245 had intersected anomalous results along the Zone 20 North horizon underneath and in the deep extension from the Bousquet II deposit. In 2008, the Company extended the Level 215 exploration drift by approximately 341 metres to provide access for the continuation of exploration drilling further west of the current reserves below Level 245. Unfortunately, the grades encountered in this area have been lower than the grades encountered in 2006-2007 drilling. Goldex Mine The Goldex Mine, which commenced commercial production in August 2008, is located in the municipality of Val d'Or, Quebec, approximately 60 kilometres east of the LaRonde Mine. At December 31, 2008, the Goldex Mine was estimated to contain proven mineral reserves of approximately 27,222 ounces comprised of 0.4 million tonnes of ore grading 1.95 grams per tonne and probable mineral reserves of 1.54 million ounces of gold comprised of 23.4 million tonnes of ore grading 2.05 grams per tonne. Location Map of the Goldex Mine The Goldex Mine is accessible by provincial highway. The elevation is approximately 302 metres above sea level. All of the Goldex Mine's power requirements are supplied by Hydro-Quebec through connections to its main power transmission grid. All of the water required at the Goldex Mine is sourced directly by aqueduct from the Thompson River immediately adjacent to the mine or through recirculation of water from the surface pond and the auxiliary tailings pond. The Goldex Mine operates under a mining lease obtained from the Ministry of Natural Resources and Wildlife (Quebec) and under certificates of approval granted by the Ministry of Sustainable Development, Environment and Parks (Quebec). The Goldex property, which the Company has a 100% working interest in, consists of 20 contiguous mining claims and one provincial mining lease, covering an aggregate of approximately 273.3 hectares, and is made up of three blocks: the Probe block (122.7 hectares); the Dalton block (10.4 hectares); and the Goldex Extension block (140.2 hectares). The claims are renewable every second year upon payment of a small fee. The mining lease expires in 2028 and is automatically renewable for three further ten-year terms upon payment of a small fee. The Company also has one lease covering 418.5 hectares of surface rights that are used for the auxiliary tailings pond. This lease is renewable annually upon payment of a small fee. The Goldex Mine includes underground operations that can be accessed from two shafts, a processing plant, an ore storage facility and other related facilities. The Goldex Extension zone, which is the gold deposit on which the Company is focusing its exploration, development and production efforts, was discovered in 1989 on the Goldex Extension block (although the Company believes a small portion of the Goldex Extension deposit occurs on the Dalton and Probe blocks). As production has commenced on the Goldex Mine, under an option agreement between the Company, Goldex Mines Limited (a predecessor to the Company) and the estate of John Michael Dalton Jr. (the "Dalton Estate"), on the exercise of the option and the payment of an aggregate of $500 to the Company, the Company will issue 18,000 shares of the Company to the beneficiaries of the Dalton Estate. Probe Mines Ltd. holds a 5% net smelter return royalty interest on the Probe block. In 2008, exploration work started on the Main zone located on the Probe property block to the west of the current mining area. The climate of the Abitibi region of northwestern Quebec, where the Goldex Mine is located is continental with average annual rainfall of 64 centimetres and average annual snowfall of 318 centimetres. The average monthly temperatures range from a minimum of -23 degrees Celsius in January to a maximum of 23 degrees Celsius in July. Under normal circumstances, mining operations are conducted year round without interruption due to weather conditions. The Company believes that the Abitibi region has sufficient experienced mining personnel to staff its operations at the Goldex Mine. In 1997, the Company completed a mining study that showed that the deposit was not economically viable to mine at the then prevailing gold price using the mining approach chosen and drill-hole indicated grade. The property was placed on a care and maintenance basis and the workings were allowed to flood. In February 2005, a new reserve and resource estimate was completed for the Goldex Extension Zone which, coupled with a revised feasibility study, led to a probable reserve estimate of 1.6 million ounces of gold contained in 20.1 million tonnes of ore grading 2.54 grams of gold per tonne. The Goldex Extension Zone resource model was revised and, in March 2005, the Company approved a revised feasibility study and the construction of the Goldex Mine. The Goldex Mine is anticipated to produce approximately 165,000 ounces of gold in 2009 at estimated total cash costs per ounce of approximately $311. Over the period of 2009 through 2017, total cash costs per ounce are estimated to average approximately $270 with average gold production of approximately 160,000 ounces annually. The Company is currently preparing a scoping study to assess the feasibility of increasing the designed daily production rate at the Goldex Mine from 6,900 tonnes per day to at least 8,000 tonnes per day. Mining and Milling Facilities At the time the Company commenced construction of the Goldex Mine, the surface facilities included a headframe, a hoistroom, a surface building containing a mechanical shop, a warehouse and an office. In addition, the Goldex property had a 790-metre deep shaft (Shaft #1), which provides access to underground workings. Shaft #1 is predominantly used to hoist waste rock from development activities. The sinking of the new production shaft was completed in 2007. The new shaft (Shaft #2) is a 5.5-metre diameter shaft with a 20-inch concrete lining and is used for ventilation as well as hoisting services. Shaft #2 is 865 metres deep and includes five stations. A refurbished friction hoist was installed for production and service duties, and an auxiliary hoist was installed for emergency and personnel service. The production hoist is equipped with one cage per skip and one skip. Each skip has a 20 metric tonne capacity, and the shaft can hoist an average of 7,000 metric tonnes of ore per day. During 2008, approximately 4,850 metres of lateral and vertical development were completed and the rock handling system was commissioned. Mining Method The Goldex Mine uses a high volume bulk mining method, which is made possible through the use of large mining stopes. Drilling and blasting of 165-millimetre production holes is used to obtain a muck size large enough to be economically efficient. Using this method requires a percentage of the broken ore to be kept in the stope to reduce the backfilling cost and to reduce sloughing on the walls. Little ore and waste development is necessary to mine out the deposit. Surface Facilities Plant construction at the Goldex Mine commenced in the second quarter of 2006 and was completed in the first quarter of 2008. Grinding at the Goldex mill is done through a two-stage circuit comprising of a SAG mill and a ball mill. The Company estimates that two-thirds of the gold will be recovered through a gravity circuit, passed over shaking tables and smelted on site. The remainder of the gold and pyrite is recovered by a flotation process. The concentrate is then thickened and trucked to the mill at the LaRonde Mine where it is further treated by cyanidation. The treated concentrate is then processed through the existing Merrill Crowe circuit at the LaRonde mill and gold recovered is consolidated with precious metals from the LaRonde Mine. The Company is targeting an average gold recovery of 93.6% In addition, surface facilities at the Goldex Mine include an electrical sub-station, a compressor building, a service building for administration and changing rooms, a warehouse building, a concrete headframe above Shaft #2, a hazardous waste storage facility and a dome covering the ore stockpile. In 2008, the processing plant building was commissioned along with the Manitou pumping station and its associated 24 kilometre pipeline. Mineral Recoveries From the commencement of commercial production in August 2008 to year-end, during 2008, the Goldex mill processed approximately 1.12 million tonnes of ore, averaging approximately 5,800 tonnes of ore treated per day and operating at approximately 90% of available time. The following table sets out the metal recoveries at the Goldex Mine in 2008. Gold 1.86 g/t 42,637 oz 63.67% 15,905 oz 23.75% 58,542 oz 87.42% 57,435 oz Environmental Matters Environmental permits for the construction and operation of an ore extracting infrastructure at the Goldex Mine were received from the Ministry of Sustainable Development, Environment and Parks (Quebec) in October 2005. The permits also covered the construction and operation of a sedimentation pond for mine water treatment and sewage facilities and these facilities have been built at the Goldex Mine site. In November 2006, the Company and the Quebec government signed an agreement permitting the Company to dispose of the Goldex tailings at the Manitou mine site, a tailings site formerly used by an unrelated third party and abandoned to the Quebec government. The Manitou mine site has issues relating to acid drainage and the construction of tailings facilities by the Company and the deposit of tailings from Goldex on the site was accepted by the Ministry of Sustainable Development, Environment and Parks (Quebec) as a valid rehabilitation plan to address the acid generation problem at Manitou. Under the agreement, the Company manages the construction and operation of the tailings facilities and the Quebec government pays all additional costs above the Company's budget for tailings facilities set out in the Goldex feasibility study. The Quebec government retains responsibility for all environmental contamination at the Manitou tailings site and for final closure of the facility. In addition, the Company has built a separate tailings deposition area (auxiliary tailings pond) near the Goldex Mine. Environmental permits for the construction and operation of the auxiliary tailings pond at the Goldex Mine were received in March 2007. In 2008, 486,000 tonnes of Goldex tailings were discharged to the auxiliary pond and 634,000 tonnes were discharged to the Manitou facility as the pipeline to the Manitou facility was not completed until August 2008. Capital Expenditures The capital costs of bringing the Goldex Mine into production were $214 million, of which $33 million was spent in 2008. Approximately $95 million was spent on the new shaft, underground development and construction and mining equipment, while an additional $60 million was spent on the processing plant and tailings facility and the remainder was spent on the surface plant. Sustaining capital expenditures are expected to be $8.9 million in 2009. Development During 2008, approximately 4,850 metres of lateral and vertical development were completed at a cost of $12 million. For 2009, 4,200 metres of development is planned with a budget of $10.7 million (including $5.5 million for deferred development). In addition, ramp access from Level 58 to Level 51 will be completed in 2009. Geology, Mineralization and Exploration Geology Geologically, the Goldex property is similar to the LaRonde property and is located near the southern boundary of the Archean-age (2.7 billion years old) Abitibi Sub-Province, a typical granite-greenstone terrane located within the Superior Province of the Canadian Shield. The southern contact of the Abitibi Sub-Province with the Pontiac Sub-Province is marked by the east-southeast trending CLL Fault Zone, the most important regional structural feature. The Goldex deposit is hosted within a quartz diorite sill, the Goldex Granodiorite, located in a succession of mafic to ultramafic volcanic rocks that are all generally oriented west-northwest. Mineralization Gold mineralization at Goldex corresponds to the quartz-tourmaline vein deposit type. The Goldex gold bearing quartz-tourmaline-pyrite veins and veinlets are the result of a strong structural control; the most significant structure directly related to mineralization is a discrete shear zone, the Goldex Mylonite, that is up to five metres in thickness and occurs within the Goldex Granodiorite, just south of the Goldex Extension Zone (which hosts all of the current mineral reserves) and other gold occurrences. Oriented west-northwest and also dipping 65 to 75 degrees north (and to a lesser extent 60 to 80 degrees south), minor fracture zones (that display reverse movement, north to south) that are developed parallel but to the north of the Goldex Mylonite, control the quartz-tourmaline-pyrite vein mineralization. Three vein sets (all oriented west northwest but with different dips) are developed within the Goldex Extension Zone. The most important vein set are extensional-shear veins that dip 30 degrees south and are usually less than 10 centimetres in thickness; synchronous and conjugate with the latter veins are less abundant extensional-shear veins (also generally less than 10 centimetres in thickness) that dip 30 to 45 degrees to the north. The third vein set is made up of shear zone veins up to a metre in thickness that occasionally occur within the steep north dipping fracture zones. The vein sets (and alteration associated with them) combine to form stacked envelopes up to 30 metres thick that also dip approximately 30 degrees south (parallel to the main vein orientation) but which always conform to the orientation (75 degree north dip) of the Goldex Granodiorite and the main fracture zones. The Goldex Extension Zone extends from 500 to 800 metres below the surface and is entirely hosted by the Goldex Granodiorite. The limits of the zone are defined by the intensity of the quartz vein stockwork envelope and assays rather than by individual veins. The zone is almost egg-shaped (flattened in the orientation of the sill) and elongated almost horizontally (also parallel to the west-northwest trending sill and fracture zones); it is over 300 metres tall by 450 metres long (in a west-northwest direction) and its thickness increases rapidly from 25 metres along the east-west edges to almost 150 metres in the centre. Exploration results have essentially delimited the Goldex Extension Zone at its immediate western fringe. More exploration will be needed to define the summit and the eastern edge of the zone. The inferred mineralization in the eastern portion of the property extends the Goldex Extension Zone 175 metres east and 125 metres below the current envelope of probable reserves. The Goldex Extension Zone is open above Level 73 to the east-southeast for approximately 300 metres. Strong albite-sericite alteration of the quartz-diorite surrounds the quartz-tourmaline-pyrite veins and covers almost 80% of the mineralized zone; outside of the envelopes, prior chlorite alteration affects the quartz diorite and gives it a darker grey-green colour. Occasionally, enclaves of relatively unaltered medium grey-green coloured quartz diorite (with no veining or gold) are found within the Goldex Extension Zone (they are included exceptionally as internal waste to allow for a smooth shape required for mining purposes). Most of the gold occurs as microscopic particles that are almost always associated with pyrite (generally adjacent to grains and crystals but also 20% included in the pyrite) that occurs in the quartz-tourmaline veins and in narrow fractures in the sericite-albite altered quartz diorite (but generally immediately adjacent to the veins); less than 1.5% of the gold occurs as Calaverite (a gold telluride). Exploration In 2008, 46 holes for a total length of 8,310 metres helped define the immediate extensions of the Goldex Extension zone, including confirming its upper limits. An additional 13 holes for a total length of 3,175 metres outlined a small inferred gold resource associated with the South zone, located in the volcanic unit immediately south of the Goldex Extension zone. Additionally, two holes for a total length of 1,134 metres were completed and confirmed the exploration potential of the Goldex Deep zone (similar in style to the Goldex Extension zone, but located approximately 250 metres below current mine infrastructure). In 2009, 62% of the exploration budget will be used to excavate a 212 metre long exploration drift to enable drilling eastern portions of the Goldex Extension Zone, 22% will be used to better drill define the gold resources in the Main zone (the former "main" interest zone above Level 33) and the remaining 16% will be to complete drilling of the Goldex Extension Zone and perform re-assays on old holes in the Goldex South zone. Kittila Mine The Kittila Mine, which commenced commercial production in September 2008, is located approximately 900 kilometres north of Helsinki and 50 kilometres northeast of the town of Kittila, in northern Finland. At December 31, 2008, the Kittila Mine was estimated to contain probable mineral reserves of 3.2 million ounces comprised of 21.4 million tonnes of ore grading 4.7 grams per tonne. The Kittila Mine is accessible by paved road from the village of Kiistala, which is located on the southern portion of the main claim block. The gold deposit is located near the small village of Rouravaara, approximately 10 kilometres north of the village of Kiistala, accessible via a good quality all-weather gravel road. The property is close to infrastructure, including hydro power, an airport, the town of Kittila, and mining and construction contractors. The project also has access to a qualified labour force. The total landholdings surrounding and including the Kittila Mine comprise 84 tenements covering an aggregate area of approximately 6,969 hectares and one mining licence covering approximately 847 hectares. The mineral titles form three distinct blocks. The main block comprises the Suurikuusikko mining licence and 69 contiguous tenements covering 5,850 hectares. The centroid of this block is located at 25.4110 degrees longitude East and 67.9683 degrees latitude North. Other tenements form isolated blocks comprising three to five contiguous or grouped tenements located in the vicinity of the main Suurikuusikko block and between the Kittila and Sodankyla Municipalities. The boundary of the mine licence is determined by ground surveyed points whereas the boundaries of the other tenements are not required to be surveyed. All of the tenements in the Kittila Mine are registered in the name of Agnico-Eagle AB, an indirect, wholly-owned subsidiary of the Company. According to the Finnish Government land tenure records, all tenements are in good standing. The expiry dates of the tenements vary up to June 2013. Tenements are valid between three and five years, providing a small annual fee is paid to maintain title and extensions can be granted for three years or more. A number of older tenements expired in 2008. These expired tenements had been explored by the Company and based on the results were determined to have no potential for gold mineralization. Currently, these tenements are not claimed. The Company currently holds a mining licence in respect of the Kittila Mine. The mine is subject to a 2.0% net smelter return royalty payable to the Republic of Finland starting in 2011. The Kittila Mine area is sparsely populated and is situated between 200 and 245 metres elevation above sea level. The topography is characterized by low rolling forested hills separated by marshes, lakes and interconnected rivers. The gold deposit is situated on an area of land that has no special use at present and there is sufficient land available for tailings facilities. Water requirements for the Kittila Mine are sourced from the nearby Seurujoki River, recirculation of water from pit dewatering and tailings pond water. The mine is located within the Arctic Circle but the climate is moderated by the Gulf Stream off the coast of Norway such that northern Finland's climate is comparable to that of eastern Canada. Winter temperatures range from -10 to -30 degrees Celsius, whereas summer temperatures range from 10 degrees Celsius to the mid-20s. Exploration and mining work can be carried out year round. Because of its northern latitude, winter days are extremely short with brief periods of 24-hour darkness around the winter solstice. Conversely, summer days are very long with a period of 24-hour daylight in early summer around the summer solstice. Annual precipitation varies between five and 50 centimetres, one-third of which falls as snow. Snow accumulation usually begins in November and remains until March or April. Location Map of the Kittila Mine The Company acquired its 100%, indirect interest in the Kittila Mine through the acquisition of Riddarhyttan that was completed in November 2005. See "— History and Development of the Company". In June 2006, on the basis of an independently reviewed feasibility study, the Company approved construction of the Kittila Mine. The Kittila Mine is currently an open pit mining operation. Underground mining via ramp access is expected to commence in 2010. Ore will be processed in a 3,000 tonne per day surface processing plant. The plant was commissioned in late 2008 and is expected to be completed by the end of the first quarter of 2009. Limited gold concentrate production started in September 2008 and gold dore bar production commenced in January 2009. The Kittila Mine is anticipated to produce approximately 125,000 ounces of gold in 2009 at estimated total cash costs per ounce of approximately $333. Over the period of 2009 to 2018, total cash costs per ounce are estimated to be approximately $350 with anticipated average gold production of approximately 160,000 ounces annually. A scoping study is underway to assess the feasibility of doubling annual gold production to 300,000 ounces. This would involve sinking a new shaft and expanding the Kittila mill. Mining and Milling Facilities The orebodies at Kittila will be mined initially from two open pits, followed by underground operations to mine the deposits at depth. Additional, smaller open pits will mine any remaining reserves close to the surface in the future. Open pit mining started in May 2008 and the extracted ore was stockpiled. As of December 2008, a total of 312,000 tonnes of ore had been stockpiled and 5.2 million tonnes of waste rock had been excavated. Work on the ramp to access the underground reserves continued and total underground development to date is approximately 5,200 metres. Mining Methods The Kittila Mine is currently mining the Suurikuusikko ore body with a 150 metre deep open pit. Ore is mined in five metre benches together with waste rock using buffer blasting techniques and is loaded selectively to minimize dilution and maximize ore recovery. Hydraulic excavators load ore into 90-tonne trucks that haul the ore to the crusher and the waste rock to the waste disposal area. Approximately 3,000 tonnes of ore per day are fed to the concentrator. Surface mining is expected to last five years, during which time the ramp access to the underground mine will continue to be developed. The underground mining method will be open stoping with delayed backfill. Stopes will be from 25 to 40 metres high and yield approximately 10,000 tonnes of ore per stope. To ensure sufficient ore production is available to supply the mill, approximately four kilometres of tunnels will be developed each year. After extraction, stopes will be filled with cemented backfill to enable the safe extraction of ore in adjacent stopes. Ore will be trucked to the surface crusher using underground haul trucks via the ramp access system. Surface Facilities Construction of the processing plant and associated equipment was completed in 2008. A new maintenance facility for the open pit equipment neared completion at year-end. Permanent surface facilities on site now include an office building, a warehouse, a maintenance shop, an oxygen plant, a processing plant, a tank farm, a crusher, conveyor housings and an ore bin. In addition, some temporary structures house contractor offices and work areas. The ore at Kittila is treated through flotation, pressure oxidation and carbon-in-leach circuits. Gold is recovered from solution using electro-winning and then poured into dore bars using an electric induction furnace. Mineral Recoveries From the commencement of limited gold concentrate production in September 2008 to year-end, during 2008, the Kittila mill processed approximately 111,225 tonnes of ore. Daily throughput has progressively increased through this period, but has intentionally been limited near 2,200 tonnes per day as mill commissioning is still ongoing. The following table sets out the metal recoveries at the Kittila Mine in 2008. Gold 3.95 g/t 3,761 oz 24.51% 3,118 oz Environmental Matters The Company currently holds a mining licence, an environmental permit and operational permits in respect of the Kittila Mine. All the permits necessary to begin production were received during 2008, including an environmental permit update to allow the change from a biological oxidation process to a pressure oxidation process and to change the slopes of the waste rock pile to decrease the footprint. The construction of the first phase of the tailings dam and waterproof bottom layer was completed in the fall of 2008. This first phase is sufficient to hold tailings from three years of production. Work will begin on the second phase in 2009. Water from dewatering the mine and water used in the mine and mill is collected and treated by sedimentation. Emissions and environmental impact are monitored in accordance with the comprehensive monitoring program that has been approved by the Finnish environmental authorities. Capital Expenditures The total capital costs of bringing the Kittila Mine into production during 2008 amounted to $195 million. Approximately $5 million was spent on underground development and construction and mining equipment while an additional $129 million was spent on the processing plant and tailings facility and the remainder was spent on the surface plant and pre-production costs. The Company expects sustaining capital expenditures at the Kittila Mine in 2009 to be approximately $35 million, most of which will be used for: mining equipment for both open pit and underground mining, development of underground mining infrastructure and exploration and conversion drilling. Development Mining at the Suurikuusikko open pit progressed throughout the year with a total of 5.2 million tonnes of waste mined from the open pit. Ore mining in the open pit started in May 2008 and a total of 345,000 tonnes of ore was transferred to the stockpile and the mill for processing. The Company expects that 9.75 million tonnes of waste and 1.04 million tonnes of ore will be transferred from the Suurikuusikko pit during 2009. Total costs for open pit development in 2008 were $15 million. In 2008 underground development progressed in both the Rouravaara and Suurikuusikko zones with 2,343 metres of ramp and sublevel access development completed during the year. The Company expects to complete 3,400 metres of lateral development and 220 metres of vertical development during 2009. Geology, Mineralization and Exploration Geology The Kittila Mine is situated within the Kittila Greenstone belt. The geology of the area is similar to that of the Abitibi region of Canada. In northern Finland, bedrock is typically covered by a thin but uniform blanket of unconsolidated glacial till. Bedrock exposures are scarce and irregularly distributed. The mine area is underlain by mafic volcanic and sedimentary rocks of the Kittila Greenstone belt. The major rock units trend north to north-northeast and are near vertical. Volcanics are further sub-divided into iron-rich and magnesium-rich rocks, located to the west and to the east, respectively. The contact between these two rock units consists of a transitional zone varying between ten and 50 metres in thickness. This zone, referred to as the Suurikuusikko Trend, is strongly sheared, brecciated and characterized by intense hydrothermal alteration and gold mineralization. The Kittila deposit is hosted by the north-south oriented Suurikuusikko Trend. The deposit contains multiple mineralized zones, which have been traced over a strike length of over 25 kilometres. Most of the work has been focused on the 4.5 kilometres that host the known gold reserves and resources. From north to south, the zones are Rimminvuoma, North Rouravaara ("Roura-N"), Central Rouravaara ("Roura-C"), Suurikuusikko ("Suuri"), North Suurikuusikko ("Suuri-N"), Etela and Ketola. The Suuri and Suuri-N zones include three parallel zones that have previously been named Main East, Main Central and Main West. The Suuri zone hosts approximately 53%, Suuri-N approximately 24%, Roura-C approximately 16% and Roura-N approximately 3% of the current probable gold reserve estimate on a contained gold basis. Mineralization The known gold mineralization in the Suurikuusikko Trend is associated with sulphide mineralization, principally arsenopyrite and, to a lesser degree, pyrite, and is almost exclusively refractory. Gold particles are locked inside fine-grained arsenopyrite (approximately 73%) or pyrite (approximately 23%). What remains is "free gold", which is manifested as extremely small grains in pyrite. Exploration In 1986, the discovery of coarse visible gold in quartz-carbonate veining along a road cut near the village of Kiistala alerted the Geological Survey of Finland ("GTK") to the gold exploration potential of the area. Following this discovery, GTK initiated regional exploration over the area and deployed a wide range of indirect exploration tools to explore this relatively unexplored area. Over the period from 1987 to 2005, GTK, and then Riddarhyttan, undertook drilling programs and other testing on the property. After it acquired the property in 1998, Riddarhyttan continued to investigate the metallurgical properties of the refractory gold mineralization with the objective of demonstrating its recoverability and assessing suitable processing scenarios and initiated engineering and environmental studies to assess the feasibility of a mining project. Most of the work on the mining licence area has focused on the Suuri and Roura zones. Up to the end of December 2008, a total of 1,202 drill holes, totalling 327,929 metres, have been completed on the property. In 2008, between six and nine drill machines have been working on the Kittila property: two to three drills on in-fill drilling; two to three drills on mine exploration; and two to three drills on resource-to-reserve conversion drilling. A total of 232 holes were completed for a length of 68,800 metres. Of these drill holes, 70 drill holes (8,863 metres) were for definition drilling, 138 drill holes (38,125 metres) were for conversion drilling and 24 drill holes (21,811 metres) were related to deep mine exploration. Total expenditures for diamond drilling in 2008 were $8.5 million, including $0.9 million for definition and delineation drilling. Exploration during 2008 increased proven and probable gold reserves to 3.2 million ounces (21.4 million tonnes of ore grading 4.7 grams per tonne) and doubled the inferred gold resource to almost 2.5 million ounces (17.6 million tonnes of ore grading 4.4 grams per tonne) as compared to 2007. The increase in probable reserves is due to expansion of the Roura zone, an increase in year-end probable reserves at Roura of 150,000 ounces of gold (a 27% increase to 0.7 million ounces comprised of 5.1 million tonnes of ore grading 4.4 grams per tonne), as well as an additional 190,000 ounces of inferred gold resource (a 19% increase compared to year-end 2007 to almost 250,000 ounces comprised of 2.6 million tonnes of ore grading 3.0 grams per tonne). Underground ramp access has now reached both the Roura and the Suuri zones and exploration with two diamond drills in 2009 will test the potential reserves and better define known underground reserves, which currently extend to a depth of 675 metres below surface. The main Suuri zone is made up of three roughly parallel lenses — East, Central and West. Prior to 2008, resource exploration at depth had focused on the East lens only. During 2008, the potential of all three lenses had begun to be tested below the depths of the current Suuri zone reserves and resources. Additional drilling at depths up to 1,000 metres continued to intersect the East Zone over a one kilometre long strike length, north to south. Multiple medium to high grade gold intercepts were cut over significant thicknesses at depths of 800 metres or more, similar to results at the original Suuri deposit. Accordingly, more deep exploration at Suuri is planned for 2009. Over 500 metres north of the Suuri zone intercepts, deep drilling of the Roura-C zone continued to return significant results and may eventually lead to another expansion of the deep gold resource at Kittila. In 2009, four drills will test the Suuri and Roura zones at depth. Outside of the Kittila mining licence area, systematic geochemical sampling and diamond drilling continued on targets along the Suurikuusikko Trend, and a number of new targets were tested by diamond drilling. Encouraging results were received from a new gold zone in the Kuotko area located approximately ten kilometres north of the mine construction site as well as from the Hako area located one kilometre north of the mining licence area. A total of 191 diamond drill holes totalling 41,033 metres have been drilled on exploration targets outside of the mining licence area from 2006 to 2008. The 2009 exploration expense budget for Kittila is the largest ever at approximately $11 million, and includes over 67,500 metres in diamond drilling, using up to eight drill machines throughout the year to help further identify the gold reserve and resource potential of the Kittila property. In addition, $3.5 million of exploration expenditures, including an estimated 18,500 metres of diamond drilling, is planned for exploration along the 25 kilometre Suurikuusikko Trend. Lapa Mine Project The Lapa mine project is a pre-production stage development property located approximately 11 kilometres east of the LaRonde Mine near Cadillac, Quebec. At December 31, 2008, the Lapa mine project was estimated to contain probable mineral reserves of 1.1 million ounces of gold comprised of 3.7 million tonnes of ore grading 8.8 grams per tonne and approximately 5,500 ounces of proven gold reserves from 22,700 tonnes of ore grading 7.5 grams per tonne. The Lapa property is made up of the Tonawanda property, which consists of 43 contiguous mining claims and one provincial mining lease covering an aggregate of approximately 702.4 hectares and the Zulapa property, which consists of one mining concession of approximately 93.5 hectares. Location Map of the Lapa Mine Project The Company's initial interest in the Lapa property was acquired in 2002 through an option agreement with Breakwater Resources Ltd. ("Breakwater"). The Company undertook an aggressive exploration program and discovered a new gold deposit almost 300 metres below the surface. In 2003, the Company purchased the Lapa property from Breakwater for a payment of $8.925 million, and a 1% net smelter return royalty on the Tonawanda property and a 0.5% net smelter return royalty on the Zulapa property. In 2008, the Company purchased all royalties from Breakwater for C$6.35 million. In addition, both the Zulapa and Tonawanda properties are subject to a 5% net profit royalty payable to Alfer Inc. and René Amyot. In 2004 an additional claim of 9.4 hectares was added to the Company's holdings at the Lapa mine project. The Lapa mine project is accessible by provincial highway. The elevation varies between approximately 320 and 390 metres above sea level. All of the Lapa mine project's power requirements are supplied by Hydro-Quebec through connections to its main power transmission grid. All of the water required at the Lapa mine project is sourced from an existing open pit on the mine site that has been allowed to flood. The climate of the Abitibi region is continental with average annual rainfall of 64 centimetres and average annual snowfall of 318 centimetres. The average monthly temperatures range from a minimum of -23 degrees Celsius in January to a maximum of 23 degrees Celsius in July. Under normal circumstances, mining operations are conducted year round without interruption due to weather conditions. The Company believes that the Abitibi region of northwestern Quebec has sufficient mining personnel to staff its operations at the Lapa mine project. In January 2009, a mining lease covering 69.9 hectares was entered into with the Ministry of Natural Resources and Wildlife (Quebec). Gold production during 2009 at the Lapa mine project is expected to be approximately 55,000 ounces at estimated total cash costs per ounce of approximately $438 and thereafter, the Lapa mine project is expected to produce an average of 115,000 ounces of gold per year through 2015, with average total cash costs per ounce of $315. Mining and Milling Facilities The Lapa site will host an underground mining operation and the ore will be trucked to the processing facility at the LaRonde Mine, which will be modified to treat the ore, recover the gold and store the residues. A Certificate of Authorization for the deposit of tailings from the Lapa mine project in the tailings pond at the LaRonde Mine was received from the Ministry of Sustainable Development, Environment and Parks (Quebec) in December 2008. In July 2004, the Company initiated sinking an 825 metre deep shaft at the Lapa property. Underground diamond drilling to validate the continuity and grade of the reserve estimate commenced in the first quarter of 2006 and continued throughout shaft sinking from the seven stations. Main stations are located at Levels 49, 69, 77, 101 and 125. In April 2006, 2,800 tonnes of development ore was extracted at Lapa and the results of a diamond drilling program were analyzed. The ore extracted was estimated to contain on average 10.65 grams of gold per tonne. These results, and results from other sampling methods, predicted higher gold grades than the Company's reserve model from February 2005. These results were incorporated into a revised feasibility study and on June 5, 2006, the Company accelerated construction of the Lapa mine project. This construction included the extension of the shaft to a depth of 1,369 metres, which was completed in October 2007. Mining Methods Two mining methods will be used at the Lapa mine project: longitudinal retreat with cemented backfill and locally transverse open stoping with cemented backfill. The primary source of ore at the Lapa mine project will be from underground mining methods. During 2008, one stope was blasted and the mining sequence will accelerate in 2009 and 2010 to reach 1,500 tonnes per day in 2010. In the underground portion of the mine, sublevels are driven at 30 metre vertical intervals. Stopes will be mined in 12 metre sections and backfilled with 100% cemented rock fill. In the transverse open stoping method, 100% of the ore is mined and filled with cemented rock fill. Excavated ore from the Lapa site will be trucked via provincial highway to the processing facility at the LaRonde Mine. Surface Facilities The initial infrastructure on the Lapa property used for sinking the Lapa shaft included the former LaRonde Shaft #1 headframe and shafthouse, which were both refurbished prior to use, a service building housing the hoist and compressors, temporary offices and settling ponds for waste water. Since mid-2006, a service building that houses engineering and operations staff has been built, along with dry facilities, an ore bin and a diesel reservoir have been built. A new mine access road was completed during the summer of 2007 and a cement plant has been completed. In November 2007, lateral development began on three horizons. The Certificate of Authorization to proceed with production was issued by the Ministry of Sustainable Development, Environment and Parks (Quebec) in October 2007. A backfill plant was commissioned in December 2008 and a sedimentation pond has been built to control suspended solids from underground dewatering discharge. Mineral Recoveries Ore at the Lapa mine project will be processed through grinding, gravity and leaching circuits. Dedicated milling facilities have been integrated into the facilities at the LaRonde Mine. Based on an expected average ore head grade of 9.1 grams per tonne, the Company estimates gold recovery to average approximately 86.2%. Environmental Matters Water used underground at the Lapa mine project is currently re-circulated from mine dewatering after settling in the sedimentation pond. The re-circulation led to ammonia content in the water, the Company experienced toxicity problems in the water pond in 2008. In response to the ammonia content in the water, during 2008 the Company built a 3.5 kilometre pipeline to deliver fresh water from the Heva river situated 3.5 kilometres away from the mine site. A sedimentation pond is used to remove suspended solids from the dewatering water before either release to the environment or re-use in the underground mining operation. The waste rock pile naturally drains towards the sedimentation pond. A waste rock sampling program implemented during the shaft sinking phase verified the non-acid generating nature of the waste rock. Water overflowing from the sedimentation pond is being sampled as required under the Quebec mining effluent guidelines, and is expected to comply with the water quality criteria. The mill residues will be sent to the LaRonde tailings area. There are no known environmental liabilities associated with the Lapa site. The Certificates of Authorization to proceed with mine production and with mill construction were issued by the Ministry of Sustainable Development, Environment and Parks (Quebec) in October and December 2007, respectively. The Certificate of Authorization for mill and tailings production was received in 2008. Capital Expenditures The Company incurred approximately $89 million in total capital costs at the Lapa mine project in 2008 and expects to incur approximately $33 million in 2009 of which $16 million relates to construction and $17 million to sustaining capital. Development In 2008, a total of 7,865 metres of lateral development was completed. Development focused on permanent drifts (ramps and haulage way) and stope preparation of mining blocks set for production in 2009 and 2010. Development work was done on three separate horizons: Level 77, Level 101 and Level 125. Geology, Mineralization and Exploration Geology Geologically, the Lapa property is similar to the LaRonde property and is also located near the southern boundary of the Archean-age (2.7 billion years old) Abitibi Sub-Province and the Pontiac Sub-Province within the Superior Province of the Canadian Shield. The most important regional structure is the CLL Fault Zone marking the contact between the Abitibi and the Pontiac Sub-Provinces, which passes through the property from west to east. The CLL Fault Zone is marked by schists and mafic to ultramafic volcanic flows that comprise the Piché group (up to approximately 300 metres in thickness in the mine area). The CLL Fault Zone is generally east-west trending but on the Lapa property it curves southward abruptly before returning to its normal trend; the flexure defines a "Z" shaped fold to which all of the lithological groups in the region conform. Feldspathic dykes cut the Piché group (more often in the sector of the fold). To the north of the Piché group lies the Cadillac group sedimentary group, which consists of approximately 500 metres or more of well-banded wacke, conglomerate and siltstone with intercalations of iron formation. The Pontiac group sedimentary rocks (up to approximately 300 metres thickness) that occur to the south of the Piché group are similar to the Cadillac group but do not contain conglomerate nor iron formation. Minor Protorozoic age (2.0 billion years) diabase dykes cut all of the rocks in a northwest direction. Mineralization All of the known gold mineralization along the CLL Fault Zone is epigenetic (late) vein type and mineralization is controlled by structure. Mineralization is associated with the fault zone and occurs all or immediately adjacent to the Piché group rocks. Although gold mineralization also occurs throughout the Piché group at Lapa, except for the Contact and the satellite zones, it is generally discontinuous and has low economic potential. The Lapa deposit is comprised of the Contact zone and five satellite zones. The ore zones are made up of multiple quartz veins and veinlets, often smokey and anastomosing, within a sheared and altered envelope (with minor sulphides and visible gold). The Contact zone is generally located at the contact between the Piché group and the Cadillac group sediments. The satellite zones are located within the Piché group at a distance varying from ten to 50 metres from the north contact with the sediments except for the Contact North zone, which is located approximately ten metres north of the Contact zone within the sediment unit. The ore envelope is not always in the same volcanic unit since the Piché/Cadillac contact is discordant. The sheared envelope consists of millimetre-thick foliation bands of biotite or sericite with silica (depending on the rock type that hosts the alteration). Sericitization predominates when the zone is in sedimentary rocks, while biotization and silicification predominates when the envelope affects the Piché group volcanics. Quartz veins and millimetre-sized veinlets that are parallel to the foliation (structural fabric) account for 5% to 25% of the mineralization. Visible gold is common in the veins and veinlets but can also be found in the altered host rock. Sulphides account for 1% to 3% of the mineralization; the most common sulphides, in order of decreasing importance, are arsenopyrite, pyrite, pyrrhotite and stibnite. Graphite is also rarely observed as inclusions in smokey quartz veins. The Contact zone (and the satellite zones) is a tabular shaped mineralized envelope that is oriented east-west and dips very steeply (-87 degrees) to the north, turning south at depth. The economic portion of the zone has been traced from roughly 450 metres below surface to below 1,500 metres in depth, has an average strike length of 300 metres and varies in thickness between 2.8 to 5.0 metres and is open at depth. Locally some thicker intervals have been intercepted but their continuity has not been demonstrated. This zone accounts for approximately 65% of the reserves. The satellite zones (North, FW, Center, South 1 and South 2) are also steeply dipping and are oriented sub-parallel or slightly oblique to the Contact zone. The thicknesses are similar to the Contact zone. Exploration Drilling in 2008 concentrated on confirming and expanding the known ore bodies (Contact zone and the other satellite zones) both in the immediate vicinity of the ore zones as well as drilling for continuity at depth. The exploration program at the Lapa mine project in 2008 tested the western and eastern limits of the Contact zone reserve area at roughly 750 metres depth below the surface. Better drill results, including visible gold, were returned on the western edge of the reserves, but were offset by unexpectedly poor results along the eastern edge of the reserves. Overall, there was no significant change in overall gold reserves and resources at Lapa from 2007 to 2008. The results are incorporated in the December 31, 2008 reserve and resource estimate. In 2008, a total of 170 holes were drilled on the Lapa property for a total length of 16,546 metres, compared to 58 holes for a total length of 17,616 metres in 2007. Of the drilling in 2008, 134 holes (6,709 metres) were for production stope delineation, 21 holes (4,745 metres) were for definition drilling and 15 holes (5,092 metres) were for exploration. In 2007, 35 holes (12,079 metres) were for definition drilling and 23 holes (5,537 metres) were for deep exploration. Expenditure on diamond drilling at the Lapa Mine during 2008 was approximately $1.2 million including $0.8 million in definition and delineation drilling expenses charged to operating costs at the Lapa mine project. Expenditures on exploration in 2008 were $0.4 million and are expected to be $0.5 million in 2009. In 2009, 45% of the exploration budget will be used for resources to reserves conversion drilling in the eastern portion of the Contact zone and 55% of the exploration budget will be used to drill the eastern and western regions of the ore zones with a goal of increasing resources. Pinos Altos Mine Project The Pinos Altos mine project is a pre-production stage development project currently under construction in northern Mexico. It is located on an 11,000 hectare property in the Sierra Madre gold belt, 285 kilometres west of the City of Chihuahua in the State of Chihuahua in northern Mexico. At December 31, 2008, the Pinos Altos mine project was estimated to contain proven and probable mineral reserves of 3.6 million ounces of gold and 100 million ounces of silver comprised of 41.8 million tonnes of ore grading 2.68 grams of gold per tonne and 74.48 grams of silver per tonne. The Pinos Altos property is made up of three blocks: the Parrena Concessions (19 concessions, 6,041.1 hectares), the Madrono Concessions (17 concessions, 873.3 hectares) and the Pinos Altos Concession (one concession, 4,192.2 hectares). Location Map of the Pinos Altos Mine Project The Madrono Concessions (which cover approximately 74% of the current mineral resource) are subject to a net smelter royalty of 3.5% payable to Minerales El Madrono S.A. de C.V. ("Madrono"). The Pinos Altos Concession (which covers approximately 26% of the current mineral resource) is subject to a 2.5% net smelter return royalty payable to the Consejo de Recursos Minerales, a Mexican Federal Government agency. After 20 years, this portion of the property will also be subject to a 3.5% net smelter return royalty payable to Madrono. The Pinos Altos mine project assets acquired by the Company in 2006 included an assignment of rights under contracts to explore and exploit the Madrono Concessions and the Pinos Altos Concession and the right to use up to 400 hectares of land owned by Madrono for mining installations for a period of 20 years after formal mining operations have been initiated, and sole ownership of the Parrena Concessions. During 2008, the Company and Madrono entered an agreement under which the Company acquired surface rights for open pit mining operations and other facilities which had not previously been contemplated. Infrastructure payments, surface rights payments and advance royalty payments totalling $35.5 million were made to Madrono in December 2008 in respect of this agreement. In 2006, the Company concluded negotiations with communal land owners (ejidos) and others for the purchase of 5,745 hectares of lands contained within the Parrena and Pinos Altos Concessions. In addition, a temporary occupation agreement with a 30-year term was negotiated with ejido Jesus del Monte for 1,470 hectares of land covered by these same concession blocks. The acquisition of these surface rights for the geologically prospective lands within the district surrounding Pinos Altos will facilitate future exploration and future mining development in these areas. The Pinos Altos mine project is directly accessible by paved interstate highway which links the cities of Chihuahua and Hermosillo and is within 10 kilometres of an extension of the state power grid. Existing and planned underground mine workings will intercept water resources sufficient to sustain the requirements for future operation. The Company believes its land position is sufficient for construction of all planned surface, infrastructure and mining facilities at the Pinos Altos mine project, including its tailings impoundment area. The Company further believes that a sufficient local and trained workforce is available in northern Mexico to support the construction and operation of the mine project. The Pinos Altos property is characterized by moderate to rough terrain with mixed forest (pine and oak) and altitude that varies from 1,770 metres to 2,490 metres above sea level. The climate is sub-humid, with about one meter of annual precipitation. The average annual temperature is 18.3 degrees Celsius. Exploration and mining work can be carried out year round. In August 2007, on the basis of an independently reviewed feasibility study, the Company approved construction of a mine at Pinos Altos. Annual gold production is expected to average 165,000 ounces of gold at total cash costs per ounce of $245, with initial gold production occurring in the third quarter of 2009. Gold production in 2009 is expected to be approximately 42,000 ounces at estimated total cash costs per ounce of approximately $354 and silver production in 2009 is expected to be approximately 600,000 ounces. An optimized mine plan and budget incorporating the reserves at December 31, 2008 will be adapted by the Company during 2009. Due to the increase in proven and probable reserves at Pinos Altos, this optimized mine plan will be accretive to the aforementioned August 2007 feasibility study. A feasibility study regarding the construction of a stand alone heap leech operation at Creston Mascota is now complete. A separate operation at Creston Mascota could, if built, produce an additional 40,000 to 50,000 ounces of gold per year. The Company has engaged the local communities in the project area with hiring, education support and medical support programs to ensure that the project provides long-term benefits to the residents living and working in the region. The Company received formal recognition from the Governor of Chihuahua State in April 2008 for distinction as a socially responsible company. Mining and Milling Facilities During 2009, major construction activity at the Pinos Altos mine project is expected to include the completion of the pre-production development of the underground and open pit mines, completion of construction for the process and surface infrastructure facilities and the commissioning and start-up of the process facilities. As at the end of 2008, process plant construction was approximately 30% complete and on schedule for commissioning in the second half of 2009. Earthworks for the project were nearly complete, major concrete civil works had been completed and progress was underway on several construction fronts including field erection of tanks, structures and service buildings. Mining Methods The surface mines at the Pinos Altos mine project will utilize traditional open pit mining techniques with bench heights of seven metres with double benches on the footwall and single benching on the hanging wall. Mining is accomplished with front end loaders, trucks, track drills and various support equipment. At the end of 2008, a surface equipment maintenance shop and warehouse for support of this equipment were in operation. At full capacity, the open pit mines will extract approximately 15 million tonnes of total material (overburden plus mineral) annually. Based upon geotechnical evaluations, the final pit slopes will vary between 45 degrees and 50 degrees. Performance of the open pit mining operation at Pinos Altos during the 2008 pre-production phase indicated that the equipment, mining methods and personnel selected for the project were satisfactory for future production phases. During the first ten years of the project life, it is expected that approximately half of the ore volume processed will be derived from open pit operations, principally at Santo Nino, Oberon de Weber and Creston Mascota. Underground mine production will produce the balance of the ore for the process plant. The underground mine will utilize the long hole sublevel stoping method to extract the ore. The Company has considerable expertise with this mining method at the LaRonde Mine in Quebec and this method is also well understood at various Mexican mining operations. The stope height is planned at 30 metres and stope width at 15 metres. Ore will be hauled to the surface utilizing underground trucks via a ramp system which is currently under development. Trucks will be loaded by scoop trams. Paste backfill will be employed to stabilize the mined-out stopes. Ventilation of the underground mine will be accomplished by raise bores, fans and the ramp system. At full capacity, the underground mine is expected to produce a maximum of 4,000 tonnes of ore per day. Performance of the lateral development underground during 2008 was sufficient to indicate that the equipment, mining methods, ground control and personnel selected were satisfactory for future production phases. During 2009, the Company plans to complete the ventilation raises and the underground infrastructure, including a shop, a warehouse, pump stations and service bays. The Company anticipates that ore production from the underground mine will begin by the first quarter of 2010. Surface Facilities The principal mineral processing facilities at the Pinos Altos mine project, which were under construction at December 31, 2008, are designed to process 4,000 tonnes of ore per day in a conventional process plant circuit which includes single-stage crushing, grinding in a SAG and ball mill in closed loop, gravity separation followed by agitated leaching, counter current decantation and metals recovery in the Merrill Crowe process. Tailings will be detoxified and filtered and then used for paste backfill in the underground mine or deposited as dry tailings in an engineered tailings impoundment area. Low grade ore will be processed in a heap leach system designed to accommodate approximately five million tonnes of mineralized material over the life of the project, the production from heap leach operations is expected to be relatively minor, contributing about 5% of total metal production planned for the life of the mine. A separate heap leach operation and ancillary support facilities are contemplated for the Creston Mascota deposit, which is currently under review by the Company following the positive feasibility evaluation completed for this deposit in 2008. In addition to the 4,000 tonnes per day process plant, surface facilities with construction underway and planned for completion in 2009 include a heap leach pad, pond, liner and pumping system; administrative support offices and change room facilities; camp facilities; a laboratory; a process plant shop; a generated power station; surface power transmission lines and substations; the engineered tailings management system; and a warehouse. Over the life of the mine, recoveries of gold and silver in the milling circuit at Pinos Altos are expected to average approximately 95% and 53%, respectively. Precious metals recovery from low grade ore processed using heap leach techniques at Pinos Altos will be lower at about 68% for gold and 12% for silver. Heap leach recoveries for Creston Mascota ore are expected to average 71% for gold and 16% for silver. Environmental Matters The Pinos Altos mine project received the necessary permit authorizations for construction and operation of a mine, including a Change in Land Use permit and an Environmental Impact Study approval from the Mexican environmental agency ("SEMARNAT") in August 2007. As of December 31, 2008, all permits necessary for the construction and operation of the Pinos Altos mine project had been received and requests for modifications to allow for future expansion of facilities, including at the Creston Mascota deposit, had been approved or were under review by SEMARNAT. Pinos Altos will employ dry stack tailings technology to minimize the geotechnical and environmental risk which could be associated with the rainfall intensities and topographic relief in the Sierra Madre region of Mexico. In 2008, temporary sedimentation ponds were built to control the quantity of suspended solids in the water from production and exploration ramp dewatering. All of the Mexican environmental regulatory requirements are expected to be met or exceeded by the Pinos Altos mine project. Capital Expenditures Estimated capital costs of construction of the Pinos Altos mine project are $228 million, of which $129 million are expected to be incurred in 2009. During 2008, a feasibility study designed to evaluate the development of the Creston Mascota deposit as a satellite project was completed by the Company and the favourable results of this study supported inclusion of this deposit into the total resources and reserves for the Pinos Altos mine project at December 31, 2008. An optimized schedule and budget for the development of the total Pinos Altos reserves at December 31, 2008 will be prepared by the Company in 2009. Development At December 31, 2008 more than 10 million tonnes of overburden had been removed from the open pit mine and nearly 3.8 kilometres of lateral development was completed in the underground mine; both of these unit mining operations were on schedule for planned production from the open pit mine in the second half of 2009 and from the underground mine in the first quarter of 2010. Geology, Mineralization and Exploration Geology The Pinos Altos mine project is in the north part of the Sierra Madre geologic province. The stratigraphic column for the region and project is as follows: Upper Volcanic Series Buenavista Ignimbrite 570m-Pale brown grey, beige rhyodacite crystal lithic tuffs, and lapilli <38Ma Frijolar andesite 420m-Brown, purple andesite lithic flow tuffs Victoria Ignimbrite 400m-Buff, brownish-grey rhyolite and dacite crystal lithic ash flow tuffs Lower Volcanic Series El Madrono Volcanics 250-750m-Interbedded greenish-grey andesite and rhyolite flows and volcanoclastics <45Ma Navosaigame Conglomerate 420m-Mostly purple conglomerates, sandstones, shales Rhyolite and andesite dykes are emplaced along faults that cut the above series. There is a classic exposure of a rhyolite dome in the northwest edge of the Pinos Altos mine project. Structure in the Pinos Altos mine project is dominated by a ten kilometre by three kilometre horst, a fault uplifted block structure, oriented west-northwest that is bounded on the south by the Santo Nino fault dipping south and on the north by the Reyna de Plata fault dipping north. Quartz-gold vein deposits are emplaced along these faults and along transfer faults that splay northwest from the Santo Nino fault. The Pinos Altos property is host to volcanic rocks belonging to both the upper volcanic supergroup and the lower volcanic complex. The lower volcanic complex is represented on the property by the Navosaigame conglomerates and the El Madrono volcanics. The Navosaigame conglomerate is made up of thinly bedded sandstone intercalated with siltstones and conglomerates. The El Madrono volcanics consist of felsic tuffs and lavas intercalated with rhyolitic tuffs and sandy volcanoclastic and sediments. The upper volcanic supergroup discordantly overlies rocks of the lower volcanic sequence. The upper volcanic group is made up of the Victoria ignimbrites, the Frijolar andesites and the Buenavista ignimbrites. Intermediate and felsic dykes as well as rhyolitic domes intrude all of these units. Lacustrine deposits are also locally recognized. The Victoria ignimbrites represent an explosive felsic volcanic event. Layers within this unit present numerous textural, compositional and colour variations. The Frijolar andesite are massive to flow banded, porphyritic, consisting of 70% plagioclase and hornblend phenocrysts in a brownish to purple aphanitic groundmass locally hosting pyrite and hematite. The Buenavista ignimbrite consists of a series of dacitic to rhyolitic pyroclastics. This unit was intersected in all of the Company's drill holes at Pinos Altos. The intrusive rocks are represented by the rhyolite and Santo Nino andesite units. The rhyolites are present as dykes and small domes. These units intrude the Victoria and Buenavista ignimbrites close to the Santo Nino and Reyna de Plata fault zones as well as close to other minor structures. The unit is pale white to reddish beige, aphanitic to porphyritic and with well developed flow banding. Pyrite, as fine grained disseminations, is commonly associated to these rhyolites. The Santo Nino andesite is a dyke which intrudes along the Santo Nino fault zone. It is of purple to greenish mauve colour, fine to medium grained and with plagioclase and hornblend phenocrysts. The Pinos Altos property is centered on a horst structure striking at an azimuth of roughly 120 degrees. The horst is defined by the Reyna de Plata fault to the north and the Santo Nino fault to the south. Within this context, the principal veins and faults are grouped as follows: (1)West-northwest ("WNW"), pre-mineralization, numerous re-activation episodes; (2)North to northeast ("NNE"), pre- and post-mineralization; (3)North to north-northwest pre- and post-mineralization, low angle fault, seen only at the Carola fault; and (4)North to north-northwest post-mineralization, basin and range type structures. The mineralization is controlled by the WNW and the NNE system. The Santo Nino and Reyna de Plata faults represent the WNW system. These faults run sub-parallel to each other and can be traced for up to seven kilometres. The principal gold occurrences on the property are hosted by the Santo Nino fault zone. Numerous episodes of movements are interpreted, including a pre-mineralization sinistral to normal movement during a north-northwest to south-southeast extension period and a post-mineralization dextral movement during a northeast to east-northeast extensional period. The NNE faults were also important to the emplacement of gold on the property. It is at the intersection of two structures, the Victoria and the El Comedero faults with the Santo Nino fault zone, that are respectively located in the Santo Nino and the Oberon de Weber ore shoots. Over 90% of the Pinos Altos mine project's mineral resource is located in the Santo Nino vein, along a regional fault zone that holds a number of other known deposits in the area. This Santo Nino vein zone has thicknesses of up to 40 metres over a length of 2.5 kilometres and a vertical extent that can reach 600 metres or more. It remains open to the west and at depth. Mineralization Gold and silver mineralization at the Pinos Altos mine project consists of low sulphidation epithermal type hydrothermal veins and breccias. The Santo Nino structure outcrops over a distance of roughly six kilometres. It strikes at 060 degrees azimuth on its eastern portion and turns to strike roughly 090 degrees azimuth on its western fringe. The structure dips at 70 degrees towards the south. The four mineralized sectors hosted by the Santo Nino structure consist of discontinuous quartz rich lenses named from east to west: El Apache, Oberon de Weber, Santo Nino and Cerro Colorado. The El Apache lens is the most weakly mineralized. The area hosts a weakly developed white quartz dominated breccia. Gold values are low and erratic over its roughly 750 metre strike length. Past drilling suggests that this zone is of limited extent at depth. The Oberon de Weber lens is followed on surface and by diamond drilling over an extent of roughly 500 metres. Shallow holes drilled by the Company show good continuity both in grade and thickness over roughly 550 metres. From previous drilling done by Penoles, continuity at depth appears to be erratic with a weakly defined western rake. The Santo Nino lens is the most vertically extensive of these lenses. It has been traced to a depth of approximately 750 metres below surface. The vein is followed on surface over a distance of 550 metres and discontinuously up to 650 metres. Beyond its western and eastern extents, the Santo Nino andesite is massive and only weakly altered. Gold grades found are systematically associated with green quartz brecciated andestite. The Cerro Colorado lens is structurally more complex than the three described above. Near the surface, it is marked by a complex superposition of brittle faults with mineralized zones which are difficult to correlate from hole to hole. Its relation to the Santo Nino fault zone is not clearly defined. Two deeper holes done by the Company during this campaign suggest better grade continuity at depth. The San Eligio zone is located approximately 250 metres north of Santo Nino. The host rock is brecciated Victoria Ignimbrite with, rarely, stockworks. There is no andesite in this sector. Unlike the other lenses, the San Eligio lens dips towards the north. The lateral extent seems to be continuous at 850 metres depth. Its average width is five metres and never exceeds 15 metres. Surface mapping and prospecting has suggested good potential for additional mineralization on strike and at depths below 150 metres. Visible gold has been seen in the drill core. The minerals present are indicative of an oxidized, epithermal, low sulphidation (and likely low sulphide) precious metals vein system rich in silver. The temperature of formation is thought to have been below 300 degrees Celsius, as no selenium minerals have been found to date. The presence of kaolinite and dickite are indicative of an acidic environment. The presence of hematite crystals in the center of acanthite indicates that the deposit was probably formed under oxidative conditions. Exploration The main objectives of the 2009 exploration program planned at Pinos Altos will be to convert the present inferred resource estimates along Cerro Colorado, San Eligio and El Apache and along the depth extension of the Santo Nino Zones, and to test the other potential targets around Creston Mascota. Budgeted exploration expenditures for 2009 at the Pinos Altos mine project are $3.5 million. Exploration and resource conversion diamond drilling will be focused at depths below 300 metres along the Santo Nino and Cerro Colorado zones and also along the San Eligio gold structure. San Eligio is located approximately 250 metres north of Santo Nino, where surface mapping and prospecting has suggested good potential for additional mineralization on strike and at depths below 150 metres. Assays from the initial round of drilling are expected to be completed shortly. Visual inspection of the drill core resulted in sightings of visible gold. The mineralization is very similar to that of Santo Nino geologically. In 2008, 139 holes were drilled on the property for a total length of 64,553 metres. The work to date has confirmed that the Santo Nino and Cerro Colorado and San Eligio structures remain open along strike and at depth. Creston Mascota In 2005, a discovery was made in the Creston Mascota area in the northwest quadrant of the Pinos Altos property, approximately seven kilometres from the main Santo Nino deposit. In the fall of 2006, surface mapping, sampling and trenching identified gold associated with at least two shallowly-dipping zones of brecciated quartz vein and quartz stock work near surface. The mineralization of the two zones, Mascota and Creston-Colorado is similar to Santo Nino except in their orientation (generally north-south with a shallow west dip). A north-south oriented, almost vertical fault appears to separate the Creston Colorado and the Mascota zones. The gold mineralization in this zone is now known to be approximately 900 metres long (north-south) with widths ranging between 50 metres and 200 metres (east-west) and thicknesses ranging between 10 metres and 60 metres. Based upon the results of infill drilling during the 2007 and 2008 exploration campaigns, a feasibility study commissioned by the Company in 2008 concluded that the Creston Mascota project contains approximately 357,000 ounces of gold in probable reserves and supports the viability of a separate open pit mine and heap leach processing facility at Creston Mascota. Meadowbank Mine Project The Meadowbank mine project is an advanced pre-production stage development property located in the Third Portage Lake area in the Kivalliq District of Nunavut in northern Canada, approximately 70 kilometres north of Baker Lake. At December 31, 2008, the Meadowbank mine project was estimated to contain probable mineral reserves of 3.6 million ounces of gold comprised of 31.7 million tonnes of ore grading 3.53 grams of gold per tonne. The Company acquired its 100% interest in the Meadowbank mine project in 2007, as the result of the successful acquisition of Cumberland (see "— History and Development of the Company"). Location Map of the Meadowbank Mine Project The Meadowbank mine project is held under 10 Crown mining leases, three exploration concessions and 11 Crown mineral claims. The Crown mining leases, which cover the Portage, Goose Island and Goose South deposits, are administered under federal legislation. The mining leases, which have renewable 10 year terms, have no annual work commitments but are subject to annual rent fees that vary according to their renewal date. The Meadowbank leases cover approximately 7,400 hectares and expire in either 2016 or 2019. Annual rent currently totals C$18,273. Production from lease areas is subject to a royalty of up to 14% of the adjusted net profits, as defined in the Territorial Mining Regulations. In order to conduct exploration on the Inuit owned lands at Meadowbank, the Company must receive approval for an annual work proposal from the KIA, the body that holds the surface rights in the Kivalliq District and administers land use in the region through various boards. The Nunavut Water Board, one such board, provided the recommendation to the Ministry of Indian Affairs and Northern Development (Canada) to grant the Meadowbank project's construction and operating licences in July 2008. The Company has obtained all of the approvals and licences required to build and operate the Meadowbank mine project. The three Meadowbank exploration concessions comprise approximately 23,100 hectares and are granted by Nunavut Tunngavik, the corporation responsible for administering subsurface mineral rights on Inuit owned lands in Nunavut. Exploration concessions cover the Vault deposit at Meadowbank and in 2009 will require annual rental fees of approximately C$58,000 and exploration expenses of approximately C$416,000. During the exploration phase, the concessions can be held for up to 20 years and the concessions can be converted into production leases with annual fees of C$1 per hectare, but no annual work commitments. Production from the concessions is subject to a 12% net profits interest royalty from which annual deductions are limited to 85% of the gross revenue. The 11 Crown mineral claims cover approximately 8,200 hectares at Meadowbank and are subject to land fees and work commitments. Land fees are payable only when work is filed. The most recent filing was in 2007, when approximately C$2,000 in land fees were paid and approximately C$331,000 in assessment work was submitted. The Kivalliq region in which the Meadowbank mine project is located has an arid arctic climate. The Meadowbank mine project site is 134 metres above sea level in low lying topography with numerous lakes. Water requirements for the Meadowbank mine project will be sourced from Second and Third Portage Lake. Operations at the Meadowbank mine project are expected to be year round with only minor weather-related interruptions to mining operations; however, these interruptions are not expected to affect ore availability for milling operations or other operating activities. The Meadowbank mine project is accessible from Baker Lake, located 70 kilometres to the south, over a 106 kilometre all-weather road, completed in March 2008. Baker Lake provides 2.5 months of summer shipping access via Hudson Bay and year round airport facilities. The Meadowbank mine project also has a 1,100 metre long gravel airstrip, permitting access by air. The Company will use ocean transportation for fuel, equipment, bulk materials and supplies from Montreal, Quebec, (or Hudson Bay port facilities) via barges and ships into Baker Lake during the summer port access period that starts in mid-July of each year. Fuel and supplies are transported to the site from Baker Lake by conventional tractor trailer units. Transportation for personnel and air cargo are provided on scheduled or chartered flights. The permanent base for employees from which to service the Meadowbank mine project are Val D'Or and Montreal, Quebec. Since February 2009, all chartered flights have landed directly at Meadowbank. The Meadowbank mine project is expected to produce an average of 335,000 ounces of gold per year from 2010 to 2018 and total cash costs per ounce are expected to average $370 over these years. A scoping study is currently underway to assess the feasibility of increasing production from 8,500 tonnes per day to 10,000 tonnes per day by accelerating development from the Goose Island and Portage open pits and potentially building a ramp-access underground operation at the southern end of the deposit. Mining and Milling Facilities Meadowbank has three major deposits that have sufficient drilling definition to sustain reserves. By the end of 2008, all of the camp infrastructure (dormitories and kitchen) was completed. The mill, service building shop and generator buildings were built and are at various stages of completion. All required aggregates used in the mining process are produced from waste material taken from the north end of the Portage pit. In 2008, a dyke was constructed to fully access the north half of the Portage pit in preparation for 2009 pit development in order to have it ready for 2010 production. Future construction will include building a second major dyke (the Bay-Goose dyke) to access the southern portion of Portage and the Goose Island pits. Beginning in 2009, the Company plans to start construction of an 8 kilometre access road to service the Vault pit. Mining Methods Mining at the Meadowbank mine project will be done by open pit with trucks and excavators and has been projected over an eight plus year mine life. Ore will be extracted conventionally using drilling and blasting with truck haulage to a primary gyratory crusher located adjacent to the mill. Sub-grade material (that is, material grading between actual cut-off and break even cut-off) will be separated and stockpiled for potential future processing. Waste rock will be hauled to one of two waste storage areas on the property, used for dyke construction or fill material or dumped into selective areas of the open pits that have previously been mined out. Mining will initially be concentrated in the Portage pit area. Waste material from the pre-stripping will be used as bulk construction materials for dykes, as well as for construction fill material around the site. During pre-production, ore grade material will be stockpiled close to the primary crusher. During years 2009 through 2013, all of the ore is scheduled to be sourced from the Portage pit. Waste material will be used to complete the construction of the Bay-Goose, Central and Stormwater dykes, with the remaining waste hauled to a primary dump north of Second Portage Lake. With the completion of the Bay-Goose dyke, the Goose Island pit will be brought into production in 2013. The Company anticipates that these two pits will operate concurrently for a period of one year, from 2013 through 2014. Waste stripping is scheduled to commence in the Vault pit in 2014, with the start of ore mining anticipated in 2014 as the Goose pit becomes depleted. During the last four years of the project life, estimated to begin in 2015, mining will be exclusively from the Vault pit. Surface Facilities Current facilities on the Meadowbank mine project consist of a modern camp with capacity for 364 employees. In March 2008, the all-weather road from Baker Lake to Meadowbank was completed. The mill has been built and interior completion is expected to be completed in late 2009. The service shop has been closed in and interior construction is anticipated to resume in the spring of 2009. The laboratory is expected to be completed in April 2009 and construction of the generator building is underway. Equipment at the site includes blasthole drills, a mass excavator, hydraulic shovels, front end loaders, haulage trucks, tracked dozers and graders. The old exploration camp at the Meadowbank mine project, which consists of all-weather structures and tents that can accommodate up to 60 people, will be maintained and used as back-up if needed. In 2008, the exploration group was relocated 8 kilometres south of the mine site location to a separate camp with an 80-person capacity. Plant site facilities in construction include a mill building, a maintenance mechanical shop building, an assay lab and a heavy vehicle maintenance shop. A separate crusher structure will flank the main process complex. Power will be supplied by an 26.4 megawatt diesel electric power generation plant with heat recovery and an on site fuel storage and distribution system. A pre-fabricated modular type accommodation complex for 360 persons is supported with a sewage treatment, solid waste disposal and potable water plant. The mill-service-power complex is connected to the accommodation complex with enclosed corridors. In addition, the Company will build peripheral infrastructure including tailings and waste impoundment areas and an 8 kilometre haul road to the Vault pit. Facilities constructed at Baker Lake include a barge landing site (built in summer 2008) located three kilometres east of the community, a storage compound consisting of an open storage area and a cold storage building. A fuel storage and distribution complex with a 40 million litre capacity has been built next to the barge landing facility. The all-weather conventional access road linking the Baker Lake storage facilities to the mine site has also been completed. The process design is based on a conventional gold plant flowsheet consisting of primary gyratory crushing, grinding, gravity concentration, cyanide leaching and gold recovery in a carbon-in-pulp ("CIP") circuit. The mill will be designed to operate 365 days per year with a design capacity of 3.1 million tonnes of ore per year (8,500 tonnes per day). The overall gold recovery is projected to be approximately 93.2%, based on projections from metallurgical test work, with about 40% typically recovered in the gravity circuit. The Company will use crushed ore that will be fed to a coarse ore stockpile and then reclaimed by a SAG mill operating in closed circuit with a pebble crusher. The SAG mill will operate together with a ball mill to reduce the ore to about 80% passing 60-90 microns, depending on the ore type and its hardness. The ball mill will operate in closed circuit with cyclones. The grinding circuit will incorporate a gravity process to recover free gold and the free gold concentrate will be leached in an intensive cyanide leach-direct electrowinning recovery process. The cyclone overflow will be thickened prior to pre-aeration with air and leaching in agitated tanks. The leached slurry will be directed to a six-tank CIP system for gold recovery. Gold in solution from the leaching circuit is recovered on carbon and subsequently stripped and then recovered from the strip solution by electrowinning, followed by smelting and the production of a dore bar. The carbon-in-pulp tailings will be treated for the destruction of cyanide using the standard sulphur-dioxide-air process. The detoxified tailings will be pumped to the permanent tailings facility. The tailings storage is designed for zero discharge, with all process water being reclaimed for re-use in the mill to minimize the water requirements for the project. Mineral Recoveries Gold recoveries are expected to be 94.1% at the Third Portage deposit, 96.1% at the Goose Island deposit and 91.3% at the Vault deposit. The different ore zones have slightly different grind sensitivities to gold recovery and, as such, different particle size distributions are recommended as target grinds in the process. The use of a slightly coarser grind for the Vault ores will allow all three of the ore zones to be processed at a consistent process throughput. Following the free gold recovery from the gravity circuit, the cyanidation circuit is designed to maximize the gold recovery; the ore from each of the three zones will be treated differently given the different sulphide content from each area. Environmental Matters (including Inuit Impact and Benefit Agreement) The development of the Meadowbank mine project was subject to an extensive environmental review process under the Nunavut Land Claims Agreement administered by the Nunavut Impact Review Board (the "NIRB"). On December 30, 2006, a predecessor to the Company received the Project Certificate from the NIRB, which includes the terms and conditions to ensure the integrity of the development process. In February 2007, a predecessor to the Company and the Nunavut government signed a Development Partnership Agreement (the "DPA") with respect to the Meadowbank mine project. The DPA provides a framework for stakeholders including the federal and municipal governments and the KIA to maximize the long-term socio-economic benefits of the Meadowbank mine project to Nunavut. An Inuit Impact Benefit Agreement for the Meadowbank mine project (the "IIBA") was signed with the KIA in March 2006. The IIBA ensures that local employment, training and business opportunities arising from all phases of the project are accessible to the Kivalliq Inuit. The IIBA also outlines the special considerations and compensation that Cumberland agreed to provide for Inuit regarding traditional, social and cultural matters. The Company currently holds a renewable exploration lease from the KIA that expires December 31, 2010. In July 2008, the Company signed a production lease for the construction and the operation of the mine, the mill and all related activities. In April 2008, the Company and KIA signed a water compensation agreement for the Meadowbank mine project addressing Inuit rights under the Land Claims Agreement respecting compensation for water use and water impacts associated with the project. Following receipt of the Project Certificate from the NIRB, all the permits and authorizations were obtained to allow for the construction, operation and ultimate reclamation of the Meadowbank mine project. The Meadowbank mine project consists of several gold-bearing deposits: Portage, Goose and Vault. A series of six dykes will be built to isolate the mining activities from neighbouring lakes. Waste rock from the Portage, Goose and Vault pits will be stored in the Portage and Vault rock storage facility. The control strategy to minimize the onset of oxidation and the subsequent generation of acid mine drainage includes freeze control of the waste rock through permafrost encapsulation and capping with an insulating convective layer of neutralizing rock (ultramafic and non-acid generating volcanic rocks). Because the site is underlain by about 450 metres of permafrost, the waste rock below the capping layer is expected to freeze, resulting in low rates of acid rock drainage generation in the long term. Tailings will be stored in Second Portage Arm. Initially the tailings will be deposited in a subaqueous environment, but the majority of tailings will be deposited on tailings beaches. A reclamation pond will be operated within the tailings storage facility. The control strategy to minimize water infiltration into the tailings storage facility and the migration of constituents out of the facility includes freeze control of the tailings through permafrost encapsulation. A four metre thick dry cover of acid neutralizing ultramafic rockfill will be placed over the tailings as an insulating convective layer to confine the permafrost active layer within relatively inert materials. The water management objectives for the project are to minimize the potential impact on the quality of surface water and groundwater resources at the site. Diversion ditches will be constructed to avoid the contact of clean runoff water with areas affected by the mine or mining activities. Contact water originating from affected areas will be intercepted, collected, conveyed to the tailings storage facility for re-use in process or decant to treatment (if needed) prior to release to receiving lakes. Capital Expenditures/Development A total of $143 million has been budgeted to be spent at the Meadowbank mine project in 2009, including over $24 million on process plant construction and process equipment and $41 million on mining pre-production and the mining fleet. Approximately 75% of the mining equipment has already been delivered to Meadowbank. Mining pre-production will include the rock work associated with the construction of the perimeter dykes around the Portage open pit. The 2009 budget also includes $4 million for power plant construction and $12 million for site infrastructure including the service facilities. The mine is expected to start production in 2010. Total capital costs of construction incurred in 2008 at the Meadowbank mine project amounted to $314 million. Geology, Mineralization and Exploration Geology The Meadowbank mine project is located within a series of Archean-aged gold deposits hosted within polydeformed rocks of the Woodburn Lake Group geological formation, part of a series of Archean supracrustal assemblages forming the Western Churchill supergroup in northern Canada. Three of the four known gold deposits are currently planned to be mined. The Goose Island and Portage deposits are hosted within highly deformed magnetite rich iron formation rocks while intermediate volcanic rock assemblages host the majority of the mineralization at the more northerly Vault deposit. The fourth deposit, PDF, shows the same characteristics as Vault, though it is not currently anticipated to be a mineable deposit. In all deposits, gold mineralization is commonly associated with quartz and the presence of iron sulphide minerals (pyrite and/or pyrrhotite). Defined over a 1.85 kilometre strike length and across lateral extents ranging from 100 metres to 230 metres, the geometry of the Portage deposit consists of general north north-west striking ore zones, which are highly folded. The mineralization in the lower limb of the fold is typically six to eight metres in true thickness, reaching up to 20 metres in the hinge area. Mineralization The Goose Island deposit is located just south of the Portage deposit. It is similar in setting (associated with iron rich formation) to the Portage deposit, but exhibits different geometry, with a north north-south trend and a steep westerly dip. Mineralized zones typically occur as a single unit near surface, splaying into several limbs at depth. The deposit is currently defined over a 750 metre strike length and down to 500 metres at depth (mainly in the southern end) with true thicknesses of ten to 12 metres (reaching up to 20 metres locally). The Vault deposit is located 7 kilometres north north-west of the Portage and Goose deposits. It is a planar and shallow dipping with a defined strike of 1,100 metres. The deposit has been disturbed by two sets of normal faults striking east-west and north-south and dipping moderately to the southeast and steeply to the east, respectively. The main lens has an average true thickness (based on one gram per tonne shell) of eight to 12 metres, reaching as high as 18 metres locally. The hanging wall lenses are typically three to five metres, and up to seven metres, in true thickness. Exploration Exploration in the project area began as early as 1980 with grass roots exploration. As some interesting targets arose, several companies conducted various types of work between 1980 and 2007. Throughout these years, six deposits were the main focus of exploration: Portage, Cannu, Bay Zone, Goose Island, Vault and PDF. Over time, Cannu, Bay Zone and Portage were combined into one pit. In 2008, the Company planned and conducted a full drilling program for the first time. A total of 75 holes were drilled. Of these 75 holes, 45 holes (11,772 metres) were for definition drilling, 14 holes (7,815 metres) were for deep exploration on Goose deposits and 16 holes (3,454 metres) were for regional exploration. Drilling conducted at Goose South and Goose Island in 2008 covered 18 holes (6,321 metres) categorized as definition drilling. Also, 14 holes (7,815 metres) targeted Goose Island at depth and accordingly were categorized as deep exploration. This drilling identified a strong continuity at depth of Goose-Goose South mineralization. This drilling exposed the potential for an eventual underground operation. Drilling conducted at Portage in 2008 covered 27 holes for a total length of 5,451 metres categorized as definition drilling. The drilling was aimed at the Bay Zone area. The results strengthened and provided continuity to the geological and mineralization models. In addition, a few holes were drilled between the Portage and Goose deposits to identify possible continuity. The focus of exploration in 2009 will be to refine the Portage mineralization model, drill the outer pit shells of the Portage and Goose pits, connect the gap between the Portage and Goose pits, add drill holes on the Goose deposit at depth and test continuity at depth under Goose. Exploration expenditures of $4.8 million for the mine and $2.0 million for regional exploration are planned for 2009. The Vault deposit, approximately seven kilometres to the north, will also be tested. Additionally, surface regional programs will be executed to follow up on known gold occurrences and identified gold and base metal showings on the regional scale of the property. Exploration Activities During 2008, the Company continued to actively explore in Quebec, Ontario, Nunavut, Nevada, Finland and Mexico. At the end of December 2008, the land holdings of the Company in Canada consisted of 75 projects comprised of 3,053 mineral titles (claims, mining leases, etc.) covering an aggregate of 209,093 hectares. Land holdings in the United States consisted of seven properties comprised of 2,996 minerals titles covering an aggregate of 25,528 hectares. Land holdings in Finland consisted of three groups of properties comprised of 137 minerals titles covering an aggregate of 11,188 hectares. Land holdings in Mexico consisted of four projects comprised of 45 mining concession titles covering an aggregate of 58,969 hectares. During 2008, the Company's Canadian exploration activities were focused on the CLL Fault Zone between the Bousquet and Lapa areas in the Abitibi region of Quebec. The Company is conducting exploration activities in other parts of the Abitibi region, including the James Bay region and other projects in Ontario. In Nevada, exploration activities during 2008 were concentrated on West Pequop located in the northeastern region of the State. With the acquisitions of the Pinos Altos mine project, the Kittila Mine and the Meadowbank mine project, in Mexico, Finland and Canada, respectively, the Company began several aggressive exploration programs. In Mexico, the exploration campaigns were in Chihuahua and Sinaloa States. In Finland, exploration included diamond drilling along the Surrikuusikko Trend both to the north and south of the Kittila Mine lease. At the Meadowbank property, the exploration activities were conducted both within the mining lease and outside of the remaining mining claims. Mineral Reserve and Mineral Resource Cautionary Note to Investors Concerning Estimates of Measured and Indicated Resources This section uses the terms "measured resources" and "indicated resources". We advise investors that while these terms are recognized and required by Canadian regulations, the SEC does not recognize them. Investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into reserves. Cautionary Note to Investors Concerning Estimates of Inferred Resources This section uses the term "inferred resources". We advise investors that while this term is recognized and required by Canadian regulations, the SEC does not recognize it. "Inferred resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable. The preparation of the information set forth below with respect to the mineral reserves at the LaRonde Mine (which includes mineral reserves at the LaRonde Mine extension), the Goldex and Kittila Mines, the Lapa, Meadowbank, and Pinos Altos mine projects and the Bousquet and Ellison properties has been supervised by the Company's Vice-President, Project Development, Marc Legault, P.Eng, a "qualified person" under NI 43-101. The Company's mineral reserve estimate was derived from internally generated data or audited reports. The criteria set forth in NI 43-101 for reserve definitions and guidelines for classification of mineral reserve are similar to those used by Guide 7. However, the definitions in NI 43-101 differ in certain respects from those under Guide 7. Under Guide 7, among other things, a mineral reserve estimate must have a "final" or "bankable" feasibility study. Guide 7 also requires the use of prices that reflect current economic conditions at the time of reserve determination which Staff of the SEC has interpreted to mean historic three-year average prices. In addition to the differences noted above, Guide 7 does not recognize mineral resources. The assumptions used for the 2008 mineral reserves and resources estimate reported by the Company in this Form 20-F were based on three-year average prices for the period ending December 31, 2008 of $725 per ounce gold, $13.32 per ounce silver, $1.27 per pound zinc, $3.15 per pound copper and exchange rates of C$1.09 per $1.00, 11.00 Mexican pesos per $1.00 and $1.37 per €1.00. The assumptions for the mineral reserves and resources estimates reported by the Company for the period ending December 31, 2007 were $583 per ounce gold, $10.77 per ounce silver, $1.19 per pound zinc, $2.65 per pound copper and exchange rates of C$1.14 per $1.00, 10.91 Mexican pesos per $1.00 and $1.29 per €1.00. Other estimates used for calculating 2007 and 2006 mineral reserve and resource information may be found in the Company's annual filings in respect of the years ended December 31, 2007 and December 31, 2006, respectively. Set out below are the reserve estimates as calculated in accordance with NI 43-101 and Guide 7, respectively (tonnages and contained gold quantities are rounded to the nearest thousand): Proven Reserve Goldex 434,000 1.95 27,000 434,000 1.95 27,000 Lapa 23,000 7.53 6,000 23,000 7.53 6,000 Kittila 199,000 4.84 31,000 199,000 4.84 31,000 Pinos Altos 97,000 1.35 4,000 97,000 1.35 4,000 LaRonde 4,075,000 2.76 362,000 4,075,000 2.76 362,000 Total Proven Reserve 4,828,000 430,000 4,828,000 430,000 Probable Reserve Goldex 23,391,000 2.05 1,544,000 23,391,000 2.05 1,544,000 Lapa 3,730,000 8.80 1,055,000 3,730,000 8.80 1,055,000 LaRonde 31,735,000 4.52 4,612,000 31,735,000 4.52 4,612,000 Kittila 21,171,000 4.69 3,193,000 21,171,000 4.69 3,193,000 Meadowbank 32,773,000 3.45 3,638,000 32,773,000 3.45 3,638,000 Pinos Altos 41,669,000 2.68 3,589,000 41,669,000 2.68 3,589,000 Total Probable Reserve 154,469,000 17,631,000 154,469,000 17,631,000 Total Proven and Probable Reserve 159,297,000 18,060,000 159,297,000 18,060,000 In the following tables setting out reserve information about the Company's mineral projects, tonnage information is rounded to the nearest 100,000 tonnes, total contained gold ounces stated do not include equivalent gold ounces for byproduct metals contained in the mineral reserve and the reported metal grades in the estimates represent in-place grades and do not reflect losses in the recovery process, that is, the metallurgical losses associated with processing the extracted ore. The mineral reserve and mineral resource figures presented in this Form 20-F are estimates, and no assurance can be given that the anticipated tonnages and grades will be achieved or that the indicated level of recovery will be realized. LaRonde Mineral Reserve and Mineral Resource Gold Proven — tonnes 2,300,000 2,800,000 3,400,000 Average grade — gold grams per tonne 3.95 3.98 3.91 Probable — tonnes 26,500,000 25,600,000 25,800,000 Average grade — gold grams per tonne 5.23 5.37 5.46 Zinc Proven — tonnes 1,800,000 1,900,000 2,400,000 Average grade — gold grams per tonne 1.19 1.06 1.15 Probable — tonnes 5,200,000 4,600,000 4,100,000 Average grade — gold grams per tonne 0.94 0.80 0.87 Total mineral reserve — tonnes 35,800,000 34,900,000 35,600,000 Total contained gold ounces 4,974,000 4,958,000 5,151,000 Notes: (1)The proven and probable mineral reserves set forth in the table above are based on net smelter return cut-off value of the ore that varies between C$61.00 per tonne and C$73.00 per tonne depending on the deposit. The Company's historical metallurgical recovery rates at the LaRonde Mine from January 1, 2003 to December 31, 2008 were 91.1% for gold, 85.9% for silver, 81.7% for copper and 84.4% for zinc. For every 10% change in the gold price, there would be an estimated 1% change in proven and probable reserves. (2)In addition to the mineral reserves set out above, at December 31, 2008, the LaRonde Mine had 6.3 million tonnes of indicated mineral resource grading 1.83 grams of gold per tonne and an inferred mineral resource of 4.9 million tonnes grading 5.91 grams of gold per tonne. (3)The following table shows the reconciliation of mineral reserves (in nearest thousand tonnes) at the LaRonde Mine by category at December 31, 2008 with those at December 31, 2007. December 31, 2007 4,672 30,225 34,897 Mined (2,639 ) 0 (2,639 ) Revision 2,042 1,510 3,552 December 31, 2008 4,075 31,735 35,810 (4)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the LaRonde Mine may be found in the 2005 LaRonde Mineral Resource & Mineral Reserve Estimate filed with Canadian securities regulatory authorities on SEDAR on March 23, 2005. Goldex Mineral Reserve and Mineral Resource Gold Proven — tonnes 434,000 250,000 100,000 Average grade — gold grams per tonne 1.95 2.23 2.25 Probable — tonnes 23,391,000 22,800,000 22,800,000 Average grade — gold grams per tonne 2.05 2.20 2.29 Total mineral reserve — tonnes 23,825,000 23,100,000 22,900,000 Total contained gold ounces 1,571,000 1,634,000 1,689,000 Notes: (1)The 2008 mineral reserve and mineral resource estimates were calculated using assumed metallurgical recoveries of 90.0%. Mining costs at Goldex were estimated to be C$24 per tonne in 2008. The cut-off grade used to evaluate drill intercepts at Goldex was 1.37 grams of gold per tonne below a depth of 2,410 metres and 1.10 grams of gold per tonne above a depth of 2,410 metres, over a minimum true thickness of approximately 15 metres. For a 10% change in the gold price, the Company estimates there would be no change in reserves. (2)The proven mineral reserve at the Goldex Mine consists only of underground and surface stockpiles of reserve-grade ore from mine development and production activities. Excavated rock from this area was stockpiled and assigned to proven mineral reserves (at a grade measured by sampling) and the extracted ore was subtracted from the probable mineral reserves. The proven reserve stockpile also contained a minor amount of sampled rock from excavations through other mineralized zones that was above the Goldex Extension Zone gold grade cut-off (1.37 grams of gold per tonne as established by the feasibility study). (3)As at December 31, 2008, Goldex was estimated to contain 0.2 million tonnes of indicated mineral resource grading 1.79 grams of gold per tonne and 11.9 million tonnes of inferred mineral resource grading 2.42 grams of gold per tonne. (4)The following table shows the reconciliation of mineral reserves (in nearest thousand tonnes) at the Godlex Mine by category at December 31, 2008 with those at December 31, 2007. December 31, 2007 250 22,849 23,099 Mined (244 ) (874 ) (1,118 ) Revision 428 1,416 1,844 December 31, 2008 434 23,391 23,825 (5)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Goldex mine project may be found in the Technical Report on the Estimation of Mineral Resource and Reserves for the Goldex Extension Zone filed with the Canadian securities regulatory authorities on SEDAR on October 27, 2005. Kittila Mineral Reserve and Mineral Resource Gold Proven — tonnes 199,000 — — Average grade — gold grams per tonne 4.84 — — Probable — tonnes 21,171,000 18,200,000 16,000,000 Average grade — gold grams per tonne 4.69 5.12 5.08 Total mineral reserve — tonnes 21,370,000 18,200,000 16,000,000 Total contained gold ounces 3,199,000 2,996,000 2,616,000 Notes: (1)The 2008 mineral reserve and mineral resource estimates were calculated using metallurgical recoveries of 83.5% in the first three years of operation and 87.0% thereafter. Gold cut-off grades used were 2.0 grams per tonne for open pit reserves and 2.7 grams per tonne for underground reserves. High gold values were cut to 50.0 grams per tonne. Open pit dilution was estimated to be 15% while underground dilution was set at 20%. The open pit operating cost is estimated to be €30.02 per tonne while the underground operating cost is estimated to be €40.62 per tonne. For a 10% change in the gold price, the Company estimates that there would be a 3.3 to 4% change in probable mineral reserves. (2)Indicated mineral resources at Kittila were 3.5 million tonnes grading 2.99 grams per tonne. In addition, the Kittila mine project had inferred mineral resources of 17.6 million tonnes of ore grading 4.42 grams per tonne. (3)The breakdown of reserves between planned open pit operations and underground operations at the Kittila mine project is (tonnages and contained ounces are rounded to the nearest thousand): Open pit Probable reserve 4,092,000 5.05 664,000 Underground Probable reserve 17,079,000 4.61 2,530,000 Total Probable reserve 21,171,000 4.69 3,194,000 (4)The following table shows the reconciliation of mineral reserves (in nearest thousand tonnes) at the Kittila Mine by category at December 31, 2008 with those at December 31, 2007. December 31, 2007 nil 18,206 18,206 Mined 310 0 310 Revision (111 ) 2,965 2,854 December 31, 2008 199 21,171 21,370 (5)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Kittila mine project may be found in the Technical Report on the July 31, 2008 Mineral Resource and Mineral Reserve Estimate of the Kittila Mine Project, Finland, filed with the Canadian securities regulatory authorities on SEDAR on December 11, 2008. Lapa Mineral Reserve and Mineral Resource Gold Proven — tonnes 23,000 2,800 — Average grade — gold grams per tonne 7.53 10.65 — Probable — tonnes 3,730,000 3,755,600 3,944,000 Average grade — gold grams per tonne 8.80 8.86 9.08 Total mineral reserve — tonnes 3,753,000 3,758,000 3,944,000 Total contained gold ounces 1,061,000 1,071,000 1,152,000 Notes: (1)The 2008 mineral reserve and mineral resource estimates were calculated using metallurgical recoveries of 86% and a cut-off grade of 8.8 grams per tonne. For the indicated mineral reserve estimates below, a minimum in situ gold grade cut-off was 4.5 grams per tonne, before dilution. The operating cost per tonne estimate for the Lapa mine project is C$90.43. The Company estimates that a 10% change in the gold price would result in an approximate 6.8% change in probable reserves. (2)In addition to the mineral reserves set out above, at December 31, 2008 the Lapa property contained 1.0 million tonnes of indicated mineral resource grading 4.36 grams of gold per tonne and 0.8 million tonnes of inferred mineral resource grading 7.97 grams of gold per tonne. (3)For the 2008 mineral reserve and mineral resource estimate, gold assays were cut to 120 grams per tonne for the Contact, FW and North zones and the other satellite zones that comprise the Lapa deposit (Center and South zones) were cut at 50 grams of gold per tonne. (4)Complete information on the verification procedures, the quality assurance program, quality control procedures parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Lapa mine project may be found in the Technical Report on the Lapa Gold Project filed with Canadian securities regulatory authorities on SEDAR on June 8, 2006. Pinos Altos Mineral Reserve and Mineral Resource Gold Proven — tonnes 97,000 — — Average grade — gold grams per tonne 1.35 — — Probable — tonnes 41,669,000 24,700,000 18,600,000 Average grade — gold grams per tonne 2.68 3.21 3.07 Total mineral reserve — tonnes 41,766,000 24,700,000 18,600,000 Total contained gold ounces 3,593,000 2,547,000 1,837,000 Notes: (1)The 2008 mineral reserve and mineral resource estimates were calculated using metallurgical recoveries of 96.5%. Minimum mining widths used were either three metres for underground or four metres for open pit. A cut-off that varied between $5.43 and $30.36 per tonne was used to determine the mineral resource for open pit mining and underground mining, respectively. A cut-off that varied between $7.51 and $21.65 per tonne was used to determine heap-leach and milled reserves, respectively, while a cut-off of $40.48 per tonne was used to determine the underground mining reserve estimate. A 10% dilution was applied for the open pit reserve estimate while a dilution that averaged 21.4% was applied for the underground reserve estimate. The Company estimates that a 10% change in the gold price would result in approximately a 3% change in mineral reserves. (2)In addition to the proven mineral reserve set out above, at December 31, 2008, the Pinos Altos mine project was estimated to contain 59,000 million ounces of silver comprised of 0.1 million tonnes of ore grading 19.08 grams of silver per tonne and in addition to the probable mineral reserve set out above, at December 31, 2008, the Pinos Altos mine project was estimated to contain 100 million ounces of silver comprised of 41.7 million tonnes of ore grading 74.61 grams of silver per tonne. Indicated mineral resources were 12.5 million tonnes grading 1.00 grams of gold per tonne and 26.08 grams of silver per tonne. In addition, the Pinos Altos property had inferred mineral resources of 4.0 million tonnes of ore grading 1.65 grams of gold and 39.95 grams of silver per tonne. (3)Gold assays were cut to either 24, 26.5, 30 or 78 grams per tonne, depending on the rock type. Silver assays were either not cut, or cut to 645, 940, 1,350 or 4,580 grams per tonne, depending on the rock type. (4)The breakdown of reserves between planned open pit operations and underground operations at the Pinos Altos mine project is (tonnages and contained ounces are rounded to the nearest thousand): Stock Pile proven reserve 97,000 1.37 4,000 Open Pit probable reserve 18,594,000 2.34 1,402,000 Underground probable reserve 23,075,000 2.95 2,187,000 Total probable reserve 41,766,000 2.68 3,593,000 (5)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Pinos Altos mine project may be found in the Pinos Altos Gold-Silver Project, Chihuahua State, Mexico, Technical Report on the Mineral Resources and Reserves as of December 31, 2008 filed with the Canadian securities regulatory authorities on SEDAR on March 25, 2009. Meadowbank Mineral Reserve and Mineral Resource Gold Probable — tonnes 32,773,000 29,261,000 Average grade — gold grams per tonne 3.45 3.67 Total mineral reserve — tonnes 32,773,000 29,261,000 Total contained gold ounces 3,638,000 3,453,000 Notes: (1)The 2007 and 2008 mineral reserve and mineral resource estimates were calculated using metallurgical recoveries of 93.50% and 92.98%, respectively. Minimum mining widths used were four metres for open pit. A cut-off of 1.50 grams of gold was used to determine the open pit reserves. A 12% dilution factor was applied for the open pit reserve estimate. The estimated operating cost used from the 2008 mineral reserve estimate was C$31.82 per tonne. For a 10% change in the gold price, the Company estimates that there would be a 2% change in probable mineral reserves. (2)Indicated mineral resources were 22.0 million tonnes grading 2.17 grams of gold per tonne. In addition, the Meadowbank mine project property had inferred mineral resources of 5.0 million tonnes of ore grading 2.78 grams of gold. (3)Complete information on the verification procedures, the quality assurance program, quality control procedures, parameters and methods and other factors that may materially affect scientific and technical information presented in this Form 20-F relating to the Meadowbank mine project may be found in the Technical Report on the Mineral Resources and Mineral Reserves Dated September 30, 2008, Meadowbank Gold Project, Nunavut, Canada filed with the Canadian securities regulatory authorities on SEDAR on December 15, 2008. Risk Mitigation The Company mitigates the likelihood and potential severity of the various risks it encounters in its day-to-day operations through the application of high standards in the planning, construction and operation of mining facilities. In addition, emphasis is placed on hiring and retaining competent personnel and developing their skills through training in safety and loss control. The Company's operating and technical personnel have a solid track record of developing and operating precious metal mines and the LaRonde Mine has been recognized for its excellence in this regard with various safety and development awards. The Company believes that its LaRonde Mine is one of the safest mines in Quebec with a lower accident frequency index than the provincial mining industry average. Nevertheless, the Company and its employees continue with a focused effort to improve workplace safety and the Company has placed additional emphasis on safety procedure training for both mining and supervisory employees. The Company also mitigates some of the Company's normal business risk through the purchase of insurance coverage. An Insurable Risk Management Policy, approved by the Board, governs the purchase of insurance coverage and only permits the purchase of coverage from insurance companies of the highest credit quality. For a more complete list of the risk factors affecting the Company, please see "Item 3 Key Information — Risk Factors". Glossary of Selected Mining Terms "agglomerate" A breccia composed largely or entirely of fragments of volcanic rocks. "alteration" Any physical or chemical change in a rock or mineral subsequent to formation. Milder and more localized than metamorphism. "amygdule" A gas cavity or vesicle in an igneous rock that is filled with secondary minerals such as calcite, quartz, chalcedony or a zeolite. "anastomosing" A network of branching and rejoining fault or vein surfaces or surface traces. "andesitic" An adjective referring to a dark-coloured igneous, calc-alkaline volcanic rock, of intermediate composition (containing between 52-63% silica). "aphanitic" A rock or ground mass exhibiting a texture of an igneous rock in which the crystalline components are not distinguishable by the unaided eye. "argillite" A compact rock, derived either from mudstone (claystone or siltstone) or shale, that has undergone a somewhat higher degree of induration than mudstone or shale but is less clearly laminated and without its fissility, and that lacks the cleavage distinctive of slate. "assay" An analysis to determine the presence, absence or concentration of one or more chemical components. "basin" An area in which sediments accumulate. "bedrock" The solid rock underlying surface deposits. "breccia" A general term applied to rock formations consisting mostly of angular fragments hosted by fine-grained matrix. "brittle" Of minerals, proneness to fracture under low stress. A quality affecting behavior during comminution of ore, whereby one species fractures more readily than others in the material being crushed. "byproduct metal" A secondary or additional metal recovered from the processing of another mineral. "carbon in pulp (CIP) circuit" A process by which soluble gold within a finely ground slurry is recovered by absorption onto coarser activated carbon. A CIP circuit comprises a series of tanks through which a leached slurry flows. Gold is captured onto captive activated carbon which will periodically be moved counter-currently from tank to tank. Head tank carbon is extracted periodically to further recover adsorbed gold before being returned to the circuit tails tank. "channel sample" The material from a level groove cut across an ore exposure to obtain a true cross section of the ore exposure. "clast" A fragment of mineral, rock or organic structure that has been moved individually from its place of origin. "cockade" An open-space vein filling in which the ore and gangue minerals are deposited in successive comblike crusts around rock fragments; e.g., around vein breccia fragments. "condemnation drilling" Drilling which is targeted at areas around a resource where the engineers want to place mine infrastructure, such as leach pads, waste stockpiles, plant infrastructure, truck shops, etc. "conglomerate" A sedimentary rock consisting of rounded, water worn pebbles or boulders cemented into a solid mass. "conjugate" Characteristic of tectonic structures (faults, folds) that were produced at the same time in the same constraint field, angled from each other depending on the nature of the rock. "contact zone" A zone of alteration or other chemical reaction surrounding a mineral in a rock. "cross-cut" A horizontal opening driven from a shaft (or near) right angles to the strike of a vein or other ore body. "crustiform" Texture resulting from minerals growing within a vein, often growing inwards from the vein wall. "cut-off grade" (A) In respect of mineral resources, the lowest grade below which the mineralized rock currently cannot reasonably be expected to be economically extracted. (B) In respect of mineral reserves, the lowest grade below which the mineralized rock currently cannot be economically extracted as demonstrated by either a preliminary feasibility study or a feasibility study. Cut-off grades vary between deposits depending upon the amenability of ore to gold extraction and upon costs of production and metal prices. "deposit" A mineralized body which has been physically delineated by sufficient drilling, trenching and/or underground work, and found to be a sufficient average grade of metal or metals to warrant further exploration and/or development expenditures; such a deposit does not qualify as a commercially mineable ore body or as containing mineral reserves, until final legal, technical and economic factors have been resolved. "development" The preparation of a mining property or area so that an orebody can be analyzed and its tonnage and quality estimated. Development is an intermediate stage between exploration and mining. "dilution" The effect of waste or low-grade ore being included in mined ore, increasing tonnage mined and lowering the overall ore grade. "dip" The angle at which a bed is inclined from the horizontal. "discordant" Said of a contact between an igneous intrusion and the country rock that is not parallel to the foliation or the bedding planes of the latter. "disseminated" Said of a mineral deposit (especially of metals) in which the desired minerals occur as scattered particles in the rock, but in sufficient quantity to make the deposit an ore. Some disseminated deposits are very large. "drift" A horizontal underground opening that follows along the length of a vein or rock formation as opposed to a crosscut which crosses the rock formation. "ductile" Of rock, able to sustain, under a given set of conditions, 5% to 10% deformation before fracturing or faulting. "dyke" or "dike" An earthen embankment, as around a drill sump or tank, or to impound a body of water or mill tailing. "electrowinning" An electrochemical process in which a metal dissolved within an electrolyte is plated onto an electrode. Used to recover metals such as cobalt, copper, gold, and nickel from solution in the leaching of ores, concentrates, precipitates, matte, etc. "envelope" 1. The outer or covering part of a fold, especially of a folded structure that includes some sort of structural break. 2. A metamorphic rock surrounding an igneous intrusion. 3. In a mineral, an outer part different in origin from an inner part. "epigenetic" An ore body formed by hydrothermal fluids and gases that were introduced into the host rocks from elsewhere, filling cavities in the host rock. "epithermal" A hydrothermal mineral deposit formed within one kilometre of the Earth's surface and in the temperature range of 50 to 200 degrees Celsius, occurring mainly as veins. Also, said of that depositional environment. "extensional-shear vein" A vein put in place in an extension fracture caused by the deformation of a rock. "fault" A fracture or a fracture zone in crustal rocks along which there has been displacement of the two sides relative to one another parallel to the fracture. The displacement may be a few inches or many miles long. "feasibility study" A comprehensive study of a mineral deposit in which all geological, engineering, legal, operating, economic, social, environmental and other relevant factors are considered in sufficient detail that it could reasonably serve as the basis for a final decision by a financial institution to finance the development of the deposit for mineral production. A "preliminary feasibility study" or "pre-feasibility study" is a comprehensive study of the viability of a mineral project that has advanced to a stage where the mining method, in the case of underground mining, or the pit configuration, in the case of an open pit, has been established and an effective method of mineral processing has been determined, and includes a financial analysis based on reasonable assumptions of technical, engineering, legal, operating, economic, social and environmental factors and the evaluation of other relevant factors which are sufficient for a qualified person, acting reasonably, to determine if all or part of the mineral resource may be classified as a mineral reserve. "flexure" A general term for a fold, warp, or bend in rock strata. A flexure may be broad and open, or small and closely compressed "floater" A single fragment of float. "float" A general term for loose fragments of ore or rock, especially on a hillside below an outcropping ledge or vein. "flotation" A process for concentrating minerals based on the selective adhesion of certain minerals to air bubbles in a mixture of water and ground up ore. When the right chemicals are added to a frothy water bath of ore that has been ground to the consistency of talcum powder, the minerals will float to the surface. The metal rich flotation concentrate is then skimmed off the surface "foliation" A general term for a planar arrangement of textural or structural features in any type of rock, especially the planar structure that results from flattening of the constituent grains of a metamorphic rock. "fracture" A general term for any break in a rock, whether or not it causes displacement, due to mechanical failure by stress. Fracture includes cracks, joints and faults. "free gold" Gold not combined with other substances. "gangue" The worthless minerals in an ore deposit. "geochemical anomaly" A concentration of one or more elements in rock, soil, sediment, vegetation or water that is markedly higher or lower than background. The term may also be applied to hydrocarbon concentration in soils. "geotechnical drilling" Drilling done to gather information on rock quality and structures for rock mechanics purposes. "glacial till" Dominantly unsorted and unstratified drift, generally unconsolidated, deposited directly by and underneath a glacier without subsequent reworking by meltwater, and consisting of a heterogeneous mixture of clay, silt, sand, gravel and boulders ranging widely in size and shape. Also referred to as "till" and ice-laid drift. "gneiss" A foliated rock formed by regional metamorphism, in which bands or lenticles of granular minerals alternate with bands or lenticles in which minerals having flaky or elongate prismatic habits predominate. Generally less than 50% of the minerals show preferred parallel orientation. Although a gneiss is commonly feldspar- and quartz-rich, the mineral composition is not an essential factor in its definition. Varieties are distinguished by texture (e.g., augen gneiss), characteristic minerals (e.g., hornblende gneiss) or general composition and/or origins (e.g., granite gneiss). "gouge" A layer of soft, earthy or clayey, fault-comminuted rock material along the wall of a vein, so named because a miner can "gouge" it out to facilitate the mining of the vein itself. "grab sample" A single sample or measurement taken at a specific time or over as short a period as feasible. "grade" The relative quality of the percentage of ore-mineral content in a mineralized body, i.e. grams of gold per tonne. "head grade" The average grade of ore fed into a mill. "hectare" A metric measurement of area equivalent to 10,000 square meters or 2.47 acres. "hornblende phenocryst" A large and usually conspicuous crystal of a black to dark green mineral generally opaque called hornblende found in some volcanic and igneous rocks. "horst" An upfaulted block of rock. "hydrothermal alteration" Alteration of rocks or minerals by the reaction of hydrothermal water with pre-existing solid phases. "indicated mineral resource" The part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters and to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be reasonably assumed. Mineral resources that are not mineral reserves do not have demonstrated economic viability. While this term is recognized and required by Canadian regulations, the SEC does not recognize it. Investors are cautioned not to assume that any part or all of the mineral deposits in this category will ever be converted into reserves. "inferred mineral resource" The part of a mineral resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. While this term is recognized and required by Canadian regulations, the SEC does not recognize it. Investors are cautioned not to assume that any part or all of the mineral deposits in this category will ever be converted into reserves. Investors are cautioned not to assume that part of or all of an inferred mineral resource exists, or is economically or legally mineable. "infill drilling" or "in-fill drilling" Drilling within a defined mineralized area to improve the definition of known mineralization. "intrusive" A body of igneous rock formed by the consolidation of magma intruded into other rocks, in contrast to lavas, which are extruded upon the surface. "kilometre" A metric measurement of distance (1.0 kilometre = 0.62 miles). "lapilli" Pyroclastics that may be either essential, accessory or accidental in origin, of a size range that has been variously defined within the limits of 2 millimetres and 64 millimetres. The fragments may be either solidified or still viscous when they land (though some classifications restrict the term to the former); thus there is no characteristic shape. An individual fragment is called a "lapillus". "lens" Generally used to describe a body of ore that is thick in the middle and tapers towards the ends, resembling a convex lens. "lithological units" Geological groups. "longitudinal retreat" A mining method where the ore is excavated in horizontal slices along the orebody and the stoping starts below and advances upwards. The ore is recovered underneath in the stope. "matrix" The non-valuable minerals in an ore. "measured mineral resource" The part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters and to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm both geological and grade continuity. While this term is recognized and required by Canadian regulations, the SEC does not recognize it. Investors are cautioned not to assume that any part or all of the mineral deposits in this category will ever be converted into reserves. "Merrill Crowe process" A separation technique for removing gold from a cyanide solution. The solution is separated from the ore by methods such as filtration and counter current decantation, and then the gold is cemented by adding zinc dust, which precipitates the gold (zinc has a higher affinity for the cyanide ion than gold). Silver and copper may also precipitate. The precipitate is further refined, e.g., by smelting, to remove the zinc and by treating with nitric acid to dissolve the silver. "metallurgical properties" Properties characterizing metals and minerals behaviour towards various processing techniques. "metamorphism" The process by which the form or structure of sedimentary or igneous rocks is changed by heat and pressure. "metasedimentary" A sedimentary rock that shows evidence of having been changed in form or structure by heat and pressure. "mineral reserve" The economically mineable part of a measured or indicated resource demonstrated by at least a preliminary feasibility study. This study must include adequate information on mining, processing, metallurgical, economic and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified. A mineral reserve includes diluting materials and allows for losses that may occur when the material is mined. "mineral resource" A concentration or occurrence of natural, solid, inorganic or fossilized organic material in or on the earth's crust in such form and quantity and of such a grade or quality that it has reasonable prospects for economic extraction. The location, quantity, grade, geological characteristics and continuity of a mineral resource are known, estimated or interpreted from specific geological evidence and knowledge. "net smelter return royalty" A phrase used to describe a royalty payment made by a producer of metals based on gross metal production from the property, less deduction of certain limited costs including smelting, refining, transportation and insurance costs. "orogenic gold deposit" A gold deposit formed by volcanism, subduction, plate divergence, folding or the movement of fault blocks. "ounce" Troy ounce = 31.103 grams "outcrop" An exposure of bedrock at the surface. "oxidation" A chemical reaction caused by exposure to oxygen that results in a change in the chemical composition of a mineral. "oxidative" Descriptive of an oxidation reaction. "penetrative strain" A change in relative configuration of all the particles of a rock or a unit of rocks due to a stress. "peroxysilica process" A water process treatment involving a combination of hydrogen peroxide and sodium silicate addition. "phenocryst" A term for large crystals or mineral grains floating in the matrix or groundmass of a porphyry. "plunge" The inclination of a fold axis or other linear structure, measured in the vertical plane. "polydeformed" A rock that has been subjected more than one time to folding, faulting, shearing, compression or extension as a result of various techtonic forces. "porphyritic" Rock texture in which one or more mineral has a larger grain size than the accompanying minerals. "Porphyry" Any igneous rock in which relatively large crystals, called phenocrysts, are set in a fine-grained groundmass. "post-mineralization" Occurring after the mineralization has taken place. "pre-mineralization" Occurring before the mineralization has taken place. "pressure oxidation process" A process by which sulphide minerals are oxidised in order to expose gold encapsulated into the mineral lattice. The main component of a pressure oxidation circuit consists of one or multiple pressurised vessels through oxygen addition. Oxygen level and process temperature are the primary control parameters of such units. "probable mineral reserve" The economically mineable part of an indicated mineral resource for which quantity, grade or quality, densities, shape and physical characteristics can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters and to support mine planning and evaluation of the economic viability of the deposit. "proven mineral reserve" The economically mineable part of a measured resource for which quantity, grade or quality, densities, shape and physical characteristics are so well established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic parameters and to support production planning and evaluation of the economic viability of the deposit. "pyroclastic" Produced by explosive or aerial ejection of ash, fragments and glassy material from a volcanic vent. Term applicable to the rocks and rock layers as well as to the textures so formed. "rake" The trend of an orebody along the direction of its strike. "recovery" A term used in process metallurgy to indicate the proportion of valuable material obtained in the processing of an ore. It is generally stated as a percentage of valuable metal in the ore that is recovered compared to the total valuable metal present in the ore. "reverse circulation" The circulation of bit-coolant and cuttings-removal liquids, drilling fluid, mud, air or gas down the bore hole outside the drill rods and upward inside the drill rods. "schist" A strongly foliated crystalline rock that can be readily split into think flakes or slabs due to the well developed parallelism of more than 50% of the minerals present in it. "Semi-autogenous grinding" or "SAG" A method of grinding rock into fine powder whereby the grinding media consist of larger chunks of rocks and steel balls. "shaft collar" A heavy wooden frame erected at the mouth of a rectangular shaft to provide a solid support for the timber sets. A more permanent structure consists of a concrete wall extending from two to eight sets in depth. On this concrete mass is bolted the bearer timbers that support the top heavy set or collar set. The term also applies to the heavy concrete ring at the mouth of a circular concrete-lined shaft. "shear" or "shearing" The deformation of rocks by lateral movement along innumerable parallel planes, generally resulting from pressure and producing such metamorphic structures as cleavage and schistosity. "sheave deck" One of the separate compartments or platforms containing a grooved pulley wheel. Commonly used in underground rope haulage. "sill" An intrusive sheet of igneous rock of roughly uniform thickness that has been forced between the bedding planes of existing rock. "slurry" The fine carbonaceous discharge from a mine washery. "step-out drilling" Process of drilling holes to intersect a mineralization horizon or structure along strike or down dip. "stope development" The driving of subsidiary openings designed to prepare blocks of ore for actual extraction by stoping. "stratigraphic column" A sketched cross-section of the staking of different layers of rock in an area. "strike" The course or bearing of the outcrop of an inclined bed, vein or fault plane on a level surface; the direction of a horizontal line perpendicular to the direction of the dip. "sublevel retreat" A mining method where the ore is excavated in horizontal slices along the orebody and the stoping starts below and advances upwards. The ore is recovered underneath in the stope. "supracrustal" Any phenomenon happening in the near-surface part of Earth's crust. "synchronous" Occurring, existing or formed at the same time; contemporary or simultaneous. The term is applied to rock surfaces on which every point has the same geologic age, such as the boundary between two ideal time-stratigraphic units in continuous and unbroken succession. It is also applied to growth (or depositional) faults and to plutons emplaced contemporaneously with orogenies. "tabular" Said of a feature having two dimensions that are much larger or longer than the third, such as a dyke, or of a geomorphic feature having a flat surface, such as a plateau. "tailing" Material rejected from a mill after most of the recoverable valuable minerals have been extracted. "tailings dam" A natural or man-made confined area suitable for depositing tailings. "tailings pond" A low-lying depression used to confine tailings, the prime function of which is to allow enough time for heavy metals to settle out or for cyanide to be destroyed before water is discharged into the local watershed. "tenement" A synonym of mineral title "thickness" The distance at right angles between the hanging wall and the footwall of a lode or lens. "tonne" 1 tonne = 1,000 kilograms = 2204.6 pounds "transfer fault" A structure that can accommodate lateral variations of deformation and strain. "transverse open stopping" A mining method where the ore is excavated in horizontal slices perpendicular to the ore and the stoping starts below and advances upwards. The ore is recovered underneath the stope through a drawpoint system. "vein" A fissure, fault or crack in a rock filled by minerals that have travelled upwards from some deep source. "winze" An internal mine shaft. "zone" An area of distinct mineralization. | 20-F |